Prefabricated photovoltaic pile hoisting hook

By designing the fixed structure of prefabricated photovoltaic pile lifting hook, using lower lifting hook plate, vertical connecting plate and threaded rod, the problem of stability due to displacement during lifting is solved, and stable clamping and stability of pipe piles are achieved Lifting.

CN221987968UActive Publication Date: 2024-11-12CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420105248.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-11-12
Estimated Expiration
2034-01-16

AI Technical Summary

Technical Problem

The existing photovoltaic pile lifting hooks are likely to affect the lifting stability due to displacement during the lifting process, especially the lifting lug hook plate only contacts the inner wall of the pipe pile and fails to be effectively fixed, resulting in unstable lifting.

Method used

A prefabricated photovoltaic pile hoist hook is designed, through the fixed connection between the lower hanging lug hook plate, the vertical connecting plate and the upper hanging lug hook plate, combined with the threaded rod and the adjustment and tightening plate, the clamping effect on the inner and outer walls of the pipe pile is achieved. Ensure stability during lifting.

Benefits of technology

By adjusting the coordination between the threaded rod and the tightening plate, the overall fixation of the hoisting hook is ensured, displacement is avoided, and the stability and safety of the hoisting are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221987968U_ABST
    Figure CN221987968U_ABST
Patent Text Reader

Abstract

The prefabricated photovoltaic pile lifting hook comprises an upper lifting lug hook plate, a lower lifting lug hook plate and a lifting lug, the lower lifting lug hook plate is positioned below the upper lifting lug hook plate; the lower lifting lug hook plate and the upper lifting lug hook plate are fixedly connected through the vertical connecting plate, and the lower lifting lug hook plate, the vertical connecting plate and the upper lifting lug hook plate form a bayonet which is larger than the thickness of the inner wall and the outer wall of a pipe pile to achieve rapid clamping. When the threaded rod drives the adjusting abutting plate to be adjusted to be close to the bottom face of the upper lifting lug hook plate, the adjusting abutting plate and the upper lifting lug hook plate clamp the inner wall and the outer wall of the pipe pile, and it is guaranteed that the whole prefabricated photovoltaic pile lifting hook cannot move on the pipe pile; the problem that lifting lug hook plates only make contact with and abut against the inner wall of the pipe pile for lifting, displacement can be generated, and lifting stability is affected is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a prefabricated photovoltaic pile hoisting hook and belongs to the technical field of photovoltaic pipe pile hoisting. Background Art

[0002] After the prefabricated pipe piles serving as the photovoltaic foundation are prefabricated in the prefabricated plant, they need to be transported to the construction site by transport vehicles, and then hoisted to the hole of the photovoltaic pile by a crane using a hook and cable.

[0003] In the existing lifting hook, such as the Chinese patent publication number CN204802853U, although the lifting hook plate can be inserted into the pipe pile and pressed against the inner wall of the pipe pile for hooking, the lifting hook plate only contacts the inner wall of the pipe pile, and displacement can occur during lifting, affecting the stability of the lifting. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a prefabricated photovoltaic pile hoisting hook.

[0005] The utility model is realized through the following technical solutions.

[0006] The utility model provides a prefabricated photovoltaic pile hoisting hook, comprising:

[0007] Upper hanging ear hook plate;

[0008] A lower lifting lug hook plate located below the upper lifting lug hook plate;

[0009] The lower hanging ear hook plate and the upper hanging ear hook plate are fixedly connected through the vertical connecting plate. The lower hanging ear hook plate, the vertical connecting plate and the upper hanging ear hook plate form a bayonet that is larger than the inner and outer wall thickness of the pipe pile to achieve rapid insertion.

[0010] The lower hanging ear hook plate is provided with an adjustable pressing plate which can move closer to or farther away from the bottom surface of the upper hanging ear hook plate.

[0011] The lower hanging ear hook plate is inclined to be provided with a threaded through hole, a threaded rod is screwed into the inclined threaded through hole, an adjusting clamping plate is fixed to the threaded rod located above the lower hanging ear hook plate, and the threaded rod carries the adjusting clamping plate to adjust the bottom surface of the upper hanging ear hook plate to move closer to or away from it.

[0012] The threaded rod is screwed into the inclined threaded through hole of the lower hanging ear hook plate and is inclined.

[0013] A lifting ear is welded and fixed on the top surface of the upper lifting ear hook plate, and a through hole is provided on the lifting ear for the cable to pass through for binding and fixing installation.

[0014] It also includes a cable and a hook of a crane. One end of the cable is bound and fixed to the through hole of the lifting ear, and the other end of the cable is installed on the hook of the crane.

[0015] The beneficial effect of the utility model is that when the threaded rod carries the adjusting clamping plate to adjust and approach the bottom surface of the upper lifting ear hook plate, the adjusting clamping plate and the upper lifting ear hook plate are clamped between the inner and outer walls of the pipe pile, ensuring that the prefabricated photovoltaic pile lifting hook as a whole will not be displaced on the pipe pile, solving the problem that the lifting ear hook plate can be displaced when it only contacts and resists the inner wall of the pipe pile during lifting, affecting the stability of lifting. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of the hoisting construction of the prefabricated photovoltaic pile of the utility model;

[0017] Figure 2 This is a structural schematic diagram of the installation of the prefabricated photovoltaic pile hoisting hook and the pipe pile of the utility model;

[0018] Figure 3 This is a structural schematic diagram of the utility model prefabricated photovoltaic pile hoisting hook;

[0019] In the figure: 1-prefabricated photovoltaic pile lifting hook; 11-lower lifting ear hook plate; 12-vertical connecting plate; 13-upper lifting ear hook plate; 14-bayonet; 15-lifting ear; 16-threaded rod; 17-adjusting clamping plate; 2-hook; 3-cable; 4-transport vehicle; 5-pile. DETAILED DESCRIPTION

[0020] The technical solution of the utility model is further described below, but the scope of protection required is not limited to the description.

