Steel pipe pile structure

By adopting a multi-section welded structure and stiffening plate design in steel pipe piles, combined with a self-propelled small hammer-bottom pile driver, the problem of unstable connection of steel pipe piles in small space construction was solved, and efficient and reliable indoor pile driving construction was achieved.

CN221956698UActive Publication Date: 2024-11-05SHANGHAI XIANDAI ARCHITECTURE ENG & CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420214890.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-11-05
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

In existing technologies, steel pipe piles are unstable in small-space construction, which cannot guarantee structural strength and reliability, especially when driving piles indoors, making construction difficult.

Method used

The structure employs a multi-section pile welding method. The upper end of the lower pile is expanded by cold extrusion to form a flared section. The upper pile is inserted and a stiffening plate is welded to the outer wall. Construction is carried out using fillet welding and a self-propelled small hammer pile machine to ensure connection stability and reliability.

Benefits of technology

It improves the applicability and structural stability of steel pipe piles in small spaces, reduces the number of joints, improves construction efficiency and pile quality, and is suitable for indoor low-ceiling environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956698U_ABST
    Figure CN221956698U_ABST
Patent Text Reader

Abstract

The utility model provides a steel pipe pile structure which comprises a pipe pile body, the pipe pile body comprises an upper-section pile, a lower-section pile and a first stiffening plate, the lower-section pile comprises a lower-section pile body part and a lower-section pile flaring part which are connected, the upper-section pile is inserted into the lower-section pile flaring part, and the lower-section pile body part is inserted into the lower-section pile flaring part. The first stiffening plates are welded to the outer wall of the upper pile section and the outer wall of the lower pile section. And the stability and reliability of connection between the upper-section pile and the lower-section pile are guaranteed, and then the structural strength is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a steel pipe pile structure. Background Art

[0002] As the main vertical force-bearing supporting member, steel pipe piles have high bearing capacity and strong stability, and thus have become a commonly used pile foundation form in the construction field. For example, the invention patent with application number CN201510261250.5, entitled "Connection structure of steel pipe pile and reinforced concrete cap", discloses that the steel pipe pile includes an upper section of the steel pipe pile, and an extended steel pipe section is welded on the top of the upper section of the steel pipe pile. Although the connection between the upper section of the steel pipe pile and the extended steel pipe section is achieved by welding, the strength and reliability of the structure cannot be guaranteed, and it is not suitable for construction in a small space. Utility Model Content

[0003] In order to solve the above problems, the utility model provides a steel pipe pile structure which is suitable for construction in a relatively small space and ensures structural strength and reliability.

[0004] The utility model provides a steel pipe pile structure, comprising a pipe pile body, wherein the pipe pile body comprises an upper section pile, a lower section pile and a first stiffening plate, the lower section pile comprises a lower section pile body part and a lower section pile flared part connected to each other, the upper section pile is inserted into the lower section pile flared part, and the first stiffening plate is welded to the outer walls of the upper section pile and the lower section pile.

[0005] As a preferred embodiment, a fillet weld is further included, and a fillet weld is provided between the outer wall of the upper pile section and the flared portion of the lower pile section.

[0006] As a preferred embodiment, the first stiffening plate includes an upper plate portion, an intermediate plate portion and a lower plate portion, the upper plate portion is welded to the outer wall of the upper section pile, the intermediate plate portion is welded to the fillet weld and the outer wall of the flared portion of the lower section pile, and the lower plate portion is welded to the outer wall of the lower section pile body portion.

[0007] As a preferred embodiment, there are multiple first stiffening plates, and the multiple first stiffening plates are arranged at circumferential intervals.

[0008] As a preferred embodiment, the tubular pile body also includes a first section pile and a second stiffening plate, the first section pile includes a first section pile sealing plate portion, and a first section pile main body portion connected to the edge of the first section pile sealing plate portion, and the second stiffening plate is respectively welded to the outer walls of the first section pile sealing plate portion and the first section pile main body portion.

[0009] As a preferred embodiment, the second stiffening plate includes a bottom plate portion and two side plate portions, the two side plate portions are respectively connected to the two ends of the bottom plate portion, the bottom plate portion is welded to the outer wall of the first section pile sealing plate portion, and the two side plate portions are respectively welded to the outer wall of the first section pile body portion.

[0010] As a preferred embodiment, the number of the second stiffening plates is two, and the two second stiffening plates are cross-arranged.

[0011] As a preferred embodiment, the upper pile section is inserted into the expanded portion of the lower pile section to a depth of 2 cm.

[0012] As a preferred embodiment, it further comprises a steel bar body, and the steel bar body is welded to the pipe pile body.

