Auxiliary tool for concrete pouring of steel pipe column
By designing an auxiliary tool for guiding pipes and supporting pads spliced by multiple connecting pipes, the problem of concrete separation and scattering in the pouring of high-rise or ultra-high-rise steel pipe columns is solved, and the construction quality is improved and the construction period is shortened. .
Patent Information
- Application Number
- CN202420268487.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-04
AI Technical Summary
During the pouring of high-rise or ultra-high-rise steel pipe columns, the concrete is prone to separation and scattering, affecting the construction quality and construction period.
An auxiliary tool including a feed trough, a feed pipe and a support pad is designed. The feed pipe is spliced by a number of connecting pipes and is fastened by connecting parts. The outlet end of the feed pipe is communicated with the feed trough. The outlet end extends to the grouting hole inside the steel pipe column to prevent concrete from being separated and scattered.
Effectively prevent concrete from being separated and scattered, ensuring the quality and construction efficiency of concrete pouring of high-rise or ultra-high-rise steel pipe columns.
Smart Images

Figure CN221973032U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, and more specifically to an auxiliary tool for pouring concrete of a steel pipe column. Background Art
[0002] When pouring concrete for steel pipe columns in construction projects, when the high-throw method is used, due to the problem of concrete pouring height, concrete can only be poured in layers and the concrete throwing height must meet the specifications and design requirements. This pouring construction process is difficult and slow, affecting the construction period, especially for the pouring of high-rise or super-high-rise steel pipe columns. During the concrete throwing process, concrete segregation is easy to occur, and the concrete is easy to scatter when it falls, and scatter onto the steel pipe column structure, thereby affecting the pouring quality.
[0003] Therefore, how to provide an auxiliary tool with a simple and stable structure, suitable for high-rise and super-high-rise steel pipe column concrete pouring, and able to effectively prevent concrete segregation and ensure the quality of steel pipe column concrete pouring, is a problem that technical personnel in this field urgently need to solve. Utility Model Content
[0004] In view of this, the utility model provides an auxiliary tool for pouring concrete of a steel pipe column, aiming to solve the above technical problems.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] An auxiliary tool for pouring concrete for steel pipe columns, comprising a feed trough, a material guide pipe corresponding to the outlet end of the feed trough, and a support pad fixedly sleeved on the outside of the inlet end of the material guide pipe; characterized in that the material guide pipe is a pipe body structure formed by splicing multiple connecting pipes, and two adjacent connecting pipes are fastened by connecting members, and the connecting members include a first connecting plate and a second connecting plate, and the first connecting plate and the second connecting plate are respectively fixed to the inner side walls of the spliced ends of two adjacent connecting pipes, and the first connecting plate and the second connecting plate are fastened by fasteners so that the two adjacent connecting pipes are fastened and docked.
[0007] Through the above technical scheme, in an auxiliary tool for pouring concrete for a steel pipe column provided by the utility model, the material guide pipe is a pipe body structure formed by splicing multiple connecting pipes, and a suitable number of connecting pipes can be selected according to the height of the steel pipe column. The inlet end of the connecting pipe on the uppermost layer is connected with the outlet end of the feed trough, and the outlet end is fastened to the connecting pipe on the lower layer through a connecting piece and extends to the grouting hole inside the steel pipe column. This structural arrangement can effectively prevent the segregation of concrete caused by the falling of concrete during the pouring of high-rise or super-high-rise steel pipe columns, and can also prevent the scattering of concrete when it is thrown down from a high place, thereby ensuring the pouring quality.
[0008] Preferably, in the above-mentioned auxiliary tool for pouring concrete of steel pipe columns, the first connecting plate includes a horizontal plate and a vertical plate fixed perpendicularly to the horizontal plate; a slot is formed between the vertical plate and the inner side wall of the connecting pipe, and the end of the horizontal plate away from the connection with the vertical plate and the second connecting plate are respectively fixed on the inner side walls of the two adjacent spliced ends of the connecting pipes, and the top end of the second connecting plate is inserted into the slot and abuts against the bottom wall of the horizontal plate; through holes are provided on the side wall of the connecting pipe located on the upper layer and the second connecting plate, and threaded holes are provided on the vertical plate, and the fastener passes through the through hole and is threadedly connected to the threaded hole. When two adjacent connecting pipes are butt-jointed and fastened, the second connecting plate is inserted into the slot formed by the first connecting plate and the inner side wall of the connecting pipe, and the fastener passes through the through hole and is threadedly connected to the threaded hole, so as to achieve butt-joint and fastening of the two adjacent connecting pipes.
[0009] Preferably, in the above auxiliary tool for pouring concrete of a steel pipe column, the second connecting plate and the side wall on which the transverse plate is fixed to the inner side wall of the connecting pipe are all arc-shaped surfaces. Simple and stable structure
[0010] Preferably, in the above-mentioned auxiliary tool for pouring concrete of steel tube columns, the fasteners are bolts.
