Building pipe installation device
By designing a combination device of support frame, lifting assembly, clamping assembly and reinforcement assembly, the inclination problem caused by the change in the center of gravity of building pipes during lifting is solved, and the stable installation of pipes is achieved.
Patent Information
- Application Number
- CN202420818442.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-04-19
AI Technical Summary
During construction, the center of gravity changes when the building pipe is lifted, which affects the normal progress of subsequent installation.
A building pipe installation device including a support frame, lifting assembly, clamping assembly and reinforcement assembly is designed. The position of the U-frame is adjusted by lifting assembly, the clamping assembly realizes pipe clamping, the reinforcement assembly fixes both ends of the pipe, and uses gears and The thread mechanism adjusts the position of the fixed plate to ensure that the pipe does not tilt.
Effectively prevent the pipe from tilting during installation, ensure the normal progress of subsequent installation, and ensure the stability of the pipe and the smooth completion of the installation.
Smart Images

Figure CN221987990U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a building pipe installation device. Background Art
[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. The place of construction work is called "construction site" or "construction site", also called construction site. During the construction of construction projects, it is necessary to install construction pipes. Pipes are necessary materials for construction projects. Commonly used ones are water pipes, drainage pipes, gas pipes, heating pipes, wire conduits and rainwater pipes.
[0003] According to the application number 202320738589.X, a construction pipe installation device is disclosed, including a support frame, a lifting assembly is fixedly installed on the middle side end of the support frame, a lifting eye frame is suspended on the front top of the lifting assembly, a mounting frame is fixedly connected to the lower top of the lifting eye frame, wide sliding grooves are provided on both sides of the lower end of the mounting frame, an electric telescopic rod is fixedly installed in the middle of the upper end surface of the mounting frame, a sliding rod is fixedly connected to the telescopic part of the lower top of the electric telescopic rod, and sliding rings are movably connected to the outer circumferential surfaces of both side ends of the sliding rod, and the front and rear end surfaces of the sliding ring are respectively swingably connected to the first connecting rod and the second connecting rod through pin shafts, the lower top of the second connecting rod is swingably connected to a curved rod, and the inner side of the lower end of the curved rod is fixedly connected to a clamping block.
[0004] The above scheme makes it easy to install the pipes and can quickly clamp or release the pipes, reducing the operation process of pipe installation; however, the above scheme still has certain shortcomings in actual use. The length of general building pipes is generally long, and the above scheme only fixes the middle part of the pipe. When the pipe is lifted, the center of gravity of the pipe will change, so that the pipe will tilt, which will affect the subsequent normal installation of the pipe. Utility Model Content
[0005] The purpose of the utility model is to provide a construction pipe installation device to solve the technical problem raised in the above background technology that when the pipe is lifted, the center of gravity of the pipe changes, so that the pipe tilts, which in turn affects the subsequent normal installation of the pipe.
[0006] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a construction pipe installation device, comprising a support frame, the outer surface of the support frame is fixedly connected with four support rods, the four support rods are commonly fixedly connected with a connecting plate, the upper surface of the connecting plate is installed with a lifting assembly, a U-shaped frame is arranged below the connecting plate, the outer surface of the U-shaped frame is installed with a clamping assembly, the outer surface of the U-shaped frame is installed with a reinforcement assembly, the reinforcement assembly comprises two cross plates, the two cross plates are fixedly connected to the outer surface of the U-shaped frame, the side surfaces of the two cross plates away from each other are fixedly connected with circular rings, the outer surfaces of the two circular rings are wrapped with a first connecting rope, the ends of the two first connecting ropes away from each other are connected with a first gear bar, the sides of the two first gear bars away from each other are provided with a second gear bar, and a gear is meshed between the first gear bar and the second gear bar.
[0007] Preferably, the lifting assembly includes a protective shell, which is installed on the upper surface of the connecting plate, and a forward and reverse motor is installed on the outer surface of the protective shell. The output end of the forward and reverse motor is fixedly connected to a collecting roller, and the collecting roller is rotatably connected to the inner wall of the protective shell, and a collecting rope is wrapped around the outer surface of the collecting roller, and the bottom end of the collecting rope passes through the upper surface of the connecting plate and extends to be fixedly connected to the upper surface of the U-shaped frame.
