Prefabricated base plate structure

Through the prefabricated assembled base plate structure, grouting holes, air holes, limit grooves and shock absorbers, the construction period and uneven elevation caused by on-site binding of steel bars and concrete pouring during urban rail transit bed base construction are solved. The problem has achieved more efficient and accurate construction, improving the stability and vibration reduction effect of the track bed.

CN221988983UActive Publication Date: 2024-11-12(SUZHOU) RAIL TRANSIT SCI & TECH RES INST CO LTD SHANGHAI CIVIL ENG GRP OF CREC +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420047366.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-11-12
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

During the construction of existing urban rail transit bed bases, the on-site binding of steel bars and concrete pouring methods have limited operations for workers, extended the construction period, and it is difficult to ensure elevation and flatness, which affects vibration reduction effects and structural safety.

Method used

Adopt prefabricated base plate structure, including grouting holes, air holes, limit grooves, shock absorbers and pre-embedded load-bearing cylinders. The base plate and pipe sheet are connected by pouring grouting materials to achieve accurate installation and limiting functions, reducing the on-site Construction volume and complexity.

Benefits of technology

Significantly shorten the construction cycle, improve project quality and economic benefits, ensure the stability and vibration reduction effect of the track bed, and reduce quality risks and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221988983U_ABST
    Figure CN221988983U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of civil engineering of urban rail transit, in particular to a prefabricated base plate structure which comprises a grouting hole formed in the middle of a base plate and a plurality of exhaust holes located in the two sides of the grouting hole and arranged in the longitudinal direction, and the grouting hole and the exhaust holes are used for pouring connection of the base plate and pipe pieces. A plurality of limiting grooves are formed in the bearing surface of the base plate; shock absorbers are arranged in the limiting grooves, the bottoms of the shock absorbers are connected with the bottom planes of the limiting grooves through elastic cushion layers, and the shock absorbers are used for being matched with the prefabricated floating slabs. The utility model has the advantages that by adopting the construction mode of prefabricating the assembly type base plate, the assembly type installation can be carried out without binding on site, and meanwhile, the limiting and damping functions are realized, so that the construction operation is quicker and more convenient. The prefabricated base plate is produced by factory molds in a unified and standardized mode, and matching is more reliable and accurate. Prism through holes, ditches, grouting holes, exhaust holes, limiting grooves, pre-embedded bearing cylinders and other structures are preset in the prefabricated base plate, and the work amount and the work difficulty of a construction site are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of civil engineering of urban rail transit, in particular to a prefabricated assembled base plate structure. Background Art

[0002] At present, in the process of urban rail transit roadbed foundation construction, the main method is to tie steel bars on site and cast them on site. This method currently has the following problems:

[0003] 1. Traditional on-site construction requires workers to tie steel bars and pour concrete on site, which is a heavy workload. In addition, due to the limited construction space, operations are constrained, thus extending the entire construction period.

[0004] 2. The on-site construction method makes it difficult to accurately control the elevation and flatness of the roadbed base, which in turn affects the vibration reduction effect and service life of the roadbed. Especially when the line involves curves, the roadbed plate adopts an outer super-high design, which makes it difficult for workers to ensure accuracy during construction, which has a negative impact on the stability and vibration reduction effect of the roadbed.

[0005] 3. Due to the complexity of the traditional construction process, which involves multiple links, there is a risk of quality problems. For example, the concrete strength fails to meet the standard, or the steel bar is improperly arranged, which may lead to a decrease in the vibration reduction effect and even endanger the safety of the tunnel structure. Utility Model Content

[0006] The purpose of the utility model is to overcome the deficiencies of the prior art and provide a prefabricated assembled base plate structure to reduce the influence of human factors, technical factors and environmental factors on the on-site construction of the roadbed base, improve construction efficiency and project quality, shorten the construction period and enhance economic benefits.

[0007] In order to achieve the above purpose, a prefabricated assembled base plate structure is designed, including: a grouting hole arranged in the middle of the base plate and a plurality of exhaust holes arranged in the longitudinal direction on both sides of the grouting hole, which are used to connect the base plate and the pipe segment by pouring grouting material; a plurality of limiting grooves are arranged on the bearing surface of the base plate, the bottom of the limiting groove is a plane near the grouting hole, and the side away from the grouting hole is an inclined surface; a shock absorber is arranged in the limiting groove, the bottom of the shock absorber is connected to the bottom plane of the limiting groove through an elastic cushion layer, and the shock absorber is used to cooperate with the prefabricated floating plate. The base plate is provided with a rectangular groove-style ditch at the central position of the plate along the track direction. Bearing surfaces are provided on both sides of the ditch, and two pairs of prism through holes are symmetrically provided near the corners on the bearing surface. The shock absorber can simultaneously withstand the bearing force in the up and down directions and the lateral shear force, and the matching surface of the shock absorber and the groove is provided with an elastic cushion layer. The bottom of the prefabricated floating plate is provided with a groove that matches the shock absorber.

