Device for treating ballastless track mud pumping through positive and negative pressure cleaning foundation bed
By setting up a positive and negative pressure cleaning base bed treatment device on the ballless track, using gas injection, cleaning and slurry suction operations, the problem of grouting technology being unable to completely clean the slurry and mud on the ballless track, and the stability of the base bed surface is achieved Improvement of sexual and operational security.
Patent Information
- Application Number
- CN202420166913.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-24
AI Technical Summary
The existing grouting technology cannot completely cure the slurry and mud on the ballless track, resulting in the mud and fine-grained soil in the base bed being unable to be effectively removed, resulting in the repeated occurrence of slurry and the grouting material being cured poorly, making it impossible to form a whole with the base bed , affects track stability and operational safety.
The base bed treatment device is adopted to clean the base bed, and the first and second pipes are arranged in the sludge-filling area of the ballastless track, and the air injection, cleaning and slurry suction operations are carried out by using the difference between positive and negative pressures. Remove mud and fine-grained soil from the base bed to improve the grading and drainage performance of the base bed surface.
Effectively remove mud and fine-grained soil from the base bed, restore the stability and strength of the surface layer of the base bed, improve the operation safety of high-speed railways, reduce maintenance costs, and extend the service life of railway lines.
Smart Images

Figure CN221956449U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ballastless track mud bubbling treatment, in particular to a device for positive and negative pressure cleaning base bed to treat ballastless track mud bubbling. Background Art
[0002] Prevalence of mud slurry disease: Mud slurry disease is common in the ballastless track slab subgrade during high-speed railway operation. In some sections of the ballastless track subgrade, medium-graded gravel or mud-stone-water mixture in the subgrade is flipped out along the gaps in the subgrade sealing layer under train load, resulting in cement slurry liquid on the hardened sealed surface, affecting the stability and smoothness of the line. According to public reports, the Shanghai-Nanjing Intercity Railway is a unit slab structure. Since its opening in 2010, it has soon experienced mud slurry disease in the subgrade. Since its operation, it has exceeded the height limit twice in dynamic inspections, seriously affecting the safety of line operation; after 5 to 10 years of operation, the CRTSII continuous slab ballastless track of the Shanghai-Hangzhou High-speed Railway, the Shanghai-Kunming High-speed Railway and the Nanjing-Hangzhou High-speed Railway have gradually begun to experience mud slurry in the subgrade in recent years, which has affected the quality of line operation.
[0003] The phenomenon of mud oozing on ballastless track is an important and complex problem in high-speed railways. Under the action of train load, fine particles in the surface layer of the subgrade are squeezed and moved upward, forming obvious mud oozing. The use of grouting technology and comprehensive drainage (preventing rainwater from seeping) for the treatment of mud oozing has been widely proven to be an effective treatment method (Patent No. ), the roadbed grouting process can effectively improve the dynamic characteristics of the track-roadbed system, thereby reducing the occurrence of mud and slurry and repairing the subgrade damaged by mud and slurry.
[0004] However, the use of grouting technology to treat mud overflow has not been able to completely cure the disease. Some sections have repeated mud overflow quickly for the following reasons:
[0005] 1. After the ballastless track subgrade is overturned and muddy, the subgrade contains a large amount of mud and fine soil particles mixed in the graded crushed stone on the surface of the subgrade. During the construction process, the grouting material cannot penetrate into the mud and fine soil particles. Only a small amount of mud is squeezed out of the surface area of the subgrade by the grouting pressure, and a large amount of mud and fine soil particles still remain in the subgrade, causing repeated overturning;
[0006] 2. The grouting material has a poor solidification effect on fine-grained soil and cannot form a whole or produce an adhesive effect with it. Under the action of dynamic force, the grouting material is separated from the fine-grained soil and the slurry turning phenomenon will occur again soon;
[0007] 3. During the grouting process, the grouting pressure will cause the ballastless track slab to lift. Although this lift is controllable with the assistance of real-time monitoring measures and will not affect the smoothness of the ballastless track line, the ballastless track slab is easily lifted, resulting in insufficient grouting volume, poor grouting effect, and repeated grouting. Summary of the invention
[0008] The purpose of the utility model is to provide a device for cleaning the base bed with positive and negative pressures to control the mud bubbling of ballastless track in accordance with the above-mentioned deficiencies of the prior art. The device comprises a first through pipe and a second through pipe arranged in and near the mud bubbling area of the ballastless track. When the first through pipe is used as a positive pressure pipe and the second through pipe is used as a negative pressure pipe, or the first through pipe is used as a negative pressure pipe and the second through pipe is used as a positive pressure pipe, the top of the positive pressure pipe is connected to an air compressor or a water pump, and the top of the negative pressure pipe is connected to a vacuum pump to perform gas injection, cleaning and slurry suction operations, thereby effectively solving the mud bubbling problem of the ballastless track base bed of the high-speed railway, thereby improving the stability of the base bed and the operational safety of the track.