[0013] As a preferred embodiment, it further comprises concrete, and the concrete is used to cast the pipe pile body and the steel bar body.

[0014] Compared with the prior art, this technical solution has the following advantages:

[0015] The pipe pile body is welded by a plurality of pile sections, and is divided into an upper pile section and a lower pile section, wherein the upper end of the lower pile section is expanded by cold extrusion to form the flared opening of the connected lower pile section. When the upper pile section and the lower pile section are welded, the upper pile section is inserted into the flared opening of the lower pile section, and then the first stiffening plate is welded on the outer walls of the upper pile section and the lower pile section at the same time, and the first stiffening plate covers the outer wall of the flared opening of the lower pile section, so as to ensure the stability and reliability of the connection between the upper pile section and the lower pile section, thereby improving the structural strength.

[0016] The first-section pile includes a first-section pile sealing plate portion and a first-section pile body portion connected to the edge of the first-section pile sealing plate portion. The second stiffening plate is added to the outer walls of the first-section pile sealing plate portion and the first-section pile body portion to make the first-section pile sealing plate portion firm.

[0017] The use of a self-propelled small hammer pile driver for construction has no restrictions on movement and is suitable for construction in small spaces with low net heights. It is suitable for conditions where the working height is limited, and is especially suitable for indoor piling.

[0018] The present invention is further described below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the steel pipe pile structure of the utility model;

[0020] Figure 2 It is a structural schematic diagram of the pipe pile body of the utility model;

[0021] Figure 3 for Figure 2 A is an enlarged schematic diagram;

[0022] Figure 4 This is a bottom view of the first section of the pile of the utility model;

[0023] Figure 5 This is a schematic diagram of the structure of the second stiffening plate of the utility model;

[0024] Figure 6 It is a schematic diagram of assembling the first section pile and the second stiffening plate of the utility model;

[0025] Figures 7 to 12 The utility model is a construction flow chart of the steel pipe pile structure.

[0026] In the figure: 100 pipe pile body, 110a upper section pile, 110b lower section pile, 110b1 lower section pile body, 110b2 lower section pile expansion part, 110c first section pile, 110c1 first section pile body, 110c2 first section pile sealing plate part, 120 first stiffening plate, 121 upper plate part, 122 middle plate part, 123 lower plate part, 130 second stiffening plate, 131 bottom plate part, 132 side plate part, 200 steel bar body, 300 concrete, 140 corner weld, 500 bottom plate, 510 opening, 600 water-swelling waterstop strip, 610 pile hammer, 620 wire rope, 630 anchor bar, 640 embedded bar, 650 pile cap bar. DETAILED DESCRIPTION

[0027] The following description is used to disclose the utility model so that those skilled in the art can implement the utility model. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the utility model defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the utility model.

[0028] like Figures 1 to 3 As shown, the steel pipe pile structure comprises:

[0029] A pipe pile body 100, the pipe pile body 100 comprises an upper section pile 110a, a lower section pile 110b and a first stiffening plate 120, the lower section pile 110b comprises a lower section pile body portion 110b1 and a lower section pile flared portion 110b2 connected to each other, the upper section pile 110a is inserted into the lower section pile flared portion 110b2, and the first stiffening plate 120 is welded to the outer wall of the upper section pile 110a and the outer wall of the lower section pile 110b;

[0030] A steel bar body 200, wherein the steel bar body 200 is welded to the pipe pile body 100;

[0031] Concrete 300 , the concrete 300 is used to cast the pipe pile body 100 and the steel bar body 200 .

[0032] The pipe pile body 100 is welded by a plurality of pile sections, and is divided into an upper pile section 110a and a lower pile section 110b, wherein the upper end of the lower pile section 110b is expanded by cold extrusion to form the connected lower pile section flared portion 110b2. When the upper pile section 110a and the lower pile section 110b are welded, the upper pile section 110a is inserted into the lower pile section flared portion 110b2, and then the first stiffening plate 120 is welded on the outer walls of the upper pile section 110a and the lower pile section 110b at the same time, and the first stiffening plate 120 covers the outer wall of the lower pile section flared portion 110b2, so as to ensure the stability and reliability of the connection between the upper pile section 110a and the lower pile section 110b.

[0033] The upper pile 110a and the lower pile 110b have the same shape and are both tubular structures. Their sizes can be selected according to design requirements. The inner diameter of the lower pile expansion part 110b2 is 2 mm larger than the outer diameter of the upper pile 110a, so that the upper pile 110a can be inserted into the lower pile expansion part 110b2, and the upper pile 110a is inserted into the lower pile expansion part 110b2 to a depth of approximately 2 cm, thereby ensuring the contact area between the two and improving the stability of the structural connection.