[0008] A prefabricated assembled base plate structure is also designed, including: a grouting hole arranged in the middle of the base plate and a plurality of exhaust holes arranged in the longitudinal direction on both sides of the grouting hole, which are used to connect the base plate and the pipe segment by pouring grouting material; a plurality of embedded load-bearing cylinders are arranged on the bearing surface of the base plate, and an elastic body is arranged in the embedded load-bearing cylinder to connect with the prefabricated floating plate. The base plate is provided with a rectangular groove-style ditch at the center of the plate along the track direction. Bearing surfaces are arranged on both sides of the ditch, and two pairs of prismatic through holes are symmetrically arranged near the corners on the bearing surface. The embedded load-bearing cylinder includes a lower base and a casing, the interior of the casing is a circular hollow structure, the lower part of the casing is fixedly connected to the lower base, and the whole after connection is embedded in the bearing surface of the base plate, the casing needs to be higher than the bearing surface, and the raised sleeve part is used to block water from flowing into the sleeve, and also serves as a limiting structure, and is assembled and installed with the prefabricated floating plate. The prefabricated floating slab is embedded with a hollow circular outer sleeve, the inner diameter of which is larger than the outer diameter of the embedded load-bearing cylinder; an elastic cushion is provided on the inner side of the outer sleeve, which cooperates with the outer side of the embedded load-bearing cylinder to play a limiting role. A support block is provided in the middle of the outer sleeve, and a cover plate is installed on the surface of the outer sleeve.

[0009] Compared with the prior art, the utility model has the following advantages:

[0010] 1. By adopting the construction method of prefabricated assembled base plate, there is no need to tie steel bars on site, which reduces the amount of on-site construction work, significantly shortens the construction period, and has significant economic benefits.

[0011] 2. The prefabricated base plate can be assembled on site with the prefabricated floating plate, and it also has the function of limiting and reducing vibration, which makes the construction work faster and more convenient. The prefabricated base plate is produced in a unified and standardized manner by the factory mold, and its coordination is more reliable and accurate.

[0012] 3. The prefabricated base plate is pre-set with prism holes, gutters, grouting holes, exhaust holes, limit grooves, embedded load-bearing tubes and other structures, which greatly reduces the workload on the construction site and reduces the difficulty of the operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 , Schematic diagram of the structure of the prefabricated base plate of embodiment 1 (front view);

[0014] Figure 2 , Schematic diagram of the prefabricated base plate structure of embodiment 1 (top view);

[0015] Figure 3 , Schematic diagram of the structure of the prefabricated base plate after the pipe segment is cast in Example 1;

[0016] Figure 4 , Schematic diagram of the three-dimensional structure of a prefabricated assembled base plate with a limiting groove in Example 1;

[0017] Figure 5 , Example 1 prefabricated base plate structure plan view;

[0018] Figure 6 , Schematic diagram of the three-dimensional structure of the shock absorber installation position in Example 1;

[0019] Figure 7 , a schematic diagram of the three-dimensional structure of the first embodiment after the overall assembly is completed;

[0020] Figure 8 , Structural plan view of embodiment 1 after the overall installation is completed;

[0021] Fig. 9 , Schematic diagram of the structure of the prefabricated assembled base plate with embedded load-bearing tube in embodiment 2;

[0022] Fig.10 , a schematic diagram of the structure of the second embodiment after the overall installation is completed;

[0023] In the figure: 1 prefabricated base plate body; 2 ditch; 3 bearing surface; 4 prism through hole; 5 exhaust hole; 6 grouting hole; 7 concrete; 8 pipe segment; 9 prefabricated base plate with limiting groove; 10 limiting groove; 11 shock absorber; 12 prefabricated floating plate with limiting groove; 13 prefabricated base plate with embedded load-bearing tube; 14 embedded load-bearing tube; 15 outer sleeve; 16 inner sleeve; 17 spring; 18 prefabricated floating plate with embedded sleeve. DETAILED DESCRIPTION

[0024] In order to make the purpose, principle and structure of the utility model clearer, it is further described below in conjunction with the drawings and specific embodiments.

