Fabricated diaphragm wall construction structure
By pre-embedding of inclined pipe casing in prefabricated ground connection walls and filling fine sand with insertion structure and funnel, the problems of complex construction and difficult to control accuracy in the prior art are solved, and simple installation of ground connection walls and Efficient construction.
Patent Information
- Application Number
- CN202420203941.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-29
AI Technical Summary
The existing underground continuous wall construction mainly adopts cast-in-place structure, which has problems such as complex construction, difficulty in ensuring accuracy and inconvenient installation of fine sand. Especially in prefabricated ground wall construction, the embedded structure of the inclined pipe is easily affected by construction, resulting in installation. Inconvenience and precision are difficult to control.
The inclined inclined tube casing is used in the upper and lower sections of the walls, and the insertion structure is connected with high-strength bolts. The funnel is filled with fine sand to fill the gap, ensuring the accurate installation and fixation of the inclined tube and simplifying the construction process.
It realizes the convenient installation and accuracy of the inclined measuring pipe, ensures the smooth splicing and construction of the prefabricated ground-connected wall, avoids waste of fine sand and blockage, and improves the simplicity and efficiency of construction.
Smart Images

Figure CN221989286U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ground-connected wall construction, in particular to an assembled ground-connected wall construction structure. Background Art
[0002] In recent years, urban subway projects are developing rapidly. As the primary project of the subway, the underground continuous wall is an important structure to ensure the safety of the station. At present, most of the underground continuous walls in my country adopt cast-in-place structures. In order to explore the development of prefabricated buildings, it is necessary to develop prefabricated underground continuous walls. Utility Model Content
[0003] The utility model provides an assembled ground-connected wall construction structure to solve the technical problems existing in the known technology.
[0004] The utility model adopts a technical solution to solve the technical problems existing in the known technology: an assembled ground-connected wall construction structure, comprising an upper wall section and a lower wall section, both sides of the upper wall section and the lower wall section are provided with vertical joint structures; an inclinometer sleeve I is pre-embedded in the upper wall section, and a wall docking structure I is pre-embedded at the lower end of the upper wall section; an inclinometer sleeve II docking with the inclinometer sleeve I is pre-embedded in the lower wall section, the inclinometer sleeve II is provided with a bottom seal, and the inclinometer sleeve II is provided with a bottom seal. A bottom seal is provided, and a wall docking structure II matching the wall docking structure I is pre-buried at the upper end of the lower section wall; the docking structure I is connected to the docking structure II, the inclinometer tube casing I is connected to the inclinometer tube casing II, inclinometer tube casings I and II are inserted with inclinometer tube casings, the inclinometer tube casings I and II are buried in the inclinometer tube casings I and II with fine sand, a funnel is inserted at the top of the inclinometer tube casing I, and the top of the inclinometer tube protrudes outside the funnel.
[0005] The wall docking structure I and the wall docking structure II are composed of embedded connecting steel plates, which protrude from the end faces of the wall, and the embedded connecting steel plates that are docked are connected by high-strength bolts; a socket structure I is provided at the lower end of the inclinometer tube sleeve I, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer tube sleeve II; the socket structure I and the socket structure II are respectively two parts of a socket-type straight pipe joint, protruding from the corresponding wall ends, and the two are connected by a socket structure; the upper wall section and the lower wall section are connected by a cast-in-place structure.
[0006] The wall docking structure I includes an embedded pipe I and a tension bolt hole I, and a hand hole I is provided above the tension bolt hole I; the wall docking structure II includes an embedded pipe II and a tension bolt hole II, and a hand hole II is provided below the tension bolt hole II; the embedded pipe I and the embedded pipe II, one is an embedded insert pipe, and the other is an embedded sleeve, the end face of the embedded sleeve is flush with the wall, the embedded insert pipe protrudes from the end face of the wall, the embedded sleeve corresponds to the embedded insert pipe one by one, and the two are glued with a socket structure; the tension bolt hole I and the tension bolt hole II correspond to each other one by one, and the two are connected by tension bolts; the bottom opening of the inclinometer tube sleeve I and the top opening of the inclinometer tube sleeve II are respectively flush with the corresponding wall, and the two are docked.
