Cable-free underground multi-load quick charging device

Through the non-contact magnetic induction charging technology and water distributor control valve without lane-type downhole multi-load fast charging device, the problems of high cost of downhole power supply equipment, long charging cycle and easy cable damage are solved, and a fast and safe downhole battery pack is achieved Charging and power supply improve underground operation efficiency.

CN221961635UActive Publication Date: 2024-11-05山东大东联石油设备有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420535006.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-11-05
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The power supply equipment of existing downhole water-injected wells has problems such as high cost, easy cable damage, long charging cycle, and inability to meet the charging needs of multiple wells in a short time. Especially in high temperature and high pressure environments, the cable is easily entangled and twisted due to fluid flow. Influences underground operation efficiency.

Method used

A non-club-free underground multi-load fast charging device is designed, using non-contact magnetic induction charging technology at the power receiving end and the power transmitting end, using winding coils and compensation coils to reduce magnetic leakage, and combining with water distributor control valves to achieve fast charging and data acquisition. , reduce the use of cables and avoid the twisted rope winding problems caused by fluid flow.

Benefits of technology

It realizes fast and safe charging and power supply of downhole battery packs, reduces construction costs, shortens charging time, extends the independent working time of the battery pack, avoids cable entanglement and crimping, and improves underground operation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221961635U_ABST
    Figure CN221961635U_ABST
Patent Text Reader

Abstract

The utility model relates to an oil field water injection well operation device, and particularly discloses a cable-free underground multi-load quick charging device. According to the technical scheme, the device comprises an electric energy receiving end and an electric energy transmitting end, a receiving end framework is arranged on the inner side of a shielding layer on the lower side of the inner wall of a shaft of the electric energy receiving end, a plurality of winding coils are sequentially arranged in the receiving end framework, and a receiving magnetic positioner is arranged on the lower side of a third winding coil; a battery pack, a motor and a water distributor control valve are mounted on the upper side of the inner wall of the shaft; a transmitting end coil and an inner core are arranged in an inner cavity of the electric energy transmitting end, and a transmitting line magnetic positioning device is arranged at the lower end of the transmitting protection sleeve. The utility model has the beneficial effects that the underground battery pack can be quickly charged and powered, other water injection wells can be continuously powered after the underground battery pack is charged and powered, the construction cost is saved, and meanwhile, due to short underground placement time, the phenomenon that a twisted rope and a cable are twisted and broken due to the fact that fluid flows can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an oilfield water injection well operation device, in particular to a non-lane underground multi-load fast charging device. Background Art

[0002] During the development of an oil field, stratification will occur underground. Generally, multiple layers of a well will be developed together. However, during development, the oil and gas layers in the well often interfere with each other, which sometimes makes the development capacity unsatisfactory and the contradictions between layers prominent. In order to deal with this phenomenon, oil fields usually use packers to seal the layers underground, and then use water distributors or production distributors to carry out stratified water injection or stratified exploitation of each layer, and pressurize the oil and gas resources in each layer underground through the pressure of the injected water.

[0003] In addition, with the development of the Internet of Things, oil fields have gradually begun to update the Internet of Things technology. In the underground intelligent measurement and control technology, various underground intelligent measurement and control technologies have gradually evolved, such as cable-type, non-cable-type, electronic control type, and hydraulic control type. And these underground measurement and control technologies are mainly divided into wired and wireless energy supply during energy transmission. At present, the cable type occupies the mainstream of the market, but the cable-type energy supply has the following disadvantages. 1. High cost. Because underground operations are all in deep wells of hundreds of meters or even thousands of meters, cable power supply and data line transmission are inevitable hardware equipment consumption. At the same time, the underground is in a high temperature and high pressure environment, and the quality requirements of cables and data lines are very high. Often, they cannot continue to work due to quality problems after working for a period of time. It often happens that due to the flow of underground fluids, the cables and data lines are entangled and knotted with each other, resulting in unexpected situations such as breaking the cable line, so the cables and data lines must be replaced. 2. Difficult to go down the well. Oil wells are different from previous water well engineering operations. Because the conditions in oil wells are very complicated, the downhole fluids are a mixture of highly mineralized liquids and solid particles. They often scale due to environmental factors, and produce wax formation after encountering water, and a series of difficult-to-determine problems will occur. When the equipment is damaged and goes down the well again, it will cause unnecessary trouble. 3. The sealing cycle is long. At present, there are multiple water injection layers in the oil field, and the water injection requirements for each layer are different. It is often necessary to adjust the opening size of the water injector to control the water injection volume. After adjusting the opening, it is necessary to adjust it again according to the current water content and flow rate. The traditional workload of each layer will increase exponentially, which will greatly extend the application cycle of the test, thereby reducing the efficiency of downhole work. 4. The charging cycle of traditional wireless charging equipment is long. At present, wireless instruments have appeared on the market, but the charging cycle of the instrument is too long to meet the needs of charging multiple wells in a short time, resulting in insufficient production capacity.

