Temporary positioning structure at orifice of large-diameter reinforcement cage
By combining the design of the support platform and telescopic components, the problem of insufficient convenience of temporary positioning structure during the steel cage splicing process is solved, and more efficient steel cage splicing and stability are achieved, and construction efficiency is improved.
Patent Information
- Application Number
- CN202420277608.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-04
Smart Images

Figure CN221956702U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of temporary positioning structures, and in particular to a temporary positioning structure for an opening of a large-diameter steel cage. Background Art
[0002] Steel cage is a structural member commonly used in construction projects to reinforce and support concrete structures.
[0003] During the construction of cast-in-place piles, the casing is first embedded, and then a hole is drilled using a drilling machine until the designed hole depth is reached. The hole is then cleaned to remove impurities such as mud and sand at the bottom of the hole, and a steel cage is placed in the hole to increase the strength and stability of the cast-in-place pile. Finally, concrete is poured into the hole.
[0004] The steel cage used in cast-in-place piles is generally made according to the length of the finished steel bars. The cast-in-place pile holes are deep, and multiple steel cages need to be spliced. During the splicing process, a steel cage needs to be placed into the hole by a crane until only the top of the first steel cage leaks out of the hole. Then the first steel cage is positioned by a temporary positioning structure. After that, the crane lifts the second steel cage and welds the bottom surface of the second steel cage to the top surface of the first steel cage. Then the welded second steel cage is placed down into the hole, and then the other steel cages are spliced in turn until the corresponding length is reached.
[0005] In the prior art, support platforms are often placed at opposite ends of the outer wall of the casing, and then a steel column passes through the two ends of the outer wall of the steel cage, and the two ends of the steel column are respectively placed on the top surface of the support platform close to it, so as to achieve temporary positioning of the steel cage. The support platform and the steel column are often placed and transported separately, so that when they are needed on the construction site, the support platform and the steel column need to be found and transported separately, which causes the construction workers to spend a long time, resulting in slow construction efficiency. Summary of the invention
[0006] In order to improve the ease of use of a temporary positioning structure, the present application provides a temporary positioning structure at the opening of a large-diameter steel cage.
[0007] The present application provides a temporary positioning structure at the opening of a large-diameter steel cage, which adopts the following technical solution:
[0008] A temporary positioning structure at the opening of a large-diameter steel cage includes a support platform, the interior of the support platform has a storage cavity running through it from top to bottom, a protective tube is located in the storage cavity, a first telescopic component is arranged on the outer wall of the support platform, the first telescopic component includes a mounting column and a first telescopic rod, the mounting column is mounted on the side wall of the support platform, the first telescopic rod is arranged in the mounting column cavity, the first telescopic rod can be retracted into or extended out of the mounting column, and one end of the first telescopic rod passes through the steel cage.
[0009] By adopting the above technical scheme, when multiple steel cages need to be spliced, the support platform is first placed on the outer side of the casing so that the support platform surrounds the casing, and then the first steel cage is placed into the drilled hole by a crane until only the top of the first steel bar leaks out of the drilled hole, and then the first telescopic rod in the mounting column is pulled out, and one end of the first telescopic rod is inserted into the steel cage, thereby temporarily supporting the steel cage, and then the crane lifts the second steel cage to the top surface of the first steel cage, and the construction personnel weld the first steel cage and the second steel cage. After the welding is completed, the second steel cage is lowered until the top of the second steel cage protrudes from the drilled hole, and then the next steel cage is spliced in turn until the splicing of the steel cage reaches the corresponding design depth. Compared with the prior art, the support platform of the present application is installed together with the first telescopic assembly, so as to facilitate the operator to find and carry, thereby improving the convenience of use of the temporary positioning structure.
[0010] Preferably, the outer wall of the support platform is provided with a second telescopic component, and the second telescopic component is arranged opposite to the first telescopic component.
[0011] By adopting the above technical solution, when the first telescopic rod is extended, the first telescopic rod supports one end of the steel cage, and the second telescopic component is extended in the same way. Under the action of the second telescopic component, the other end of the steel cage can be supported, thereby making the temporary limitation of the steel cage more stable and reducing the instability and shaking of the steel cage.
[0012] Preferably, the first telescopic assembly further includes a second telescopic rod, the second telescopic rod is movably inserted into the first telescopic rod, and one end of the first telescopic rod passes through the steel cage.
[0013] By adopting the above technical solution, under the action of the second telescopic rod, the overall extension length of the first telescopic assembly can be increased, thereby reducing the situation where the steel cage slips from the first telescopic assembly.
