Combined slope wharf
By designing a combined slope dock in mountain rivers, and adjusting the composition ratio of slopes and steps, the problems of insufficient space and construction difficulty of traditional slope docks under large water level and steep terrain are solved, achieving a more economical and environmentally friendly The construction of the wharf meets the needs of ship docking and loading and unloading with large water levels.
Patent Information
- Application Number
- CN202323660704.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-29
AI Technical Summary
In mountainous rivers with large water level changes, steep terrain on the bank slope and narrow river sections, traditional slope docks are too long, resulting in insufficient layout space, high project investment and difficult construction, making it difficult to meet the large water level difference. and loading and unloading operation requirements.
A combined slope dock is designed, including the lower river ramp, end step and end platform set on the side of the river channel. The end platform is located near the shore side of the end step. The longitudinal slope ratio of the lower river ramp is 1:11 to 1: 9. The slope of the end step is 1:2-1:7. By adjusting the composition ratio of the ramp and step, the overall length is shortened and space limitations are adapted to.
Shortened the overall length of Xiahe ramp, reduced construction difficulty and engineering investment, reduced the impact on the utilization of natural coastline and ecological environment, and achieved manual and mechanical loading and unloading during the low water level period, meeting the large water level The docking and loading and unloading needs of ships in mountainous rivers.
Smart Images

Figure CN221989214U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a design scheme for a slope dock, and more specifically, to a combined slope dock. Background Art
[0002] Inland waterway transport business places higher demands on the construction of inland river terminals, especially mountain river terminals. In order to promote the high-quality development of inland waterway transport, the construction of mountain river terminals is particularly important. However, mountain rivers have the characteristics of large water level fluctuations, chaotic flow, steep terrain, and narrow river surface. To adapt to the above characteristics, conventional mountain river terminal designs usually adopt sloped terminals.
[0003] Compared with vertical docks, slope docks have the characteristics of strong adaptability to large water level differences, simple construction, convenient use and low later maintenance costs. They are a common dock form in mountainous rivers. However, for mountainous rivers with large water level fluctuations, steep bank slopes and narrow river sections, traditional slope docks lack layout space due to their long down-river ramps, which greatly increases project investment and construction difficulty. For example, when the water level difference is 15m and the slope is 10%, the length of the ramp needs to be at least 150m; when the water level difference is 30m and the slope is 10%, the length of the ramp needs to be at least 360m. Therefore, on the basis of the traditional ramp dock layout, it is of great significance to propose a slope dock that is more adaptable to space restrictions and meets the needs of berthing and loading and unloading operations with large water level differences. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a combined slope wharf, which can solve the design problem of a slope wharf that needs to meet the requirements of berthing and loading and unloading operations with a large water level difference when the layout space is limited.
[0005] The technical solution adopted by the utility model to solve its technical problems is: constructing a combined slope dock, including a dock working surface for ships to dock and load and unload at medium and low water levels, wherein the dock working surface includes a down-river ramp arranged on the side of the river channel, an end step and an end platform arranged at the end of the down-river ramp, and the end platform is arranged on the nearshore side of the end step.
[0006] According to the above scheme, the minimum longitudinal slope ratio of the downstream river ramp is 1:11, and the maximum longitudinal slope ratio of the downstream river ramp is 1:9.
[0007] According to the above scheme, the slope of the end step is between 1:2 and 1:7.
[0008] The combined slope dock of the utility model has the following beneficial effects:
[0009] The utility model can greatly shorten the overall length of the river ramp, reduce the construction difficulty, reduce the project investment, reduce the use of the natural coastline, and reduce the impact on the ecological environment. At the same time, during the low water level period, the loading and unloading can be completed by combining manual and mechanical methods. It can meet the needs of low-water level ship docking and loading and unloading at the slope dock in mountainous rivers with large water level differences, and is particularly suitable for slope docks on mountainous rivers. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0011] Figure 1 It is a schematic diagram of the plan structure of the combined slope dock of the utility model;
[0012] Figure 2 It is a schematic diagram of the longitudinal section structure of the combined slope dock of the utility model;
[0013] Figure 3 It is a schematic diagram of the planar connection structure of the ramp dock with steps at the end of the utility model;
[0014] Figure 4 It is a schematic diagram of the longitudinal section structure of the ramp wharf with steps at the end of the utility model;
[0015] In the figure: 1. Downriver ramp, 2. Terminal platform, 3. Terminal steps, 4. Berthed vessels, 5. Designed low water level, 6. Designed high water level. DETAILED DESCRIPTION
[0016] In order to have a clearer understanding of the technical features, purposes and effects of the present utility model, the specific implementation methods of the present utility model are now described in detail with reference to the accompanying drawings.