[0009] The purpose of this utility model is achieved by the following technical solutions:
[0010] A device for cleaning the base bed with positive and negative pressures to control mud bubbling of ballastless track, characterized in that it comprises a first through pipe and a second through pipe installed in and near the mud bubbling area of the ballastless track, the first through pipe and the second through pipe are respectively arranged at intervals along the line direction of the ballastless track, the first through pipe is arranged on both sides of the ballastless track, the second through pipe is arranged in the middle of the ballastless track, the bottoms of the first through pipe and the second through pipe both extend into the surface layer of the base bed, when the first through pipe is used as a positive pressure pipe and the second through pipe is used as a negative pressure pipe, or when the first through pipe is used as the negative pressure pipe and the second through pipe is used as the positive pressure pipe, the top of the positive pressure pipe is connected to an air compressor or a water pump, and the top of the negative pressure pipe is connected to a vacuum pump.
[0011] The first through-tube is installed on both sides of the base plate and the top of the first through-tube extends out of the base plate.
[0012] The second through-tube is installed in the middle of the track plate, the top of the second through-tube extends to the outside of the track plate, and the bottom of the second through-tube extends to the surface layer of the base bed through the base plate.
[0013] The spacing between the second through tubes is greater than the spacing between the first through tubes.
[0014] The length of the first through-tube extending into the surface layer of the base bed is equal to the length of the second through-tube extending into the surface layer of the base bed.
[0015] The portion of the first through-tube extending into the surface layer of the base bed and the portion of the second through-tube extending into the surface layer of the base bed are both provided with eyelets.
[0016] The advantages of the utility model are: combining air injection, cleaning and slurry suction operations, effectively removing mud and fine-grained soil in the ballastless track slab subgrade, thereby avoiding the problem that traditional slurry and mud management methods cannot completely clean up the mud and lead to poor management effect, and can effectively improve the grading of the subgrade surface, restore the drainage performance and strength of the subgrade surface, ensure the stability of the subgrade, and improve the safety of high-speed rail operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a plan view of the utility model;
[0018] Figure 2 It is a schematic elevation view of the utility model. DETAILED DESCRIPTION
[0019] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:
[0020] like Figure 1~2 As shown, the marks in the figure represent respectively:
[0021] A first through pipe 1, a second through pipe 2, a base bed surface layer 3, a base plate 4, a track plate 5, and a sealing layer 6.
[0022] Example: Figure 1~2 As shown, the present embodiment relates to a device for cleaning the base bed with positive and negative pressure to control mud bubbling of ballastless track, which mainly comprises a first through pipe 1 and a second through pipe 2 installed in and near the mud bubbling area of the ballastless track, the first through pipe 1 has a length of 70-80 cm, the second through pipe 2 has a length of 100-120 cm, the first through pipe 1 and the second through pipe 2 have a diameter of 2-5 cm, the first through pipe 1 and the second through pipe 2 are made of PVC pipes or metal pipes, the first through pipe 1 and the second through pipe 2 are respectively arranged at intervals along the line direction of the ballastless track, the first through pipe 1 is arranged on both sides of the ballastless track, and the second through pipe 2 is arranged in the middle of the ballastless track.
