Sizing material cooling device

By setting up internal and external cooling water pipes and sandwich structures in the rubber cooling device, the problem of difficulty in controlling the temperature of AB rubber is solved, and the rapid cooling of the rubber and the improvement of production efficiency are achieved, ensuring the continuity of production.

CN221965909UActive Publication Date: 2024-11-08SHENZHEN FUCHENGWEI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323349656.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2024-11-08
Estimated Expiration
2033-12-08

AI Technical Summary

Technical Problem

During the silicone foam coating and forming process, the temperature control of AB materials is difficult, resulting in low cooling efficiency and affecting production efficiency and product yield.

Method used

A rubber cooling device including an inner cooling water pipe, a hose pipe and an outer cooling water pipe is designed, and the rubber is quickly cooled by providing the first and second interlayers and a spiral runner baffle.

Benefits of technology

The device can quickly cool AB rubber, improve production efficiency, reduce inventory demand, and ensure production continuity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221965909U_ABST
    Figure CN221965909U_ABST
Patent Text Reader

Abstract

The utility model provides a sizing material cooling device which comprises an inner cooling water pipe, a sizing material conveying pipe and an outer cooling water pipe which are sequentially and concentrically arranged, a first interlayer used for conveying sizing materials is arranged between the inner cooling water pipe and the sizing material conveying pipe, and a second interlayer is arranged between the sizing material conveying pipe and the outer cooling water pipe. A glue inlet is formed in one end of the glue conveying pipe, a glue outlet is formed in the other end of the glue conveying pipe, a first water inlet and a first water outlet are formed in the two ends of the inner cooling water pipe respectively, and a second water inlet and a second water outlet which are communicated with the second interlayer are formed in the two ends of the outer cooling water pipe respectively. By arranging the glue conveying pipe and respectively arranging the inner cooling water pipe and the outer cooling water pipe on the inner side and the outer side of the glue conveying pipe, the glue in the glue conveying pipe can be quickly cooled, so that the glue can be quickly cooled to reach the temperature required by use, the turnover use efficiency of the glue is greatly improved, the stock of the glue is reduced, and the production cost is reduced. And the production continuity is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of silicone foam coating and molding, in particular to a rubber material cooling device. Background Art

[0002] During the silicone foam coating and molding process, the temperature requirement for AB glue is relatively high, and the characteristics of AB glue lead to poor thermal conductivity and low cooling efficiency, which makes it impossible to control the temperature of the AB glue pumped out in the screw feeding system of the glue dispenser. It usually takes 24 hours to cool down to meet the use temperature requirements, which greatly affects the production turnover efficiency. It can only be produced by lowering the temperature of AB glue in advance and then feeding it through the screw feeding system. In this way, a large amount of AB glue inventory needs to be increased to meet production use. At the same time, the inability to control the temperature of AB glue will lead to a narrow window for the foaming reaction and cross-linking reaction of AB glue coating, thereby increasing the difficulty of continuous production and reducing the yield of the product. Utility Model Content

[0003] In order to solve the problems of slow rubber material cooling and low turnover efficiency in the prior art, the utility model provides a rubber material cooling device which can quickly cool the rubber material.

[0004] The utility model provides a rubber cooling device, comprising an inner cooling water pipe, a rubber delivery pipe and an outer cooling water pipe which are concentrically arranged in sequence, a first interlayer for conveying rubber is arranged between the inner cooling water pipe and the rubber delivery pipe, a second interlayer is arranged between the rubber delivery pipe and the outer cooling water pipe, a rubber inlet is arranged at one end of the rubber delivery pipe, a rubber outlet is arranged at the other end of the rubber delivery pipe, a first water inlet and a first water outlet are respectively arranged at both ends of the inner cooling water pipe, and a second water inlet and a second water outlet which are connected to the second interlayer are respectively arranged at both ends of the outer cooling water pipe.

[0005] As a further improvement of the present invention, a spirally arranged flow channel baffle is further provided in the second interlayer.

[0006] As a further improvement of the utility model, the length of the rubber delivery pipe is greater than the length of the inner cooling water pipe, and the length of the inner cooling water pipe is greater than the length of the outer cooling water pipe.

[0007] As a further improvement of the utility model, the first water inlet is provided with a first water inlet pipe, and the first water outlet is provided with a first water outlet pipe. The first water inlet pipe and the first water outlet pipe are respectively arranged vertically at both ends of the inner cooling water pipe, and the first water inlet pipe and the first water outlet pipe pass through the side wall of the rubber delivery pipe.