[0004] From the above technology, we can see that there is still a lack of a new water distribution instrument system that is not affected by the well depth and will not cause the cables to be entangled with each other due to the flow of liquid in the well, resulting in sparks and cable breakage. It can collect downhole information and actively control the opening of the water nozzle to adjust the water injection volume of each oil layer. Utility Model Content

[0005] The purpose of the utility model is to provide a non-harnessed underground multi-load fast charging device to address the above-mentioned defects in the prior art. The device can quickly charge and supply power to the battery pack underground, and can continue to supply power to other water injection wells after completion. It does not require the cost of thousands of meters of cables as in the past, thus saving construction costs. At the same time, because the underground placement time is short, the rope and the cable will not be entangled with each other and become broken due to the flow of fluid.

[0006] The utility model mentions a non-grasping underground multi-load fast charging device, and its technical scheme is: including an electric energy receiving end and an electric energy transmitting end, the electric energy receiving end is composed of a receiving magnetic positioning, a receiving end skeleton, a shielding layer, a wellbore, a receiving end circuit board, a first winding coil, a second winding coil, a third winding coil, a battery pack, a motor, and a water distributor control valve. The shielding layer is arranged on the lower side of the inner wall of the wellbore, and the receiving end skeleton is arranged on the inner side of the shielding layer. The first winding coil, the second winding coil and the third winding coil are arranged in sequence in the receiving end skeleton, and the receiving magnetic positioning is arranged on the lower side of the third winding coil; the receiving end circuit board is installed on the upper side of the first winding coil; the battery pack, the motor and the water distributor control valve are installed on the upper side of the inner wall of the wellbore;

[0007] The electric energy transmitting end is composed of a transmitting line magnetic positioning, a transmitting end coil, an inner core, a transmitting protection sleeve, a transmitting end circuit board, a twisted rope, and a cable. The transmitting end coil and the inner core are installed in the inner cavity of the transmitting protection sleeve, and the transmitting line magnetic positioning is installed at the lower end of the transmitting protection sleeve. The top of the transmitting protection sleeve is connected to the twisted rope and the cable, and the cable is connected to the transmitting end circuit board installed in the inner cavity of the inner core.

[0008] Preferably, the above-mentioned motor is connected to the water distributor control valve, drives the water distributor control valve to open or close through the motor, and is located on the upper inner wall of the wellbore; the battery pack is installed on the other side of the upper inner wall of the wellbore.

[0009] Preferably, one output end of the first winding coil is connected to the motor, and the other output end is connected to the battery pack, so that when the battery pack is charged, the motor is powered synchronously.

[0010] Preferably, the second winding coil and the third winding coil are respectively connected to a water content probe and a flow meter probe.

[0011] Preferably, the first winding coil, the second winding coil and the third winding coil all use 10 strands of Litz wire inside, and include a main receiving coil and a compensation coil inside the main receiving coil, wherein the number of turns of the main receiving coil is 150 turns each, and the number of turns of the compensation coil is 100 turns each.

[0012] Preferably, the above-mentioned receiving end circuit board is provided with a charging module and a wireless transceiver module, which charges the battery pack and powers the motor synchronously by controlling the resonance of the main receiving coil of the first winding coil; when charging, the battery pack is first output with a constant current, and after continuous charging for a period of time, the voltage of the battery pack is detected to check whether the current power reaches 80%, and then a constant voltage output is performed; finally, the voltage of the battery pack is detected to see whether it reaches 24V.

[0013] Preferably, when the above-mentioned battery pack is charged, the initial charging mode selects a 60KHZ frequency for constant current charging, and the charging module in the receiving end circuit board detects whether the battery power of the battery pack has reached 80%. If it reaches 80%, it starts to switch to 80KHZ frequency for constant voltage charging; the flow rate, moisture content, and opening information are sent to the transmitting end circuit board of the power transmitting end through the wireless transceiver module on the receiving end circuit board; when it is detected that the battery voltage of the battery pack has reached 24V, the circuit switch is disconnected, and the power transmitting end is no longer powered on the well.