[0023] In this embodiment, when the first through pipe 1 is used as a positive pressure pipe and the second through pipe 2 is used as a negative pressure pipe, or when the first through pipe 1 is used as a negative pressure pipe and the second through pipe 2 is used as a positive pressure pipe, the top of the positive pressure pipe is connected to an air compressor (gas injection) or a water pump (cleaning), and the top of the negative pressure pipe is connected to a vacuum pump (slurry suction) to perform gas injection, cleaning and slurry suction operations, which can effectively remove mud and fine particles in the ballastless track slab subgrade.
[0024] like Figure 1~2As shown, the ballastless track includes a base plate 4 and a track plate 5 which are sequentially installed on the bed surface layer 3. The bed surface layer 3 is closed by a sealing layer 6. The first through pipe 1 is installed on both sides of the base plate 4. The top of the first through pipe 1 extends to the outside of the base plate 4 and the bottom extends to the inside of the bed surface layer 3. The second through pipe 2 is installed in the middle of the track plate 5. The top of the second through pipe 2 extends to the outside of the track plate 5 and the bottom extends to the inside of the bed surface layer 3 through the base plate 4. The spacing between the second through pipes 2 is greater than the spacing between the first through pipes 1. The spacing between the second through pipes 2 is 125 cm, and the spacing between the first through pipes 1 is 62 cm. The length of the first through pipe 1 extending into the bed surface layer 3 is equal to the length of the second through pipe 2 extending into the bed surface layer 3, both of which are 40 cm. The portion of the first through pipe 1 extending into the bed surface layer 3 and the portion of the second through pipe 2 extending into the bed surface layer 3 are both provided with eyelets, and the diameter of the eyelets is 10 mm, so as to improve the effects of gas injection, cleaning and slurry absorption.
[0025] like Figure 1~2 As shown, this embodiment also has the following construction method:
[0026] 1. Drill holes on the track plate where mud and slurry are generated, and lay out the first through pipe and the second through pipe.
[0027] Layout scope: Except for the mud bubbling area, pipes are laid in the area extending 5 to 10 meters on both sides of the line.
[0028] Layout: The first through pipe is vertically arranged on the base plate, with a spacing of 62cm and a pipe length of 70~80cm, and is subject to penetrating the surface of the base bed; the second through pipe is vertically arranged on the track plate, with a spacing of 125cm and a pipe length of 100~120cm, and is subject to penetrating the surface of the base bed.
[0029] Pipe diameter and pipe material: The diameter range of the first and second pipes is 2~5cm. The bottom of the first and second pipes entering the surface of the base bed (length 40cm) are evenly opened with holes, and the diameter of the holes is within 10mm to ensure wide and effective coverage. The pipe material can be PVC pipe or metal pipe; the upper part of the pipe head is equipped with quick connectors and valves for connecting to the equipment.
[0030] 2. After the first through pipe and the second through pipe are laid out, the first through pipe on the base plate is connected to the air compressor as a positive pressure pipe to provide positive air pressure, and the second through pipe on the track plate is connected to the vacuum pump as a negative pressure pipe.
[0031] Positive pressure pipe pressure control: air pressure is controlled within the range of 0.8MPa to 10MPa to adapt to different foundation conditions and disease severity; the air compressor should be above 0.5m³, and when conditions permit, a gas storage tank should be equipped to ensure stable air pressure; if the air pressure demand cannot be met, 2 to 10 air compressors can be used to connect positive pressure pipes.
[0032] Negative pressure tube pressure control: The negative pressure tube is connected to the vacuum pump, and the vacuum pump pressure is maintained above 0.1MPa. If the air pressure requirement cannot be met, 2 to 10 vacuum pumps can be used to connect the negative pressure tube.
[0033] 3. After the positive pressure pipe and the negative pressure pipe are connected, open the valves of the negative pressure pipes simultaneously along the line direction of the ballastless track to start construction, and start after 3 to 5 minutes; open the valves of the positive pressure pipes in sequence along the line direction of the ballastless track, and maintain the pressure in the positive pressure pipe above 0.8MPa, and gradually increase the pressure in the positive pressure pipe as needed, according to the situation of mud being sucked out of the negative pressure pipe. If the mud is stably sucked out of the negative pressure pipe, maintain the pressure in the positive pressure pipe unchanged; if there is no mud in the negative pressure pipe, increase the pressure in the positive pressure pipe by 0.3MPa each time until no mud is sucked out.
