Transformer characteristic test board
By designing the joint structure of sleeves, shells, rubber rings, sponge blocks, silicone pads and cotton layers on the transformer characteristic test bench, the problems of misconnection, oxidation and rust in joint connection and maintenance are solved, and a higher degree of contact is achieved detection accuracy and safety.
Patent Information
- Application Number
- CN202420263063.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-03
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-03
AI Technical Summary
The existing transformer characteristic test bench has problems such as misconnection, oxidation and rust in connection and maintenance of connectors, which affects the accuracy of detection and has a risk of leakage.
A joint structure including sleeve, shell, rubber ring, sponge block, silicone pad and cotton layer is designed to achieve flexible movement and protection of the joint through the mating of sponge block and gap. The silicone pad and cotton layer are used for cleaning and protection. Connectors, ties assemblies are used to improve safety and stability.
Enhance the connection strength between the joint and the wire, reduce the damage rate, avoid joint rust and contamination, and improve the safety and accuracy of the test.
Smart Images

Figure CN221976913U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of transformer processing, and specifically relates to a transformer characteristic test bench. Background Art
[0002] The transformer characteristic test bench is suitable for factory inspection and assessment of the main electrical performance of power transformers. It is safe to use. The main items of the factory test use a color display and Chinese prompts to achieve real-time monitoring of the entire test process. The transformer characteristic test bench integrates the test wiring display, data acquisition, analysis and processing, measurement control, storage, printing, and protection. The entire test process is completed automatically, with the outstanding advantages of high efficiency and high precision. The transformer characteristic test bench has an LCD backlight display screen, which can display 18 parameters such as three-phase voltage and current at the same time. Digital instruments replace pointer instruments. All test data are displayed on the screen in real time (locked), avoiding errors caused by parallax, conversion, calculation and other factors during the test, making the test more accurate. In particular, it completely solves the difficulties of operators reading multiple meters at the same time and recording multiple groups of data at the same time, ensuring the accuracy and reliability of the test data. The data processing adopts automatic storage and microcomputer printing. The data table is beautiful and standardized, the handwriting is neat and clear, and the test data is filled in the corresponding data in real time. Table, avoid manual transcription and recording process, ensure the authenticity and reliability of data, transformer comprehensive test bench is a comprehensive equipment for measuring various performance parameters of transformer, mainly for power transformer, distribution transformer no-load, load characteristics of test, can also be tested transformer frequency induction and power frequency withstand voltage test, the device measurement part is controlled by high-end single chip microcomputer, digital display, no-load, short circuit and other test data are synchronously sampled by single chip microcomputer, avoid the error caused by the traditional test method of voltage, ammeter, power meter reading and manual calculation, in order to ensure the correct use of transformer comprehensive test bench, in the first paragraph of use to know the precautions for use of transformer comprehensive test bench, before starting, the high voltage side and low voltage side terminals on the instrument panel are connected to the high voltage side and low voltage corresponding terminals of the test product, carefully check to confirm that the wiring is correct, also need to pay attention to the wiring position of the joint, whether it is oxidized and rusted, whether there are stains, need to be cleaned and maintained in time, the damage of the joint not only affects the inaccurate results of the transformer characteristic test bench, but also prone to leakage and other dangers. Utility Model Content
[0003] The purpose of the utility model is to provide a transformer characteristic test bench to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a transformer characteristic test bench, comprising a test bench main body, one end of a wire connected to the test bench main body is installed, the other end of the wire is installed with a joint, a sleeve is fixedly sleeved at the connection position between the joint and the wire, an outer shell is sleeved on the outer walls of the sleeve and the joint, a rubber ring is fixedly installed at a position close to the sleeve on the outer shell, the rubber ring is sleeved on the sleeve, a sponge block is fixedly installed at the top of the inner wall of the outer shell, a notch is provided on the surface of the sponge block, openings are opened on both the front and rear sides of the surface of the outer shell, a silicone pad is fixedly installed on the inner wall of the opening, a cotton cloth layer is fixedly installed on the inner wall of the silicone pad, and a cable tie assembly is installed on the outer shell.
[0005] Preferably, the cable tie assembly includes a first protrusion, the first protrusion is fixedly mounted on one side surface of the shell, one end of the cable tie is fixedly mounted on the first protrusion, and a second protrusion is fixedly mounted on the other side surface of the shell, a strip groove is provided on the second protrusion, the cable tie passes through the strip groove, and the inner wall of the strip groove is fixedly mounted with a locking tooth.
[0006] Preferably, a sphere is fixedly mounted on the other end of the cable tie.
[0007] Preferably, the latch teeth are made of rubber.
[0008] Preferably, a rubber pad is fixedly mounted on the surface of the sponge block.
[0009] Preferably, a plurality of ridges are provided on the surface of the sleeve.
