Prefabricated UHPC (Ultra High Performance Concrete) composite track foundation structure of portal crane
Through the prefabricated UHPC composite track infrastructure, the problems of foundation settlement and track stability of the gantry crane are solved, and the construction speed is fast and the foundation is stable is achieved, ensuring the high load capacity and track straightness of the crane.
Patent Information
- Application Number
- CN202420498908.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The cast-in-place reinforced concrete foundation beams of the gantry crane are prone to cause uneven settlement of the foundation under frequent lifting heavy objects. The construction process is complex and the construction period is long. The tracks are prone to snake curves and need to wait 28 days before use.
The prefabricated UHPC composite track foundation structure includes composite reinforced foundations, prefabricated UHPC track foundations, track fasteners and tracks. The foundation bearing capacity is enhanced by compacting foundations, three-way geogrids and concrete hardened layers, and the fastener grooves and The rail groove ensures track stability.
It achieves simplicity and fast construction, stable foundation, and difficult track deviation, shortens construction time, avoids the problems of uneven foundation settlement and track bending, and ensures the stability and safety of the structure.
Smart Images

Figure CN221988984U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of crane foundations, in particular to a prefabricated UHPC composite track foundation structure for a gantry crane. Background Art
[0002] Gantry cranes are important engineering equipment for regional vertical lifting and transportation. Compared with tower cranes and bridge cranes, gantry cranes have a larger load capacity and can move horizontally under load. At present, the foundation of gantry cranes is mostly a cast-in-place reinforced concrete foundation beam structure. The design and calculation of the foundation beam only considers whether there is sufficient foundation bearing capacity, and rarely considers the foundation settlement under cyclic loads. Therefore, it is necessary to consider that the foundation beam foundation is prone to uneven foundation settlement when subjected to the load of frequent lifting of heavy objects, and when using The foundation beam is the foundation of the track. When constructing the lifting site, it is necessary to wait until the foundation beam construction is completed before the site hardening can be carried out. The construction process is complicated and the construction period is long. On the other hand, since the heavy objects are not completely aligned with the crane's lifting center during lifting, the crane often carries lateral loads due to the slight swing of the heavy objects when lifting goods. Under the repeated action of lateral loads, the back of the track fasteners is prone to loosening and failure due to the lack of a structure to resist lateral effects, and the line is prone to serpentine curves. At the same time, the cast-in-place foundation beams need to be put into use 28 days after the construction is completed and maintained, which takes a long time to wait. UHPC, or ultra-high performance concrete, is a cement-based high-performance concrete with excellent mechanical properties and durability. It is the best concrete material for making concrete components with concentrated stress and high working intensity, and it has a long service life. Utility Model Content
[0003] The utility model aims to provide a prefabricated UHPC composite track foundation structure for a gantry crane which has the advantages of convenient installation, long service life, high bearing capacity and stable track.
[0004] In order to achieve the above purpose, the technical solution of the utility model is:
[0005] A prefabricated UHPC composite track foundation structure for a gantry crane comprises a composite reinforced foundation, a prefabricated UHPC track foundation, track fasteners and tracks. The composite reinforced foundation is composed of a compacted foundation, a three-way geogrid and a cement hardened layer from bottom to top, and a foundation installation groove is reserved in the concrete hardened layer during pouring; the prefabricated UHPC track foundation is installed in the foundation installation groove, and the foundation installation groove is filled with a quick-setting UHPC slurry before installation; a fastener groove for facilitating the installation of a track fastener and a track groove for installing a track are provided on the top surface of the prefabricated UHPC track foundation, a bolt sleeve matching the track fastener is pre-embedded in the fastener groove, and the track is installed in the track groove and compressed by the track fastener.
[0006] As a further improvement, the compaction degree of the compacted foundation reaches 95% to 98%. When the compaction degree cannot meet the requirements, lime or fly ash stabilized aggregate can be used for replacement. The replacement width and depth should be greater than 2 to 3 times the bottom width of the prefabricated UHPC track foundation; the three-way geogrid should adopt steel-plastic geogrid, and the laying range of the three-way geogrid is 2 to 3 times the bottom width of the prefabricated UHPC track foundation; the concrete hardened layer should be made of C30 to C45 concrete.
