Orifice opening and closing protection plate for large-diameter cast-in-place pile
By designing large-diameter cast-in-closing protective plates, using the structure of the support frame and cover plate, the problems of impurities entering and safety of construction personnel during the casting process are solved, and the quality and construction safety of cast-in-filled piles are improved.
Patent Information
- Application Number
- CN202420252886.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-01
AI Technical Summary
During the construction of the cast pile, impurities enter the concrete through the cast hole, affecting its adhesion force, resulting in a decrease in the quality of the cast pile, and the construction personnel have a risk of falling into the hole.
Design a large diameter cast-in-placement pile orifice opening protection plate, including a support frame and a cover plate. The cover plate is located on the top of the cartridge, the filling tube is inserted into the cover plate opening, the support frame and the cartridge are connected stably, and the cover plate can be rotatably opened for observation. The perfusion process and improve structural stability through the support column and insertion.
Effectively reduce impurities entering the holes, improve the quality of cast piles, protect construction personnel, and ensure the safety and stability of the casting process.
Smart Images

Figure CN221956732U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of protective plates, and in particular to an opening and closing protective plate for a large-diameter bored pile hole. Background Art
[0002] Cast-in-place piles are made by drilling holes in the ground and pouring steel bars and concrete into the holes to form a three-dimensional pile body that bears the foundation load.
[0003] During the construction of bored piles, the casing is first embedded, and then a drilling machine is used to drill holes until the designed hole depth is reached. The hole is then cleaned to remove impurities such as mud and sand at the bottom of the hole. A pre-designed steel skeleton is then arranged in the hole to increase the strength and stability of the bored pile. Finally, concrete is poured into the hole.
[0004] In the process of pouring concrete, concrete is transported into the hole through a pouring pipe. In the process of pouring concrete, other impurities will enter the hole from the hole mouth, and the impurities will affect the bonding strength of the concrete, thereby causing the quality of the bored pile to deteriorate. Summary of the invention
[0005] In order to reduce the situation where impurities enter the hole during the pouring of concrete, the present application provides a large-diameter bored pile hole opening and closing protective plate.
[0006] The present application provides a large-diameter cast-in-place pile opening and closing protection plate, which adopts the following technical solution:
[0007] A large-diameter bored pile hole opening and closing protective plate includes a support frame, the support frame has a cavity running through it from top to bottom, the support frame is arranged on the top surface of a casing, a cover plate is installed on the top surface of the support frame, the cover plate is located in the support frame cavity, the cover plate is located on the top of the casing, an opening is opened in the middle of the cover plate, and a casting pipe is inserted into the cover plate opening.
[0008] By adopting the above technical solution, when construction workers need to pour concrete into the hole, the support frame is placed on the top surface of the casing, and then the pouring pipe is inserted into the opening between the two cover plates. Concrete enters the hole along the pouring pipe cavity. Under the action of the cover plate, the casing is covered, thereby reducing the situation of impurities entering the hole during the pouring of concrete, thereby improving the quality of the bored piles. At the same time, the cover plate can also protect the construction workers and reduce the situation of construction workers falling into the hole.
[0009] Preferably, a support column is provided at the bottom of the support frame.
[0010] By adopting the above technical solution, under the action of the support column, the connection stability between the support frame and the casing can be improved, and after the support frame is subjected to a thrust, the situation where the support frame slides off the top surface of the casing is reduced.
[0011] Preferably, a mounting groove is provided on the top surface of the support frame, the cover plate is located in the mounting groove, and the bottom surface of the cover plate is in contact with the top surface of the support frame.
[0012] By adopting the above technical solution, the cover plate is located in the installation groove, and the bottom surface of the cover plate is in contact with the top surface of the support frame, so that the support frame supports the cover plate, thereby dispersing part of the gravity of the cover plate on the top surface of the support frame, thereby improving the connection stability between the cover plate and the support frame.
[0013] Preferably, there are two cover plates, which are arranged opposite to each other, and the cover plates are rotatably connected to the support frame.
[0014] By adopting the above technical solution, the construction workers apply an upward force to the cover plate so that the cover plate can be rotated upward, thereby realizing the opening of the cover plate. The construction workers can observe the pouring of concrete in the hole by opening the cover plate, which is convenient for the construction workers to observe unexpected events that occur during the pouring of concrete.
[0015] Preferably, a pull ring is provided on the top surface of the cover plate.
[0016] By adopting the above technical solution, the construction workers hold the pull ring tightly and apply upward force to the pull ring, and open the cover plate under the drive of the pull ring. Therefore, under the action of the pull ring, it is convenient for the construction workers to open the cover plate, reducing the situation where it is difficult for the construction workers to open the cover plate.
[0017] Preferably, a connecting groove is provided at an inner end of the bottom surface of the support frame, and the top surface of the casing is located in the connecting groove.