[0008] Preferably, the lifting assembly also includes two arc-shaped plates, both of which are fixedly connected to the outer surface of the connecting plate, and both of which are slidably connected to the outer surfaces of the two arc-shaped plates with guide rods, and the bottom ends of the guide rods are fixedly connected to the upper surface of the U-shaped frame.
[0009] Preferably, the clamping assembly includes a servo motor, which is mounted on the outer surface of the U-shaped frame. The output end of the servo motor is fixedly connected to a bidirectional screw rod, and one end of the bidirectional screw rod away from the servo motor is rotatably connected to the inner wall of the U-shaped frame.
[0010] Preferably, the outer surface of the bidirectional screw is threadedly connected to two movable plates, and the bottom surface of the movable plate is fixedly connected to a clamping plate.
[0011] Preferably, the clamping assembly further comprises two vertical rods, both of which are fixedly connected to the inner wall of the U-shaped frame, and the outer surfaces of the two vertical rods are slidably connected to the outer surfaces of the two movable plates.
[0012] Preferably, the outer surfaces of the two first gear bars are both provided with a fixing frame, and the outer surface of the fixing frame is rotatably connected to a rotating rod, and the bottom ends of the two rotating rods are both fixedly connected to the outer surface of the gear.
[0013] Preferably, the outer surfaces of the two fixed frames are fixedly connected to L-shaped plates, and the outer surfaces of the L-shaped plates are threadedly connected to threaded rods, the bottom ends of the two threaded rods are rotatably connected to fixed plates, the outer surfaces of the two second gear bars are fixedly connected to second connecting ropes, and the outer surfaces of the second connecting ropes are fixedly connected to circular ropes.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The utility model is equipped with a hoisting assembly, a U-shaped frame, a clamping assembly and a reinforcement assembly. The hoisting assembly can adjust the position of the U-shaped frame to facilitate the subsequent clamping of the building pipes. The clamping assembly can clamp the pipes to facilitate the subsequent installation. The reinforcement assembly can fix the two ends of the pipes to ensure that there will be no tilting when installing the pipes, and can ensure the normal installation of the subsequent pipes.
[0016] 2. The utility model is equipped with a horizontal plate, a circular ring, a first connecting rope, a first gear bar, a second gear bar, a gear, a fixed frame, a rotating rod, an L-shaped plate, a threaded rod, a fixed plate, a second connecting rope and a circular rope. By rotating the rotating rod, the distance between the gear and the first gear bar and the second gear bar can be adjusted by utilizing the engagement between them. By rotating the threaded rod, the fixed plate can be moved by utilizing the threaded connection between the threaded rod and the L-shaped plate. When the fixed plate contacts the rotating rod, the rotating rod is limited. Subsequently, two circular ropes are put into both ends of the pipe to complete the fixation of the two ends of the pipe. Therefore, the pipe will not fall over when being installed, and the subsequent normal installation of the pipe can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional structural schematic diagram of the front view of the utility model;
[0018] Figure 2 It is a three-dimensional structural schematic diagram of the lifting assembly of the utility model;
[0019] Figure 3 It is a three-dimensional structural schematic diagram of the clamping assembly of the utility model;
[0020] Figure 4 It is a three-dimensional structural schematic diagram of the reinforcement component of the utility model;
[0021] Figure 5 For this utility model Figure 4 Enlarged structural diagram at A in the middle.