[0007] A further improvement is that the prefabricated UHPC track foundation is 1.5m to 2.5m long, and its cross-section is a rectangle of 30 to 35cm in length and 15 to 20cm in width. The prefabricated UHPC track foundation is made of UHPC ultra-high performance concrete with a compressive strength of 100MPa to 120Mpa; the rail groove is arranged on the longitudinal center line of the upper surface of the prefabricated UHPC track foundation, the rail groove is 4 to 5cm deep and 8 to 12cm wide; the fastener groove is arranged on both sides of the rail groove, the fastener groove is 2 to 3cm deep and 5 to 6cm wide, and one end of the fastener groove is directly connected to the rail groove.
[0008] As a further improvement, a first lap joint and a second lap joint are respectively provided at both ends of the prefabricated UHPC track foundation. The first lap joint extends from the upper surface of the prefabricated UHPC track foundation, with a length of 10 to 15 cm and a height of 1 / 2 of the height of the prefabricated UHPC track foundation. The second lap joint extends from the lower surface of the prefabricated UHPC track foundation, and its length and height match those of the first lap joint.
[0009] A further improvement is that the track fastener consists of a track clamp, a high-strength screw and a nut. The high-strength screw and the nut cooperate with each other to clamp the track clamp on the fastener groove, and one end of the clamp contacts the edge of the fastener groove, and the other end clamps the track in the track groove. The size of the high-strength screw matches the bolt sleeve.
[0010] As a further improvement, the bolt sleeves are embedded in the bottom of the fastener groove along the length direction of the prefabricated UHPC track foundation, and the spacing between adjacent bolt sleeves is 50 to 80 cm.
[0011] The technical effects of the utility model are:
[0012] (1) The construction is simple and easy, and the construction speed is fast: During the construction at the crane hoisting site, that is, when the site is prepared and the concrete surface layer is poured, a solid wood pressure plate wrapped with plastic film is set at the installation position of the prefabricated UHPC track foundation. After the concrete surface layer hardens, a foundation installation groove is formed. Then the prefabricated UHPC track foundation is directly installed in the foundation installation groove, and the subsequent track installation is carried out. The track foundation construction is convenient and the installation speed is fast, which greatly shortens the time for the track foundation to be put into use and saves manpower and material costs.
[0013] (2) Able to withstand heavy loads, the foundation is stable and not prone to uneven settlement: By compacting or improving the foundation under the concrete surface layer, the bearing capacity of the foundation is increased, and then reinforcement is used to enhance its shear resistance, further avoiding the risk of uneven foundation settlement and ensuring the stability and safety of the superstructure.
[0014] (3) The track is stable and not prone to deviation: By setting the fastener groove and the rail groove to limit the position of the track fastener and the track, one end of the track clamp is in contact with the edge of the fastener groove. The edge of the fastener groove provides the track clamp with a reaction force to resist the lateral action, further ensuring the straight posture of the track, making it less likely for the track to bend and form a serpentine curve. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative work, among which:
[0016] Figure 1 This is a schematic diagram of a prefabricated UHPC composite track foundation structure for a gantry crane according to the utility model;
[0017] Figure 2 This is a schematic diagram of the prefabricated UHPC track foundation structure of the utility model;
[0018] Among them, 1 is a composite reinforced foundation, 11 is a compacted foundation, 12 is a three-way geogrid, 13 is a concrete hardened layer, 131 is a foundation installation groove, 2 is a prefabricated UHPC track foundation, 21 is a fastener groove, 211 is a bolt sleeve, 22 is a rail groove, 23 is a first lap joint, 24 is a second lap joint, 3 is a rail fastener, 31 is a rail splint, 32 is a high-strength screw, 33 is a nut, and 4 is a track. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Embodiment 1:
[0021] like Figure 1-2As shown, the utility model provides a prefabricated UHPC composite track foundation structure for a gantry crane, including a composite reinforced foundation 1, a prefabricated UHPC track foundation 2, a track fastener 3, and a track 4. The composite reinforced foundation 1 is composed of a compacted foundation 11, a three-way geogrid 12, and a concrete hardened layer 13 from bottom to top. The concrete hardened layer 13 is reserved with a foundation installation groove 131 when pouring. The foundation installation groove 131 is made when pouring the concrete hardened layer 13. When pouring the concrete hardened layer 13, the foundation installation groove 131 is A solid wood pressing plate wrapped with plastic film is arranged at position 31, and the solid wood pressing plate is taken out to be formed after the concrete hardens; the prefabricated UHPC track foundation 2 is installed in the foundation installation groove 131, and the foundation installation groove 131 is filled with quick-setting UHPC slurry before installation. The top surface of the prefabricated UHPC track foundation 2 is provided with a fastener groove 21 for facilitating the installation of the track fastener 3 and a track groove 22 for installing the track 4, and a bolt sleeve 211 matching the track fastener 3 is pre-embedded in the fastener groove 21, and the track 4 is installed in the track groove 22 and is tightened by the track fastener 3.