[0017] like Figure 1-4As shown, the combined slope wharf of the utility model includes a wharf working surface for ships to dock and load and unload at medium and low water levels, wherein the wharf working surface includes a river-discharging ramp 1 arranged on the side of the river channel, a terminal step 3 and a terminal platform 2 arranged at the end of the river-discharging ramp 1, and the terminal platform 2 is arranged on the nearshore side of the terminal step 3. The minimum longitudinal slope ratio of the river-discharging ramp is 1:11, and the maximum longitudinal slope ratio of the river-discharging ramp is 1:9. The slope of the terminal step 3 is between 1:2 and 1:7. The ramp wharf with the terminal step 3 means that while meeting the design of the highest and lowest water levels for berthing, the terminal section of the ramp wharf is changed from a car-discharging river channel design to a step or a combination of a step and a platform. The slope of the step can be adjusted to be greater than the ramp section, greatly shortening the length of the ramp wharf. According to the specification, the longitudinal slope of the ramp for cars to get off the river should not be greater than 1:11. When pedestrian steps are set on the ramp, the slope of the ramp can be adjusted to 1:2-1:7. Therefore, this design can greatly shorten the overall length of the ramp 1 for getting off the river. At the same time, when the water level is low, loading and unloading can be completed by combining manual and mechanical methods (or passengers can get on and off the ship directly through the steps), which better meets the needs of ship berthing and loading and unloading at the designed low water level 5.
[0018] The car ramp 1 with terminal step 3 is composed of three parts: the ramp 1, the terminal platform 2 and the terminal step 3. The ramp 1, the terminal platform 2 or the terminal step 3 together form a dock working surface for ships to dock and load at low and medium water levels. Among them, the longitudinal slope ratio of the ramp 1 should not be greater than 1:11, and should not be greater than 1:9 under difficult conditions, and the slope of the terminal step 3 should be between 1:2 and 1:7.
[0019] When designing the automobile descent ramp 1 with the terminal step 3, the construction environment of the project construction site should be taken into consideration. Under the condition of ensuring the space limit of the slope dock construction, the composition ratio of the steps and the descent ramp 1 should be reasonably allocated in combination with the water level change history of the construction site, and the terminal platform 2 should be set at the terminal position to facilitate the work of automobiles and mobile loading and unloading machinery.
[0020] When using the car embankment ramp 1 with the end step 3, when the working water level is above the end step 3 and the end platform 2, the designed wharf can use the embankment ramp 1 to directly disembark passengers or load and unload cargo; when the working water level is below the end step 3 and the end platform 2, the wharf can disembark passengers through the end step 3, and at the same time complete cargo loading and unloading operations through manual loading and unloading of the end step 3 and mechanical loading and unloading of the end platform 2.
[0021] Example
[0022] When a certain wharf is designed with a high water level of 6H h Take 639m (1985 national elevation) and design low water level for 5H lWhen the height is 605m, the designed high and low water level difference δH=34m.
[0023] When a common ramp is used to lower a wharf, the shoreline L1 occupied by the ramp 1 is calculated as follows:
[0024] L1=(H h -H l )×11=374m
[0025] When the water level of the ramp down river wharf is below 620m and a step combined with a platform is used, the calculation of the shoreline L2 occupied by the ramp down river 1 is as follows:
[0026] L2=(H h -620)×11+(620-H l )×2=239m
[0027] When the design scheme of the car ramp 1 with steps is adopted, compared with the ordinary ramp pier scheme, the length of the shoreline occupied by the ramp 1 is saved:
[0028] L1-L2=135m
[0029] Save ramp length:
[0030]
[0031] In summary, it is believed that the design scheme of the pier 1 with a ramp for cars launching into the river with steps is more advantageous than the ordinary ramp pier scheme in that it is limited in layout space and needs to meet the needs of berthing and loading and unloading operations with large water level differences.
[0032] The embodiments of the utility model are described above in conjunction with the accompanying drawings, but the utility model is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the utility model, ordinary technicians in this field can also make many forms without departing from the scope of protection of the utility model and the claims, which all fall within the protection of the utility model.
Claims
1. A combined slope dock, It is characterized in that The invention comprises a dock working surface for ships to dock and load and unload at medium and low water levels, wherein the dock working surface comprises a river-discharging ramp arranged on the side of the river channel, a terminal step and a terminal platform arranged at the end of the river-discharging ramp, and the terminal platform is arranged on the nearshore side of the terminal step.
2. The combined slope dock according to claim 1, It is characterized in that The minimum longitudinal slope ratio of the ramp down to the river is 1:11, and the maximum longitudinal slope ratio of the ramp down to the river is 1:
9.
3. The combined slope dock according to claim 1, It is characterized in that The slope of the end step is between 1:2 and 1:7.