[0034] like Figure 3 As shown, the steel pipe pile structure further includes a fillet weld 140, and a fillet weld 140 is provided between the outer wall of the upper pile section 110a and the flared portion 110b2 of the lower pile section.

[0035] The fillet weld 140 is specifically welded on the outer wall of the upper pile 110a and the end face of the flared portion 110b2 of the lower pile. The fillet weld ∠10 and the weld thickness are 10mm to ensure the welding quality. The fillet weld 140 is welded between the outer wall of the upper pile 110a and the flared portion 110b2 of the lower pile along the circumferential direction of the pipe pile body 100. By setting the fillet weld 140, the upper pile 110a and the lower pile 110b are pre-connected, and then the connection is strengthened by the first stiffening plate 120.

[0036] like Figure 3 As shown, the first stiffening plate 120 includes an upper plate portion 121, an intermediate plate portion 122 and a lower plate portion 123, the upper plate portion 121 is welded to the outer wall of the upper section pile 110a, the intermediate plate portion 122 is welded to the fillet weld 140 and the outer wall of the lower section pile expansion portion 110b2, and the lower plate portion 123 is welded to the outer wall of the lower section pile body portion 110b1.

[0037] The first stiffening plate 120 is welded to the interface between the upper pile 110a and the lower pile 110b to improve the stability of the connection between the upper pile 110a and the lower pile 110b. The first stiffening plate 120 can be integrally formed by stamping or the like, and the middle plate portion 122 is respectively raised relative to the upper plate portion 121 and the lower plate portion 123, so that the middle plate portion 122 is adapted to be welded to the fillet weld 140 and the outer wall of the flared portion 110b2 of the lower pile. The size of the first stiffening plate 120 can be selected according to design requirements.

[0038] There are multiple first stiffening plates 120, and the multiple first stiffening plates 120 are arranged at intervals in a circle. For example, there are four first stiffening plates 120, and two of them are opposite to each other, so as to ensure the structural strength and reliability after the upper pile 110a and the lower pile 110b are connected.

[0039] It can be seen that the upper pile section 110a and the lower pile section 110b are connected and fixed by the fillet weld 140 and the first stiffening plate 120 respectively, ensuring the reliable connection quality between the pile sections. In actual testing, the joints of the pile body are well sealed without leakage.

[0040] like Figures 4 to 6 As shown, the pipe pile body 100 also includes a first section pile 110c and a second stiffening plate 130. The first section pile 110c includes a first section pile sealing plate portion 110c2 and a first section pile body portion 110c1 connected to the edge of the first section pile sealing plate portion 110c2. The second stiffening plate 130 is welded to the outer walls of the first section pile sealing plate portion 110c2 and the first section pile body portion 110c1, respectively.

[0041] The pipe pile body 100 is welded by a plurality of pile sections, and the pile that first enters the hole in the bottom plate 500 is the first-section pile 110c. The thickness of the first-section pile sealing plate 110c2 is 30 mm, so as to seal the bottom of the first-section pile body 110c1, so as to ensure that when the pile hammer enters the first-section pile body 110c1 and acts on the first-section pile sealing plate 110c2, the first-section pile 110c will not be damaged. In addition, the second stiffening plate 130 is added to the outer wall of the first-section pile sealing plate 110c2 and the first-section pile body 110c1, so as to make the first-section pile sealing plate 110c2 firm.

[0042] like Figures 4 to 6 As shown, the second stiffening plate 130 includes a bottom plate portion 131 and two side plate portions 132, the two side plate portions 132 are respectively connected to the two ends of the bottom plate portion 131, the bottom plate portion 131 is welded to the outer wall of the first section pile sealing plate portion 110c2, and the two side plate portions 132 are respectively welded to the outer wall of the first section pile body portion 110c1.

[0043] The second stiffening plate 130 can be formed by stamping to tie the first-section pile sealing plate portion 110c2 and the first-section pile body portion 110c1 together, thereby ensuring the firmness of the first-section pile sealing plate portion 110c2.

[0044] Furthermore, the number of the second stiffening plates 130 is two, and the two second stiffening plates 130 can be cross-arranged to further improve the reliability and stability of the structure.

[0045] like Figure 1 As shown, the steel bar body 200 can be welded by cross bars and embedded bars, and the welding is carried out by double-sided welding. The steel bar body 200 is overlapped in the opening of the bottom plate 500, and the pipe pile body 100 is extended below the bottom plate 500. The steel bar body 200 and the pipe pile body 100 are welded, and the embedded bars can be inserted into the bottom plate 500 to improve the structural strength.

