Offshore ultra-large type fan false blade tool
By designing the fake blade tooling for super-large offshore fans and adjusting the blade installation position and angle using connecting components and drawstring parts, the problem of difficulty in blade installation is solved, and more efficient installation efficiency and economicality is achieved.
Patent Information
- Application Number
- CN202420854120.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-23
AI Technical Summary
In offshore wind power projects, it is difficult to install the blades of super-large fans, especially because the blades are long, heavy and smooth, which leads to difficulty in rotating the wheel hub and lifting the blades. The existing split installation solutions have problems of installation difficulty and low efficiency.
A fake blade tooling for offshore super-large fan is designed. By connecting components and pulling ropes, the crane can adjust the installation position and angle of the fake blade body, use the hanging rope and auxiliary rope to drive the wheel hub to rotate, and use the locking parts and matching. Heavy blocks improve installation efficiency.
The installation process of super-large fan blades is simplified, the installation difficulty and time is reduced, the installation efficiency is improved, the requirements for cranes and ships are reduced, and a more economical installation solution is achieved.
Smart Images

Figure CN221973703U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of offshore wind turbine power generation, and in particular to a false blade tooling for an offshore super-large wind turbine. Background Art
[0002] Against the backdrop of the depletion of fossil energy and severe climate change, wind energy has become a renewable, clean energy with little environmental impact, and its strategic value is increasingly prominent. All countries attach great importance to wind energy. In addition, large offshore power plants are a new market industry, and similar engineering construction experience is very scarce.
[0003] As offshore wind power projects are getting farther and farther from the shore, the scale of single offshore wind turbines is getting larger and larger. The extra-long and extra-heavy blades cannot be hoisted as a whole impeller. Currently, the wind turbine is installed in a split installation manner, that is, all wind turbine components are transported to the vicinity of the offshore installation platform by ship, and then the wind turbine components are assembled on the basis of the wind turbine. This solution is more convenient to transport and has lower requirements on the equipment level of cranes and ships. It is a more economical installation solution.
[0004] However, the split installation also faces many challenges. The hub is first installed on the foundation of the wind turbine. Since the blades are long, heavy and have a smooth surface, the installation angle of the blades is only suitable for installation from bottom to top or horizontally. Therefore, when installing the last set of blades, it is necessary to first use the turning wheel to turn the hub to the specified angle and lock the hub, and then hoist the blades into the hub. However, since the blades are heavy and have a smooth surface, and the blades installed first are all on one side, it is difficult to turn the angle of the hub with the turning wheel, and the crane is not convenient to assist the rotation of the hub, which increases the difficulty of impeller installation. Therefore, it is urgent to develop a tool that is convenient for assisting the installation of super-large offshore wind turbines. Utility Model Content
[0005] In order to facilitate the installation of super-large offshore wind turbines, the present application provides a false blade tooling for super-large offshore wind turbines.
[0006] The present application provides a super-large offshore wind turbine false blade fixture, which adopts the following technical solution:
[0007] A false blade tooling for an offshore super-large wind turbine comprises a false blade body detachably arranged on a hub via a connecting assembly, the false blade body is provided with a hanging assembly connected to a crane and used to drive the false blade to move, and the false blade body is provided with a pulling rope member for pulling the hub to rotate smoothly.
[0008] By adopting the above technical solution, the hub is installed on the foundation of the wind turbine, and the crane adjusts the installation position and installation angle of the false blade body through the lifting assembly. The false blade body is installed on the hub through the connecting assembly, and then some blades are installed in the hub. When the hub needs to be rotated, the crane pulls the hub to rotate smoothly to the specified angle through the pull rope, and then locks the hub. Finally, the false blade body is taken out and the blade is installed in the hub, which is convenient for assisting the installation of super-large offshore wind turbines.
[0009] Further, the connection component includes:
[0010] A connector, the connector is plugged and arranged on the hub, and the false blade body is rotatably connected to a side of the connector away from the hub;
[0011] A plurality of locking members are arranged in a circumferential array on a side of the connector close to the hub and are used to lock the connector on the hub.
[0012] By adopting the above technical solution, the fake blade body is fixedly installed on the connecting head, and the crane adjusts the installation position and installation angle of the connecting head to plug and install the connecting head on the wheel hub, and then the connecting head and the wheel hub are locked by multiple sets of locking parts, so that the angle of the wheel hub can be adjusted through the fake blade body.
[0013] Further, the hanging assembly comprises:
[0014] A first connecting block, the first connecting block being arranged on a side of the false blade body close to the hub;
[0015] a second connecting block, the second connecting block being arranged on a side of the false blade body away from the hub;
[0016] A lifting rope, both ends of which are respectively arranged on the first connecting block and the second connecting block. The lifting rope is connected to the crane and is used to drive the false blade body to move and be installed on the hub.