[0025] Embodiment 1:

[0026] The utility model provides a prefabricated assembled base plate structure, comprising a prefabricated base plate body (1), a water ditch (2), a bearing surface (3), a prism through hole (4), an exhaust hole (5), a grouting hole (6), concrete (7) and a pipe segment (8).

[0027] A rectangular groove-style water ditch (2) is provided at the upper end of the base plate (1) in the center of the plate along the track direction; a grouting hole (6) is provided in the middle of the prefabricated base plate (1), and two exhaust holes (5) are provided on both sides of the grouting hole in the longitudinal direction, so as to facilitate on-site pouring of concrete (7) between the prefabricated base plate and the pipe segment (8), and also provide convenience for monitoring operation to ensure accurate grouting operation; bearing surfaces (3) are provided on both sides of the water ditch (2), and two pairs of prism through holes (4) are symmetrically designed near the corners on the bearing surfaces. In addition, a limiting structure is provided on the bearing surface (3) to facilitate assembly-type installation of the prefabricated base plate and the prefabricated floating plate.

[0028] like Figure 4 , 5 As shown in , 6, a limiting groove (10) is provided on the bearing surface of the base plate, half of the bottom of the limiting groove is a plane, and the other half is a slope that gradually rises from the inside to the outside.

[0029] The shock absorber (11) can simultaneously bear the bearing force in the up-down direction and the lateral shear force, and an elastic cushion layer is provided on the mating surface between the shock absorber and the groove, and the exterior of the shock absorber is waterproofed. The shock absorber is placed inside the groove, and the design size of the groove is slightly larger than the design size of the shock absorber, so as to meet the requirements of the various contact surfaces of the shock absorber and the limiting groove for mating.

[0030] like Figure 7 As shown, a schematic diagram of the overall structure of the prefabricated base plate of the first embodiment after assembly is completed, wherein the prefabricated floating plate (12) having a limiting groove acts on the prefabricated base plate through the shock absorber (11); when the prefabricated floating plate is about to undergo relative displacement with the prefabricated base plate, the shock absorber capable of resisting lateral shear load is offset by the side surfaces of the upper and lower grooves, thereby satisfying the limiting condition; the first embodiment can be installed with only simple on-site assembly and has vibration reduction and limiting functions.

[0031] Compared with the existing technology, the utility model has the following advantages: 1) The design of the groove slope facilitates the installation and replacement of the shock absorber. After the prefabricated base plate and the pipe segment are cast, the height of the inner plane of the groove is lower than the height of the outer bearing surface of the groove. The design of the slope can smoothly transition the height difference between the two, so that the shock absorber can be replaced by pulling. When the height compensation is required for the base settlement problem in the future, it is only necessary to lift the upper floating plate appropriately, pull out the shock absorber from the slope for replacement, which is very convenient for subsequent maintenance. 2) Since the two sides of the prefabricated base plate are thinner than the middle position, the design of the slope can effectively ensure the thickness of the two sides of the base plate and maintain the strength of the outer side of the prefabricated base plate so that it can meet the engineering requirements.

[0032] Embodiment 2:

[0033] The utility model provides a prefabricated assembled base plate structure, comprising a prefabricated base plate body (1), a water ditch (2), a bearing surface (3), a prism through hole (4), an exhaust hole (5), a grouting hole (6), concrete (7) and a pipe segment (8).

[0034] A rectangular groove-style water ditch (2) is provided at the upper end of the base plate (1) in the center of the plate along the track direction; a grouting hole (6) is provided in the middle of the prefabricated base plate (1), and two exhaust holes (5) are provided on both sides of the grouting hole in the longitudinal direction, so as to facilitate on-site pouring of concrete (7) between the prefabricated base plate and the pipe segment (8), and also provide convenience for monitoring operation to ensure accurate grouting operation; bearing surfaces (3) are provided on both sides of the water ditch (2), and two pairs of prism through holes (4) are symmetrically designed near the corners on the bearing surfaces. In addition, a limiting structure is provided on the bearing surface (3) to facilitate assembly-type installation of the prefabricated base plate and the prefabricated floating plate.

[0035] like Fig. 9 As shown, this embodiment has a prefabricated assembled base plate (13) with a pre-embedded load-bearing tube, and a pre-embedded load-bearing tube (14) is provided on the bearing surface of the prefabricated base plate; the pre-embedded load-bearing tube includes a lower base and a casing, the interior of the casing is a circular hollow structure, the lower part of the casing is fixedly connected to the lower base, and the whole after connection is pre-embedded inside the bearing surface of the prefabricated base plate, and the casing needs to be 150mm higher than the bearing surface; the raised sleeve part can effectively block water from flowing into the sleeve, preventing the spring inside the sleeve from being corroded, and also serves as a limit structure, which can be assembled with the prefabricated floating plate.

