Prefabricated structure for grouting plugging of assembled wharf pile core node
Through the prefabricated structure of brackets, formwork and sealers, the problems of complicated cast-in-place processes and poor pile core sealing effects in the high pile dock structure are solved, and construction is simplified and quality assurance is achieved, saving time and cost.
Patent Information
- Application Number
- CN202420617417.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In the structure of high pile docks, the cast-in-place process is complicated, the materials are consumed, the craftsmanship is greatly affected by the water environment, and the assembly development is slow, especially at the pile core nodes, the grouting and sealing effect is poor, which is prone to slurry leakage problems.
Prefabricated structure, including brackets, formwork and beams, the brackets are connected to the formwork, the flange part is hung on the pipe pile, and a reserved cavity and hole are provided on the beam. It is equipped with a sealer to achieve simple installation and effective sealing on site, avoiding Leaking slurry.
The construction process is simplified, the time and cost of offshore operations is saved, the quality of pile core and cavity node grouting is improved, and the sealing effect is ensured.
Smart Images

Figure CN221989321U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of prefabricated wharf construction, and specifically relates to a prefabricated structure for grouting and plugging of pile core nodes of prefabricated wharfs. Background Art
[0002] In the high-pile wharf structure system, pile caps, cross beams and longitudinal beams are mostly cast-in-place structures, and the assembly of high-pile wharf structures has developed slowly. The process of using cast-in-place on water is complicated, and it is necessary to set up the steel hoop auxiliary support system, lay the bottom formwork, tie the steel bars, install the side formwork, pour concrete, and remove the side formwork and steel hoop. After the upper pile caps, cross beams and other cast-in-place components are cast, it is necessary to wait until low tide to carry out the demolition construction. Not only does it consume a lot of turnover materials and require a large number of ship engines and cranes to assist in the operation, but the work efficiency is greatly affected by the water environment. When seizing the water level window period, multiple working faces and multiple teams are required to carry out construction at the same time to complete the operation.
[0003] Therefore, it is urgent to propose a prefabricated structure for grouting and plugging the pile core nodes of prefabricated wharfs to promote the development of prefabricated wharf structural systems. Utility Model Content
[0004] In view of the above-mentioned shortcomings or deficiencies of the prior art, the technical problem to be solved by the present application is to provide a prefabricated structure for grouting and plugging of the pile core nodes of an assembled wharf.
[0005] To solve the above technical problems, this application is implemented through the following technical solutions:
[0006] The present application proposes a prefabricated structure for grouting and plugging of pile core nodes of assembled wharfs, comprising at least: a bracket, a template and a crossbeam, wherein one end of the bracket is connected to the template, and the other end of the bracket is provided with a flange portion, and the flange portion is hung on the pipe pile to be installed; the crossbeam is provided with at least one reserved cavity and at least two reserved holes, the reserved cavity corresponds to the pipe pile on which the bracket is provided, the projection of one of the reserved holes is inside the pipe pile, and the projection of one of the reserved holes is outside the pipe pile, and both of the two reserved holes are connected to the reserved cavity.
[0007] Optionally, in the above-mentioned prefabricated structure for grouting and sealing of pile core nodes of assembled wharfs, the bracket is connected to the first surface of the template.
[0008] Optionally, in the above-mentioned prefabricated structure for grouting and plugging of pile core nodes of assembled wharfs, the edge of the template is 1 to 3 cm away from the inner surface of the pipe pile.
[0009] Optionally, in the above-mentioned prefabricated structure for grouting and plugging of pile core nodes of assembled wharfs, the support is a steel cage structure.
[0010] Optionally, the above-mentioned prefabricated structure for grouting and plugging of pile core nodes of assembled wharfs further includes: steel sections, which are arranged inside the bracket.
[0011] Optionally, in the above-mentioned prefabricated structure for grouting and sealing of pile core nodes of assembled wharfs, a geotextile structure is provided on the circumference of the template, and / or a plugger is further provided above the first surface of the template.
[0012] Optionally, in the above-mentioned prefabricated structure for grouting and plugging of pile core nodes of assembled wharfs, the cross-section of the plugger is an inverted trapezoidal structure.
[0013] Optionally, in the above-mentioned prefabricated structure for grouting and sealing of pile core nodes of assembled wharfs, the sealer is made of rubber material.
[0014] Optionally, in the above-mentioned prefabricated structure for grouting and sealing of pile core nodes of assembled wharfs, the thickness of the sealer is not less than 5 mm.
[0015] Optionally, in the above-mentioned prefabricated structure for grouting and plugging of pile core nodes of assembled wharf, the template is made of wood or metal material.