[0017] By adopting the above technical solution, through holes are opened on the first connecting block and the second connecting block; the two ends of the lifting rope pass through the through holes respectively and are connected to the first connecting block and the second connecting block, and the lifting rope is used to connect with the crane, so as to drive the false blade body to move and install it on the hub through the crane.
[0018] Furthermore, the pulling rope member is a pulling rope with two ends respectively arranged on the first connecting block and the second connecting block, the pulling rope is longer than the lifting rope, and the lifting rope is connected to the crane.
[0019] By adopting the above technical solution, the two ends of the pulling rope are fixedly installed on the first connecting block and the second connecting block respectively. When it is necessary to rotate the hub by turning the wheel, the pulling rope is pulled by the crane to pull the hub to rotate smoothly through the false blade body.
[0020] Furthermore, the false blade body is provided with an auxiliary component for assisting the false blade body in hoisting and facilitating the adjustment of the installation angle, and the auxiliary component is connected to the hoist.
[0021] By adopting the above technical solution, the lifting rope is mainly used to lift the false blade body to the specified position, and the crane is connected to the false blade body through an auxiliary component to adjust the installation angle of the false blade body, thereby facilitating the installation of the false blade body.
[0022] Furthermore, the auxiliary components include:
[0023] An auxiliary block, the auxiliary block is arranged on the false blade body and is located on a side of the first connecting block close to the connecting head;
[0024] An auxiliary rope is arranged on the auxiliary block and connected to the hoist.
[0025] By adopting the above technical solution, one end of the auxiliary rope is connected to the auxiliary block, and the installation angle of the false blade body is adjusted by lifting the auxiliary rope or the hanging rope alone, so as to facilitate the installation of the false blade body on the hub.
[0026] Furthermore, a counterweight block for increasing the force of the false blade body on the wheel hub is arranged on the side of the false blade body away from the connecting head.
[0027] By adopting the above technical solution, the counterweight block is made of a material with a relatively high density, thereby increasing the force of the false blade body on the hub, thereby reducing the adverse effects caused by impeller eccentricity before the blades are installed.
[0028] Furthermore, a locking hole that cooperates with a locking piece is provided on the connecting plate on the hub for connecting to the blade, and the locking piece consists of a connecting bolt and a locking nut. The connecting bolt is arranged on the connecting head and passes through the locking hole, and the locking nut is threadedly arranged on the connecting bolt and is tightened on the end of the connecting plate away from the connecting head.
[0029] By adopting the above technical solution, after adjusting the installation position and installation angle of the false blade body by crane, it can be moved freely along the axis of the connecting head. When the connecting head is inserted into the wheel hub, the connecting bolt passes through the locking hole, and then the locking nut is threadedly connected to the connecting bolt and tightened on the end of the connecting plate away from the connecting head, so as to lock the false blade body on the wheel hub.
[0030] In summary, the present application includes at least one of the following beneficial technical effects:
[0031] By installing the hub on the foundation of the wind turbine, the crane adjusts the position of the lifting rope and the auxiliary rope to adjust the installation position and installation angle of the false blade body, passes the connecting bolt on the connecting head through the locking hole and inserts it into the hub, locks the connecting head through the connecting nut, and then installs some blades into the hub. When the hub needs to be rotated, the crane is connected to the pulling rope, and the hub is driven to rotate by pulling the rope, so as to rotate the hub to the specified angle, lock the hub, and finally take out the false blade body and install the blade into the hub, so as to assist the installation of super-large offshore wind turbines. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the false blade tooling structure of the present application;
[0033] Figure 2 yes Figure 1 Enlarged schematic diagram of part A in the middle.
[0034] Figure numerals: 1. false blade body; 2. connecting assembly; 21. connecting head; 22. locking piece; 221. connecting bolt; 222. locking nut; 3. lifting assembly; 31. first connecting block; 32. second connecting block; 33. lifting rope; 4. auxiliary assembly; 41. auxiliary block; 42. auxiliary rope; 5. pulling rope piece; 51. pulling rope; 6. counterweight block; 7. hub; 71. connecting plate. DETAILED DESCRIPTION
[0035] The following is combined with Figure 1-2 This application is described in further detail.
[0036] The embodiment of the present application discloses a false blade tooling for an offshore super-large wind turbine.