[0022] In the figure: 1. support frame; 2. support rod; 3. connecting plate; 4. lifting assembly; 401. protective shell; 402. forward and reverse motor; 403. collecting roller; 404. collecting rope; 405. arc plate; 406. guide rod; 5. U-shaped frame; 6. clamping assembly; 601. servo motor; 602. screw rod; 603. moving plate; 604. clamping plate; 605. vertical rod; 7. reinforcement assembly; 701. horizontal plate; 702. circular ring; 703. first connecting rope; 704. first gear bar; 705. second gear bar; 706. gear; 707. fixed frame; 708. rotating rod; 709. L-shaped plate; 710. threaded rod; 711. fixed plate; 712. second connecting rope; 713. circular rope. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 A construction pipe installation device comprises a support frame 1, a group of support legs are fixedly connected to the bottom surface of the support frame 1, and the bottom ends of the support legs are fixedly connected to moving wheels. The installation device can be moved by means of the provided moving wheels, which is convenient for the subsequent installation of construction pipes. At the same time, a handle is fixedly connected to the outer surface of the support frame 1, and the provided handle is convenient for subsequent staff to move the installation device. Four support rods 2 of the same size are fixedly connected to the outer surface of the support frame 1, and the four support rods 2 are fixedly connected to a connecting plate 3 together. By fixing the connecting plate 3 with the four support rods 2, the stability of the connecting plate 3 during use can be guaranteed, and the subsequent normal installation of construction pipes can be guaranteed.
[0025] A lifting assembly 4 is installed on the upper surface of the connecting plate 3, and the lifting assembly 4 includes a protective shell 401. The protective shell 401 is installed on the upper surface of the connecting plate 3, and a forward and reverse motor 402 is installed on the outer surface of the protective shell 401. The installation of the forward and reverse motor 402 is achieved through the setting of the protective shell 401, which facilitates the use of the forward and reverse motor 402 by subsequent staff.
[0026] The output end of the forward and reverse motor 402 is fixedly connected to a collecting roller 403 , and the collecting roller 403 is rotatably connected to the inner wall of the protective shell 401 .
[0027] Through the operation of the forward and reverse motor 402, the output end of the forward and reverse motor 402 can drive the collecting roller 403 to rotate, thereby facilitating the subsequent installation of the building pipes. The rotational connection between the collecting roller 403 and the protective shell 401 can ensure the stability of the collecting roller 403 during use, and can ensure the subsequent normal installation of the building pipes.
[0028] A collecting rope 404 is wrapped around the outer surface of the collecting roller 403, and the bottom end of the collecting rope 404 passes through the upper surface of the connecting plate 3 and extends to be fixedly connected to the upper surface of the U-shaped frame 5. The forward and reverse motor 402 rotates to drive the collecting roller 403 to rotate, thereby realizing the collection or release of the collecting rope 404, and then realizing the up and down movement of the U-shaped frame 5, which is convenient for the subsequent installation of construction pipes.
[0029] The lifting assembly 4 also includes two arc plates 405, both of which are fixedly connected to the outer surface of the connecting plate 3, and the outer surfaces of the two arc plates 405 are slidably connected to guide rods 406, and the bottom ends of the guide rods 406 are fixedly connected to the upper surface of the U-shaped frame 5.
[0030] When the U-shaped frame 5 starts to move up and down, the sliding connection between the guide rod 406 and the arc plate 405 can guide the movement of the U-shaped frame 5 to a certain extent, ensure the stability of the U-shaped frame 5 during the movement, and ensure the normal installation of the subsequent construction pipes.
[0031] A U-shaped frame 5 is arranged below the connecting plate 3, and a clamping assembly 6 is installed on the outer surface of the U-shaped frame 5. The clamping assembly 6 includes a servo motor 601, and the servo motor 601 is installed on the outer surface of the U-shaped frame 5. A bidirectional screw rod 602 is fixedly connected to the output end of the servo motor 601, and the end of the bidirectional screw rod 602 away from the servo motor 601 is rotatably connected to the inner wall of the U-shaped frame 5.
[0032] The servo motor 601 can drive the bidirectional screw rod 602 to rotate, and the rotation connection between the bidirectional screw rod 602 and the U-shaped frame 5 can ensure the stability of the bidirectional screw rod 602 during the rotation process.
[0033] The outer surface of the bidirectional screw rod 602 is threadedly connected to two movable plates 603, and the bottom surface of the movable plate 603 is fixedly connected to a clamping plate 604. Through the operation of the servo motor 601, the bidirectional screw rod 602 can be driven to rotate, and the two movable plates 603 can be moved towards each other, thereby clamping the construction pipes, facilitating subsequent installation work.