[0014] Preferably, the second telescopic assembly includes a moving rod, one end of the moving rod passes through the steel cage, and one end of the moving rod is inserted into the second telescopic rod cavity.
[0015] By adopting the above technical solution, after the second telescopic rod is extended, the second telescopic rod is inserted into the steel cage, and then the mobile rod is extended. Similarly, the mobile rod is inserted into the steel cage and the mobile rod is inserted into the second telescopic rod, thereby improving the connection stability between the second telescopic rod and the mobile rod and reducing the breakage of the second telescopic rod and the mobile rod.
[0016] Preferably, a rolled edge is provided on the inner side of the top surface of the mounting column, a connecting groove is formed between the outer wall of the rolled edge and the inner wall of the mounting column, a side plate is provided on the outer wall of the bottom surface of the first telescopic rod, an inserting groove is formed between the inner wall of the side plate and the outer wall of the first telescopic rod, the side plate is inserted into the connecting groove, and the rolled edge is inserted into the inserting groove.
[0017] By adopting the above technical solution, the side plate is inserted into the connecting groove, and the rolled edge is inserted into the plug-in groove, so that one end of the mounting column and one end of the first telescopic rod are interlocked, thereby improving the connection stability between the first telescopic rod and the mounting column, so that when the first telescopic rod is in an extended state, the instability and shaking of the first telescopic rod away from one end of the mounting column can be reduced.
[0018] Preferably, the mounting column is rotatably connected to the supporting platform.
[0019] By adopting the above technical solution, the mounting column is rotatably connected to the support platform. When the structure is not needed, the side wall of the mounting column fits with the outer wall of the support platform, thereby reducing the space occupied by the structure and making it convenient for construction workers to store and move it. When the structure needs to be used, the mounting column is rotated upward until the long side direction of the mounting column is perpendicular to the long side direction of the mounting groove.
[0020] Preferably, the support platform is provided with lifting ears.
[0021] By adopting the above technical solution, under the action of the lifting lug, the crane can lift the supporting platform through the lifting lug, thereby facilitating the movement of the supporting platform.
[0022] Preferably, an installation groove is provided on the outer wall of the support platform, and the side wall of the installation column is located in the installation groove.
[0023] By adopting the above technical solution, the side wall of the mounting column is located in the mounting groove, and the supporting platform limits the mounting column in the width direction. Under the action of friction, the separation between the side wall of the mounting column and the side wall of the supporting platform is reduced, thereby improving the connection stability between the mounting column and the supporting platform.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] 1. When multiple steel cages need to be spliced, first place the support platform on the outer side of the casing so that the support platform surrounds the casing, and then use a crane to place the first steel cage into the drilled hole until only the top of the first steel bar leaks out of the drilled hole, then pull out the first telescopic rod in the mounting column, and one end of the first telescopic rod is inserted into the steel cage, thereby temporarily supporting the steel cage, and then the crane lifts the second steel cage to the top surface of the first steel cage, and the construction personnel weld the first steel cage and the second steel cage. After welding, the second steel cage is lowered until the top of the second steel cage protrudes from the drilled hole, and then the next steel cage is spliced in turn until the splicing of the steel cage reaches the corresponding design depth. Compared with the prior art, the support platform of the present application is installed together with the first telescopic assembly, which is convenient for operators to find and carry, thereby improving the convenience of use of the temporary positioning structure.
[0026] 2. When the first telescopic rod is extended, the first telescopic rod supports one end of the steel cage, and the second telescopic component is extended in the same way. Under the action of the second telescopic component, the other end of the steel cage can be supported, thereby making the temporary limit of the steel cage more stable and reducing the instability and shaking of the steel cage. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0028] Figure 2 It is a cross-sectional view of an embodiment of the present application.
[0029] Figure 3 yes Figure 2 A is an enlarged view of the middle image.
[0030] Figure 4 It is a schematic diagram of the overall structure of another form of an embodiment of the present application.
[0031] Explanation of the accompanying drawings: 1. Support platform; 11. Mounting groove; 2. First telescopic component; 21. Mounting column; 211. Curling; 22. First telescopic rod; 221. Side plate; 23. Second telescopic rod; 3. Second telescopic component; 31. Moving rod; 4. First limiting component; 5. Second limiting component; 6. Lifting ear; 7. Steel cage; 8. Casing. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-4 This application is described in further detail.
[0033] The embodiment of the present application discloses a temporary positioning structure at the opening of a large-diameter steel cage.
[0034] Reference Figure 1A temporary positioning structure at the opening of a large-diameter steel cage includes a support platform 1, the support platform 1 has a storage cavity inside, the storage cavity is a cavity penetrating from top to bottom, a casing 8 is located in the storage cavity, and the top surface of the support platform 1 is higher than the top surface of the casing 8, thereby reducing the contact with the casing 8 and reducing the movement or collapse of the casing 8 due to force.