[0014] Preferably, the above-mentioned water distributor control valve includes a valve barrel, a valve core, a pump plug, a liquid inlet, a nut, a pressure balancing hole, an external thread, and a connecting shaft. The upper outer wall of the valve barrel is provided with a liquid inlet, the middle outer wall is provided with a pressure balancing hole, and the lower outer wall is provided with an external thread. The inner cavity of the valve barrel is equipped with a valve core, the upper end of the valve core is connected to the pump plug, and the lower end is connected to the connecting shaft.

[0015] Preferably, an upper sealing ring is installed on the outer side of the upper part of the pump plug, and a lower sealing ring is installed on the outer side of the lower part of the pump plug; and an upper valve core seal and a lower valve core seal are provided in the middle of the valve core.

[0016] The method for using the non-handled underground multi-load fast charging device mentioned in the utility model includes the following process:

[0017] First, install and fix the electric energy receiving end underground, fix the receiving magnetic positioning, receiving end skeleton, shielding layer, receiving end circuit board, first winding coil, second winding coil, third winding coil, battery pack, motor, and water distributor control valve in the wellbore respectively, the receiving magnetic positioning is located at the bottom of the wellbore, the motor is connected to the water distributor control valve, and controls the movement of the valve core to drive the pump plug to cooperate with the liquid inlet on the valve cylinder to achieve the size control of the liquid inlet; the battery pack is installed on one side of the motor and the water distributor control valve, and is connected to the first winding coil; the second winding coil and the third winding coil are respectively connected to the water content probe and the flow meter probe;

[0018] Second, the power transmitter is driven downward into the wellbore through the winch and cable. When the magnetic positioning signal of the power transmitter and the magnetic positioning signal of the receiver induce each other to produce a mutation signal, the magnetic positioning of the transmitter reaches the receiver magnetic positioning position, and the winch stops lowering the winch and cable.

[0019] Third, the ground system on the well starts to supply power to the power transmitter through the cable, and the direct current is inverted into alternating current through the transmitter circuit board on the power transmitter, and an alternating magnetic field is generated through the transmitter coil. After the first winding coil, the second winding coil and the third winding coil in the power receiving end receive the induced magnetic field, they generate current for power supply through circuit resonance. Among them, the first winding coil charges the battery pack and simultaneously powers the motor during charging, the second winding coil is connected to the water content probe to obtain water content data, and the third winding coil is connected to the flow meter probe to obtain flow data. Since the water content and flow information in the well are relatively stable and will not change for a long time after the measurement is completed, the switches of the water content probe and the flow meter probe are disconnected when charging is completed; after the charging and measurement functions are completed, the power transmitter is pulled out of the well using a rope.

[0020] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0021] 1) The utility model adopts a non-contact device that does not require repeated installation of the pipe column and does not require shutdown of work and production during the charging process for rapid charging;

[0022] 2) The transmitting coil of the power transmitting end adopted by the utility model is a single coil, and the power receiving end adopts a first winding coil, a second winding coil and a third winding coil, and a compensation coil is added. Compared with a single coil to a single coil, the power receiving end of the utility model can effectively reduce magnetic leakage and improve the charging efficiency and power supply efficiency of the underground battery pack;

[0023] 3) The utility model sends the underground water content and flow rate information to the power receiving end after collection, and then disconnects the switch of the water content probe and the flow meter probe, thereby reducing the power consumption of the battery pack and extending the use time of the battery pack for independent underground work;

[0024] 4) The utility model can charge the battery pack at the power receiving end in the well in a short time, control the motor action at the same time, and collect water content data and flow data at the same time. After completion, it can continue to supply power to other water injection wells, without the need for thousands of meters of cables as in the past, thus saving costs. At the same time, because the time spent in the well is short, the rope and the cable will not be entangled with each other and broken due to the flow of fluid. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1It is a schematic diagram of the overall structure of the utility model;

[0026] Figure 2 It is a structural schematic diagram of the electric energy receiving end of the utility model;

[0027] Figure 3 It is a structural schematic diagram of the electric energy transmitting end of the utility model;

[0028] Figure 4 is a schematic diagram of the transverse structure of the first winding coil, the second winding coil, and the third winding coil;

[0029] Figure 5 It is a structural diagram of the water distributor control valve when it is closed;

[0030] Figure 6 It is a structural diagram of the opening part of the water distributor control valve;