[0008] As a further improvement of the utility model, the second water inlet is provided with a second water inlet pipe, the second water outlet is provided with a second water outlet pipe, and the second water inlet pipe and the second water outlet pipe are respectively arranged perpendicularly to both ends of the external cooling water pipe.

[0009] As a further improvement of the present invention, the second water inlet pipe and the first water inlet pipe are arranged at the same end, and the second water outlet pipe and the first water outlet pipe are arranged at the same end.

[0010] As a further improvement of the utility model, the glue inlet is provided with a first connector, and the glue outlet is provided with a second connector.

[0011] As a further improvement of the utility model, the inner cooling water pipe, the rubber delivery pipe and the outer cooling water pipe are all copper pipes.

[0012] The beneficial effect of the utility model is that the utility model achieves rapid cooling of the rubber in the rubber delivery pipe by arranging a rubber delivery pipe and arranging an inner cooling water pipe and an outer cooling water pipe on the inner and outer sides of the rubber delivery pipe respectively, so that the rubber can be quickly cooled to reach the required temperature for use, which greatly improves the turnover efficiency of the rubber, reduces the inventory of the rubber, and ensures the continuity of production. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a structural schematic diagram of a rubber material cooling device of the utility model;

[0014] Figure 2 It is a cross-sectional view of a rubber material cooling device of the utility model.

[0015] Figure numerals: 1-rubber delivery pipe; 2-inner cooling water pipe; 3-outer cooling water pipe; 4-flow channel baffle; 5-first interlayer; 6-second interlayer; 7-first water inlet pipe; 8-first water outlet; 9-second water inlet pipe; 10-second water outlet pipe. DETAILED DESCRIPTION

[0016] In the description of the present invention, it should be understood that if there are descriptions involving orientation, such as orientations or positional relationships indicated by up, down, front, back, left, and right, the orientation description may be based on the orientation or positional relationships shown in the drawings. This is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0017] In the description of the utility model, if there is a description of quantity, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of first or second, it is only used to distinguish the technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0018] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0019] like Figure 1 and Figure 2 As shown, the utility model discloses a rubber cooling device, comprising an inner cooling water pipe 2, a rubber delivery pipe 1 and an outer cooling water pipe 3 which are concentrically arranged in sequence, a first interlayer 5 for conveying rubber is provided between the inner cooling water pipe 2 and the rubber delivery pipe 1, a second interlayer 6 is provided between the rubber delivery pipe 1 and the outer cooling water pipe 3, a rubber inlet is provided at one end of the rubber delivery pipe 1, and a rubber outlet is provided at the other end of the rubber delivery pipe 1, a first water inlet and a first water outlet 8 are respectively provided at both ends of the inner cooling water pipe 2, and a second water inlet and a second water outlet which are connected to the second interlayer 6 are respectively provided at both ends of the outer cooling water pipe 3.

[0020] When in use, the glue inlet of the glue delivery pipe 1 is connected with the glue outlet of the screw feeding mechanism of the glue dispensing machine, the glue outlet of the glue delivery pipe 1 is connected with the glue outlet high-pressure pipe, the inner cooling water pipe 2 realizes the circulation of cooling water through the first water inlet and the first water outlet 8, and the outer cooling water pipe 3 realizes the circulation of cooling water through the second water inlet and the second water outlet. Since the rubber material is circulated through the first interlayer 5 between the rubber delivery pipe 1 and the inner cooling water pipe 2, and cooling water is provided in the second interlayer 6 between the rubber delivery pipe 1 and the outer cooling water pipe 3, the upper and lower sides of the first interlayer 5 are all cooling water, so that the rubber material in the first interlayer 5 can be quickly cooled to meet the process use requirements.

[0021] In the technical solution, a spirally arranged flow channel baffle 4 is further provided in the second interlayer 6, and the flow channel baffle 4 can spirally guide the flowing cooling water so that it can fully contact the outer wall of the rubber delivery pipe 1 to achieve a rapid cooling effect.

[0022] In the present technical solution, the length of the rubber delivery pipe 1 is greater than the length of the inner cooling water pipe 2, and the length of the inner cooling water pipe 2 is greater than the length of the outer cooling water pipe 3, so that the inner cooling water pipe 2 can be ensured to be inside the rubber delivery pipe 1, and the outer cooling water pipe 3 can not only wrap the rubber delivery pipe 1 but also avoid the water inlet and outlet of the inner cooling water pipe 2, making its layout more reasonable.

