Discrete prevention device for concrete pouring construction

By designing the sealing device of the hopper and the barrel, and using components such as magnetic rings and sealing covers, the problems of splashing and slurry leakage during concrete pouring are solved, and the surface quality and construction efficiency of concrete are improved.

CN221973030UActive Publication Date: 2024-11-08SINOHYDRO BUREAU 5
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420448146.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-11-08
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

During the concrete pouring process, the existing string cylinder devices have problems of concrete splashing and leakage, resulting in defects such as sand marks and aggregate exposure on the surface of the concrete.

Method used

A discrete device for concrete pouring construction is designed, including a hopper, a sealing device and multiple string cylinders. It is connected by hanging rings, chains, hooks, and combined with magnetic rings, sealing covers, sealing curtains and other components to form a sealing system to prevent concrete from splashing. and leaking slurry.

Benefits of technology

It effectively prevents splashing and slurry leakage of concrete during transportation, and improves the surface quality and construction efficiency of concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221973030U_ABST
    Figure CN221973030U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of auxiliary equipment for concrete construction, and particularly discloses an anti-dispersion device for concrete pouring construction, which is characterized in that a hopper is provided with a first connecting ring, the upper part of a tumbling cylinder is provided with a hanging ring, and the lower part is provided with a second connecting ring; the hanging ring of the lower tumbling barrel is connected to the second connecting ring of the upper tumbling barrel through the chain and the hook in sequence; the hanging ring on the uppermost tumbling barrel is connected to the first connecting ring of the hopper through a chain and a hook in sequence; the sealing cover is arranged at the upper part of the tumbling barrel; the convex ring is arranged at the top of the sealing cover, the upper sealing curtain sleeve is arranged outside the sealing cover, and the outer side is connected to the inner wall of the tumbling barrel; the first magnetic ring is arranged at the top of the convex ring; second magnetic rings are arranged on the lower portions of the first connecting ring and the second connecting ring, and the first magnetic ring and the second magnetic rings attract each other. Concrete transportation and pouring are completed through the multiple tumbling barrels and the hoppers, the sealing devices are arranged at the joints of the tumbling barrels and the hoppers and the joints of the tumbling barrels for sealing, and concrete splashing and slurry leakage are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete construction auxiliary equipment, in particular to a concrete pouring construction anti-dispersion device. Background Art

[0002] Concrete pouring is the process of pouring concrete into a mold until it is plasticized. When pouring concrete, the free height of concrete should not exceed 2 meters. Segregation will occur when the free fall height of concrete exceeds 2 meters. Concrete segregation, also known as concrete dispersion, is a phenomenon in which the cohesive force between the components of the concrete mixture is insufficient to resist the sinking of coarse aggregates, and the components of the concrete mixture separate from each other, resulting in uneven internal composition and structure. It is usually manifested as the separation of coarse aggregates and mortar, which in turn affects the various properties of concrete, causing defects such as sand patterns and exposed aggregates on the concrete surface. Therefore, concrete for pile foundations exceeding 2 meters must be transported using concrete anti-dispersion devices such as conduits, string tubes, and chutes.

[0003] The existing string tubes are generally connected by hanging through a pair of hooks. When the string tubes are spliced ​​in later use, the gap between two adjacent string tubes is large, and there are problems of concrete splashing and leakage during the concrete transportation process.

[0004] Therefore, it is necessary to provide a concrete pouring construction anti-dispersion device to solve the above technical problems. Utility Model Content

[0005] The technical problem to be solved by the utility model is to provide a concrete construction anti-dispersion device to solve the problems of concrete splashing and slurry leakage during concrete transportation.

[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is: a concrete pouring construction anti-dispersion device, including a hopper, a sealing device and a plurality of string tubes;

[0007] A hopper is provided with a first connecting ring;

[0008] The string tube has a hanging ring at the top and a second connecting ring at the bottom;

[0009] Multiple string barrels are arranged vertically, and the hanging ring of the lower string barrel is connected to the second connecting ring of the upper string barrel through chains and hooks in sequence; the hanging ring on the uppermost string barrel is connected to the first connecting ring of the hopper through chains and hooks in sequence;

[0010] The sealing device includes a sealing cover, an upper sealing curtain, a convex ring, a first magnetic ring and a second magnetic ring; the sealing cover is arranged on the upper part of the string tube; the convex ring is arranged on the top of the sealing cover, and the upper sealing curtain sleeve is arranged outside the sealing cover, and the outer side is connected to the inner wall of the string tube; the first magnetic ring is arranged on the top of the convex ring; the lower parts of the first connecting ring and the second connecting ring are both provided with a second magnetic ring, and the first magnetic ring and the second magnetic ring attract each other.