[0018] By adopting the above technical solution, the top surface of the casing is located in the connecting groove, so that the inner wall of the supporting frame surrounds the casing. When the supporting frame is subjected to thrust, the bottom surface of the supporting frame slides along the bottom surface of the casing until the outer wall of the casing abuts against the inner wall of the supporting frame. The casing generates a reaction force on the inner wall of the supporting frame, making it difficult for the supporting frame to slide off the top surface of the casing, thereby reducing the situation where the supporting frame slides off the top surface of the casing due to external force.
[0019] Preferably, the support column is hinged to the support frame.
[0020] By adopting the above technical solution, after the concrete is poured into the hole, the pouring pipe is pulled out from the opening, and then the support column is rotated upward until the outer wall of the support column abuts against the bottom surface of the cover plate, thereby folding the support column and facilitating the construction workers' transportation.
[0021] Preferably, the support column includes an insertion portion, the insertion portion is a conical column, and the insertion portion is inserted into the ground.
[0022] By adopting the above technical solution, the insertion part is inserted into the ground, thereby improving the connection stability between the ground and the support column. Under the action of the support column, the support frame is placed on the top surface of the casing more stably, and there are fewer cases where the support frame slides and shakes on the top surface of the casing, so that the pouring pipe can be better poured with concrete. The insertion part is a conical column, and the diameter of the bottom surface of the insertion part is smaller than the diameter of the top surface of the insertion part, so that when the insertion part is inserted into the ground, the contact area between the bottom surface of the insertion part and the ground is smaller, so that the resistance of the ground to the insertion part is smaller, so that the insertion part can be better inserted into the ground.
[0023] In summary, the present application includes at least one of the following beneficial technical effects:
[0024] 1. When construction workers need to pour concrete into the hole, they place the support frame on the top of the casing, then insert the pouring pipe into the opening between the two cover plates, and the concrete enters the hole along the pouring pipe cavity. Under the action of the cover plate, the casing is covered, thereby reducing the situation of impurities entering the hole during the concrete pouring process, thereby improving the quality of the bored pile. At the same time, the cover plate can also protect the construction workers and reduce the situation of construction workers falling into the hole.
[0025] 2. The insertion part is inserted into the ground, thereby improving the connection stability between the ground and the support column. Under the action of the support column, the support frame is placed on the top surface of the casing more stably, and there is less sliding and shaking of the support frame on the top surface of the casing, so that the pouring pipe can be better poured with concrete. The insertion part is a conical column, and the bottom surface diameter of the insertion part is smaller than the top surface diameter of the insertion part, so that when the insertion part is inserted into the ground, the contact area between the bottom surface of the insertion part and the ground is smaller, so that the resistance of the ground to the insertion part is smaller, so that the insertion part can be better inserted into the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0027] Figure 2 It is a schematic diagram of the overall structure from another perspective of the embodiment of the present application.
[0028] Explanation of the accompanying drawings: 1. Support frame; 11. Installation groove; 2. Cover plate; 21. Hinge; 22. Placement groove; 23. Pull ring; 3. Casing; 4. Infusion pipe; 5. Support column; 51. Support part; 52. Insertion part. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-2 This application is described in further detail.
[0030] The embodiment of the present application discloses a large-diameter bored pile hole opening and closing protection plate.
[0031] Reference Figure 1 and Figure 2 A large-diameter bored pile hole opening and closing protective plate includes a support frame 1, the support frame 1 has a storage cavity inside, the storage cavity is a cavity penetrating from top to bottom, a mounting groove 11 is opened at the inner end of the top surface of the support frame 1, a cover plate 2 is arranged on the top surface of the support frame 1, the cover plate 2 is located in the mounting groove 11, so that the support frame 1 supports the cover plate 2, the top surface of the support frame 1 and the top surface of the cover plate 2 are on the same horizontal plane, the top surface of the support frame 1 and the top surface of the cover plate 2 are hinged by a hinge 21, the construction personnel apply an upward force to the cover plate 2, and the cover plate 2 can be rotated upward along the hinge 21, thereby realizing the opening of the cover plate 2.
[0032] There are two cover plates 2, which are arranged opposite to each other. When the two cover plates 2 are fitted together, a circular opening is formed in the middle. A connecting groove is opened at the inner end of the bottom surface of the support frame 1. The bottom surface of the support frame 1 is placed on the top surface of the casing 3, and the top surface of the casing 3 is located in the connecting groove, so that the inner wall of the support frame 1 surrounds the casing 3. When the support frame 1 is subjected to thrust, the bottom surface of the support frame 1 slides along the bottom surface of the casing 3 until the outer wall of the casing 3 abuts against the inner wall of the support frame 1. The casing 3 generates a reaction force on the inner wall of the support frame 1, making it difficult for the support frame 1 to slide off from the top surface of the casing 3, thereby reducing the situation where the support frame 1 slides off from the top surface of the casing 3 due to external force.
