No.0 block beam section construction support suitable for circular bearing platform and narrow pier structure
By designing No. 0 block beam section construction bracket suitable for circular bearings and narrow pier structures, using components such as pipe pile standard sections and embedded parts, the brackets in the existing technology are solved under the small-size bearings and narrow pier structures. The support difficulties and uneven settlement problems have achieved improvements in construction safety, efficiency and cost.
Patent Information
- Application Number
- CN202420139370.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-19
AI Technical Summary
When the existing No. 0 block beam section construction bracket faces small-sized bearings and narrow pier structures, it is difficult to effectively support heavier and longer beam sections, and there are problems such as uneven settlement, high construction complexity and low safety. Unable to adapt to changes in the pier and the support.
A No. 0-block beam section construction bracket suitable for circular bearings and narrow pier structures is designed, which is connected to the flange through standard sections of pipe piles, and is combined with a coupling system, a horizontal distribution beam, a longitudinal distribution beam and a bottom mold system. Using embedded parts and embedded steel mesh, flexible adjustment and stable connection of the brackets are achieved, uneven settlement is avoided, and structural stability is improved through spot welding and welding connections.
It realizes the efficiency, safety and applicability of the bracket, reduces construction costs and risks, meets the safety and efficiency needs of bridge construction, and solves the problem that the bearing size is smaller than the segment web spacing.
Smart Images

Figure CN221956540U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, and particularly relates to a 0# block beam section construction bracket suitable for circular caps and narrow pier structures. Background Art
[0002] Prestressed concrete continuous beam bridge is a kind of prestressed bridge. It has good overall performance, high structural rigidity, small deformation, good seismic performance, especially the main beam deformation deflection curve is gentle, the bridge deck expansion joints are few, driving is comfortable, etc. With the continuous improvement, perfection and promotion of cantilever casting construction method and cantilever assembly construction method, continuous beam bridges have gradually occupied a major position in bridges with a span of 40 to 200 meters. At present, whether it is an urban bridge, an elevated road, a valley elevated trestle, or a cross-river bridge, prestressed concrete continuous beams have played their unique advantages and become the winning solution. In the construction of the continuous beam superstructure, the construction of the No. 0 block segment is the first step of the upper suspended casting construction. In view of the lightweight trend of the bridge substructure, the design of the No. 0 block construction support will face more severe challenges. It needs to be applicable to smaller abutments, narrower piers, and bear heavier and longer beam sections. However, the methods commonly used in the No. 0 block support method construction are the full-span support method, the steel pipe support method, and the pseudo-frame method. Among them, the full-span support method is limited by the foundation bearing conditions and the size of the abutment, and is not suitable for continuous beam structures with high piers and high beam sections. The steel pipe support method is limited by the abutment support surface. In most cases, it is necessary to use a combination of steel pipe piles supported on the bridge abutment + independent foundations on the pier side (or driven pile foundations), which has the problem of uneven foundation settlement. The pseudo-frame method is limited by the pier width. When the pier width is too narrow, the support cannot align with the beam web to provide more favorable support, and the safety is low. In addition, this method has a relatively complex process, a large amount of assembly and disassembly construction, and is difficult to construct. It can be seen that the above-mentioned traditional construction method has great limitations and cannot adapt to various changes in the pier body and the abutment. Therefore, it is urgent to design a more convenient, efficient, economical and comprehensive No. 0 block beam section construction support. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides a No. 0 block beam segment construction support suitable for circular pedestals and narrow pier structures, which fully utilizes the structural characteristics of the inclined leg support itself to solve the problem that the pipe piles cannot support the beam segment web because the pedestal size is smaller than the segment web spacing; it meets the safety, efficiency and applicability requirements of bridge construction and achieves cost reduction and efficiency improvement.
[0004] The utility model achieves the above technical objectives through the following technical means.
[0005] A No. 0 block beam section construction support suitable for circular pedestals and narrow pier structures comprises pipe piles formed by connecting standard sections of pipe piles through flanges, the pipe piles are fixed on the pedestals, and the pipe piles on both sides of the piers are connected as a whole through a connecting system; a transverse distribution beam is arranged on the top of the pipe pile, a pad for adjusting the inclination angle of the longitudinal distribution beam is arranged above the transverse distribution beam, and the longitudinal distribution beam is arranged on the pad; a bottom formwork system is arranged on the longitudinal distribution beam, and safety railings are welded at the edges of the transverse distribution beam and the longitudinal distribution beam away from the pier body, and an operating platform is laid.
[0006] Furthermore, connecting stiffening plates are welded around the bottom of the pipe pile, embedded parts are arranged in the base, the embedded parts are composed of steel bars with hooks welded to steel plates, and the connecting stiffening plates are welded to the steel plates of the embedded parts.