[0022] like Figure 1 As shown, the compaction degree of the compacted foundation 11 reaches 95%; the three-dimensional geogrid 12 should be made of steel-plastic geogrid, and the laying range of the three-dimensional geogrid 12 is 3 times the bottom width of the prefabricated UHPC track foundation 2; the concrete hardened layer 13 should be made of C30 concrete casting.
[0023] like Figure 2 As shown, the prefabricated UHPC track foundation 2 is 2m long, and its cross-section is a rectangle of 30cm long × 20cm high. The prefabricated UHPC track foundation 2 is made of UHPC ultra-high performance concrete with a compressive strength of 100MPa; the track groove 22 is arranged on the longitudinal center line of the upper surface of the prefabricated UHPC track foundation 2, and the track groove is 4cm deep and 8cm wide; the fastener groove 21 is arranged on both sides of the track groove 22, and the fastener groove 21 is 2cm deep and 5cm wide, and one end of the fastener groove 21 is directly connected to the track groove 22.
[0024] like Figure 2 As shown, the first lap joint 23 and the second lap joint 24 are respectively provided at both ends of the prefabricated UHPC track foundation 2. The first lap joint 23 extends from the upper surface of the prefabricated UHPC track foundation 2, with an extension length of 10 to 15 cm and an extension height of 1 / 2 of the height of the prefabricated UHPC track foundation 2. The second lap joint 24 extends from the lower surface of the prefabricated UHPC track foundation 2, and its extension length and extension height match those of the first lap joint 23.
[0025] like Figure 1As shown, the rail fastener 3 is composed of a rail clamp 31, a high-strength screw 32, and a nut 33. The high-strength screw 32 and the nut 33 cooperate with each other to clamp the rail clamp 31 on the fastener groove 21, and one end of the rail clamp 31 contacts the edge of the fastener groove 21, and the other end clamps the rail 4 in the rail groove 22. The size of the high-strength screw 32 matches the bolt sleeve 211.
[0026] The beneficial effects of the utility model are:
[0027] The construction is simple and easy, and the construction speed is fast: when constructing at the crane hoisting site, that is, when the site is prepared and the concrete surface layer is poured, a solid wood press plate wrapped with plastic film is set at the installation position of the prefabricated UHPC track foundation. After the concrete surface layer hardens, a foundation installation groove is formed, and then the prefabricated UHPC track foundation is directly installed in the foundation installation groove, and subsequent track installation is carried out. The track foundation construction is convenient and the installation speed is fast, which greatly shortens the time for the track foundation to be put into use and saves manpower and material costs.
[0028] It can withstand heavy loads, and its foundation is stable and not prone to uneven settlement: by compacting or improving the foundation under the concrete surface layer to increase its bearing capacity, and then using reinforcement to enhance its shear resistance, the risk of uneven foundation settlement is further avoided, ensuring the stability and safety of the superstructure.