[0007] The advantages and positive effects of the utility model are as follows: by pre-embedding the inclinometer casing in the upper and lower wall sections, convenient conditions are provided for the on-site installation of the inclinometer casing, and because the inclinometer casing is pre-embedded during prefabrication, it is not affected by assembly construction; because there is a gap between the inclinometer casing and the casing, the inclinometer casing is easy to install, and the installation accuracy is easy to ensure, which can ensure that the inclinometer work is successfully completed after the prefabricated wall is slotted; using a funnel to pour fine sand into the gap between the inclinometer casing and the casing, it can be ensured that the fine sand accurately enters the annular gap between the inclinometer casing and the casing, and will not enter the inclinometer casing, will not be scattered outside, will not cause clogging of the inclinometer casing, and will not cause waste of fine sand. In addition, the utility model has a simple structure and is convenient for construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a structural schematic diagram of Example 1 of the utility model;
[0009] Figure 2 for Figure 1 A top view of
[0010] Figure 3 This is a schematic diagram of the structure of Example 2 of the utility model;
[0011] Figure 4 for Figure 3 Top view of the .
[0012] In the figure: 1-1, upper wall section; 1-2, lower wall section; 2-1, inclinometer casing I; 2-2, inclinometer casing II; 3, embedded connecting steel plate; 4, socket-type straight pipe joint; 5, inclinometer pipe; 6-1, hand hole I; 6-2, hand hole II; 7, high-strength bolts; 8, tension bolts; 9, funnel. DETAILED DESCRIPTION
[0013] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings:
[0014] See also Figure 1 to Figure 4A prefabricated assembled ground-connected wall comprises an upper wall section 1-1 and a lower wall section 1-2, and both sides of the upper wall section 1-1 and the lower wall section 1-2 are provided with vertical joint structures.
[0015] An inclinometer casing Ⅰ2-1 is pre-buried in the upper wall section 1-1, and a wall docking structure Ⅰ is pre-buried at the lower end of the upper wall section 1-1.
[0016] An inclinometer casing II 2-2 docking with the inclinometer casing I 2-1 is pre-buried in the lower wall section 1-2, and the inclinometer casing II 2-2 is provided with a bottom seal. A wall docking structure II matching with the wall docking structure I is pre-buried at the upper end of the lower wall section 1-2.
[0017] The docking structure I is connected to the docking structure II, the inclinometer casing I2-1 is connected to the inclinometer casing II2-2, an inclinometer casing 5 is inserted in the inclinometer casing I2-1 and the inclinometer casing II2-2, the inclinometer casing 5 is buried in the inclinometer casing I2-1 and the inclinometer casing II2-2 with fine sand, a funnel 9 is inserted at the top of the inclinometer casing I2-1, and the top of the inclinometer casing 5 protrudes outside the funnel 9.
[0018] Example 1:
[0019] See also Figure 1 and Figure 2 , an assembled ground-connected prefabricated wall, the wall butt joint structure I and the wall butt joint structure II are composed of pre-buried connecting steel plates 3, the pre-buried connecting steel plates 3 protrude from the end surface of the wall, and the butted pre-buried connecting steel plates 3 are connected by high-strength bolts;
[0020] A socket structure I is provided at the lower end of the inclinometer tube sleeve I2-1, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer tube sleeve II2-2. The socket structure I and the socket structure II are respectively two parts of the socket-type straight pipe joint 4 and the protruding wall end, and the two are connected by the socket structure; the upper wall section 1-1 and the lower wall section 1-2 are connected by a cast-in-place structure (not shown in the figure).
