Large ship stern shaft out-of-cabin hoisting device
By designing a large ship stern shaft exit hoisting device, and adjusting the stern shaft posture using a wind-moving hoist, reducing the cutting size and workload, solving the problems of long construction period and high cost in the existing technology, and achieving rapid lifting and Efficient repair.
Patent Information
- Application Number
- CN202420416276.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The existing large ship stern shaft lifting plan requires cutting a large number of hull structures, resulting in a long construction period and high cost, which cannot meet the "short, flat and fast" repair requirements.
A large ship stern shaft exit hoisting device including a door machine, a first air-moving hoist, a second air-moving hoist, a third air-moving hoist, a protective round tube and a limit workpiece are designed, and the air-moving hoist is adjusted by adjusting the air-moving hoist. Length, change the stern shaft from flat hoist to large angle hoisting, reducing the cutting size and workload of process holes.
It effectively shortens the ship repair cycle, reduces construction costs, improves lifting efficiency, and realizes rapid lifting and transportation of the stern shaft of large ships.
Smart Images

Figure CN221971030U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ship hoisting, in particular to a large-scale ship stern shaft out-of-cabin hoisting device. Background Art
[0002] The stern shaft is the last section of the shaft system. Its head end flange is connected to the middle shaft flange through tight bolts. The tail end is conical and is used to install the propeller. It is an important part of the hull structure.
[0003] The stern shaft of a large ship is installed on the stern bearing and the front bearing, wherein the stern bearing is the part of the hull in contact with the water, the front bearing is the part connected to the engine room, and the stern shaft compartment is located between the stern bearing and the front bearing and is basically a closed structure.
[0004] For a long time, when a small stern shaft is hoisted out of the cabin, a process hole needs to be opened on the side of the ship's stern shaft room, and hand hoists and pneumatic hoists are hung in the stern shaft room. The hoists are used to transport the stern shaft to the process hole, and then the gantry crane or truck crane is used to lift the stern shaft out of the stern shaft room. When a large stern shaft is hoisted out of the cabin, due to the large size of the stern shaft and the small space of the stern shaft cabin, a process hole slightly larger than the stern shaft is opened directly above the stern shaft to lift the stern shaft out of the cabin.
[0005] However, the existing scheme for lifting large stern shafts out of the cabin requires that the entire hull structure above the stern shafts be cut off during lifting. Due to the large size of the structure at the cutting point, the amount of cutting is large and the construction period is long. Therefore, in order to meet the "short, flat and fast" requirements of ship repair operations, it is urgent to propose a large ship stern shaft lifting device out of the cabin to improve the lifting efficiency and cost of large ship stern shafts out of the cabin. Utility Model Content
[0006] The purpose of the utility model is to solve the deficiencies of the above-mentioned prior art and provide a large-scale ship stern shaft out of the cabin lifting device, which reduces the workload and cost of large-scale ship stern shaft out of the cabin lifting, shortens the ship's repair cycle, and realizes the rapid lifting of large-scale ship stern shaft out of the cabin.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] A large ship stern shaft out of cabin lifting device, comprising a gantry crane, a first pneumatic hoist, a second pneumatic hoist, a third pneumatic hoist, a protective round pipe and a limit tooling;
[0009] The top of the first pneumatic hoist and the top of the second pneumatic hoist are respectively connected to the door machine through a sling;
[0010] The bottom of the first pneumatic hoist is connected to the bow of the ship's stern shaft through a first sling, and the bottom of the second pneumatic hoist is connected to the stern of the ship's stern shaft through a second sling;
[0011] The third pneumatic hoist is equipped with a crane hook, which is fixed to the ceiling of the cabin where the stern shaft is located. The top of the third pneumatic hoist is connected to the crane hook, and the bottom is connected to the stern of the ship's stern shaft through a third sling.
[0012] The protective circular tube and the limiting tool are both arranged on the stern shaft of the ship. The protective circular tube is sleeved on the bow of the stern shaft of the ship to limit the position of the first sling, and the limiting tool is fixed to the stern of the stern shaft of the ship to limit the position of the second sling.
[0013] Preferably, the connection position between the first sling and the stern shaft of the ship is the first lifting point, and the connection position between the second sling and the stern shaft of the ship is the second lifting point;
[0014] The first lifting point is located in front of the protective round tube and is in close contact with the protective round tube, and the second lifting point is located behind the limiting tooling and is in close contact with the limiting tooling;
[0015] The connection position between the third pneumatic hoist and the stern shaft of the ship is the third lifting point, and the third lifting point is located behind the second lifting point.