[0046] like Figure 1 As shown, the concrete 300 is poured into the opening 510 of the bottom plate 500 where the steel bar body 200 is located, as well as inside and outside the pipe pile body 100 .

[0047] like Figures 7 to 12 As shown, the construction process of the steel pipe pile structure is as follows:

[0048] In the first step, a suitable opening 510 is drilled on the bottom plate 500 using a water drill, see Figure 7 .

[0049] The second step is to insert the first pile 110c into the opened hole 510. Figure 8 .

[0050] The third step is to connect the second pile section and weld the second pile section to the first pile section 110c by using the fillet weld 140 and the first stiffening plate 120. Fig. 9 .

[0051] A wooden wedge is wedged in the gap of the pile hole to correct the verticality of the pile, and then a pile hammer 610 is hoisted in. The pile hammer 610 may weigh 2 tons and is lifted up by a winch and a steel wire rope 620 to a height of about 1 m. The winch brake is released to allow the pile hammer 610 to fall freely, and the first-section pile sealing plate 110c2 of the first-section pile 110c is hit by gravity to drive the pile hammer 610 into the soil.

[0052] The fourth step is to wait for the pile hammer 610 to enter the ground. When the upper end of the pile body 100 is about 20 cm higher than the bottom plate surface, stop hammering and then connect the piles. The pile connection is welded by the fillet weld 140 and the first stiffening plate 120. At the same time, ensure the verticality of the downward connected piles. The verticality is detected by the theodolite. Fig.10 . After that, the piles are hammered one by one to drive them to the designed elevation.

[0053] Step 7: In the last pile construction, overlap anchor bar 630, see Fig.11 .

[0054] Step 8: Seal the pile at the opening 510 to overlap the planting reinforcement 640 and the pile cap reinforcement 650, and pour concrete 300, see Figure 1 and Fig.12 .

[0055] In the third step, a self-propelled small hammer pile driver is used for construction. The movement is not restricted and it is suitable for construction in small spaces with low net height. The pile driver can be moved automatically or manually by rollers. The existing technology mainly uses the static pressure pile method with a reaction frame for construction. When the static pressure method is used in a space with a net height of about 2.5m, the reaction frame will occupy part of the net height space, resulting in a small length of a single pile section and a large increase in the number of joints of the whole pile. It is difficult to control the integrity of the pile body construction and the quality of the joints. Taking the actual project as an example, a self-propelled small hammer pile driver is used for pile sinking construction in a basement with a minimum net height of 2.3m. The length of each pile section can be ensured to be 2m, and the total length of a 26m pile has only 12 joints. The fewer the joints of the pile body, the more reliable the quality of the pile body. In the conventional static pressure pile method for construction with a reaction frame, the length of a single pile is about 1m, and 25 joints need to be processed for a 26m pile length. The length of a single pile section is longer, the number of joints of the whole pile is less, and the quality of the welds between the pile sections is reliable. It is an efficient and energy-saving construction method, and the pile guide performance is good and the verticality is good. In addition, compared with the static pressure construction of the reaction frame, there is no need to perform perforation anchoring and subsequent plugging work on the first section of the pile sealing plate, which has less impact on the first section of the pile sealing plate and makes the waterproof sealing treatment simpler.

[0056] In the third step, the self-propelled small hammer pile driver is first installed and fixed. For example, the pile driver can be fastened to the bottom plate 500 to prevent the pile frame from shaking, wherein the pile frame is kept vertical to the foundation plane, and the verticality control is measured by theodolite. Figure 7 The pile driver is connected to the pile hammer 610 via a steel wire rope 620 to drive the pile hammer 610 to rise and fall.

[0057] In the third step, when sinking piles, in order to ensure welding quality and welding deformation, welding is performed by two workers. After welding, it takes 3 minutes to cool down before hammering piles.

[0058] In step 8, when the embedded reinforcement overlaps the longitudinal tensile reinforcement, the overlap joints should be staggered. Figure 1 The top surface of the bottom plate 500 is the bottom plate surface elevation C, and the bottom surface of the first section pile 110c is the interface (pile bottom design elevation) B, wherein C40 slightly expanded fine stone concrete is poured from the bottom plate surface elevation C to the interface B, and C20 concrete is poured below the interface B.

[0059] like Figure 1 As shown, a water-swelling waterstop strip 600 is provided in the opening 510 of the base plate 500. Use a wire brush, putty knife, or brush to clean the debris and dust on the original concrete floor of the construction joint and keep it dry. For the horizontal construction joint, tear off the isolation paper wrapped on the bonding surface of the water-swelling waterstop strip 600, and use the self-adhesiveness of the waterstop strip to directly stick the waterstop strip on the concrete surface of the construction joint. The water-swelling waterstop strip 600 is built into the opening 510 after the concrete 300 is poured.