[0034] 4. After the pressure in the positive pressure pipe rises to the maximum pressure, and no mud is sucked out of the negative pressure pipe and it stabilizes for more than 5 minutes, separate the positive pressure pipe from the air compressor and connect it to the water pump, which is connected to clean water. Open the positive pressure pipe valves in turn and inject clean water. The clean water will clean the base bed and then be sucked out by the negative pressure pipe. Turn on the water pump until clean water is sucked out of the negative pressure pipe and stop.
[0035] Water pump pressure control: The water pump pressure is controlled within the range of 0.5MPa to 3MPa, and the flow rate is 0.1~0.5 cubic meters per minute.
[0036] 5. After completing steps 1 to 4, swap the positive pressure pipe and the negative pressure pipe, that is, use the first pipe as the negative pressure pipe and the second pipe as the positive pressure pipe, repeat steps 3 to 4, and repeat the switch multiple times, that is, if in the previous round, the second pipe is used as the positive pressure pipe and the first pipe is used as the negative pressure pipe, then in the next round, the first pipe is used as the positive pressure pipe and the second pipe is used as the negative pressure pipe, and this cycle is repeated multiple times to ensure that the surface of the base bed is clean.
[0037] 6. After completing steps 1 to 5, use the first and second through pipes to inject the quick-setting and quick-hardening materials into the surface layer of the base bed at a pressure of 0.3 MPa as needed, pull out or cut off the first and second through pipes, and seal the drilled holes with cement mortar to complete the construction.
[0038] By using the above method, the surface of the base bed can be effectively cleaned, the gradation of the base bed can be restored, an ideal space can be provided for filling materials, and the stability and durability of the remediation effect can be improved; the operating safety and reliability of the high-speed railway ballastless track can be improved, maintenance costs can be reduced, and the service life of the railway line can be extended.
[0039] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A device for cleaning the base bed with positive and negative pressure to treat mud bubbling on ballastless track, characterized in that: It comprises a first through pipe and a second through pipe installed in and near the mud bubbling area of the ballastless track, the first through pipe and the second through pipe are respectively arranged at intervals along the line direction of the ballastless track, the first through pipe is arranged on both sides of the ballastless track, the second through pipe is arranged in the middle of the ballastless track, the bottoms of the first through pipe and the second through pipe both extend into the surface layer of the base bed, when the first through pipe is used as a positive pressure pipe and the second through pipe is used as a negative pressure pipe, or when the first through pipe is used as the negative pressure pipe and the second through pipe is used as the positive pressure pipe, the top of the positive pressure pipe is connected to an air compressor or a water pump, and the top of the negative pressure pipe is connected to a vacuum pump.
2. The device for cleaning the base bed with positive and negative pressure to treat mud bubbling on ballastless track according to claim 1, characterized in that: The first through-tube is installed on both sides of the base plate and the top of the first through-tube extends out of the base plate.
3. A device for cleaning the base bed with positive and negative pressure to treat mud bubbling on ballastless track as claimed in claim 2, characterized in that: The second through-tube is installed in the middle of the track plate, the top of the second through-tube extends to the outside of the track plate, and the bottom of the second through-tube extends to the surface layer of the base bed through the base plate.
4. The device for cleaning the base bed with positive and negative pressure to treat mud bubbling on ballastless track according to claim 1, characterized in that: The spacing between the second through tubes is greater than the spacing between the first through tubes.
5. The device for cleaning the base bed with positive and negative pressure to treat mud oozing on ballastless track according to claim 1, characterized in that: The length of the first through-tube extending into the surface layer of the base bed is equal to the length of the second through-tube extending into the surface layer of the base bed.
6. The device for cleaning the base bed with positive and negative pressure to treat mud bubbling on ballastless track according to claim 1, characterized in that: The portion of the first through-tube extending into the surface layer of the base bed and the portion of the second through-tube extending into the surface layer of the base bed are both provided with eyelets.