[0016] Preferably, the first pneumatic hoist, the second pneumatic hoist and the third pneumatic hoist have the same structure, including a pneumatic hoist body and a chain. A positioning hook is provided on the top of the pneumatic hoist body, and a hook is fixedly connected to the bottom end of the chain.
[0017] Preferably, the first and second pneumatic hoists are both 100T pneumatic hoists, and the third pneumatic hoist is a 60T pneumatic hoist.
[0018] Preferably, the first sling and the second sling are formed by connecting a plurality of slings in series, and two adjacent slings are connected by a shackle.
[0019] Preferably, the protective circular tube is fixed to the stern shaft of the ship by bolts or by binding with steel wire ropes.
[0020] Beneficial technical effects brought by the utility model:
[0021] The utility model proposes a device for lifting the stern shaft out of the cabin of a large ship. By adjusting the length of the pneumatic hoist on the device for lifting the stern shaft out of the cabin of the large ship, the stern shaft of the ship is changed from being lifted out of the cabin at a flat angle to being lifted out of the cabin at a large angle, thereby reducing the cutting size and cutting workload of the process hole, reducing the task volume and construction cost of lifting the stern shaft out of the cabin of the large ship, effectively shortening the repair period of the ship, improving the lifting efficiency of the stern shaft out of the cabin of the large ship, and realizing the rapid lifting out of the cabin of the stern shaft of the large ship. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1The utility model is a schematic diagram of a large ship stern shaft out of the cabin lifting device.
[0023] Figure 2 It is a schematic diagram of a protective circular tube, in which (a) is a front view of the protective circular tube, and (b) is a side view of the protective circular tube.
[0024] Figure 3 This is a schematic diagram of a pneumatic hoist.
[0025] Figure 4 Schematic diagram of the process hole.
[0026] Figure 5 This is a schematic diagram of the installation of the stern shaft out-of-cabin lifting device for large ships.
[0027] Figure 6 This is a schematic diagram of the bow of the ship's stern shaft being lifted.
[0028] Figure 7 This is a schematic diagram of the crane unhooking process.
[0029] Figure 8 Schematic diagram of the ship's stern shaft angle adjustment process.
[0030] Fig. 9 This is a schematic diagram of the ship's stern shaft being lifted out of the cabin and placed at the designated position.
[0031] In the figure: 1. gantry crane, 2. first pneumatic hoist, 3. second pneumatic hoist, 4. third pneumatic hoist, 5. protective round pipe, 6. limit tooling, 7. first sling, 8. second sling, 9. third sling, 10. shackle, 11. sling, 12. crane hook, 13. ship stern shaft, 14. pneumatic hoist body, 15. chain, 16. positioning hook, 17. hook. DETAILED DESCRIPTION
[0032] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0033] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0034] In the present invention, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention. They do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.
[0035] In the present utility model, terms such as "connected" and "connection" should be understood in a broad sense, indicating that the connection can be fixed, integral or detachable; it can be directly connected or indirectly connected through an intermediate medium. For relevant scientific research or technical personnel in this field, the specific meaning of the above terms in the present utility model can be determined according to specific circumstances, and it cannot be understood as a limitation of the present utility model.
[0036] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0037] This embodiment discloses a large-scale ship stern shaft out of the cabin lifting device, such as Figure 1 As shown, it includes a door machine 1, a first pneumatic hoist 2, a second pneumatic hoist 3, a third pneumatic hoist 4, a protective circular tube 5 and a limiting tool 6.
[0038] The top of the first pneumatic hoist and the top of the second pneumatic hoist are respectively connected to the gantry machine through a sling 11, and the top of the first pneumatic hoist and the second pneumatic hoist are lifted by the gantry machine. The bottom of the first pneumatic hoist is connected to the bow of the ship's stern shaft 13 through the first sling 7, and the bottom of the second pneumatic hoist is connected to the stern of the ship's stern shaft 13 through the second sling 8.
[0039] The third pneumatic hoist is used to lift the stern of the ship's stern shaft. A traveling hook 12 is provided in conjunction with the third pneumatic hoist. The traveling hook 12 is fixed on the ceiling of the cabin where the stern shaft is located. The top of the third pneumatic hoist is connected to the traveling hook, and the bottom is connected to the stern of the ship's stern shaft through the third sling.