[0021] When the ground-connected wall is manufactured in the factory, the inclinometer sleeve is embedded. When the ground-connected wall is constructed on site, the lower wall 1-2 is first lowered into the groove and hung with a through rod, and then the upper wall 1-1 is lifted, so that the inclinometer sleeve I2-1 and the inclinometer sleeve II2-2 are connected through the socket-type straight pipe joint 4, and the embedded connecting steel plate 3 is made face to face, and the upper and lower wall sections are connected together by high-strength bolts 7, and the steel plate and the embedded angle steel are welded around to form a cavity inside, and the steel plate and the embedded angle steel of the upper wall 1-1 are spot welded to leave a gap, and a grouting hole is opened for the welded steel plate, and the grouting pipe is inserted into the grouting hole and then the double liquid slurry is poured. When the double liquid slurry flows out from the gap, it is proved that the cavity has been filled, and the grouting is stopped, and the whole assembled ground-connected wall is lowered. When the entire assembled ground-connected wall is lowered to the set position, it is hung with a through-bar, and the inclinometer tube 5 is lowered into the inclinometer tube casing Ⅰ2-1 and the inclinometer tube casing Ⅱ2-2 at one time, and fine sand is used to bury it. Because there is a gap between the inclinometer tube 5 and the casing, after the inclinometer tube 5 is lowered into place, fine sand is poured using a funnel 9, and the gap is filled with fine sand to fix the inclinometer tube 5. The use of the funnel 9 can ensure that the fine sand enters the annular gap between the inclinometer tube 5 and the casing, does not enter the inclinometer tube, does not spill out, does not cause clogging of the inclinometer tube, and does not cause waste of fine sand. Then use a crane to hang the entire assembled ground-connected wall, pull out the through-bar, lower the entire assembled ground-connected wall to the designed position, pour the double liquid slurry at the bottom of the wall, and pour the concrete at the bottom of the wall.
[0022] Example 2:
[0023] See also Figure 3 and Figure 4 , an assembled ground-connected prefabricated wall, the wall docking structure I includes a pre-buried pipe I and a tension bolt hole I, and a hand hole I6-1 is provided above the tension bolt hole I.
[0024] The wall docking structure II includes a pre-buried pipe II and a tension bolt hole II, and a hand hole II6-2 is provided below the tension bolt hole II.
[0025] The embedded pipe I and the embedded pipe II, one is the embedded insert pipe 5-1, and the other is the embedded sleeve 5-2. The embedded sleeve 5-2 is flush with the wall, and the embedded insert pipe 5-1 protrudes from the end face of the wall. The embedded sleeve 5-2 corresponds to the embedded insert pipe 5-1 one by one, and the two are glued with a socket structure; the tension bolt hole I and the tension bolt hole II correspond to each other one by one, and the two are connected by tension bolts 8.
[0026] The bottom opening of the inclinometer tube casing Ⅰ2-1 and the top opening of the inclinometer tube casing Ⅱ2-2 are respectively flush with the corresponding wall, and the two are butted against each other.
[0027] When the ground-connected wall is manufactured in the factory, the inclinometer sleeve is embedded. When the ground-connected wall is constructed on site, the lower wall 1-2 is first lowered into the groove and hung with a through rod, and the tension bolt 8 is inserted into the hand hole Ⅱ6-2 of the lower wall. Then the upper wall 1-1 is lifted, and AB component glue is applied on the embedded plug 5-1, in the embedded sleeve 5-2, and at the transverse joints of the upper and lower walls. After the embedded plug 5-1 is aligned with the embedded sleeve 5-2, the upper wall is lowered. When the two sections of the assembled ground-connected wall are combined, the AB component glue at the transverse joint gap is smoothed, and then the lock nut of the tension bolt 8 is screwed into the hand hole Ⅰ6-1 of the upper wall to complete the connection and fixation of the upper and lower assembled ground-connected walls. Lower the entire assembled ground-connected wall again. When the entire assembled ground-connected wall is lowered to the set position, hang it with a through bar, and start lowering the inclinometer tube 5 into the inclinometer tube casing Ⅰ2-1 and the inclinometer tube casing Ⅱ2-2 at one time, and bury it with fine sand. Because there is a gap between the inclinometer tube 5 and the casing, after the inclinometer tube 5 is lowered into place, use a funnel 9 to pour fine sand, and fill the gap with fine sand to fix the inclinometer tube 5. Use the funnel 9 to ensure that the fine sand enters the annular gap between the inclinometer tube 5 and the casing, does not enter the inclinometer tube, does not spill out, does not cause clogging of the inclinometer tube, and does not cause waste of fine sand. Then use a crane to hang the entire assembled ground-connected wall, pull out the through bar, lower the entire assembled ground-connected wall to the designed position, pour the double liquid slurry at the bottom of the wall, and pour the concrete at the bottom of the wall.
