Protection device suitable for slope section well digging foundation steel bar stress meter signal line
By designing a reinforced bar stress gauge signal line protection device, using hinged sheets and sponge-filled signal line troughs, the problems of signal line damage and data acquisition difficulties in well digging foundation construction are solved, and the protection and monitoring efficiency of signal line is improved.
Patent Information
- Application Number
- CN202420561751.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of well excavation foundation, the signal line of the steel bar stress gauge is easily damaged, which leads to difficulty in data collection. Due to the long construction period and large concrete pouring volume, the signal line protection is insufficient, resulting in serious damage to the signal line and difficult to connect, affecting the monitoring data. Get it.
A reinforced bar stress gauge signal line protection device is designed, consisting of two articulated sheets, equipped with signal trace grooves, elastic components and sponge filling, which can gather multiple signal lines to prevent concrete from being broken and messyly wound. Easy to disassemble and inspect through bolt holes.
Effective protection of signal lines improves the survival rate and working efficiency of the steel bar stress gauge, simplifies installation and data acquisition, and ensures the accuracy of monitoring points and the integrity of signal lines.
Smart Images

Figure CN221976357U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering monitoring, in particular to a protection device suitable for a signal line of a steel bar stress meter of a well digging foundation in a slope section. Background Art
[0002] Reinforced concrete structures are widely used in engineering fields such as bridges, buildings, railways, transportation, hydropower, and dams. They are closely related to people's lives, and the importance of their structural bearing capacity is self-evident. A steel bar stress gauge is an instrument for measuring the stress of steel bars in reinforced concrete structures. It is widely used in steel cages of foundation pit retaining structures, foundation pit support structures, roadbed pile raft structures, and anti-sliding piles. According to different working principles, steel bar stress gauges are divided into vibrating string type and resistance strain gauge type, and the receiving instruments are frequency meters and resistance strain gauges respectively; these two types of steel bar stress gauges measure the stress value of the main reinforcement by measuring the steel string frequency and the resistance change of the resistance strain gauge, and then convert the axial force and bending moment of the concrete structure.
[0003] During the installation and construction of the steel bar stress gauge for the well foundation, when the signal line of the steel bar stress gauge is connected after welding, the signal line of the steel bar stress gauge is often damaged due to the long construction period of the well foundation and the construction team's lack of understanding of the monitoring points. The damage to the signal line will result in the inability to smoothly collect the internal force monitoring data of the foundation. In addition, since the well foundation is large (the dimensions of the well foundation are 9m long, 9m wide and 11m deep), the volume of poured concrete is large, the steel bar stress gauges are arranged more, and the number of signal lines is large. During the concrete pouring process, if there are no corresponding protection measures for the steel bar stress gauge signal line, it is very easy to cause damage to the signal line, and it is difficult to connect after damage, or after connection, the signal line is severely damaged, resulting in failure to collect data. Utility Model Content
[0004] In order to avoid the deficiencies of the above-mentioned prior art, the utility model provides a protection device for the signal line of a steel bar stress gauge for a well foundation on a slope section. The device can gather together the leads of multiple steel bar stress gauges, which can not only ensure that the leads are not broken by cast-in-place concrete, but also prevent the signal lines from being entangled in a disorderly manner and causing difficulties in data collection. In addition, the steel bar stress gauge signal line protection device can be closed or opened through a bolt hole to facilitate the inspection of the signal line. The spring layer and sponge can further protect the signal line. The independent design of multiple signal line routing troughs can facilitate the determination of the location of the monitoring point.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The utility model discloses a protective device for a signal line of a steel bar stress gauge of a well foundation in a slope section. The protective device consists of a first page and a second page. One end of the first page is hinged to the second page, and bolt holes are arranged on the other ends of the first page and the second page. A plurality of signal wiring grooves are arranged at corresponding positions of the first page and the second page. When the first page and the second page are combined, a complete signal wiring groove is formed.
[0007] Elastic components are arranged inside the first sheet and the second sheet.
[0008] The side walls of the signal wiring groove are filled with sponge.
[0009] The first leaf plate and the second leaf plate back plates are provided with welded auxiliary steel bars.
[0010] The first sheet and the second sheet have the same shape.