[0060] In summary, the pipe pile body 100 is formed by welding a plurality of pile sections, and is divided into an upper pile section 110a and a lower pile section 110b, wherein the upper end of the lower pile section 110b is expanded by cold extrusion to form the connected lower pile section flared portion 110b2. When the upper pile section 110a and the lower pile section 110b are welded, the upper pile section 110a is inserted into the lower pile section flared portion 110b2, and then the first stiffening plate 120 is welded on the outer walls of the upper pile section 110a and the lower pile section 110b at the same time, and the first stiffening plate 120 covers the outer wall of the lower pile section flared portion 110b2, so as to ensure the stability and reliability of the connection between the upper pile section 110a and the lower pile section 110b. The first pile section 110c includes a first pile section cover plate 110c2 and a first pile section body 110c1 connected to the edge of the first pile section cover plate 110c2, so that the first pile section cover plate 110c2 is firm. The construction is carried out using a self-propelled small hammer pile driver, which is not restricted in movement and is suitable for small space and low net height construction. It can be seen that it is suitable for the case where the working height is limited, especially for indoor piling.

[0061] The embodiments described above are only used to illustrate the technical ideas and features of the utility model, and their purpose is to enable technicians in this field to understand the content of the utility model and implement it accordingly. The patent application scope of the utility model cannot be limited only by this embodiment, that is, any equivalent changes or modifications made according to the spirit disclosed by the utility model still fall within the patent scope of the utility model.

Claims

1. A steel pipe pile structure, characterized in that: The invention comprises a pipe pile body (100), wherein the pipe pile body (100) comprises an upper pile section (110a), a lower pile section (110b) and a first stiffening plate (120), wherein the lower pile section (110b) comprises a lower pile section body portion (110b1) and a lower pile section expansion portion (110b2) connected to each other, wherein the upper pile section (110a) is inserted into the lower pile section expansion portion (110b2), and the first stiffening plate (120) is welded to the outer walls of the upper pile section (110a) and the lower pile section (110b).

2. The steel pipe pile structure according to claim 1, characterized in that: It also includes a fillet weld (140), wherein a fillet weld (140) is provided between the outer wall of the upper pile section (110a) and the flared portion (110b2) of the lower pile section.

3. The steel pipe pile structure according to claim 2, characterized in that: The first stiffening plate (120) comprises an upper plate portion (121), an intermediate plate portion (122) and a lower plate portion (123); the upper plate portion (121) is welded to the outer wall of the upper pile section (110a); the intermediate plate portion (122) is welded to the fillet weld (140) and the outer wall of the flared portion (110b2) of the lower pile section; and the lower plate portion (123) is welded to the outer wall of the lower pile section body portion (110b1).

4. The steel pipe pile structure according to claim 1, characterized in that: The number of the first stiffening plates (120) is multiple, and the multiple first stiffening plates (120) are arranged at circumferential intervals.

5. The steel pipe pile structure according to claim 1, characterized in that: The pipe pile body (100) further comprises a first-section pile (110c) and a second stiffening plate (130); the first-section pile (110c) comprises a first-section pile sealing plate portion (110c2) and a first-section pile body portion (110c1) connected to the edge of the first-section pile sealing plate portion (110c2); the second stiffening plate (130) is respectively welded to the outer walls of the first-section pile sealing plate portion (110c2) and the first-section pile body portion (110c1).

6. The steel pipe pile structure according to claim 5, characterized in that: The second stiffening plate (130) comprises a bottom plate portion (131) and two side plate portions (132), the two side plate portions (132) being respectively connected to the two ends of the bottom plate portion (131), the bottom plate portion (131) being welded to the outer wall of the first section pile sealing plate portion (110c2), and the two side plate portions (132) being respectively welded to the outer wall of the first section pile body portion (110c1).

7. The steel pipe pile structure according to claim 5, characterized in that: The number of the second stiffening plates (130) is two, and the two second stiffening plates (130) are arranged crosswise.

8. The steel pipe pile structure according to claim 1, characterized in that: The upper pile section (110a) is inserted into the expanded opening (110b2) of the lower pile section to a depth of 2 cm.

9. The steel pipe pile structure according to claim 1, characterized in that: It also comprises a steel bar body (200), wherein the steel bar body (200) is welded to the pipe pile body (100).

10. The steel pipe pile structure according to claim 9, characterized in that: It also includes concrete (300), and the concrete (300) is used to cast the pipe pile body (100) and the steel bar body (200).