[0011] Preferably, in the above auxiliary tool for pouring concrete of steel pipe columns, the number of the first connecting plates and the second connecting plates are both multiple and the same, and are evenly distributed on the inner side walls of the splicing ends of two adjacent connecting pipes, so as to enhance the connection strength of the two adjacent connecting pipes.
[0012] Preferably, in the above-mentioned auxiliary tool for pouring concrete of steel pipe columns, the feed trough is funnel-shaped.
[0013] Preferably, in the above auxiliary tool for pouring concrete of a steel pipe column, two symmetrical lifting ears are fixed on the top edge of the feed chute, and the device is hoisted into place by the lifting ears.
[0014] Preferably, in the above auxiliary tool for pouring concrete on a steel pipe column, the support pad is a double-layer plate composed of a steel plate and a rubber plate; the steel plate is located on the upper layer, the rubber plate is located on the lower layer, and the bottom wall of the rubber plate is used to abut against the top edge of the steel pipe column. Under the condition of ensuring effective rigidity, the provision of the rubber plate can prevent the steel pipe column component from being damaged.
[0015] It can be seen from the above technical solutions that, compared with the prior art, the utility model discloses an auxiliary tool for pouring concrete of a steel pipe column, which has the following beneficial effects:
[0016] The utility model has a simple and stable structure and is easy to install and disassemble. The material guide pipe formed by splicing multiple connecting pipes is suitable for pouring concrete of high-rise or super-high-rise steel pipe columns. At the same time, the setting of the material guide pipe can effectively prevent the segregation and scattering of concrete, and effectively ensure the pouring quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0018] Figure 1 The accompanying drawing is a schematic diagram of the structure of the auxiliary tool for pouring concrete of a steel pipe column provided by the utility model;
[0019] Figure 2 The accompanying drawing is a schematic structural diagram of two adjacent connecting pipes provided by the utility model;
[0020] Figure 3 The accompanying drawing is a structural schematic diagram of the connection between the first connecting plate and the connecting pipe provided by the utility model;
[0021] Figure 4 The accompanying drawing is a structural schematic diagram of the connection between the second connecting plate and the connecting pipe provided by the utility model;
[0022] Figure 5 The accompanying drawing is a schematic structural diagram of the auxiliary tool for pouring concrete of a steel pipe column and a steel pipe column provided by the utility model.
[0023] in:
[0024] 1-Feeding chute;
[0025] 2- material guide pipe;
[0026] 21-connecting pipe;
[0027] 3-Support pad;
[0028] 4- first connecting plate;
[0029] 41- horizontal board; 42- vertical board;
[0030] 5- second connecting plate;
[0031] 51-through hole;
[0032] 6- Fasteners;
[0033] 7-threaded hole;
[0034] 8- hanging lug;
[0035] 9-Steel pipe column. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0037] See attached Figure 1 To Attachment Figure 5 The embodiment of the utility model discloses an auxiliary tool for pouring concrete of a steel pipe column, comprising a feed trough 1, a guide pipe 2 correspondingly connected to the outlet end of the feed trough 1, and a support pad 3 fixedly sleeved on the outer side of the inlet end of the guide pipe 2; it is characterized in that the guide pipe 2 is a pipe body structure formed by splicing a plurality of connecting pipes 21, and two adjacent connecting pipes 21 are fastened by a connecting piece, and the connecting piece includes a first connecting plate 4 and a second connecting plate 5, and the first connecting plate 4 and the second connecting plate 5 are respectively fixed to the inner side walls of the spliced ends of the two adjacent connecting pipes 21, and the first connecting plate 4 and the second connecting plate 5 are fastened by a fastener 6, so that the two adjacent connecting pipes 21 are fastened and docked.
[0038] In order to further optimize the above technical solution, the first connecting plate 4 includes a horizontal plate 41 and a vertical plate 42 fixed vertically to the horizontal plate 41; a slot is formed between the vertical plate 42 and the inner wall of the connecting tube 21, and the end of the horizontal plate 41 away from the vertical plate 42 and the second connecting plate 5 are respectively fixed on the inner walls of the spliced ends of the two adjacent connecting tubes 21, and the top of the second connecting plate 5 is inserted into the slot and abuts against the bottom wall of the horizontal plate 41; through holes 51 are provided on the side walls of the connecting tube 21 located on the upper layer and the second connecting plate 5, and threaded holes 7 are provided on the vertical plate 42, and the fastener 6 passes through the through hole 51 and is threadedly connected to the threaded hole 7.
[0039] In order to further optimize the above technical solution, the second connecting plate 5 and the side wall of the horizontal plate 41 fixed to the inner side wall of the connecting pipe 21 are all arc-shaped surfaces.