[0007] Furthermore, the inclination angle range of the outer pipe pile of the foundation is less than 45°.
[0008] Furthermore, a pre-buried steel mesh is provided in the pedestal for improving the shear resistance of concrete at the edge of the pedestal.
[0009] Furthermore, spot welding is used to connect the pipe piles to the transverse distribution beams, the transverse distribution beams to the pads, and the pads to the longitudinal distribution beams, and stiffening plates are welded between the pipe piles and the transverse distribution beams; the pad height is adjusted before the longitudinal distribution beams are erected, and the inclination angle of the longitudinal distribution beams is adjusted by adjusting the pad height.
[0010] Furthermore, the standard section of the pipe pile is divided into section lengths according to the pier height of the bridge pier; the number of longitudinal piles of the pipe pile is set according to the size of the circular abutment and the length of the corresponding beam section.
[0011] The utility model has the following beneficial effects:
[0012] The utility model makes full use of the characteristics of its own components to support all the pipe piles on the pedestal, avoiding the problem of uneven settlement. By adjusting the inclination angle of the pipe piles and the position of the bottom section pipe piles, the various size and shape requirements of the pedestal can be met, and it is not affected by the width of the pier body. The pipe piles can be supported on the web of the beam section, and the structural force is clear, which improves the construction safety. The utility model reduces the risk of high-altitude operations, improves construction efficiency, and reduces construction and installation costs through the assembled design of the support structure. The utility model solves the problem that the pipe piles cannot support the web of the beam section because the size of the pedestal is smaller than the spacing of the segment webs. While meeting the safety, efficiency, and applicability requirements of bridge construction, it achieves the goal of reducing efficiency and increasing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the inclined arrangement of the longitudinal distribution beam of the utility model;
[0014] Figure 2 This is a cross-sectional view of the far pier side of the construction support described in the utility model;
[0015] Figure 3 This is a cross-sectional view of the construction support near the pier side of the utility model;
[0016] Figure 4 It is a schematic diagram of the arrangement position of the pipe piles on the cap according to the utility model.
[0017] In the figure: 1-cap; 2-pier; 3-box girder; 4-embedded parts; 5-embedded steel mesh; 6-standard section of pipe pile; 7-connection system; 8-transverse distribution beam; 9-pad; 10-longitudinal distribution beam; 11-safety railing; 12-bottom formwork system; 13-operating platform. DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.
[0019] The utility model is suitable for the No. 0 block beam section construction support of the circular pedestal and narrow pier structure, including embedded parts 4, embedded steel mesh 5, pipe pile standard section 6, connecting system 7, transverse distribution beam 8, cushion block 9, longitudinal distribution beam 10, safety railing 11, bottom formwork system 12, and operating platform 13.
[0020] The segment length of the pipe pile standard section 6 is divided according to the pier height of the bridge pier 2. A plurality of pipe pile standard sections 6 of different lengths are connected to each other through flanges to form pipe piles. The assembled construction method reduces the risk of aerial operations while meeting the construction needs and improves the construction efficiency. The number of longitudinal piles of the pipe piles can be flexibly set according to the size of the circular cap 1 and the length of the corresponding beam section. In this embodiment, the number and position of the pipe piles on the cap 1 are as follows: Figure 4 shown.
[0021] like Figures 1 to 3 As shown, the bottom section of the standard section 6 of the pipe pile is fixed on the cap 1. Specifically, a connecting stiffener is welded around the bottom of the bottom section of the standard section 6 of the pipe pile. The cap 1 is provided with an embedded part 4, which is composed of a steel bar with a hook and a steel plate welded together. The connecting stiffener of the bottom section of the standard section 6 of the pipe pile is welded to the steel plate of the embedded part 4 to achieve the fixation of the pipe pile, which can reduce the construction alignment accuracy and avoid the problem of difficulty in bolt connection and hole alignment. By adjusting the inclination angle of the outer pipe pile (the inclination angle is less than 45°), the standard section 6 of the pipe pile can be applied to caps 1 of various shapes.
[0022] like Figures 1 to 3As shown, a pre-embedded steel mesh 5 is also provided in the pedestal 1 , and the diameter, spacing, length, number of layers of the pre-embedded steel mesh 5 and the number of steel bars in a single layer of the steel mesh are determined through specific calculations to improve the shear resistance of the concrete at the edge of the pedestal 1 .