[0040] The protective round tube 5 and the limiting tool 6 are both arranged on the stern shaft 13 of the ship, and the protective round tube is sleeved on the bow of the stern shaft of the ship. Figure 2 As shown, it is used to limit the position of the first sling. The limiting fixture is fixed to the stern of the ship's stern shaft by bolts, and is used to limit the position of the second sling. The protective round tube and the limiting fixture are used to limit the position of the sling tied to the ship's stern shaft, so as to prevent the lifting point from sliding when the length of the pneumatic hoist is adjusted.
[0041] The connection point between the first sling and the stern shaft of the ship is the first lifting point, which is located in front of the protective circular tube and is tightly attached to the protective circular tube; the connection position between the second sling and the stern shaft of the ship is the second lifting point, which is located behind the limiting fixture and is tightly attached to the limiting fixture; the connection point between the third pneumatic hoist and the stern shaft of the ship is the third lifting point, which is located behind the second lifting point.
[0042] In this embodiment, the first pneumatic hoist and the second pneumatic hoist are both 100T pneumatic hoists, the third pneumatic hoist is a 60T pneumatic hoist, and the first pneumatic hoist, the second pneumatic hoist and the third pneumatic hoist have the same structure. Figure 3 As shown, it comprises a pneumatic hoist body 14 and a chain 15 , a positioning hook 16 is arranged on the top of the pneumatic hoist body, and a hook 17 is fixedly connected to the bottom end of the chain.
[0043] In this embodiment, the first sling and the second sling are both formed by connecting multiple 100T slings, the third sling is a 60T sling, the sling 11 is made of polyester fiber, and two adjacent slings 11 in the first sling and the second sling are connected by a shackle 10.
[0044] The above-mentioned large-scale ship stern shaft out-of-cabin lifting device is applied to the large-scale ship stern shaft out-of-cabin lifting, and the specific lifting process includes the following steps:
[0045] Step 1: Open a process hole on the ship, such as Figure 4 As shown, Figure 4 The shaded part in the middle is the location where the process hole is opened, and the hull structure that is removed after the process hole is opened is the cut-off part.
[0046] In this embodiment, the size of the process hole is determined according to the size of the cargo hold bottom plate and the space between the stern shafts. The process hole is opened at the bottom of the cargo hold of the ship and located at the top between the stern shafts. In addition, in order to ensure that the stern shaft of the ship can be smoothly unloaded from the cabin during the lifting process, in this embodiment, the length of the process hole is set to 2 / 3 of the length of the stern shaft of the ship, and the width of the process hole is greater than the width of the stern shaft of the ship.
[0047] Step 2: After the process hole is opened, install the large ship stern shaft out of the cabin lifting device, set the protective round tube sleeve on the bow of the ship's stern shaft, tie the limit tooling to the stern of the ship's stern shaft, and connect the first pneumatic hoist and the second pneumatic hoist to the gantry machine, then fix the top of the first lifting belt to the first pneumatic hoist, tie the bottom of the first lifting belt to the bow of the ship's stern shaft and close to the protective round tube, and tie the top of the second lifting belt to the bow of the ship's stern shaft and close to the protective round tube. The first end is fixedly connected to the second pneumatic hoist, the bottom end of the second lifting belt is tied to the stern of the ship's stern shaft and close to the limiting fixture, and then the top end of the third pneumatic hoist is connected to the crane hook, and the bottom end is tied to the stern of the ship's stern shaft. The gantry crane is used to cooperate with the first pneumatic hoist, the second pneumatic hoist and the third pneumatic hoist to lift the ship's stern shaft, so that the height of the bow of the ship's stern shaft is higher than the height of the stern, and the bow of the ship's stern shaft is lifted, such as Figure 5 shown.
[0048] Step 3: Use the gantry crane to slowly lift the bow of the ship's stern shaft and gradually move it toward the bow of the ship's stern shaft. During the movement, observe the space between the stern of the ship's stern shaft and the middle bearing bracket of the hull to prevent the stern of the ship's stern shaft from colliding with the bearing bracket. Figure 6 shown.
[0049] Step 4: After the gantry crane is fully stressed and stable, the first and second pneumatic hoists are controlled to adjust the posture of the stern shaft of the ship by using the first and second pneumatic hoists, and the crane is unhooked at the same time. Figure 7 As shown, the stern shaft of the ship is hoisted by using the first pneumatic hoist and the second pneumatic hoist.