[0037] Reference Figure 1 A false blade tooling for an offshore super-large wind turbine comprises a false blade body 1 which is detachably arranged on a hub 7 through a connecting assembly 2, a hanging assembly 3 which is connected to a crane and is used to drive the false blade to move is arranged on the false blade body 1, and a pulling rope member 5 which is used to pull the hub 7 to rotate smoothly is arranged on the false blade body 1.
[0038] Reference Figure 1 and Figure 2The connection assembly 2 includes a connector 21 and a locking piece 22. The end of the connector 21 close to the wheel hub 7 is a cylindrical structure that cooperates with the joint of the wheel hub 7. The connector 21 can be plugged and installed on one of the joints of the wheel hub 7. The side of the connector 21 away from the wheel hub 7 is rotatably connected to the false blade body 1. The false blade body 1 can rotate along the axis of the connector 21 as the rotation axis, so as to facilitate the pull rope member 5 to drive the wheel hub 7 to rotate; the locking piece 22 is provided with multiple groups, and the multiple groups of locking pieces 22 are arranged in a circumferential array on the side of the connector 21 close to the wheel hub 7. Through the multiple groups of locking pieces 22 locks the connecting head 21 on the wheel hub 7. The wheel hub 7 is provided with a connecting plate 71 for connecting to the blades. The connecting plate 71 is provided with a locking hole that cooperates with the locking piece 22. The locking piece 22 consists of a connecting bolt 221 and a locking nut 222. One end of the connecting bolt 221 is fixedly installed on the end face of the connecting head 21 close to the wheel hub 7. When the connecting head 21 is inserted into the wheel hub 7, the connecting bolt 221 passes through the locking hole, and the locking nut 222 is threadedly connected to the connecting bolt 221 and pressed against the end of the connecting plate 71 away from the connecting head 21.
[0039] Reference Figure 1 The lifting assembly 3 includes a first connecting block 31, a second connecting block 32 and a lifting rope 33. The first connecting block 31 is fixedly mounted on a side of the false blade body 1 close to the hub 7; the second connecting block 32 is fixedly mounted on a side of the false blade body 1 away from the hub 7. Through holes are provided on the first connecting block 31 and the second connecting block 32; both ends of the lifting rope 33 pass through the through holes and are connected to the first connecting block 31 and the second connecting block 32 respectively. The lifting rope 33 is used to connect to the crane, so as to drive the false blade body 1 to move and be installed on the hub 7 through the crane.
[0040] Reference Figure 1 In order to facilitate the auxiliary lifting of the false blade and to adjust the installation position and installation angle of the false blade body 1, an auxiliary component 4 is arranged on the false blade body 1, and the auxiliary component 4 includes an auxiliary block 41 and an auxiliary rope 42. The auxiliary block 41 is fixedly mounted on the false blade body 1, and the auxiliary block 41 is located on the side of the first connecting block 31 close to the connecting head 21. The auxiliary rope 42 is fixedly mounted on the auxiliary block 41, and the other end of the auxiliary rope 42 is connected to the crane; when the false blade body 1 needs to be lifted for installation, the crane is respectively connected to the lifting rope 33 and the auxiliary rope 42, and the installation position and installation angle of the false blade body 1 are adjusted by adjusting the positions of the lifting rope 33 and the auxiliary rope 42, so as to facilitate the installation of the false blade body 1 on the hub 7.
[0041] Reference Figure 1The pulling rope member 5 is a pulling rope 51 whose two ends are respectively installed on the first connecting block 31 and the second connecting block 32, and the length of the pulling rope 51 is greater than the lifting rope 33; when it is necessary to rotate the hub 7 through the turning wheel, since the blades are heavy and long, and the blades of the impeller are not fully installed, the multi-impeller has a large eccentricity, which is not convenient for adjustment through the turning wheel. The pulling rope 51 is pulled by the crane to pull the hub 7 to rotate smoothly through the false blade body 1.
[0042] Reference Figure 1 In order to increase the force of the false blade on the impeller, a counterweight block 6 is arranged on the side of the false blade body 1 away from the connecting head 21. The counterweight block 6 is made of a material with a relatively high density, so as to increase the force of the false blade body 1 on the hub 7, thereby reducing the adverse effects caused by the eccentricity of the impeller before the blade is installed.