[0016] Compared with the prior art, this application has the following technical effects:
[0017] The brackets, templates and beams of this application are all pre-made, easy to install on the construction site, and the sealing method is simple, which can effectively avoid problems such as leakage. In particular, the pile core sealing effect is poor and there is leakage during the grouting process of the prefabricated wharf node. This application saves offshore operation time and construction costs, and provides a strong guarantee for the grouting quality of the pile core and cavity nodes. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0019] Figure 1 : A schematic diagram of the structure of the connection between the stent, the template and the occluder in one embodiment of the present application;
[0020] Figure 2 :like Figure 1 Schematic diagram of the structure shown applied to a pipe pile;
[0021] Figure 3 :like Figure 2 A partial schematic diagram of the structure shown after being connected to the crossbeam;
[0022] In the figure: pipe pile 0, bracket 1, template 2, crossbeam 3, first reserved hole 4, second reserved hole 5, reserved cavity 6, plugger 7, flange part 8. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0024] like Figures 1 to 3 As shown, one of the embodiments of the present application is a prefabricated structure for grouting and plugging of pile core nodes of an assembled wharf, comprising at least: a bracket 1, a template 2 and a crossbeam 3, one end of the bracket 1 is connected to the template 2, and the other end of the bracket 1 is provided with a flange portion 8, and the flange portion 8 is hung on the pipe pile 0 to be installed; at least one reserved cavity 6 and at least two reserved holes are provided on the crossbeam 3, and the reserved cavity 6 corresponds to the pipe pile 0 on which the bracket 1 is provided, and a projection of one of the reserved holes is inside the pipe pile 0, and a projection of one of the reserved holes is outside the pipe pile 0, and both of the reserved holes are connected to the reserved cavity 6.
[0025] In this embodiment, the bracket 1, template 2 and crossbeam 3 are all pre-made, and the template 2 is connected to one end of the bracket 1. The other end of the bracket 1 is provided with a flange 8 for connecting to the pipe pile 0 to be installed, and the flange 8 is hung on the pipe wall of the pipe pile 0, so that the template 2 is located inside the pipe pile 0 as a bottom plate. The crossbeam 3 is provided with at least one reserved cavity 6 corresponding to the pipe pile 0, and two reserved holes for setting grouting pipes connected to the reserved cavity 6. When the reserved cavity 6 of the crossbeam 3 is set corresponding to the pipe pile 0, the first reserved hole 4 corresponds to the inside of the pipe pile 0, so as to grout the inside of the pipe pile 0, and the second reserved hole 5 corresponds to the outside of the pipe pile 0, so as to grout the reserved cavity 6. This embodiment is easy to install on site, the plugging method is simple, and the leakage problem can be effectively avoided. In particular, the pile core plugging effect is poor and there is leakage during the grouting process of the assembled wharf node. This embodiment saves offshore operation time and construction costs, and provides a strong guarantee for the grouting quality of the pile core and cavity nodes.
[0026] Specifically, the support 1 is a steel cage structure, which is formed by winding steel bars. On the one hand, the steel bars are easy to obtain, and on the other hand, the steel bars can provide a certain rigidity for the project.
[0027] Specifically, the support 1 is connected to the first surface of the template 2 , that is, the edge of the template 2 protrudes from the outer surface of the support 1 , so as to reduce the construction difficulty and facilitate the support 1 to smoothly enter the pipe pile 0 .
[0028] Optionally, the edge of the template 2 is 1 to 3 cm away from the inner surface of the pipe pile 0 to prevent the inner wall of the pipe pile 0 from being uneven, which makes it difficult for the template 2 to enter the pipe pile 0, and to provide a 1 to 3 cm margin space. During subsequent construction, the staff can select the raw material particle size of the poured concrete according to the distance between the template 2 and the inner wall of the pipe pile 0, thereby avoiding leakage. In this embodiment, the edge of the template 2 is 2 cm away from the inner surface of the pipe pile 0.
[0029] Optionally, the prefabricated structure for grouting and plugging the pile core nodes of the assembled wharf further includes: steel sections, which are arranged inside the bracket 1 and can provide force for the bracket 1 and also guide the bracket 1 into the pipe pile 0.
[0030] Optionally, a geotextile structure is provided on the circumference of the template 2 , and / or a plugger 7 is provided above the first surface of the template 2 .
[0031] In this embodiment, the geotextile is wrapped around the circumference of the template 2 to fill the gap between the inner wall of the pipe pile 0 and the template 2 to provide leakage protection. At the same time, the present application also sets a plug 7 above the template 2, which is also used to fill the gap between the template 2 and the inner wall of the pipe pile 0. This embodiment adopts double leakage prevention measures to provide reliable protection for pile core plugging.