[0011] The beneficial effects obtained by the utility model are:
[0012] 1. It can bring together multiple signal lines to prevent them from being tangled in a disorderly manner, which will cause difficulties in data collection. It can also provide effective protection for the signal lines, improve the survival rate of the steel bar stress gauge, and improve work efficiency.
[0013] 2. The signal line protection device of the steel bar stress gauge can be disassembled or assembled for easy storage, and it is also convenient to check the integrity of the signal line.
[0014] 3. Simple structure, easy installation and low cost; its protective device is easy to weld on the steel cage and can accurately distinguish the location of the monitoring point. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the connection of the pages of the present utility model.
[0016] Figure 2 It is a schematic diagram of the overall structure of the utility model.
[0017] Figure 3 It is a front view of a sheet of the present utility model.
[0018] Figure 4 It is a top view of the page of the utility model.
[0019] Figure 5 It is a schematic diagram of the sponge installation of the utility model.
[0020] Figure 6 This is a schematic diagram of the overall structure of the well digging foundation.
[0021] Figure 7 Schematic diagram of the layered arrangement of steel bar stress gauges for well foundation.
[0022] Figure 8 Schematic diagram of the numbering of each layer of steel bar stress gauges for well foundation.
[0023] In the figure: first page 1, second page 2, bolt hole 3, bolt 4, nut 5, signal line routing groove 6, spring 7, welding auxiliary steel bar 8, sponge 9, steel column 10, steel bar stress gauge 11, soil pressure gauge box 12. DETAILED DESCRIPTION
[0024] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1-Figure 8 In this embodiment, the steel bar stress gauge signal line protection device consists of two identical pages, a first page 1 and a second page 2. The first page 1 and the second page 2 are hinged into a whole through bolts 4 and nuts 5. The first page 1 and the second page 2 can rotate around the bolts 4 to facilitate construction.
[0026] The first leaf 1 and the second leaf 2 divide the signal line axis slot 6 into two halves. When in use, the signal lines do not need to be passed through the axis slots 6 separately. It is only necessary to straighten the lines and then lock the first leaf 1 and the second leaf 2. When the signal line needs to be tested, the bolts corresponding to the bolt holes can be removed for inspection.
[0027] Furthermore, the first leaf 1 and the second leaf 2 of the steel bar stress gauge signal line protection device are both provided with a spring layer 7, one end of the spring layer 7 is fixed to the back plate, and the other end is against the panel, and the panel and the back plate are welded through a steel column 10. A sponge 9 is installed inside the signal line routing groove 6 to reduce the extrusion of the signal line and ensure the integrity of the signal line.
[0028] Furthermore, the number of the wiring ducts 6 of the steel bar stress gauge signal line protection device can be reasonably controlled according to the number of on-site stress gauges.
[0029] Furthermore, the signal line protection device of the steel bar stress gauge can be welded to the steel cage by auxiliary welding of the steel bars 8 .
[0030] Directions:
[0031] Weld the steel bar stress gauge signal line protection device to the steel cage. After the steel bar stress gauge is installed, the stress gauge signal line can be placed in the wiring trough. After the signal line is placed, lock the steel bar stress gauge signal line protection device. When the foundation pit is too deep, the number of steel bar stress gauge signal line protection devices can be increased according to site needs.
[0032] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A protection device for a signal line of a steel bar stress gauge for a well foundation in a slope section, characterized in that: It consists of a first page and a second page, one end of the first page and the second page are hinged, and bolt holes are arranged on the other ends of the first page and the second page; a plurality of signal wiring grooves are arranged at corresponding positions of the first page and the second page, and when the first page and the second page are combined, a complete signal wiring groove is formed.
2. The protective device for the signal line of the steel bar stress gauge of the slope section well digging foundation according to claim 1 is characterized in that: Elastic components are arranged inside the first sheet and the second sheet.
3. The protective device for the signal line of the steel bar stress gauge of the slope section well digging foundation according to claim 1 is characterized in that: The side walls of the signal wiring groove are filled with sponge.
4. The protective device for the signal line of the steel bar stress gauge of the slope section well digging foundation according to claim 1 is characterized in that: The first leaf plate and the second leaf plate back plates are provided with welded auxiliary steel bars.
5. The protective device for the signal line of the steel bar stress gauge of the slope section well digging foundation according to claim 1 is characterized in that: The first sheet and the second sheet have the same shape.