[0010] Compared with the prior art, the utility model has the following beneficial effects: a transformer characteristic test bench, through the cooperation of the sleeve and the shell, the sleeve can strengthen the strength of the wire and the joint position, reduce the damage rate, in the process of use, the shell is pulled downward, the shell moves downward on the outer wall of the sleeve, the joint extends out of the shell for use, and after use, the shell is pulled upward, the shell moves to wrap the joint, through the cooperation of the sponge block and the notch, the sponge block is provided with a notch, the reservation of the notch facilitates the movement of the joint, the sponge block can cover the end of the shell to prevent the entry of debris, At the same time, the humid air on the surface enters into the shell, which plays a shielding role. Through the cooperation of the silicone pad and the cotton cloth layer, a silicone pad is opened on the shell, and a cotton cloth layer is set on one side of the silicone pad close to the joint. Before use, pinch the silicone pads on both sides at the same time, and the silicone pads begin to deform. At this time, the cotton cloth layer fits onto the joint, and the silicone pad is moved in a small range. At this time, the cotton cloth layer wipes the joint. Under the action of the shell, dust is prevented from adhering to the joint. Wipe and maintain before use to avoid rust and damage at the joint position. It is also safer and more reliable when testing the transformer to be tested. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model.
[0012] Figure 2 It is an enlarged schematic diagram of the joint structure of the utility model.
[0013] Figure 3 for Figure 2 Cross-section of the middle shell structure.
[0014] In the figure: 1. test bench body; 2. wire; 3. connector; 4. sleeve; 5. ridge; 6. shell; 7. rubber ring; 8. sponge block; 9. silicone pad; 10. cotton cloth layer; 11. first protrusion; 12. cable tie; 13. sphere; 14. second protrusion; 15. strip groove; 16. tooth; 17. rubber pad. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0016] See also Figure 1-3 The utility model provides a technical solution: a transformer characteristic test bench, including a test bench main body 1, one end of a wire 2 is installed on the test bench main body 1, a joint 3 is installed on the other end of the wire 2, a sleeve 4 is fixedly sleeved at the connection position between the joint 3 and the wire 2, a shell 6 is sleeved on the outer walls of the sleeve 4 and the joint 3, a rubber ring 7 is fixedly installed at a position close to the sleeve 4 on the shell 6, the rubber ring 7 is sleeved on the sleeve 4, a sponge block 8 is fixedly installed on the top of the inner wall of the shell 6, a notch is provided on the surface of the sponge block 8, openings are opened on both sides of the surface of the shell 6, a silicone pad 9 is fixedly installed on the inner wall of the opening, a cotton cloth layer 10 is fixedly installed on the inner wall of the silicone pad 9, and a tie assembly is installed on the shell 6.
[0017] The test bench body 1 is a prior art, in which a plurality of wires 2 are arranged, and a connector 3 is installed at the end of the wire 2 for connecting to the transformer to be tested. During use, the outer shell 6 is pulled downward, and the outer shell 6 moves downward on the outer wall of the sleeve 4, and the connector 3 extends out of the outer shell 6 for use. After use, the outer shell 6 is pulled upward, and the outer shell 6 moves to wrap the connector 3. A notch is arranged on the sponge block 8, and the reservation of the notch facilitates the movement of the connector 3. The sponge block 8 can cover the end of the outer shell 6 to prevent the entry of debris, and the surface is also moist. Air enters the shell 6, which plays a shielding role. A silicone pad 9 is opened on the shell 6. A cotton cloth layer 10 is set on one side of the silicone pad 9 close to the joint 3. Before use, pinch the silicone pads 9 on both sides at the same time. The silicone pads 9 begin to deform. At this time, the cotton cloth layer 10 adheres to the joint 3, and the silicone pad 9 is pinched and moved in a small range. At this time, the cotton cloth layer 10 wipes the joint 3. Under the action of the shell 6, dust is prevented from adhering to the joint 3. Wipe and maintain it before use to prevent rust and damage at the joint 3. It is also safer and more reliable when testing the transformer to be tested.
[0018] Specifically, the cable tie assembly includes a first protrusion 11, which is fixedly mounted on one side of the shell 6, and one end of a cable tie 12 is fixedly mounted on the first protrusion 11. A second protrusion 14 is fixedly mounted on the other side of the shell 6, and a strip groove 15 is provided on the second protrusion 14. The cable tie 12 passes through the strip groove 15, and a locking tooth 16 is fixedly mounted on the inner wall of the strip groove 15.