[0011] As a further technical solution of the above scheme, the string tube includes an inner tube and an outer tube; the sealing cover is arranged on the upper part of the inner tube, and the outer side of the upper sealing curtain is connected to the outer tube; the inner tube is sleeved inside the outer tube.

[0012] As a further technical solution of the above solution, it also includes a lower sealing curtain, which is sleeved on the lower part of the inner tube and connected to the inner wall of the outer tube at the outer side.

[0013] As a further technical solution of the above solution, it also includes an inner support frame, an outer support frame and a telescopic spring, the inner support frame is sleeved on the inner tube, and the outer support frame is arranged on the inner wall of the outer tube; one end of the telescopic spring is connected to the inner support frame, and the other end is connected to the outer support frame.

[0014] As a further technical solution of the above solution, a plurality of telescopic springs are provided.

[0015] Compared with the prior art, the utility model has the following advantages and beneficial effects: the utility model completes the concrete transportation and pouring through a plurality of string tubes and hoppers, and a sealing device is arranged at the connection between the string tubes and the hoppers, and the string tubes to prevent concrete splashing and leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.

[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of the connection between the string tube and the sealing device.

[0018] Figure 3 for Figure 2 A schematic diagram of the enlarged structure in the middle.

[0019] Figure 4 It is a schematic diagram of the connection relationship between the outer supporting frame and the inner supporting frame.

[0020] The meanings of the numbers in the figure are: hopper-1; first connecting ring-11; sealing device-2; sealing cover-21; upper sealing curtain-22; convex ring-23; first magnetic ring-24; second magnetic ring-25; lower sealing curtain-26; string tube-3; hanging ring-31; second connecting ring-32; chain-33; hook-34; inner tube-35; outer tube-36; inner support frame-4; outer support frame-5; telescopic spring-6. DETAILED DESCRIPTION

[0021] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the accompanying drawings in the embodiments of the utility model, so as to have a further understanding of the concept of the utility model, the technical problems solved, the technical features constituting the technical solutions and the technical effects brought about.

[0022] like Figure 1 to Figure 4 As shown, the utility model is a concrete pouring construction anti-dispersion device, comprising a hopper 1, a sealing device 2 and a plurality of string tubes 3;

[0023] The hopper 1 is provided with a first connecting ring 11;

[0024] The string tube 3 has a hanging ring 31 at the upper part and a second connecting ring 32 at the lower part;

[0025] A plurality of string tubes 3 are arranged vertically, and the hanging ring 31 of the lower string tube 3 is connected to the second connecting ring 32 of the upper string tube 3 in sequence through a chain 33 and a hook 34; the hanging ring 31 on the uppermost string tube 3 is connected to the first connecting ring 11 of the hopper 1 in sequence through a chain 33 and a hook 34;

[0026] The sealing device 2 includes a sealing cover 21, an upper sealing curtain 22, a convex ring 23, a first magnetic ring 24 and a second magnetic ring 25; the sealing cover 21 is arranged on the upper part of the string tube 3; the convex ring 23 is arranged on the top of the sealing cover 21, and the upper sealing curtain 22 is sleeved outside the sealing cover 21, and the outer side is connected to the inner wall of the string tube 3; the first magnetic ring 24 is arranged on the top of the convex ring 23; the lower parts of the first connecting ring 11 and the second connecting ring 32 are both provided with a second magnetic ring 25, and the first magnetic ring 24 and the second magnetic ring 25 attract each other.

[0027] When using the device, the staff first hangs the hopper 1 on the lifting equipment and assembles the string tubes 3. Multiple string tubes 3 are overlapped up and down, and the hanging ring 31 at the bottom is connected to the second connecting ring 32 at the top through the chain 33 and the hook 34. When connected, the first magnetic ring 24 of the string tube 3 at the bottom and the second magnetic ring 25 of the second connecting ring 32 are attracted to each other, and the sealing cover 21 is smoothly supported to complete the sealing between adjacent string tubes 3, thereby improving the sealing performance of the device and avoiding the splashing of concrete mortar in the connecting gap during the concrete pouring process; the hopper 1 is connected at the top using the same connection method, and it is only necessary to connect the hanging ring 31 to the first connecting ring 11, and then the hopper 1 can be introduced during the concrete pouring.

[0028] like Figure 1As shown, as a preferred embodiment, the string tube 3 includes an inner tube 35 and an outer tube 36; the sealing cover 21 is arranged on the upper part of the inner tube 35, and the outer side of the upper sealing curtain 22 is connected to the outer tube 36; the inner tube 35 is sleeved inside the outer tube 36. In this embodiment, the string tube 3 is arranged on the inner tube 35 and the outer tube 36, and the outer tube 36 is connected to the external hopper 1 and other string tubes 3 as a mounting base. When pouring concrete, it moves downward from the inner tube 35. During the contact between the falling concrete and the inner tube 35, the inner tube 35 vibrates inside the outer tube 36, so that the concrete on the inner wall of the inner tube 35 can fall more smoothly, preventing the concrete from being blocked inside the inner tube 35, and improving the use efficiency.

