Reserved space concrete pouring device for floor construction
By designing a concrete casting device including vibrating cylinder, telescopic rod and hydraulic push rod, the compactness and strength problems caused by air bubbles in the concrete are solved, and flexible adjustment of reserved space is achieved, improving product quality and worker operation convenience.
Patent Information
- Application Number
- CN202323381799.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The presence of bubbles in existing concrete pouring devices causes pores, affecting compactness and strength, and reserved space to adjust, making it difficult to disassemble wooden boards or pipes and cannot be adjusted.
A coagulation casting device including a vibrating cylinder, a telescopic rod, a hydraulic push rod and a motor was designed to eliminate air bubbles through vibration, and adjust the reserved space through hydraulic and electric push rods to increase the practicality and convenience of the device.
It improves the compactness and strength of concrete, facilitates adjustment according to the size of the space, and reduces labor intensity and dismantling difficulties.
Smart Images

Figure CN221973028U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete pouring, in particular to a reserved space concrete pouring device for floor construction. Background Art
[0002] Concrete refers to an artificial stone made of cement as the main cementitious material, mixed with water, sand, gravel, and when necessary, chemical admixtures and mineral admixtures in appropriate proportions, and then evenly stirred, compacted into a dense shape, and cured and hardened. Prefabricated components made of concrete are widely used in prefabricated buildings. Prefabricated components can be assembled into buildings on site, especially in the construction of subway stations, where prefabricated concrete components are needed. In the production process of prefabricated components, casting devices are usually used to speed up the forming of prefabricated components.
[0003] In existing concrete pouring devices, there are bubbles inside the concrete, which will produce pores during pouring, resulting in insufficient density and strength of the concrete wall, thereby reducing product quality; when reserving space for concrete, workers generally use wooden boards or pipes to reserve space, which not only causes trouble in subsequent disassembly, but also cannot be adjusted according to the size of the space. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a reserved space concrete pouring device for floor construction.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a reserved space concrete pouring device for floor construction, including a device body, a plurality of telescopic rods are fixedly connected to the inner wall of the device body, a vibration cylinder is fixedly connected to the driving end of the telescopic rod, a vibration motor is fixedly connected to the bottom end of the vibration cylinder, a second hydraulic push rod is fixedly connected to the bottom end of the device body, a circular smooth groove is fixedly connected to the driving end of the second hydraulic push rod, a third hydraulic push rod is fixedly connected to the upper side of the inner wall of the circular smooth groove, a circular slider is fixedly connected to the driving end of the third hydraulic push rod, and the outer wall of the circular slider is slidably connected to the inner wall of the circular smooth groove.
[0006] As a further description of the above technical solution:
[0007] The inner wall of the device body corresponding to the outer wall of the telescopic rod is fixedly connected with a spring.
[0008] As a further description of the above technical solution:
[0009] The left and right sides of the top of the vibration cylinder are fixedly connected with first hydraulic push rods, and the driving ends of the first hydraulic push rods penetrate the inner wall of the vibration cylinder and are fixedly connected with scrapers.
[0010] As a further description of the above technical solution:
[0011] A feed inlet is fixedly connected to the right side of the outer wall of the vibration cylinder.
[0012] As a further description of the above technical solution:
[0013] The left and right sides of the bottom end of the vibration cylinder are fixedly connected with valves, and the bottom ends of the valves are fixedly connected with discharge ports.
[0014] As a further description of the above technical solution:
[0015] The left and right sides of the inner wall of the device body are fixedly connected with a second motor, and the driving end of the second motor is fixedly connected with a winding drum.
[0016] As a further description of the above technical solution:
[0017] The outer wall of the winding drum is fixedly connected with a fixing belt, the front end of the left fixing belt is fixedly connected with a clamping block on the left side, and the front end of the right fixing belt is fixedly connected with a clamping groove on the right side.
[0018] Beneficial Effects
[0019] The utility model has the following beneficial effects:
[0020] 1. In the utility model, firstly, concrete is poured into the vibration cylinder through the feed port, and then the vibration motor is started. The vibration motor drives the vibration cylinder to vibrate, so that the concrete inside is vibrated and the bubbles inside are broken, so that the density and strength of the poured concrete wall are high, and the product quality is improved.