[0031] In the above figure: receiving magnetic positioning 1, receiving end skeleton 2, shielding layer 3, wellbore 4, receiving end circuit board 5, first winding coil 6, second winding coil 7, third winding coil 8, transmitting line magnetic positioning 9, transmitting end coil 10, inner core 11, transmitting protection sleeve 12, transmitting end circuit board 13, twisted rope 14, cable 15, battery pack 16, motor 17, water distributor control valve 18, main receiving coil 6.1, compensation coil 6.2, valve cylinder 18.1, valve core 18.2, pump plug 18.3, liquid inlet 18.4, nut 18.5, upper sealing ring 18.6, lower sealing ring 18.7, pressure balance hole 18.8, valve core upper seal 18.9, external thread 18.10, connecting shaft 18.11, valve core lower seal 18.12. DETAILED DESCRIPTION

[0032] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0033] Example 1, reference Figure 1-Figure 6The utility model mentions a non-grasping underground multi-load fast charging device, including an electric energy receiving end and an electric energy transmitting end. The electric energy receiving end is composed of a receiving magnetic positioning 1, a receiving end skeleton 2, a shielding layer 3, a wellbore 4, a receiving end circuit board 5, a first winding coil 6, a second winding coil 7, a third winding coil 8, a battery pack 16, a motor 17, and a water distributor control valve 18. The shielding layer 3 is arranged on the lower side of the inner wall of the wellbore 4, and the receiving end skeleton 2 is arranged on the inner side of the shielding layer 3. The first winding coil 6, the second winding coil 7 and the third winding coil 8 are arranged in sequence in the receiving end skeleton 2, and the receiving magnetic positioning 1 is arranged on the lower side of the third winding coil 8; the receiving end circuit board 5 is installed on the upper side of the first winding coil 6; the battery pack 16, the motor 17 and the water distributor control valve 18 are installed on the upper side of the inner wall of the wellbore 4;

[0034] The electric energy transmitting end is composed of a transmitting line magnetic positioning 9, a transmitting end coil 10, an inner core 11, a transmitting protection sleeve 12, a transmitting end circuit board 13, a twisted rope 14, and a cable 15. The transmitting end coil 10 and the inner core 11 are installed in the inner cavity of the transmitting protection sleeve 12, and the transmitting line magnetic positioning 9 is installed at the lower end of the transmitting protection sleeve 12. The top of the transmitting protection sleeve 12 is connected to the twisted rope 14 and the cable 15, and the cable 15 is connected to the transmitting end circuit board 13 installed in the inner cavity of the inner core 11.

[0035] The motor 17 is connected to the water distributor control valve 18 , which drives the water distributor control valve 18 to open or close, and is located on the upper inner wall of the wellbore 4 ; the battery pack 16 is installed on the other side of the upper inner wall of the wellbore 4 .

[0036] In addition, one output end of the first winding coil 6 is connected to the motor 17 and the other end is connected to the battery pack 16. When charging the battery pack 16, the motor 17 is powered synchronously. Moreover, the second winding coil 7 and the third winding coil 8 are respectively connected to the water content probe and the flow meter probe.

[0037] Reference Figure 4 The first winding coil 6, the second winding coil 7, and the third winding coil 8 mentioned in the utility model all use 10 internal strands of Litz wire, and include a main receiving coil 6.1 and a compensation coil 6.2 inside the main receiving coil 6.1, wherein the number of turns of the main receiving coil 6.1 is 150 turns, and the number of turns of the compensation coil 6.2 is 100 turns.

[0038] In addition, the above-mentioned receiving end circuit board 5 is provided with a charging module and a wireless transceiver module. By controlling the resonance of the main receiving coil 6.1 of the first winding coil 6, the battery pack 16 is charged and the motor 17 is powered synchronously; when charging, a constant current output is first performed to the battery pack 16. After continuous charging for a period of time, the voltage of the battery pack 16 is detected to check whether the current power reaches 80%, and then a constant voltage output is performed; finally, the voltage of the battery pack 16 is detected to see whether it reaches 24V.

[0039] When the battery pack 16 of the utility model is charged, the initial charging mode selects a 60KHZ frequency for constant current charging. The charging module in the receiving end circuit board 5 detects whether the battery power of the battery pack 16 has reached 80%. If it has reached 80%, it starts to switch to 80KHZ frequency for constant voltage charging; the flow rate, moisture content, and opening information are sent to the transmitting end circuit board 13 of the power transmitting end through the wireless transceiver module on the receiving end circuit board 5; when it is detected that the battery voltage of the battery pack 16 has reached 24V, the circuit switch is disconnected, and the power transmitting end is no longer powered.