[0029] like Figure 2 As shown, as a preferred embodiment, it also includes a lower sealing curtain 26, which is sleeved on the lower part of the inner tube 35 and connected to the inner wall of the outer tube 36 on the outer side. In this embodiment, the lower sealing curtain 26 is arranged at the lower part of the inner tube 35. If the concrete overflows from the upper sealing curtain 22 during pouring, it can be intercepted by the lower sealing curtain 26 again to avoid concrete splashing, thereby further improving the stability of the device.

[0030] like Figure 1 and Figure 4 As shown, it also includes an inner support frame 4, an outer support frame 5 and a telescopic spring 6. The inner support frame 4 is sleeved on the inner tube 35, and the outer support frame 5 is arranged on the inner wall of the outer tube 36; one end of the telescopic spring 6 is connected to the inner support frame 4, and the other end is connected to the outer support frame 5. In this embodiment, a fixed outer support frame 5 is arranged on the inner wall of the outer tube 36, and the inner support frame 4 is arranged on the inner tube 35. The inner support frame 4 and the outer support frame 5 serve as supports. When the inner tube 35 shakes during concrete pouring, the telescopic spring 6 moves with it, thereby improving the stability of the device.

[0031] like Figure 4 As shown, as a preferred embodiment, the telescopic spring 6 is provided with a plurality of telescopic springs. In this embodiment, a plurality of telescopic springs 6 are provided, and the plurality of telescopic springs 6 act together to improve the stability of the device.

[0032] The words “connection” and “fixation” appearing in the description of the present invention may refer to fixed connection, processing and forming, welding, or mechanical connection. The specific meanings of the above terms in the present invention shall be understood according to the specific circumstances.

[0033] In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., which indicate the orientation or position relationship, are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying a specific orientation that the device or element referred to must have, and therefore cannot be understood as a limitation on the present invention.

[0034] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.

Claims

1. A device for preventing dispersion during concrete pouring construction, characterized in that: It comprises a hopper (1), a sealing device (2) and a plurality of string tubes (3); The hopper (1) is provided with a first connecting ring (11); A string tube (3) having a hanging ring (31) at the upper portion and a second connecting ring (32) at the lower portion; A plurality of string barrels (3) are arranged vertically, and the hanging ring (31) of the lower string barrel (3) is connected to the second connecting ring (32) of the upper string barrel (3) in sequence through a chain (33) and a hook (34); the hanging ring (31) on the uppermost string barrel (3) is connected to the first connecting ring (11) of the hopper (1) in sequence through a chain (33) and a hook (34); The sealing device (2) comprises a sealing cover (21), an upper sealing curtain (22), a convex ring (23), a first magnetic ring (24) and a second magnetic ring (25); the sealing cover (21) is arranged on the upper part of the string tube (3); the convex ring (23) is arranged on the top of the sealing cover (21); the upper sealing curtain (22) is sleeved and arranged outside the sealing cover (21), and the outer side is connected to the inner wall of the string tube (3); the first magnetic ring (24) is arranged on the top of the convex ring (23); the lower parts of the first connecting ring (11) and the second connecting ring (32) are both provided with the second magnetic ring (25), and the first magnetic ring (24) and the second magnetic ring (25) attract each other.

2. A concrete pouring construction anti-dispersion device as claimed in claim 1, characterized in that: The string tube (3) comprises an inner tube (35) and an outer tube (36); the sealing cover (21) is arranged on the upper part of the inner tube (35), and the outer side of the upper sealing curtain (22) is connected to the outer tube (36); the inner tube (35) is sleeved inside the outer tube (36).

3. A concrete pouring construction anti-dispersion device as claimed in claim 2, characterized in that: It also includes a lower sealing curtain (26), which is sleeved on the lower part of the inner cylinder (35) and connected to the inner wall of the outer cylinder (36) at the outer side.

4. A concrete pouring construction anti-dispersion device as claimed in claim 2, characterized in that: It also comprises an inner support frame (4), an outer support frame (5) and a telescopic spring (6); the inner support frame (4) is sleeved on the inner tube (35), and the outer support frame (5) is arranged on the inner wall of the outer tube (36); one end of the telescopic spring (6) is connected to the inner support frame (4), and the other end is connected to the outer support frame (5).

5. A concrete pouring construction anti-dispersion device as claimed in claim 4, characterized in that: The telescopic springs (6) are provided in plurality.