[0032] Optionally, the plugger 7 is made of rubber material and has a certain deformation space, so that the plugger 7 can be set closely against the inner wall of the pipe pile 0 to ensure the plugging effect.
[0033] Specifically, the cross-section of the occluder 7 is an inverted trapezoidal structure.
[0034] In this embodiment, the plugger 7 is arranged above the template 2 like a trumpet structure, with the small opening end abutting against the bracket 1 and the large opening end abutting against the inner wall of the pipe pile 0, thereby effectively bearing the poured concrete and achieving a good plugging effect.
[0035] Optionally, the thickness of the occluder 7 is not less than 5 mm, so as to ensure that the occluder 7 has a certain bearing capacity. In this embodiment, the thickness of the occluder 7 is set to 10 mm.
[0036] Optionally, the template 2 is made of wood or metal.
[0037] In this embodiment, for the sake of convenience and quick construction and cost control, the template 2 is made of wood. Of course, those skilled in the art may also use steel or iron.
[0038] This embodiment is constructed in the following manner:
[0039] S1, pile sinking;
[0040] S2, install the clamp and set up the auxiliary platform;
[0041] S3, cutting the pile head and pumping water out of the pile;
[0042] S4, placing the connected stent 1, template 2 and occluder 7 proposed in this embodiment in the pile;
[0043] S5, pouring pile core bottom sealing concrete;
[0044] S6, hoisting the cross beam 3 proposed in this embodiment to a preset position, that is, placing the cross beam 3 on the auxiliary platform, and the reserved cavity 6 corresponds to the pipe pile 0;
[0045] S7, grouting pipeline connection;
[0046] S8, pumping grouting material to the pile core and the reserved cavity 6;
[0047] S9, complete the grouting of all the reserved cavities 6 on the pile cores and the beams 3 in sequence, and then continue to grout the next beam 3 until the grouting of the reserved cavities 6 of all the pile cores and the beams 3 is completed;
[0048] S10, perform surface construction;
[0049] S11, cleaning equipment.
[0050] In the description of this application, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0051] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0052] In the description of this embodiment, the terms "upper", "lower", "left", "right", etc., and the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation of the present application. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0053] The above embodiments are only used to illustrate the technical solution of the present application but not to limit it. The present application is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solution of the present application can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application, and should be included in the scope of the claims of the present application.
Claims
1. A prefabricated structure for grouting and plugging the core nodes of assembled wharf piles, characterized in that: At least: A bracket, a template and a crossbeam, one end of the bracket is connected to the template, and the other end of the bracket is provided with a flange portion, and the flange portion is hung on the pipe pile to be installed; the crossbeam is provided with at least one reserved cavity and at least two reserved holes, the reserved cavity corresponds to the pipe pile on which the bracket is provided, one of the reserved holes is projected inside the pipe pile, and one of the reserved holes is projected outside the pipe pile, and both of the reserved holes are connected to the reserved cavity.
2. The prefabricated structure for grouting and plugging the core nodes of assembled wharf piles according to claim 1, characterized in that: The bracket is connected to the first surface of the template.
3. The prefabricated structure for grouting and plugging the core nodes of assembled wharf piles according to claim 1, characterized in that: The edge of the template is 1 to 3 cm away from the inner surface of the pipe pile.
4. The prefabricated structure for grouting and plugging the pile core nodes of an assembled wharf according to any one of claims 1 to 3, characterized in that: The support is a steel cage structure.
5. The prefabricated structure for grouting and plugging the pile core nodes of an assembled wharf according to any one of claims 1 to 3, characterized in that: Also includes: The steel section is arranged inside the bracket.
6. The prefabricated structure for grouting and plugging the pile core nodes of an assembled wharf according to any one of claims 1 to 3, characterized in that: A geotextile structure is provided on the circumference of the template, and / or a plug is provided above the first surface of the template.
7. The prefabricated structure for grouting and plugging the core nodes of assembled wharfs according to claim 6, characterized in that: The cross section of the occluder is an inverted trapezoidal structure.
8. The prefabricated structure for grouting and plugging the core nodes of assembled wharfs according to claim 6, characterized in that: The occluder is made of rubber material.
9. The prefabricated structure for grouting and plugging the core nodes of assembled wharfs according to claim 6, characterized in that: The thickness of the occluder is not less than 5 mm.
10. The prefabricated structure for grouting and plugging the pile core nodes of an assembled wharf according to any one of claims 1 to 3, characterized in that: The template is made of wood or metal.