[0035] Reference Figure 2 and Figure 3 A first telescopic component 2 is provided on the outer wall of the support platform 1. The first telescopic component 2 includes a mounting column 21 and a first telescopic rod 22. The top surface of the mounting column 21 is rotatably connected to the top surface of the support platform 1. A mounting groove 11 is provided on the outer wall of the support platform 1. The side wall of the mounting column 21 is located in the mounting groove 11. The support platform 1 limits the mounting column 21 in the width direction. Under the action of friction, the separation of the side wall of the mounting column 21 and the side wall of the support platform 1 is reduced, thereby improving the connection stability between the mounting column 21 and the support platform 1. A placement cavity is provided inside the mounting column 21. An opening is provided at the top of the mounting column 21, and the opening is connected to the placement cavity. A curling edge 211 is fixed to the inner side of the top surface of the mounting column 21, and a connecting groove is formed between the outer wall of the curling edge 211 and the inner wall of the mounting column 21.
[0036] One end of the first telescopic rod 22 is inserted into the placement cavity of the mounting column 21, and accordingly, a side plate 221 is fixed to the outer wall of the bottom surface of the first telescopic rod 22, and a plug-in groove is formed between the inner wall of the side plate 221 and the outer wall of the first telescopic rod 22. When the first telescopic rod 22 is in an extended state, the side plate 221 is adapted to be inserted into the connection groove, and accordingly, the rolled edge 211 is adapted to be inserted into the plug-in groove, so that one end of the mounting column 21 and one end of the first telescopic rod 22 form an interlocking state, thereby improving the connection stability between the first telescopic rod 22 and the mounting column 21, so that when the first telescopic rod 22 is in an extended state, the instability and shaking of the first telescopic rod 22 away from one end of the mounting column 21 can be reduced.
[0037] The first telescopic assembly 2 also includes a second telescopic rod 23, one end of the second telescopic rod 23 is inserted into the cavity of the first telescopic rod 22, when the second telescopic rod 23 is retracted into the cavity of the first telescopic rod 22, the horizontal plane of the top surface of the second telescopic rod 23 is higher than the horizontal plane of the top surface of the first telescopic rod 22, so that it is convenient for construction personnel to pull the second telescopic rod 23 out of the cavity of the first telescopic rod 22, and the connection method between the second telescopic rod 23 and the first telescopic rod 22 is consistent with the connection method between the first telescopic rod 22 and the mounting column 21, which is not described in detail in the present application. Under the action of the second telescopic rod 23, the overall length of the first telescopic assembly 2 can be increased, so that holes with larger diameters can also be used.
[0038] Reference Figure 1 and Figure 4When multiple steel cages 7 need to be spliced, first place the support platform 1 on the outer side of the casing 8 so that the support platform 1 surrounds the casing 8, and then use a crane to put the first steel cage 7 into the drilled hole until only the top of the first steel bar leaks out of the drilled hole, and then apply an upward force to the mounting column 21 to rotate the mounting column 21 upward until the long side direction of the mounting column 21 is perpendicular to the long side direction of the mounting groove 11, and the bottom surface of the first telescopic rod 22 is in contact with the top surface of the support platform 1, so that the support platform 1 supports the first telescopic rod 22, and then pull the second telescopic rod 23 out of the first telescopic rod 22, and insert the second telescopic rod 23 from the hole in the outer wall of the steel cage 7 until the second telescopic rod 23 is buckled with the first telescopic rod 22, and then pull the first telescopic rod 22 out of the mounting column 21 until the first telescopic rod 22 is buckled with the mounting column 21, thereby supporting one end of the steel cage 7.
[0039] The outer wall of the support platform 1 is rotatably connected to the second telescopic component 3, and the second telescopic component 3 is symmetrical with the first telescopic component 2 about the center of the support platform 1. The structure of the second telescopic component 3 is consistent with that of the first telescopic component 2. In the embodiment of the present application, detailed description is not given. The second telescopic component 3 includes a moving rod 31. The structure of the moving rod 31 is different from that of the second telescopic rod 23 in that the wide side of the moving rod 31 is smaller than the wide side of the second telescopic rod 23, so that one end of the moving rod 31 is inserted into the cavity of the second telescopic rod 23.