[0023] In the present technical solution, the first water inlet is provided with a first water inlet pipe 7, and the first water outlet 8 is provided with a first water outlet pipe. The first water inlet pipe 7 and the first water outlet pipe are respectively vertically arranged at both ends of the inner cooling water pipe 2. The first water inlet pipe 7 and the first water outlet pipe pass through the side wall of the rubber delivery pipe 1, and are used to be connected with the inlet and outlet of the circulating water device respectively.

[0024] In the present technical solution, the second water inlet is provided with a second water inlet pipe 9, and the second water outlet is provided with a second water outlet pipe 10. The second water inlet pipe 9 and the second water outlet pipe 10 are respectively vertically arranged at both ends of the external cooling water pipe 3, and are used to be connected with the inlet and outlet of the circulating water device respectively.

[0025] In the present technical solution, the second water inlet pipe 9 and the first water inlet pipe 7 are arranged at the same end, and can be connected to the water outlet of the circulating water device through a tee. The second water outlet pipe 10 and the first water outlet pipe are arranged at the same end, and can also be connected to the water inlet of the circulating water device through a tee.

[0026] In this technical solution, the glue inlet is provided with a first connector, and the glue outlet is provided with a second connector. The first connector is used to connect to the glue outlet of the screw feeding mechanism of the glue dispensing machine, and the second connector is used to connect to the glue outlet high-pressure pipe.

[0027] In the present technical solution, the inner cooling water pipe 2, the rubber delivery pipe 1 and the outer cooling water pipe 3 are all copper pipes, which have good heat conduction effect.

[0028] The utility model achieves rapid cooling of the rubber in the rubber delivery pipe 1 by arranging a rubber delivery pipe 1 and arranging an inner cooling water pipe 2 and an outer cooling water pipe 3 on the inner and outer sides of the rubber delivery pipe 1, so that the rubber can be quickly cooled to reach the required temperature for use, which greatly improves the turnover efficiency of the rubber, reduces the inventory of the rubber, and ensures the continuity of production.

[0029] The above contents are further detailed descriptions of the present invention in combination with specific preferred implementations, and the specific implementation of the present invention cannot be considered to be limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A rubber material cooling device, Features: It comprises an inner cooling water pipe, a rubber delivery pipe and an outer cooling water pipe which are arranged concentrically in sequence, a first interlayer for conveying rubber is provided between the inner cooling water pipe and the rubber delivery pipe, a second interlayer is provided between the rubber delivery pipe and the outer cooling water pipe, a rubber inlet is provided at one end of the rubber delivery pipe, a rubber outlet is provided at the other end of the rubber delivery pipe, a first water inlet and a first water outlet are respectively provided at both ends of the inner cooling water pipe, a second water inlet and a second water outlet which are connected to the second interlayer are respectively provided at both ends of the outer cooling water pipe.

2. The rubber material cooling device according to claim 1, Features: A spirally arranged flow channel baffle is also provided in the second interlayer.

3. The rubber material cooling device according to claim 1, Features: The length of the rubber delivery pipe is greater than the length of the inner cooling water pipe, and the length of the inner cooling water pipe is greater than the length of the outer cooling water pipe.

4. The rubber material cooling device according to claim 1, Features: The first water inlet is provided with a first water inlet pipe, and the first water outlet is provided with a first water outlet pipe. The first water inlet pipe and the first water outlet pipe are respectively arranged perpendicularly to the two ends of the inner cooling water pipe, and the first water inlet pipe and the first water outlet pipe pass through the side wall of the rubber delivery pipe.

5. The rubber material cooling device according to claim 4, Features: The second water inlet is provided with a second water inlet pipe, and the second water outlet is provided with a second water outlet pipe. The second water inlet pipe and the second water outlet pipe are respectively arranged perpendicularly to two ends of the external cooling water pipe.

6. The rubber material cooling device according to claim 5, Features: The second water inlet pipe and the first water inlet pipe are arranged at the same end, and the second water outlet pipe and the first water outlet pipe are arranged at the same end.

7. The rubber material cooling device according to claim 1, Features: The glue inlet is provided with a first connector, and the glue outlet is provided with a second connector.

8. The rubber material cooling device according to claim 1, Features: The inner cooling water pipe, the rubber delivery pipe and the outer cooling water pipe are all copper pipes.