[0040] Reference Figure 5 and Figure 6 The water distributor control valve 18 mentioned in the utility model includes a valve cylinder 18.1, a valve core 18.2, a pump plug 18.3, a liquid inlet 18.4, a nut 18.5, a pressure balance hole 18.8, an external thread 18.10, and a connecting shaft 18.11. The upper outer wall of the valve cylinder 18.1 is provided with a liquid inlet 18.4, the middle outer wall is provided with a pressure balance hole 18.8, and the lower outer wall is provided with an external thread 18.10. The inner cavity of the valve cylinder 18.1 is installed with a valve core 18.2, the upper end of the valve core 18.2 is connected to the pump plug 18.3, and the lower end is connected to the connecting shaft 18.11. The pressure balance hole 18.8 can play a role in pressure balance.

[0041] Among them, the upper sealing ring 18.6 is installed on the upper outer side of the pump plug 18.3 of the utility model, and the lower sealing ring 18.7 is installed on the lower outer side of the pump plug 18.3; the middle part of the valve core 18.2 is provided with a valve core upper seal 18.9 and a valve core lower seal 18.12, which can play a better sealing role.

[0042] The method for using the non-towed underground multi-load fast charging device mentioned in the utility model includes the following process:

[0043] First, install and fix the electric energy receiving end underground, and fix the receiving magnetic positioning 1, the receiving end skeleton 2, the shielding layer 3, the receiving end circuit board 5, the first winding coil 6, the second winding coil 7, the third winding coil 8, the battery pack 16, the motor 17, and the water distributor control valve 18 in the wellbore 4 respectively. The receiving magnetic positioning 1 is located at the bottom of the wellbore 4. The motor 17 is connected to the water distributor control valve 18 and controls the movement of the valve core 18.2 to drive the pump plug 18.3 to cooperate with the liquid inlet 18.4 on the valve cylinder 18.1 to achieve the size control of the liquid inlet 18.4; the battery pack 16 is installed on one side of the motor 17 and the water distributor control valve 18, and is connected to the first winding coil 6; the second winding coil 7 and the third winding coil 8 are respectively connected to the water content probe and the flow meter probe;

[0044] Second, the electric energy transmitting end is driven downward into the wellbore 4 through the rope 14 and the cable 15. When the magnetic positioning signal of the electric energy transmitting end and the magnetic positioning signal of the receiving magnetic positioning 1 mutually induce each other to produce a mutation signal, the transmitting line magnetic positioning 9 reaches the receiving magnetic positioning 1 position, and the winch stops lowering the rope 14 and the cable 15;

[0045] Third, the surface system on the well starts to supply power to the power transmitter through the cable 15, and the DC power is inverted into AC power through the transmitter circuit board 13 on the power transmitter, and an alternating magnetic field is generated through the transmitter coil 10. After the first winding coil 6, the second winding coil 7 and the third winding coil 8 in the power receiving end receive the induced magnetic field, they generate current for power supply through circuit resonance, wherein the first winding coil 6 charges the battery pack 16 and simultaneously supplies power to the motor 17 when the battery pack 16 is charged, the second winding coil 7 is connected to the water content probe to obtain water content data, and the third winding coil 8 is connected to the flow meter probe to obtain flow data. Since the water content and flow information in the well are relatively stable and will not change for a long time after the measurement is completed, the water content probe and the flow meter probe are disconnected after charging is completed, so that the power of the battery pack 16 can be saved; after the charging and measurement functions are completed, the power transmitter is pulled out of the well using the rope 14.

[0046] The above are only some preferred embodiments of the utility model. Any person skilled in the art may modify the above technical solutions or modify them into equivalent technical solutions. Therefore, the corresponding simple modifications or equivalent transformations made according to the technical solutions of the utility model shall fall within the scope of protection claimed by the utility model.