[0040] In order to further optimize the above technical solution, the fastener 6 is a bolt.
[0041] In order to further optimize the above technical solution, the number of the first connecting plates 4 and the second connecting plates 5 are both multiple and the same, and are evenly distributed on the inner side walls of the splicing ends of two adjacent connecting pipes 21.
[0042] In order to further optimize the above technical solution, the feed trough 1 is funnel-shaped. Of course, it is not limited to the funnel shape, and other shapes of structures can also be used, so that concrete can enter the material guide pipe through the feed trough.
[0043] In order to further optimize the above technical solution, two symmetrical lifting ears 8 are fixed on the top edge of the feeding chute 1 .
[0044] In order to further optimize the above technical solution, the support pad 3 is a double-layer plate composed of a steel plate and a rubber plate; the steel plate is located on the upper layer, the rubber plate is located on the lower layer, and the bottom wall of the rubber plate is used to abut against the top edge of the steel pipe column 9.
[0045] The implementation methods of the utility model are:
[0046] According to the height of the steel pipe column 9, a suitable number of connecting pipes 21 are selected, and multiple connecting pipes 21 are spliced and fastened through connecting pieces to form a material guide pipe 2; a tower crane is used to hoist the device through the lifting lug 8, so that the outlet end of the material guide pipe 2 is inserted into the grouting hole reserved in the steel pipe column 9, the inlet end of the material guide pipe 2 is flush with the top edge of the steel pipe column 9, and the rubber plate of the bottom layer of the supporting pad 3 is abutted against the top edge of the steel pipe column 9; concrete is poured into the feed trough 1 to complete the casting of the steel pipe column 9. The utility model has a simple structure and can be quickly assembled, hoisted and used.
[0047] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0048] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. An auxiliary tool for pouring concrete on a steel pipe column, comprising a feed trough (1), a guide pipe (2) correspondingly connected to the outlet end of the feed trough (1), and a support pad (3) fixedly sleeved on the outer side of the inlet end of the guide pipe (2); characterized in that: The material guide tube (2) is a tube structure formed by splicing a plurality of connecting tubes (21), and two adjacent connecting tubes (21) are fastened by a connecting piece, and the connecting piece comprises a first connecting plate (4) and a second connecting plate (5), and the first connecting plate (4) and the second connecting plate (5) are respectively fixed to the inner side walls of the spliced ends of the two adjacent connecting tubes (21), and the first connecting plate (4) and the second connecting plate (5) are fastened by a fastener (6), so that the two adjacent connecting tubes (21) are fastened and butted.
2. The auxiliary tool for pouring concrete of a steel pipe column according to claim 1, characterized in that: The first connecting plate (4) comprises a transverse plate (41) and a vertical plate (42) vertically fixed to the transverse plate (41); a slot is formed between the vertical plate (42) and the inner side wall of the connecting tube (21); the end of the transverse plate (41) away from the connection with the vertical plate (42) and the second connecting plate (5) are respectively fixed on the inner side walls of the spliced ends of two adjacent connecting tubes (21); the top end of the second connecting plate (5) is inserted into the slot and abuts against the bottom wall of the transverse plate (41); through holes (51) are provided on the side wall of the connecting tube (21) and the second connecting plate (5) located at the upper layer; a threaded hole (7) is provided on the vertical plate (42); the fastener (6) passes through the through hole (51) and is threadedly connected to the threaded hole (7).
3. The auxiliary tool for pouring concrete of a steel pipe column according to claim 2, characterized in that: The second connecting plate (5) and the side wall of the transverse plate (41) fixed to the inner side wall of the connecting pipe (21) are both arc-shaped surfaces.
4. The auxiliary tool for pouring concrete of a steel pipe column according to claim 2, characterized in that: The fastener (6) is a bolt.
5. An auxiliary tool for pouring concrete into a steel pipe column according to any one of claims 1 to 4, characterized in that: The first connecting plates (4) and the second connecting plates (5) are both multiple and of the same number, and are evenly distributed on the inner side walls of the spliced ends of two adjacent connecting pipes (21).
6. The auxiliary tool for pouring concrete of a steel pipe column according to claim 1, characterized in that: The feeding trough (1) is funnel-shaped.
7. The auxiliary tool for pouring concrete of a steel pipe column according to claim 6, characterized in that: Two symmetrical lifting ears (8) are fixed on the top edge of the feeding trough (1).
8. The auxiliary tool for pouring concrete of a steel pipe column according to claim 1, characterized in that: The support pad (3) is a double-layer plate composed of a steel plate and a rubber plate; the steel plate is located on the upper layer, the rubber plate is located on the lower layer, and the bottom wall of the rubber plate is used to abut against the top edge of the steel pipe column (9).