[0050] Step 5, control the length of the first pneumatic hoist and the second pneumatic hoist, and adjust the horizontal angle between the stern shaft of the ship and the horizontal plane to 55°, such as Figure 8 As shown, after the horizontal projection length of the ship's stern shaft is made smaller than the length of the process hole, the gantry crane is gradually lifted, and the stern shaft of the ship is slowly lifted upward by the gantry crane until the stern shaft of the ship is lifted out of the cabin, thereby realizing the large-angle lifting of the stern shaft of the ship.
[0051] Step 6: After the stern shaft of the ship is hoisted out of the cabin, the first pneumatic hoist and the second pneumatic hoist are controlled to adjust the length of the first sling and the second sling so that the bow and stern of the ship's stern shaft are flush. After the stern shaft of the ship is horizontal, the gantry crane is used to hoist the stern shaft of the ship onto the pre-set wooden pier. Fig. 9 As shown, the lifting of the ship's stern shaft is completed.
[0052] It can be seen that the method for lifting the stern shaft of a large ship out of the cabin proposed by the utility model uses the large ship stern shaft out of the cabin lifting device to change the ship's stern shaft from a flat lifting stern shaft out of the cabin to a large-angle lifting stern shaft out of the cabin, which not only reduces the cutting size of the process hole, but also effectively reduces the task workload and construction cost of lifting the stern shaft of a large ship out of the cabin, saves construction time, reduces costs and increases efficiency, meets the "short, flat and fast" work requirements of the ship repair industry, improves the lifting efficiency of the stern shaft of a large ship out of the cabin, realizes the rapid lifting of the stern shaft of a large ship out of the cabin, and provides technical support for improving the timeliness of lifting the stern shaft of a ship.
[0053] Although the above describes the specific implementation mode of the utility model in combination with the accompanying drawings, it is not a limitation of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the protection scope of the utility model.
Claims
1. A large ship stern shaft out of the cabin lifting device, characterized in that: It includes a gantry crane, a first pneumatic hoist, a second pneumatic hoist, a third pneumatic hoist, a protective round pipe and a limit tooling; The top of the first pneumatic hoist and the top of the second pneumatic hoist are respectively connected to the door machine through a sling; The bottom of the first pneumatic hoist is connected to the bow of the ship's stern shaft through a first sling, and the bottom of the second pneumatic hoist is connected to the stern of the ship's stern shaft through a second sling; The third pneumatic hoist is equipped with a crane hook, which is fixed to the ceiling of the cabin where the stern shaft is located. The top of the third pneumatic hoist is connected to the crane hook, and the bottom is connected to the stern of the ship's stern shaft through a third sling. The protective circular tube and the limiting tool are both arranged on the stern shaft of the ship. The protective circular tube is sleeved on the bow of the stern shaft of the ship to limit the position of the first sling, and the limiting tool is fixed to the stern of the stern shaft of the ship to limit the position of the second sling.
2. The large ship stern shaft out of cabin lifting device according to claim 1, characterized in that: The connection position between the first lifting belt and the stern shaft of the ship is the first lifting point, and the connection position between the second lifting belt and the stern shaft of the ship is the second lifting point; The first lifting point is located in front of the protective round tube and is in close contact with the protective round tube, and the second lifting point is located behind the limiting tooling and is in close contact with the limiting tooling; The connection position between the third pneumatic hoist and the stern shaft of the ship is the third lifting point, and the third lifting point is located behind the second lifting point.
3. The large ship stern shaft out of cabin lifting device according to claim 2, characterized in that: The first pneumatic hoist, the second pneumatic hoist and the third pneumatic hoist have the same structure, including a pneumatic hoist body and a chain. A positioning hook is arranged on the top of the pneumatic hoist body, and a hook is fixedly connected to the bottom end of the chain.
4. The large ship stern shaft out of cabin lifting device according to claim 3, characterized in that: The first and second pneumatic hoists are both 100T pneumatic hoists, and the third pneumatic hoist is a 60T pneumatic hoist.
5. The large ship stern shaft out of cabin lifting device according to claim 1, characterized in that: The first sling and the second sling are formed by connecting a plurality of slings in series, and two adjacent slings are connected by a shackle.
6. The large ship stern shaft out of cabin lifting device according to claim 1, characterized in that: The protective round tube is fixed to the stern shaft of the ship by bolts or by binding with steel wire ropes.