[0036] like Fig.10 As shown, a schematic diagram of the structure of the prefabricated base plate of the second embodiment after the prefabricated installation is completed, the prefabricated floating plate (18) is embedded with a hollow circular outer sleeve (15), the inner diameter of the outer sleeve (15) is slightly larger than the outer diameter of the embedded load-bearing cylinder (14); an elastic cushion layer is provided on the inner side of the outer sleeve, and the inner side of the outer sleeve cooperates with the outer side of the embedded load-bearing cylinder to play a limiting role;

[0037] A prominent support block is provided in the middle area of ​​the outer sleeve, and a cover plate is installed on the surface of the outer sleeve to prevent dust and other impurities from entering the interior of the sleeve. The prefabricated base plate assembly installation process of Example 2 is as follows: first, the inner sleeve (16) is embedded in the outer sleeve (15) so that the bottom of the inner sleeve (16) is connected to the embedded load-bearing casing (14); then, by twisting the inner sleeve (16), the spring (17) inside the inner sleeve is gradually shortened and closely attached to the support block in the outer sleeve (15); finally, a split gasket of equal thickness is added under the support block to realize the jacking operation of the floating plate, thereby completing the assembly installation.

[0038] The above is only a specific implementation method of this utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field within the technical scope disclosed by the utility model, according to the technical solution and new concept of the utility model, shall be covered by the protection scope of the utility model.

Claims

1. A prefabricated base plate structure, characterized in that include A grouting hole arranged in the middle of the base plate and a plurality of exhaust holes arranged in the longitudinal direction on both sides of the grouting hole are used to connect the base plate and the pipe segment by pouring grouting material; A plurality of limiting grooves are arranged on the bearing surface of the base plate, wherein the bottom of the limiting groove is a flat surface on one side close to the grouting hole and an inclined surface on the other side away from the grouting hole; A shock absorber is arranged in the limiting groove, wherein the bottom of the shock absorber is connected to the bottom plane of the limiting groove through an elastic cushion layer, and the shock absorber is used to cooperate with the prefabricated floating plate.

2. A prefabricated assembly base plate structure as claimed in claim 1, characterized in that The shock absorber can bear the bearing force in the up-and-down directions and the lateral shear force at the same time, and elastic cushion layers are arranged on the matching surfaces of the shock absorber and the groove.

3. A prefabricated base plate structure as claimed in claim 1, characterized in that The bottom of the prefabricated floating plate is provided with a groove matched with the shock absorber.

4. A prefabricated base plate structure, characterized in that include A grouting hole arranged in the middle of the base plate and a plurality of exhaust holes arranged in the longitudinal direction on both sides of the grouting hole are used to connect the base plate and the pipe segment by pouring grouting material; A plurality of pre-buried load-bearing cylinders are arranged on the bearing surface of the base plate, wherein elastic bodies are arranged inside the pre-buried load-bearing cylinders and connected with the prefabricated floating plate.

5. A prefabricated assembly base plate structure as claimed in claim 1 or 4, characterized in that The base plate is provided with a rectangular groove-style ditch at the center of the plate along the track direction.

6. A prefabricated base plate structure as claimed in claim 5, characterized in that Bearing surfaces are arranged on both sides of the ditch, and two pairs of prism through holes are symmetrically arranged on the bearing surfaces near the corners.

7. A prefabricated base plate structure as claimed in claim 4, characterized in that The embedded load-bearing tube includes a lower base and a casing. The interior of the casing is a circular hollow structure. The lower part of the casing is fixedly connected to the lower base. The whole is embedded in the bearing surface of the base plate after connection. The casing needs to be higher than the bearing surface. The raised sleeve part is used to block water from flowing into the sleeve. It also serves as a limiting structure and is assembled with the prefabricated floating plate.

8. A prefabricated base plate structure as claimed in claim 7, characterized in that A hollow circular outer sleeve is embedded in the prefabricated floating plate, and the inner diameter of the outer sleeve is larger than the outer diameter of the embedded load-bearing cylinder. An elastic cushion layer is provided on the inner side of the outer sleeve, which cooperates with the outer side of the embedded load-bearing cylinder through the inner side of the outer sleeve, thereby playing a limiting role.

9. A prefabricated base plate structure as claimed in claim 8, characterized in that A supporting block is arranged in the middle of the outer sleeve, and a cover plate is installed on the surface of the outer sleeve.