[0021] like Figures 1 to 3 shown.

[0022] A prefabricated photovoltaic pile hoisting hook 1 of the present application comprises:

[0023] The lower hanging ear hook plate 11 and the upper hanging ear hook plate 13 are fixedly connected by the vertical connecting plate 12. The lower hanging ear hook plate 11, the vertical connecting plate 12 and the upper hanging ear hook plate 13 form a bayonet 14. The bayonet 14 is larger than the inner and outer wall thickness of the pipe pile 5 for quick insertion.

[0024] A lifting ear 15 is welded and fixed on the top surface of the upper lifting ear hook plate 13, and a through hole is provided on the lifting ear 15 for the cable 3 to pass through, be tied and fixed for installation.

[0025] The lower hanging ear hook plate 11 is inclined to be provided with a threaded through hole, and a threaded rod 16 is screwed into the inclined threaded through hole. The threaded rod 16 located above the lower hanging ear hook plate 11 is fixed with an adjusting clamping plate 17, and the threaded rod 16 brings the adjusting clamping plate 17 to adjust the bottom surface of the upper hanging ear hook plate 13 to move closer to or away from it; when the threaded rod 16 brings the adjusting clamping plate 17 to adjust the bottom surface of the upper hanging ear hook plate 13 to move closer to it, the adjusting clamping plate 17 and the upper hanging ear hook plate 13 are clamped between the inner and outer walls of the pipe pile 5, ensuring that the prefabricated photovoltaic pile lifting hook 1 as a whole will not be displaced on the pipe pile 5, solving the problem that the hanging ear hook plate can be displaced when it only contacts and abuts against the inner wall of the pipe pile during lifting, affecting the stability of lifting.

[0026] The threaded rod 16 is screwed into the inclined threaded through hole of the lower hanging ear hook plate 11 and is also inclined. When the clamping plate 17 is adjusted to bear the vertical downward gravity of the pipe pile 5, the vertical downward gravity of the pipe pile 5 will generate a self-locking force on the threaded pair of the threaded rod 16 and the inclined threaded through hole of the lower hanging ear hook plate 11, ensuring that the threaded rod 16 and the inclined threaded through hole of the lower hanging ear hook plate 11 are screwed and locked.

[0027] A prefabricated photovoltaic pile hoisting construction method of the present application includes:

[0028] The hook 2 of the crane is bound and fixed with the through hole of the lifting ear 15 through the cable 3, the bayonet 14 is inserted into the pipe pile 5, the upper lifting ear hook plate 13 contacts the outer wall of the pipe pile 5, and the threaded rod 16 is screwed and adjusted so that the adjusting clamping plate 17 contacts the inner wall of the pipe pile 5, and the adjusting clamping plate 17 and the upper lifting ear hook plate 13 are clamped between the inner and outer walls of the pipe pile 5. Prefabricated photovoltaic pile lifting hooks are installed at both ends of the pipe pile 5 in the same form through the cable 3, and the hook 2 lifts and lowers the pipe pile 5 from the transport vehicle 4 with the cable 3.

[0029] Two prefabricated photovoltaic pile lifting hooks 1 are correspondingly adjusted and clamped on the pipe openings at both ends of a pipe pile 5, and a smooth lifting process without displacement is performed in combination with the cable 3 and the lifting hook 2 of the crane.

Claims

1. A prefabricated photovoltaic pile hoisting hook, characterized in that: include: Upper hanging lug hook plate (13); A lower lifting lug hook plate (11) located below the upper lifting lug hook plate (13); The lower hanging ear hook plate (11) and the upper hanging ear hook plate (13) are fixedly connected via a vertical connecting plate (12); the lower hanging ear hook plate (11), the vertical connecting plate (12) and the upper hanging ear hook plate (13) form a snap-in opening (14) which is larger than the inner and outer wall thicknesses of the pipe pile (5) and can be quickly snapped in; the lower hanging ear hook plate (11) is provided with an adjustable tightening plate (17) which can be moved closer to or away from the bottom surface of the upper hanging ear hook plate (13).

2. The prefabricated photovoltaic pile hoisting hook according to claim 1, characterized in that: The lower hanging ear hook plate (11) is provided with an inclined threaded through hole, a threaded rod (16) is screwed into the inclined threaded through hole, an adjustment clamping plate (17) is fixed to the threaded rod (16) located above the lower hanging ear hook plate (11), and the threaded rod (16) brings the adjustment clamping plate (17) to adjust the bottom surface of the upper hanging ear hook plate (13) to move closer to or farther away from it.

3. The prefabricated photovoltaic pile hoisting hook according to claim 2, characterized in that: The threaded rod (16) is screwed into the inclined threaded through hole of the lower hanging ear hook plate (11) and is inclined.

4. The prefabricated photovoltaic pile hoisting hook according to claim 1, characterized in that: A lifting lug (15) is welded and fixed to the top surface of the upper lifting lug hook plate (13), and a through hole is provided on the lifting lug (15) for the cable (3) to pass through for binding and fixing.

5. The prefabricated photovoltaic pile hoisting hook according to claim 4, characterized in that: It also includes a cable (3) and a hook (2) of a crane.

6. The prefabricated photovoltaic pile hoisting hook according to claim 5, characterized in that: One end of the cable (3) is bound and fixed to the through hole of the lifting ear (15), and the other end of the cable (3) is installed on the lifting hook (2) of the lifting vehicle.