[0040] After the first telescopic component 2 is extended, the second telescopic component 3 is extended in the same way, and the moving rod 31 is inserted into the second telescopic rod 23. Under the action of the second telescopic component 3, the other end of the steel cage 7 can be supported, thereby achieving temporary limiting of the steel cage 7. Then the crane lifts the second steel cage 7 to the top surface of the first steel cage 7, and the construction personnel weld the first steel cage 7 and the second steel cage 7. After welding, the second steel cage 7 is lowered until the top of the second steel cage 7 extends out of the drill hole, and then the next steel cage 7 is spliced in turn until the splicing of the steel cage 7 reaches the corresponding design depth. Compared with the prior art, the support platform 1 and the first telescopic component 2, and the support platform 1 and the second telescopic component 3 of the present application are rotatably connected, so as to facilitate the operator to find and carry, thereby improving the convenience of use of the temporary positioning structure.
[0041] In order to make the limiting of the steel cage 7 more stable, the outer wall of the support platform 1 is also provided with a first limiting component 4 and a second limiting component 5. The structure of the first limiting component 4 is consistent with the structure of the first telescopic component 2, and the structure of the second limiting component 5 is consistent with the structure of the second telescopic component 3. In the embodiment of the present application, detailed description is not given. The first limiting component 4 and the second limiting component 5 are arranged opposite to each other, and the connecting line between the first limiting component 4 and the second limiting component 5 is perpendicular to the connecting line between the first telescopic component 2 and the second telescopic component 3. When the first limiting component 4, the second limiting component 5, the first telescopic component 2 and the second telescopic component 3 are in the extended state and penetrate into the steel cage 7, the first limiting component 4 and the second limiting component 5 are located at the top of the first telescopic component 2 and the second telescopic component 3.
[0042] A lifting lug 6 is fixed to the top surface of the support platform 1, and the number of the lifting lug 6 depends on the specific situation. In the embodiment of the present application, there are four lifting lugs 6, and the four lifting lugs 6 are evenly distributed along the top surface of the support platform 1. Under the action of the lifting lug 6, the crane can lift the support platform 1 through the lifting lug 6, thereby facilitating the movement of the support platform 1.
[0043] The above are all preferred embodiments of the present application. The embodiments are only explanations of the present application and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A temporary positioning structure at the opening of a large diameter steel cage. It is characterized in that The invention comprises a support platform (1), wherein the support platform (1) has a storage cavity extending vertically therethrough, a protective tube (8) is located in the storage cavity, a first telescopic assembly (2) is arranged on the outer wall of the support platform (1), the first telescopic assembly (2) comprises a mounting column (21) and a first telescopic rod (22), the mounting column (21) is mounted on the side wall of the support platform (1), the first telescopic rod (22) is arranged in the cavity of the mounting column (21), the first telescopic rod (22) can be retracted into or extended out of the mounting column (21), and one end of the first telescopic rod (22) passes through a steel cage (7).
2. A temporary positioning structure at the opening of a large diameter steel cage according to claim 1, It is characterized in that The outer wall of the support platform (1) is provided with a second telescopic component (3), and the second telescopic component (3) is arranged opposite to the first telescopic component (2).
3. A temporary positioning structure at the opening of a large diameter steel cage according to claim 2, It is characterized in that The first telescopic assembly (2) further comprises a second telescopic rod (23), the second telescopic rod (23) being movably inserted into the first telescopic rod (22), and one end of the first telescopic rod (22) passing through the steel cage (7).
4. A temporary positioning structure at the opening of a large diameter steel cage according to claim 3, It is characterized in that The second telescopic assembly (3) comprises a moving rod (31), one end of the moving rod (31) passes through the steel cage (7), and one end of the moving rod (31) is inserted into the cavity of the second telescopic rod (23).
5. A temporary positioning structure at the opening of a large diameter steel cage according to claim 1, It is characterized in that A rolled edge (211) is provided on the inner side of the top surface of the mounting column (21), a connecting groove is formed between the outer wall of the rolled edge (211) and the inner wall of the mounting column (21), a side plate (221) is provided on the outer wall of the bottom surface of the first telescopic rod (22), a plug-in groove is formed between the inner wall of the side plate (221) and the outer wall of the first telescopic rod (22), the side plate (221) is inserted into the connecting groove, and the rolled edge (211) is inserted into the plug-in groove.
6. A temporary positioning structure at the opening of a large diameter steel cage according to claim 1, It is characterized in that The mounting column (21) is rotatably connected to the supporting platform (1).
7. A temporary positioning structure at the opening of a large diameter steel cage according to claim 1, It is characterized in that The support platform (1) is provided with a lifting lug (6).
8. A temporary positioning structure at the opening of a large diameter steel cage according to claim 1, It is characterized in that The outer wall of the support platform (1) is provided with a mounting groove (11), and the side wall of the mounting column (21) is located in the mounting groove (11).