[0028] Since the single-span assembled ground-anchored wall is heavy and difficult to hoist, the single-span prefabricated wall is prefabricated in sections and assembled into grooves.
[0029] At the construction site, when the upper and lower wall sections are joined and lowered to the set position, they are hung with a through bar, and the inclinometer tube 5 is lowered into the inclinometer tube casing Ⅰ2-1 and the inclinometer tube casing Ⅱ2-2 at one time, and then fixed. Because there is a certain gap between the inclinometer tube 5 and the casing, the inclinometer tube is easy to install and the installation accuracy is easy to ensure.
[0030] If the inclinometer tube adopts a direct pre-buried structure, the following problems will occur: 1) The position of the directly pre-buried inclinometer tube is difficult to determine; 2) The prefabricated ground-connected wall is affected by the tension during the lifting process, and the directly pre-buried inclinometer tube is prone to displacement and deformation, which in turn leads to uncontrollable shape and position tolerances of the inclinometer tube, which has an adverse effect on the measurement or makes it impossible to measure; 3) When two sections of prefabricated ground-connected walls are spliced, it is difficult to completely and accurately connect the directly pre-buried inclinometer tube, which is prone to misalignment and makes it impossible to measure.
[0031] Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the scope of protection of the present invention.
Claims
1. An assembled ground-connected wall construction structure, characterized in that: Including the upper wall and the lower wall, Both sides of the upper wall section and the lower wall section are provided with vertical joint structures An inclinometer casing I is pre-buried in the upper wall section, and a wall docking structure I is pre-buried at the lower end of the upper wall section. An inclinometer casing II is embedded in the lower wall section and is connected to the inclinometer casing I. The inclinometer casing II is provided with a bottom seal. A wall docking structure II is embedded in the upper end of the lower wall section and is matched to the wall docking structure I. The docking structure I is connected to the docking structure II, the inclinometer casing I is connected to the inclinometer casing II, inclinometer casing I and inclinometer casing II are inserted with inclinometer casing I and inclinometer casing II, the inclinometer casing is buried in the inclinometer casing I and inclinometer casing II with fine sand, a funnel is inserted at the top of the inclinometer casing I, and the top of the inclinometer casing protrudes outside the funnel.
2. The assembled ground-connected wall construction structure according to claim 1 is characterized in that: The wall butt joint structure I and the wall butt joint structure II are composed of pre-buried connecting steel plates, the pre-buried connecting steel plates protrude from the end faces of the wall, and the butted pre-buried connecting steel plates are connected by high-strength bolts; A socket structure I is provided at the lower end of the inclinometer casing I, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer casing II. The socket structure I and the socket structure II are respectively two parts of a socket-type straight pipe joint, protruding from the corresponding wall ends, and the two are connected by a socket structure; The upper wall section and the lower wall section are connected via a cast-in-place structure.
3. The assembled ground-connected wall construction structure according to claim 1 is characterized in that: The wall docking structure I comprises a pre-buried pipe I and a tension bolt hole I, and a hand hole I is provided above the tension bolt hole I. The wall docking structure II includes a pre-buried pipe II and a tension bolt hole II, and a hand hole II is provided below the tension bolt hole II. The embedded pipe I and the embedded pipe II are one embedded plug and the other embedded sleeve. The end face of the embedded sleeve is flush with the wall, and the embedded plug protrudes from the end face of the wall. The embedded sleeve corresponds to the embedded plug one by one, and the two are connected by a socket structure; the tension bolt hole I corresponds to the tension bolt hole II one by one, and the two are connected by tension bolts; The bottom opening of the inclinometer tube casing I and the top opening of the inclinometer tube casing II are respectively flush with the corresponding wall, and the two are butted against each other.