[0029] The track is stable and not prone to deviation: the position of the track fasteners and tracks is limited by setting fastener grooves and rail grooves. One end of the track clamp is in contact with the edge of the fastener groove. The edge of the fastener groove provides a reaction force for the track clamp to resist lateral effects, further ensuring the straight posture of the track and making it less likely for the track to bend and form a serpentine curve.
[0030] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and the implementation scheme. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A prefabricated UHPC composite track foundation structure for a gantry crane, characterized in that: The invention comprises a composite reinforced foundation (1), a prefabricated UHPC track foundation (2), a track fastener (3), and a track (4). The composite reinforced foundation (1) is composed of a compacted foundation (11), a three-dimensional geogrid (12), and a concrete hardened layer (13) from bottom to top. The concrete hardened layer (13) is provided with a foundation installation groove (131) when pouring. The prefabricated UHPC track foundation (2) is installed in the foundation installation groove (131). Before installation, the foundation installation groove (131) is filled with a quick-setting UHPC slurry. The top surface of the prefabricated UHPC track foundation (2) is provided with a fastener groove (21) for facilitating installation of the track fastener (3) and a track groove (22) for installing the track (4). A bolt sleeve (211) matching the track fastener (3) is pre-buried in the fastener groove (21). The track (4) is installed in the track groove (22) and is pressed by the track fastener (3).
2. A prefabricated UHPC composite track foundation structure for a gantry crane according to claim 1, characterized in that: The compaction degree of the compacted foundation (11) reaches 95% to 98%. When the compaction degree cannot meet the requirements, lime or fly ash stabilized aggregate can be used for replacement. The replacement width and depth should be greater than 2 to 3 times the bottom width of the prefabricated UHPC track foundation (2); the three-dimensional geogrid (12) should be a steel-plastic geogrid, and the laying range of the three-dimensional geogrid (12) is 2 to 3 times the bottom width of the prefabricated UHPC track foundation (2); the concrete hardened layer (13) should be cast and manufactured by C30 to C45 concrete.
3. The prefabricated UHPC composite track foundation structure for a gantry crane according to claim 1, characterized in that: The prefabricated UHPC track foundation (2) is 1.5m to 2.5m long and has a cross section of a rectangle with a length of 30 to 35cm and a width of 15 to 20cm. The prefabricated UHPC track foundation (2) is made of UHPC ultra-high performance concrete with a compressive strength of 100MPa to 120MPa. The track groove (22) is arranged on the longitudinal center line of the upper surface of the prefabricated UHPC track foundation (2), with a track groove depth of 4 to 5cm and a width of 8 to 12cm. The fastener groove (21) is arranged on both sides of the track groove (22), with a track groove depth of 2 to 3cm and a track width of 5 to 6cm, and one end of the fastener groove (21) is directly connected to the track groove (22).
4. The prefabricated UHPC composite track foundation structure for a gantry crane according to claim 1, characterized in that: The two ends of the prefabricated UHPC track foundation (2) are respectively provided with a first lap joint (23) and a second lap joint (24); the first lap joint (23) extends from the upper surface of the prefabricated UHPC track foundation (2), has an extension length of 10 to 15 cm, and has an extension height of 1 / 2 the height of the prefabricated UHPC track foundation (2); the second lap joint (24) extends from the lower surface of the prefabricated UHPC track foundation (2), and its extension length and extension height match those of the first lap joint (23).
5. The prefabricated UHPC composite track foundation structure for a gantry crane according to claim 1, characterized in that: The track fastener (3) is composed of a track clamp (31), a high-strength screw (32), and a nut (33). The high-strength screw (32) and the nut (33) cooperate with each other to clamp the track clamp (31) on the fastener groove (21), and one end of the clamp is in contact with the groove edge of the fastener groove (21), and the other end clamps the track (4) in the track groove (22). The size of the high-strength screw (32) matches that of the bolt sleeve (211).
6. The prefabricated UHPC composite track foundation structure for a gantry crane according to claim 1, characterized in that: The bolt sleeves (211) are pre-buried in the bottom of the fastener groove (21) along the length direction of the prefabricated UHPC track foundation (2), and the spacing between adjacent bolt sleeves (211) is 50 to 80 cm.