[0034] The clamping assembly 6 also includes two vertical rods 605, which are fixedly connected to the inner wall of the U-shaped frame 5, and the outer surfaces of the two vertical rods 605 are slidably connected to the outer surfaces of the two movable plates 603. The sliding connection between the movable plate 603 and the vertical rods 605 can ensure the stability of the movable plate 603 during movement, and can ensure the subsequent clamping effect on the construction pipes.
[0035] A reinforcement component 7 is installed on the outer surface of the U-shaped frame 5, and the reinforcement component 7 includes two horizontal plates 701, and the two horizontal plates 701 are fixedly connected to the outer surface of the U-shaped frame 5. The side of the two horizontal plates 701 away from each other is fixedly connected to a ring 702, and the outer surfaces of the two rings 702 are wound with a first connecting rope 703, and the ends of the two first connecting ropes 703 away from each other are connected to a first gear bar 704, and the side of the two first gear bars 704 away from each other is provided with a second gear bar 705, and a gear 706 is meshed between the first gear bar 704 and the second gear bar 705, and the outer surfaces of the two first gear bars 704 are provided with a fixed frame 707, and the outer surface of the fixed frame 707 is rotatably connected to a rotating rod 708, and the bottom ends of the two rotating rods 708 are fixedly connected to the outer surface of the gear 706.
[0036] By meshing the gear 706 with the first gear bar 704 and the second gear bar 705, the second gear bar 705 and the first gear bar 704 can be moved in similar directions by rotating the rotating rod 708, thereby adjusting the contraction or release length of the first gear bar 704 and the second gear bar 705, making it convenient to fix the two ends of the building pipes later and ensuring stability during the subsequent installation of the building pipes.
[0037] The outer surfaces of the two fixing frames 707 are fixedly connected with L-shaped plates 709, and the inner walls of the fixing frames (707) are slidably connected with the outer surfaces of the first gear bar 704 and the second gear bar 705, which can ensure the subsequent normal fixation of the pipe.
[0038] The outer surface of the L-shaped plate 709 is threadedly connected to a threaded rod 710, and the bottom ends of the two threaded rods 710 are rotatably connected to a fixed plate 711. The upper surface of the fixed plate 711 is installed with an anti-slip pad. By rotating the threaded rod 710, the outer surfaces of the two second gear bars 705 are fixedly connected to the second connecting rope 712, and the outer surface of the second connecting rope 712 is fixedly connected to a circular rope 713.
[0039] By utilizing the threaded connection between the threaded rod 710 and the fixing plate 711 , the fixing plate 711 can be driven to move up and down, so that the rotating rod 708 can be limited and fixed, thereby ensuring the subsequent stability of the fixing of the building pipe.
[0040] Working principle: when hoisting and installing the building pipes, first start the forward and reverse motors 402. The output ends of the forward and reverse motors 402 drive the collecting rollers 403 to rotate, and the collecting ropes 404 inside the collecting rollers 403 begin to be released. The guide U-shaped frame 5 passing through the guide rod 406 will slowly move downward. When it moves to a suitable position, start the servo motor 601, and the output end of the servo motor 601 starts to drive the bidirectional screw rod 602 to rotate, and then the two moving plates 603 will move in a similar direction. First, the two clamping plates 604 will contact the outer surface of the building pipes, move to clamp the building pipes, and then turn. The movable rotating rod 708 utilizes the engagement between the gear 706 and the first gear bar 704 and the second gear bar 705 to adjust the extended length of the first gear bar 704 and the second gear bar 705. After the adjustment is completed, the threaded rod 710 is rotated, and the threaded connection between the threaded rod 710 and the L-shaped plate 709 can be used to realize the up and down movement of the fixed plate 711. When the fixed plate 711 contacts the rotating rod 708, the rotating rod 708 is limited first, and then the two circular ropes 713 are put into the two ends of the pipe. Therefore, the pipe will not fall over when it is installed, which can ensure the subsequent normal installation of the pipe.