[0021] 2. In the utility model, the circular chute is driven down by the electric push rod, and then the second hydraulic push rod is started to drive the circular chute down, so that it can be adjusted according to the required space size, increasing the practicality of the device. The circular chute can also be raised by the electric push rod, which is convenient for workers to take out the device and reduce labor intensity. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a three-dimensional diagram of a reserved space concrete pouring device for floor construction proposed by the utility model;
[0023] Figure 2 This is a schematic diagram of the structure of a vibration cylinder of a reserved space concrete pouring device for floor construction proposed by the utility model;
[0024] Figure 3 This is a schematic diagram of the fixing belt structure of a reserved space concrete pouring device for floor construction proposed by the utility model;
[0025] Figure 4This is a schematic diagram of the spring structure of a reserved space concrete pouring device for floor construction proposed by the utility model;
[0026] Figure 5 This is a schematic diagram of the third telescopic rod structure of a reserved space concrete pouring device for floor construction proposed by the utility model.
[0027] Legend:
[0028] 1. Device body; 2. Vibrating cylinder; 3. Telescopic rod; 4. Spring; 5. Feed inlet; 6. First hydraulic push rod; 7. Scraper; 8. Vibrating motor; 9. Discharge outlet; 10. Second motor; 11. Winding drum; 12. Fixing belt; 13. Block; 14. Slot; 15. Second hydraulic push rod; 16. Slide groove; 17. Sliding block; 18. Third hydraulic push rod; 19. Valve. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0031] Reference Figure 1-5The utility model provides an embodiment: a reserved space concrete pouring device for floor construction, comprising a device body 1, a plurality of telescopic rods 3 are fixedly connected to the inner wall of the device body 1, a driving end of the telescopic rod 3 is fixedly connected to a vibration cylinder 2, a bottom end of the vibration cylinder 2 is fixedly connected to a vibration motor 8, and the vibration cylinder 2 is driven by the vibration motor 8 to vibrate, so that the internal concrete is vibrated, and the bubbles existing inside are broken, so that the density and strength of the poured concrete wall are high, and the product quality is increased, a second hydraulic push rod 15 is fixedly connected to the bottom end of the device body 1, a circular groove 16 is fixedly connected to the driving end of the second hydraulic push rod 15, a third hydraulic push rod 18 is fixedly connected to the upper side of the inner wall of the circular groove 16, a circular slider 17 is fixedly connected to the driving end of the third hydraulic push rod 18, and the outer wall of the circular slider 17 is slidably connected to the inner wall of the circular groove 16, the second hydraulic push rod 15 is started, the circular groove 16 is lowered, and when it is lowered to an appropriate position, the third hydraulic push rod 18 is started again. The third hydraulic push rod 18 drives the round slide block 17 downward, so that the depth and length of the required reserved space can be adjusted by the second hydraulic push rod 15 and the third hydraulic push rod 18, thereby increasing the practicability of the device.
[0032] Furthermore, the inner wall of the device body 1 corresponding to the outer wall of the telescopic rod 3 is fixedly connected with a spring 4, and the spring 4 and the telescopic rod 3 can be used for shock absorption during vibration to avoid affecting the reserved space at the back. The left and right sides of the top of the vibration cylinder 2 are fixedly connected with the first hydraulic push rod 6, and the driving ends of the first hydraulic push rod 6 penetrate the inner wall of the vibration cylinder 2 and are fixedly connected with a scraper 7. The right side of the outer wall of the vibration cylinder 2 is fixedly connected with a feed port 5, and the left and right sides of the bottom end of the vibration cylinder 2 are fixedly connected with a valve 19, and the bottom end of the valve 19 is fixedly connected with a discharge port 9. Start the first hydraulic push rod 6, and the first hydraulic push rod 6 drives the scraper 7 to press down the concrete inside the vibration cylinder 2, and then beat the concrete. Open the valve 19, and the concrete will flow downward through the squeezing of the scraper 7, through the valve 19 and the discharge port 9, and flow into the pre-fixed frame. The left and right sides of the inner wall of the device body 1 are fixedly connected with the second motor 10, and the driving end of the second motor 10 is fixedly connected with the winding drum 11, and the outer wall of the winding drum 11 is fixedly connected with a fixing belt 12. The left front end of the left fixing belt 12 is fixedly connected with a clamping block 13, and the right front end of the right fixing belt 12 is fixedly connected with a clamping groove 14. Wrap the fixing belt 12 around the column half a circle, and then clamp the clamping block 13 into the clamping groove 14. Start the second motor 10, tighten the fixing belts 12 on both sides, and fix the device on the column.