[0019] The cable tie assembly can improve safety during use. The cable tie 12 is sleeved onto the connection position of the transformer to be tested, such as Figure 2 and Figure 3 In the direction shown in the figure, when the shell 6 is pulled downward, the first protrusion 11 and the second protrusion 14 can be driven to move together. During the movement, the cable tie 12 moves in the strip groove 15 on the second protrusion 14. At this time, the latch 16 is constantly in contact with the cable tie 12. The latch 16 is lowered downward. During use, it moves in the opposite direction of the latch 16 to increase the damping feeling. The shell 6 moves until the connector 3 is completely exposed and the connector 3 is connected to the transformer to be tested. At this time, the pull belt and the shell 6 are stuck to the two sides of the connector 3. During use, if the wire 2 is accidentally pulled, the connector 3 will not fall directly after the position is loosened, thereby improving safety.
[0020] Specifically, a ball 13 is fixedly mounted on the other end of the cable tie 12 .
[0021] A sphere 13 is fixed at the end of the cable tie 12 . The sphere 13 cannot pass through the strip groove 15 , so it can limit the end of the cable tie 12 and prevent the cable tie 12 from being separated from the second protrusion 14 .
[0022] Specifically, the latch teeth 16 are made of rubber.
[0023] The rubber-made latch teeth 16 can increase the friction force, and the limiting effect is more significant.
[0024] Specifically, a rubber pad 17 is fixedly mounted on the surface of the sponge block 8 .
[0025] A rubber pad 17 is fixed on the surface of the sponge block 8. The rubber pad 17, like the sponge block 8, has a notch on the surface through which the joint 3 can extend. The rubber pad 17 is used to support the sponge block 8. The sponge is soft and easy to deform and also easy to be damaged. In order to avoid damage to the sponge block 8, a rubber pad 17 is fixed on the surface of the sponge block 8, which can strengthen the support and reduce the damage rate.
[0026] Specifically, a plurality of ridges 5 are provided on the surface of the sleeve 4 .
[0027] The convex ridge 5 can increase the surface friction of the sleeve 4. When the shell 6 moves on the outer wall of the sleeve 4, it can increase the resistance of the shell 6 when moving, thereby preventing the shell 6 from being separated from the connector 3 during storage.
[0028] Working principle: During use, push the outer shell 6 downward, the outer shell 6 moves downward on the outer wall of the sleeve 4, and the joint 3 extends out from the outer shell 6 for use. After use, push the outer shell 6 upward, and the outer shell 6 moves to wrap the joint 3. A notch is provided on the sponge block 8, and the notch is reserved to facilitate the movement of the joint 3. The sponge block 8 can block the end of the outer shell 6 to prevent the entry of debris, and also prevent humid air from entering the outer shell 6, which plays a shielding role. A silicone pad 9 is provided on the outer shell 6, and a cotton cloth layer 10 is provided on the side of the silicone pad 9 close to the joint 3. Before use, pinch the silicone pads 9 on both sides at the same time, and the silicone pads 9 begin to deform. At this time, the cotton cloth layer 10 adheres to the joint 3, and wipes and maintains it before use.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A transformer characteristic test bench, comprising a test bench body (1), characterized in that: The test bench body (1) is mounted with one end of a wire (2) connected thereto, the other end of the wire (2) being mounted with a connector (3), the connection position between the connector (3) and the wire (2) being fixedly sleeved with a sleeve (4), the outer walls of the sleeve (4) and the connector (3) being sleeved with an outer shell (6), a rubber ring (7) being fixedly mounted at a position close to the sleeve (4) on the outer shell (6), the rubber ring (7) being sleeved on the sleeve (4), a sponge block (8) being fixedly mounted at the top of the inner wall of the outer shell (6), a notch being provided on the surface of the sponge block (8), openings being provided on both the front and rear sides of the surface of the outer shell (6), a silicone pad (9) being fixedly mounted on the inner wall of the opening, a cotton cloth layer (10) being fixedly mounted on the inner wall of the silicone pad (9), and a cable tie (12) assembly being mounted on the outer shell (6).
2. A transformer characteristic test bench according to claim 1, characterized in that: The cable tie (12) assembly comprises a first protrusion (11), the first protrusion (11) being fixedly mounted on one side of the outer shell (6), one end of the cable tie (12) being fixedly mounted on the first protrusion (11), and a second protrusion (14) being fixedly mounted on the other side of the outer shell (6), a strip groove (15) being provided on the second protrusion (14), the cable tie (12) passing through the strip groove (15), and a latching tooth (16) being fixedly mounted on the inner wall of the strip groove (15).
3. A transformer characteristic test bench according to claim 2, characterized in that: The other end of the cable tie (12) is fixedly mounted with a sphere (13).
4. A transformer characteristic test bench according to claim 2, characterized in that: The latch teeth (16) are made of rubber.
5. The transformer characteristic test bench according to claim 1, characterized in that: A rubber pad (17) is fixedly mounted on the surface of the sponge block (8).
6. A transformer characteristic test bench according to claim 1, characterized in that: The surface of the sleeve (4) is provided with a plurality of ridges (5).