[0043] Reference Figure 1 Before construction, each part is transported to the designated location by a transport ship, and then the wind turbine is assembled. First, the hub 7 is lifted and installed on the foundation of the wind turbine by a crane, and the angle of the hub 7 is adjusted by a turntable. The crane is connected to the lifting rope 33 and the auxiliary rope 42 respectively, and the false blade body 1 is lifted into the air. By adjusting the positions of the lifting rope 33 and the auxiliary rope 42, the installation position and installation angle of the false blade body 1 are adjusted. Finally, the connecting bolt 221 on the connecting head 21 is passed through the locking hole and inserted into the hub 7. The connecting head 21 is locked on the hub 7 by connecting the nut, and then some blades are installed in the hub 7. When the hub 7 needs to be rotated, the crane is connected to the pulling rope 51, and the hub 7 is driven to rotate by the pulling rope 51, so as to rotate the hub 7 to the specified angle, lock the hub 7, and finally take out the false blade body 1, and install the blade into the hub 7, which is convenient for assisting the installation of super-large offshore wind turbines.
[0044] The working principle of the embodiment of the present application is as follows:
[0045] By installing the hub 7 on the wind turbine foundation, the crane adjusts the installation position and installation angle of the false blade body 1 by adjusting the positions of the lifting rope 33 and the auxiliary rope 42, and the connecting bolt 221 on the connecting head 21 is passed through the locking hole and inserted into the hub 7. The connecting head 21 is locked by connecting the nut, and then some blades are installed in the hub 7. When the hub 7 needs to be rotated, the crane is connected to the pulling rope 51, and the hub 7 is driven to rotate by the pulling rope 51, so as to rotate the hub 7 to the specified angle, lock the hub 7, and finally take out the false blade body 1, and install the blade into the hub 7, so as to assist the installation of super-large offshore wind turbines.
[0046] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A false blade tooling for an offshore super-large wind turbine, characterized by: The invention comprises a false blade body (1) which is detachably arranged on a wheel hub (7) via a connecting assembly (2); the false blade body (1) is provided with a hanging assembly (3) which is connected to a crane and is used to drive the false blade to move; and the false blade body (1) is provided with a pulling rope member (5) which is used to pull the wheel hub (7) to rotate smoothly.
2. The offshore super-large wind turbine false blade tooling according to claim 1 is characterized by: The connection component (2) comprises: A connector (21), the connector (21) being plugged and arranged on the hub (7), and the false blade body (1) being rotationally connected to a side of the connector (21) away from the hub (7); Locking members (22), wherein a plurality of groups of the locking members (22) are arranged in a circumferential array on a side of the connecting head (21) close to the wheel hub (7) and are used to lock the connecting head (21) on the wheel hub (7).
3. The offshore super-large wind turbine false blade tooling according to claim 1 is characterized by: The hanging assembly (3) comprises: A first connection block (31), the first connection block (31) being arranged on a side of the false blade body (1) close to the hub (7); A second connecting block (32), the second connecting block (32) being arranged on a side of the false blade body (1) away from the hub (7); A lifting rope (33), the two ends of which are respectively arranged on the first connecting block (31) and the second connecting block (32); the lifting rope (33) is connected to a crane and is used to drive the false blade body (1) to move and be installed on the wheel hub (7).
4. The offshore super-large wind turbine false blade tooling according to claim 3 is characterized by: The pulling rope member (5) is a pulling rope (51) with two ends respectively arranged on the first connecting block (31) and the second connecting block (32); the pulling rope (51) is longer than the hanging rope (33); and the hanging rope (33) is connected to the crane.
5. The offshore super-large wind turbine false blade tooling according to claim 3 is characterized by: The false blade body (1) is provided with an auxiliary component (4) for assisting the false blade body (1) in hoisting and facilitating the adjustment of the installation angle, and the auxiliary component (4) is connected to the hoist.
6. The offshore super-large wind turbine false blade tooling according to claim 5 is characterized by: The auxiliary component (4) comprises: An auxiliary block (41), the auxiliary block (41) being arranged on the false blade body (1) and located on a side of the first connecting block (31) close to the connecting head (21); An auxiliary rope (42) is arranged on the auxiliary block (41) and connected to the crane.
7. The offshore super-large wind turbine false blade tooling according to claim 1 is characterized by: A counterweight block (6) for increasing the force of the false blade body (1) on the wheel hub (7) is provided on the side of the false blade body (1) away from the connecting head (21).
8. The offshore super-large wind turbine false blade tooling according to claim 2 is characterized by: A locking hole cooperating with a locking member (22) is formed on a connecting plate (71) on the hub (7) and used for connecting with the blades. The locking member (22) is composed of a connecting bolt (221) and a locking nut (222). The connecting bolt (221) is arranged on the connecting head (21) and passes through the locking hole. The locking nut (222) is threadedly arranged on the connecting bolt (221) and is pressed against an end of the connecting plate (71) away from the connecting head (21).
Citation Information
Cited By
Installation method for offshore ultra-large fan blade
CN118517373A
Dummy blade for emergency measures to minimize renewable energy power generation loss in offshore wind turbines
KR103025352B1