[0033] Working principle: first pull out the fixing belts 12 on both sides, wrap the fixing belts 12 around the column half a circle, then insert the clamping block 13 into the clamping slot 14, start the second motor 10, tighten the fixing belts 12 on both sides, fix the device on the column, pour the concrete into the vibration tube 2 through the feed port 5, start the vibration motor 8, and drive the vibration tube 2 to vibrate through the vibration motor 8, so that the concrete inside is vibrated, and the bubbles inside are broken, so that the density and strength of the poured concrete wall are high, and the product quality is improved. During the vibration, the spring 4 and the telescopic rod 3 can be used for shock absorption to avoid affecting the reserved space at the back. When the vibration is completed, the first hydraulic push rod 6 is started, and the first hydraulic push rod 6 drives the scraper 7 to press down the concrete inside the vibration tube 2, and then the valve 19 is opened. The concrete will flow downward through the extrusion of the scraper 7, through the valve 19 and the discharge port 9, and flow into the pre-fixed frame. When the concrete flows down, the second hydraulic push rod 15 is started again to lower the circular groove 16. When it drops to an appropriate position, the third hydraulic push rod 18 is started again. The third hydraulic push rod 18 drives the round slider 17 downward, so that the depth and length of the required reserved space can be adjusted by the second hydraulic push rod 15 and the third hydraulic push rod 18 to increase the practicality of the device. When the concrete solidifies, the second hydraulic push rod 15 and the third hydraulic push rod 18 are started again to raise the round groove 16 and the round slider 17, and then the clamping block 13 and the clamping groove 14 are unlocked, and the fixing belt 12 is collected by the second motor 10, and the worker directly takes out the device, which is convenient for the worker to take out and reduces labor intensity.
[0034] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A reserved space concrete pouring device for floor construction, comprising a device body (1), characterized in that: A plurality of telescopic rods (3) are fixedly connected to the inner wall of the device body (1); a driving end of the telescopic rod (3) is fixedly connected to a vibration cylinder (2); a bottom end of the vibration cylinder (2) is fixedly connected to a vibration motor (8); a second hydraulic push rod (15) is fixedly connected to the bottom end of the device body (1); a driving end of the second hydraulic push rod (15) is fixedly connected to a circular groove (16); a third hydraulic push rod (18) is fixedly connected to the upper side of the inner wall of the circular groove (16); a driving end of the third hydraulic push rod (18) is fixedly connected to a circular slider (17); an outer wall of the circular slider (17) is slidably connected to the inner wall of the circular groove (16).
2. A reserved space concrete pouring device for floor construction according to claim 1, characterized in that: The inner wall of the device body (1) and the outer wall of the telescopic rod (3) are both fixedly connected with a spring (4).
3. The reserved space concrete pouring device for floor construction according to claim 1, characterized in that: The left and right sides of the top of the vibration cylinder (2) are fixedly connected to first hydraulic push rods (6), and the driving ends of the first hydraulic push rods (6) penetrate the inner wall of the vibration cylinder (2) and are fixedly connected to scrapers (7).
4. The reserved space concrete pouring device for floor construction according to claim 1, characterized in that: A feed inlet (5) is fixedly connected to the right side of the outer wall of the vibration cylinder (2).
5. The reserved space concrete pouring device for floor construction according to claim 1, characterized in that: The left and right sides of the bottom end of the vibration cylinder (2) are fixedly connected to valves (19), and the bottom ends of the valves (19) are fixedly connected to discharge ports (9).
6. The reserved space concrete pouring device for floor construction according to claim 1, characterized in that: The left and right sides of the inner wall of the device body (1) are fixedly connected to a second motor (10), and the driving end of the second motor (10) is fixedly connected to a winding drum (11).
7. A reserved space concrete pouring device for floor construction according to claim 6, characterized in that: The outer wall of the winding drum (11) is fixedly connected with a fixing belt (12), the front end of the left fixing belt (12) is fixedly connected with a clamping block (13) on the left side, and the front end of the right fixing belt (12) is fixedly connected with a clamping groove (14) on the right side.