Claims

1. A non-tethered underground multi-load fast charging device, comprising an electric energy receiving end and an electric energy transmitting end, characterized in that: The electric energy receiving end is composed of a receiving magnetic positioning device (1), a receiving end frame (2), a shielding layer (3), a wellbore (4), a receiving end circuit board (5), a first winding coil (6), a second winding coil (7), a third winding coil (8), a battery pack (16), a motor (17), and a water distributor control valve (18). The shielding layer (3) is arranged on the lower side of the inner wall of the wellbore (4), the receiving end frame (2) is arranged on the inner side of the shielding layer (3), the first winding coil (6), the second winding coil (7) and the third winding coil (8) are arranged in sequence in the receiving end frame (2), and the receiving magnetic positioning device (1) is arranged on the lower side of the third winding coil (8); the receiving end circuit board (5) is installed on the upper side of the first winding coil (6); the battery pack (16), the motor (17) and the water distributor control valve (18) are installed on the upper side of the inner wall of the wellbore (4); The electric energy transmitting end is composed of a transmitting line magnetic positioning (9), a transmitting end coil (10), an inner core (11), a transmitting protection sleeve (12), a transmitting end circuit board (13), a twisted rope (14), and a cable (15); the transmitting end coil (10) and the inner core (11) are arranged in the inner cavity of the transmitting protection sleeve (12); the transmitting line magnetic positioning (9) is arranged at the lower end of the transmitting protection sleeve (12); the twisted rope (14) and the cable (15) are connected to the top of the transmitting protection sleeve (12); and the cable (15) is connected to the transmitting end circuit board (13) installed in the inner cavity of the inner core (11).

2. The non-towed underground multi-load fast charging device according to claim 1 is characterized in that: The motor (17) is connected to the water distributor control valve (18), and is driven by the motor (17) to open or close the water distributor control valve (18), and is located on the upper inner wall of the wellbore (4); the battery pack (16) is installed on the other side of the upper inner wall of the wellbore (4).

3. The non-lane underground multi-load fast charging device according to claim 2 is characterized in that: One output end of the first winding coil (6) is connected to the motor (17) and the other output end is connected to the battery pack (16). When the battery pack (16) is charged, power is simultaneously supplied to the motor (17).

4. The non-lane underground multi-load fast charging device according to claim 3 is characterized in that: The second winding coil (7) and the third winding coil (8) are respectively connected to a water content probe and a flow meter probe.

5. The non-towed underground multi-load fast charging device according to claim 4 is characterized in that: The first winding coil (6), the second winding coil (7), and the third winding coil (8) all use 10 strands of Litz wire inside, and include a main receiving coil (6.1) and a compensation coil (6.2) inside the main receiving coil (6.1), wherein the number of turns of the main receiving coil (6.1) is 150 turns, and the number of turns of the compensation coil (6.2) is 100 turns.

6. The non-towed underground multi-load fast charging device according to claim 5 is characterized in that: The receiving end circuit board (5) is provided with a charging module and a wireless transceiver module, and after controlling the resonance of the main receiving coil (6.1) of the first winding coil (6), the battery pack (16) is charged and the motor (17) is powered synchronously; when charging, a constant current output is firstly performed on the battery pack (16); after continuous charging for a period of time, the voltage of the battery pack (16) is detected to check whether the current power reaches 80%, and then a constant voltage output is performed; finally, the voltage of the battery pack (16) is detected to check whether it reaches 24V.

7. The non-lane underground multi-load fast charging device according to claim 6 is characterized in that: When the battery pack (16) is charged, the initial charging mode selects a 60 kHz frequency for constant current charging. The charging module in the receiving end circuit board (5) detects whether the battery power of the battery pack (16) has reached 80%. If it has reached 80%, it starts switching to an 80 kHz frequency for constant voltage charging. The flow rate, water content, and opening information are sent to the transmitting end circuit board (13) of the power transmitting end through the wireless transceiver module on the receiving end circuit board (5). When it is detected that the battery voltage of the battery pack (16) has reached 24V, the circuit switch is disconnected, and the power transmitting end is no longer powered.

8. The non-lane underground multi-load fast charging device according to claim 7 is characterized in that: The water distributor control valve (18) comprises a valve barrel (18.1), a valve core (18.2), a pump plug (18.3), a liquid inlet (18.4), a nut (18.5), a pressure balance hole (18.8), an external thread (18.10), and a connecting shaft (18.11). The upper outer wall of the valve barrel (18.1) is provided with a liquid inlet (18.4), the middle outer wall is provided with a pressure balance hole (18.8), and the lower outer wall is provided with an external thread (18.10). The inner cavity of the valve barrel (18.1) is provided with a valve core (18.2), the upper end of the valve core (18.2) is connected to the pump plug (18.3), and the lower end is connected to the connecting shaft (18.11).

9. The non-lane underground multi-load fast charging device according to claim 8 is characterized in that: An upper sealing ring (18.6) is installed on the outer side of the upper part of the pump plug (18.3), and a lower sealing ring (18.7) is installed on the outer side of the lower part of the pump plug (18.3); a valve core upper seal (18.9) and a valve core lower seal (18.12) are provided in the middle of the valve core (18.2).