[0041] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A construction pipe installation device, comprising a support frame (1), characterized in that: The outer surface of the support frame (1) is fixedly connected to four support rods (2), and the four support rods (2) are commonly fixedly connected to a connecting plate (3), and a lifting assembly (4) is installed on the upper surface of the connecting plate (3), and a U-shaped frame (5) is arranged below the connecting plate (3), and a clamping assembly (6) is installed on the outer surface of the U-shaped frame (5), and a reinforcement assembly (7) is installed on the outer surface of the U-shaped frame (5), and the reinforcement assembly (7) includes two transverse plates (701), and the two transverse plates (701) are fixedly connected to the U-shaped frame (701). The outer surface of the frame (5) is fixedly connected to a circular ring (702) on the side away from each other of the two horizontal plates (701), the outer surfaces of the two circular rings (702) are wound with a first connecting rope (703), the ends of the two first connecting ropes (703) away from each other are connected to a first gear bar (704), the sides of the two first gear bars (704) away from each other are provided with a second gear bar (705), and a gear (706) is meshed between the first gear bar (704) and the second gear bar (705).
2. A construction pipe installation device according to claim 1, characterized in that: The hoisting assembly (4) comprises a protective shell (401), wherein the protective shell (401) is mounted on the upper surface of the connecting plate (3), a forward and reverse motor (402) is mounted on the outer surface of the protective shell (401), a collecting roller (403) is fixedly connected to the output end of the forward and reverse motor (402), and the collecting roller (403) is rotatably connected to the inner wall of the protective shell (401), a collecting rope (404) is wound around the outer surface of the collecting roller (403), and the bottom end of the collecting rope (404) passes through the upper surface of the connecting plate (3) and extends to be fixedly connected to the upper surface of the U-shaped frame (5).
3. A construction pipe installation device according to claim 2, characterized in that: The hoisting assembly (4) further comprises two arc-shaped plates (405), both of which are fixedly connected to the outer surface of the connecting plate (3), and both of which are slidably connected to the outer surfaces of the two arc-shaped plates (405) with guide rods (406), and the bottom ends of the guide rods (406) are fixedly connected to the upper surface of the U-shaped frame (5).
4. A construction pipe installation device according to claim 1, characterized in that: The clamping assembly (6) comprises a servo motor (601), the servo motor (601) is mounted on the outer surface of the U-shaped frame (5), the output end of the servo motor (601) is fixedly connected to a bidirectional screw rod (602), and one end of the bidirectional screw rod (602) away from the servo motor (601) is rotatably connected to the inner wall of the U-shaped frame (5).
5. A construction pipe installation device according to claim 4, characterized in that: The outer surface of the bidirectional screw rod (602) is threadedly connected to two movable plates (603), and the bottom surface of the movable plate (603) is fixedly connected to a clamping plate (604).
6. A construction pipe installation device according to claim 4, characterized in that: The clamping assembly (6) further comprises two vertical rods (605), both of which are fixedly connected to the inner wall of the U-shaped frame (5), and the outer surfaces of the two vertical rods (605) are slidably connected to the outer surfaces of the two movable plates (603).
7. A construction pipe installation device according to claim 1, characterized in that: The outer surfaces of the two first gear bars (704) are both provided with a fixing frame (707), and the outer surface of the fixing frame (707) is rotatably connected to a rotating rod (708), and the bottom ends of the two rotating rods (708) are both fixedly connected to the outer surface of the gear (706).
8. A construction pipe installation device according to claim 7, characterized in that: The outer surfaces of the two fixed frames (707) are fixedly connected to an L-shaped plate (709), and the outer surface of the L-shaped plate (709) is threadedly connected to a threaded rod (710), the bottom ends of the two threaded rods (710) are rotatably connected to a fixed plate (711), the outer surfaces of the two second gear bars (705) are fixedly connected to a second connecting rope (712), and the outer surface of the second connecting rope (712) is fixedly connected to a circular rope (713).