[0033] When construction workers need to pour concrete into the hole, they place the support frame 1 on the top surface of the casing 3, and then insert the pouring pipe 4 into the opening between the two cover plates 2. Concrete enters the hole along the cavity of the pouring pipe 4. Under the action of the two cover plates 2, the casing 3 is covered, thereby reducing the situation of impurities entering the hole during the pouring of concrete, thereby improving the quality of the bored piles. At the same time, after the two cover plates 2 are fitted together, they can also protect the construction workers and reduce the situation of construction workers falling into the hole.
[0034] Reference Figure 2 The top surfaces of the two cover plates 2 are respectively provided with placement grooves 22, and the top surfaces of the two cover plates 2 are rotatably connected with pull rings 23, and the pull rings 23 are located in the placement grooves 22. Under the action of the placement grooves 22, when the pull rings 23 are not needed, the outer wall of the pull rings 23 fits with the top surface of the cover plate 2, so that the pull rings 23 are hidden in the placement grooves 22 as a whole, thereby reducing the situation where the pull rings 23 protrude from the top surface of the cover plate 2, and further reducing the situation where the pull rings 23 protrude and cause scratches. The construction personnel can open the cover plate 2 through the pull rings 23 to observe the situation of pouring concrete in the hole.
[0035] A support column 5 is provided on the bottom surface of the support frame 1, and the support column 5 includes a support portion 51 and an insertion portion 52. The top end of the support portion 51 is hinged to the bottom surface of the support frame 1, and the top surface of the insertion portion 52 is fixed to the bottom surface of the support portion 51. The insertion portion 52 is inserted into the ground. In the embodiment of the present application, the insertion portion 52 is a conical column, and the bottom surface diameter of the insertion portion 52 is smaller than the top surface diameter of the insertion portion 52, so that when the insertion portion 52 is inserted into the ground, the contact area between the bottom surface of the insertion portion 52 and the ground is smaller, thereby reducing the resistance of the ground to the insertion portion 52, so that the insertion portion 52 can be better inserted into the ground.
[0036] The number of support columns 5 depends on the specific situation. In the embodiment of the present application, the number of support columns 5 is four, and the four support columns 5 are evenly distributed on the bottom surface of the support frame 1. The bottom ends of the four support columns 5 are respectively inserted into the ground, thereby improving the connection stability between the ground and the support columns 5. Under the action of the support columns 5, the support frame 1 is placed on the top surface of the casing 3 more stably, and the support frame 1 is less likely to slide and shake on the top surface of the casing 3, so that the pouring pipe 4 can be better poured with concrete. After the pouring of concrete in the hole is completed, the pouring pipe 4 is pulled out from the opening, and then the support column 5 is pulled out of the ground, and then the support column 5 is rotated upward until the outer wall of the support column 5 abuts against the bottom surface of the cover plate 2, thereby folding the support column 5, which is convenient for construction personnel to carry.
[0037] The implementation principle of the opening and closing protective plate of a large-diameter bored pile hole in the embodiment of the present application is as follows:
[0038] When construction workers need to pour concrete into the hole, they first open the support column 5 and insert the support column 5 into the ground until the top surface of the casing 3 fits with the bottom surface of the support frame 1, then insert the pouring pipe 4 into the opening between the two cover plates 2, and finally let the concrete enter the hole along the inner wall of the pouring pipe 4.
[0039] The above are all preferred embodiments of the present application. The embodiments are only explanations of the present application and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A large diameter cast-in-place pile hole opening and closing protection plate, characterized in that: The invention comprises a support frame (1), wherein the support frame (1) has a cavity extending vertically therethrough, the support frame (1) is arranged on the top surface of a protective tube (3), a cover plate (2) is installed on the top surface of the support frame (1), the cover plate (2) is located in the cavity of the support frame (1), the cover plate (2) is located on the top of the protective tube (3), an opening is provided in the middle of the cover plate (2), and a perfusion pipe (4) is inserted into the opening of the cover plate (2); The top surface of the support frame (1) is provided with a mounting groove (11), the cover plate (2) is located in the mounting groove (11), and the bottom surface of the cover plate (2) is in contact with the top surface of the support frame (1).
2. A large diameter bored pile hole opening and closing protection plate according to claim 1, characterized in that: A support column (5) is provided at the bottom of the support frame (1).
3. A large diameter bored pile hole opening and closing protection plate according to claim 1, characterized in that: There are two cover plates (2), the two cover plates (2) are arranged opposite to each other, and the cover plates (2) are rotatably connected to the support frame (1).
4. A large diameter bored pile hole opening and closing protection plate according to claim 1, characterized in that: A pull ring (23) is provided on the top surface of the cover plate (2).
5. The large diameter bored pile hole opening and closing protection plate according to claim 1, characterized in that: A connection groove is provided at an inner end of the bottom surface of the support frame (1), and the top surface of the protective tube (3) is located in the connection groove.
6. A large diameter bored pile hole opening and closing protection plate according to claim 2, characterized in that: The support column (5) is hinged to the support frame (1).
7. A large diameter bored pile hole opening and closing protection plate according to claim 2, characterized in that: The support column (5) comprises an insertion portion (52), the insertion portion (52) is a conical column, and the insertion portion (52) is inserted into the ground.