[0023] like Figures 1 to 3 As shown, the pipe piles on both sides of the pier 2 are connected as a whole by a connecting system 7, a transverse distribution beam 8 is arranged on the top of the pipe pile, a pad 9 is arranged above the transverse distribution beam 8 to adjust the height, and the longitudinal distribution beam 10 is placed on the pad 9; the pipe pile and the transverse distribution beam 8, the transverse distribution beam 8 and the pad 9, and the pad 9 and the longitudinal distribution beam 10 are all spot-welded, and a stiffening plate is welded between the pipe pile and the transverse distribution beam 8 to further ensure the stability of the connection; before the longitudinal distribution beam 10 is erected, the height of the corresponding pad 9 should be adjusted according to the height requirement, and the distance between the top of the transverse distribution beam 8 near the pier side and the longitudinal distribution beam 10 is greater than 0, and the inclination angle of the longitudinal distribution beam 10 can be adjusted by the pad 9 to meet the longitudinal slope requirements of the bottom surface of different beam sections.
[0024] like Figures 1 to 3 As shown, a bottom formwork system 12 is provided on the longitudinal distribution beam 10, and the box beam 3 can be cast and constructed based on the bottom formwork system 12; safety railings 11 are welded at the edges of the transverse distribution beam 8 and the longitudinal distribution beam 10 away from the pier body, and an operating platform 13 is laid.
[0025] The specific construction method of the No. 0 block beam section construction support suitable for circular cap and narrow pier structure described in the utility model includes the following process:
[0026] Step 1: During the pouring construction of the cap 1, the embedded steel mesh 5 and embedded parts 4 are constructed simultaneously. After the construction of the cap 1 and the pier 2 is completed, the construction support is installed.
[0027] Step 2: Process the bracket pipe pile components into standard sections and assemble them. After transporting them to the construction site, they are hoisted as a whole by lifting equipment. The bottom section of the pipe pile standard section 6 is welded to the embedded part 4. After the installation of the pipe pile standard sections 6 on both sides of the pier 2 is completed, they are connected through the connecting system 7 to enhance the overall stability.
[0028] Step 3: Install the transverse distribution beam 8. After installation, adjust the inclination angle of the longitudinal distribution beam 10 by adjusting the height of the pad 9. Finally, complete the installation of the bottom formwork system 12 and the safety railing 11. After pre-compression of the construction support, construction can be carried out after adjustment.
[0029] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.
Claims
1. A No. 0 beam section construction support suitable for circular caps and narrow pier structures, characterized in that: The invention comprises a pipe pile formed by connecting a pipe pile standard section (6) via a flange plate, wherein the pipe pile is fixed on a cap (1), and the pipe piles on both sides of a pier (2) are connected as a whole via a connecting system (7); a transverse distribution beam (8) is arranged on the top of the pipe pile, a cushion block (9) for adjusting the inclination angle of a longitudinal distribution beam (10) is arranged above the transverse distribution beam (8), and the longitudinal distribution beam (10) is arranged on the cushion block (9); a bottom formwork system (12) is arranged on the longitudinal distribution beam (10), and safety railings (11) are welded at the edges of the transverse distribution beam (8) and the longitudinal distribution beam (10) away from the pier body of the pier (2), and an operating platform (13) is laid.
2. The No. 0 beam section construction support suitable for circular cap and narrow pier structure according to claim 1 is characterized in that: The bottom of the pipe pile is welded with connecting stiffening plates around its periphery. An embedded part (4) is arranged in the cap (1). The embedded part (4) is formed by welding a steel bar with a hook and a steel plate. The connecting stiffening plate is welded to the steel plate of the embedded part (4).
3. The No. 0 beam segment construction support suitable for circular cap and narrow pier structure according to claim 1, characterized in that: The inclination angle range of the outer pipe pile of the cap (1) is less than 45°.
4. The No. 0 beam segment construction support suitable for circular cap and narrow pier structure according to claim 1, characterized in that: The cap (1) is also provided with a pre-buried steel mesh (5) for improving the anti-punching performance of concrete at the edge of the cap (1).
5. The No. 0 beam segment construction support suitable for circular cap and narrow pier structure according to claim 1, characterized in that: The pipe piles and the transverse distribution beam (8), the transverse distribution beam (8) and the cushion block (9), and the cushion block (9) and the longitudinal distribution beam (10) are all connected by spot welding; the height of the cushion block (9) is adjusted before the longitudinal distribution beam (10) is erected, and the inclination angle of the longitudinal distribution beam (10) is adjusted by adjusting the height of the cushion block (9).
6. The No. 0 beam segment construction support suitable for circular cap and narrow pier structure according to claim 1, characterized in that: The pipe pile standard section (6) is divided into section lengths according to the pier height of the bridge pier (2); the number of longitudinal pipe piles is set according to the size of the circular cap (1) and the length of the corresponding beam section.
Citation Information
Cited By
Construction method for 0 # block of double-amplitude prestress continuous box girder
CN119593314A