By using mounting plates and threaded rods to fix the structure in the bench, combined with protractor measurement and box hoisting, the problems of inconvenience in installation and disassembly and reduced stability of the existing bench are solved, and stable construction on ultra-high slopes is achieved and convenient material transportation.

CN221989356UInactive Publication Date: 2024-11-12CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420368128.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing benches are inconvenient to install and disassemble during ultra-high slope blasting excavation, and their stability is reduced after long-term use, which cannot effectively resist the influence of external forces during material transportation.

Method used

A frame is designed to support the frame through two mounting plates, using protractors and pointers to measure the inclination angle, keep multiple pedals horizontal, combine threaded rods and nut fixing structures, simplify the installation and disassembly process, and facilitate material transportation through material boxes and hoists. .

Benefits of technology

The stability and convenient installation and disassembly of the bench are achieved, the safety and operation efficiency of construction workers on ultra-high slopes are improved, and labor intensity is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989356U_ABST
    Figure CN221989356U_ABST
Patent Text Reader

Abstract

The utility model discloses a benching method construction rack used in ultrahigh slope blasting excavation, and particularly relates to the technical field of construction racks, the benching method construction rack comprises a frame, a partition plate is fixedly arranged in the frame, a plurality of pedals are fixedly arranged between the two sides of the partition plate and the frame, and the pedals are evenly distributed on the partition plate. Fixing assemblies are arranged at the top and the bottom of the frame, each fixing assembly comprises a mounting plate, and grooves are formed in the sides, close to the frame, of the two mounting plates. According to the utility model, the two mounting plates are fixed at the top and the bottom of the side slope, then the protractor is matched with the pointer to measure the inclination angle of the frame, so that the plurality of pedals in the frame are kept horizontal, and after the nut on the threaded rod is tightened, a constructor can climb up and down by means of the plurality of pedals, so that the construction efficiency is improved. Blasting is conducted on the ultrahigh slope through a step method, the workbin is pulled to move through cooperation of the workbin and the winch, so that constructors can be assisted in moving the workbin, and time and labor are saved during use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction platforms, in particular to a step method construction platform used in super-high slope blasting excavation. Background Art

[0002] The blasting excavation of super-high slopes is mainly carried out by step-oriented controlled blasting, and the construction should be carried out in steps from top to bottom. In order to reduce the impact of blasting falling objects and ensure the uninterrupted navigation of the adjacent waterway, the "reserved rock sill protection" block-controlled blasting excavation is adopted for each layer of excavation facing the navigation side. First, a trough trench is formed along the outer side of the existing mountain slope by hydraulic fracturing, and then the remaining part is blasted. Every 10m step is taken as a construction cycle until the excavation reaches the large platform. For mountains with a single excavation of more than 5 meters, the deep hole loosening blasting method is adopted on the premise of ensuring the progress and safety of the construction; for large independent boulders and mountains less than 5 meters, the protective layer is less than 1.5 meters. Slope smooth blasting; in areas where large mechanical equipment cannot be transported to the working face for drilling operations, manual climbing to the working face is adopted for shallow hole blasting, and when manual climbing up and down on the working face, it is necessary to set up a construction platform on the slope for construction personnel to move around.

[0003] For example, the auxiliary operation platform for slope support with the prior art publication number CN209989824U, the utility model arranges an adjusting bracket fixedly connected to the anchor rod outside the slope, and fixes the track on the outer end of the adjusting bracket. Before installing the track, the length of the adjusting bracket can be adjusted so that the outer ends of all the adjusting brackets are on the same inclined plane, so that even if the slope is uneven, it will not affect the installation of the track. The adjusting bracket is fixedly connected to the anchor rod through the anchor plate, the connection structure is stable, and the adjustment method is also very simple.

[0004] However, the above-mentioned prior art still has the following problems when in use: the above-mentioned platform needs to be fixed with the help of multiple anchor rods, which is very inconvenient to install and disassemble, and since the platform is tilted, when materials are transported by rail, the weight of the materials will cause outward force on the platform, which will reduce the stability of the platform after long-term use. Based on this, the utility model provides a step method construction platform for super-high slope blasting excavation with good stability and easy installation and disassembly. Utility Model Content

[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a step-method construction platform for blasting and excavation of super-high slopes. The frame is fixed by two mounting plates, has good stability, and is very convenient to install and disassemble. The protractor and the pointer cooperate to measure the inclination angle of the frame, so that the multiple pedals in the frame can be kept level, which is convenient for construction workers to climb up and down with the help of the multiple pedals. The step method is used for blasting at super-high slopes to solve the problems arising from the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a step-method construction platform for super-high slope blasting excavation, comprising a frame, a partition is fixedly provided inside the frame, a plurality of pedals are fixedly provided on both sides of the partition and between the frame, the plurality of pedals are evenly distributed on the partition, a fixing assembly is provided at the top and bottom of the frame, the fixing assembly comprises a mounting plate, both mounting plates are provided with grooves on one side close to the frame, a threaded rod is fixedly passed through the top and bottom ends of the frame, both ends of the threaded rod pass through the inner walls on both sides of the groove and extend to the outside of the mounting plate, the outer walls of the two threaded rods are threadedly connected with nuts, the nuts are in contact with the outer walls of the mounting plates and are used to fix the threaded rods, and a plurality of first bolts are passed through the tops of the two mounting plates for fixing the mounting plates.

[0007] In a preferred embodiment, through holes are provided on the tops of the two mounting plates, and the through holes are provided on one side of the plurality of first bolts. The through holes are provided on the mounting plates to facilitate construction workers to carry the mounting plates.

[0008] In a preferred embodiment, a protractor is fixedly sleeved on each of the two threaded rods, and a pointer is fixedly mounted on the inner wall of one side of each of the two grooves. The pointer cooperates with the protractor to measure the tilt angle of the frame.

[0009] In a preferred embodiment, a slide groove is provided on the outer wall at the front end of the partition, a slider is slidably provided in the slide groove, and a material box is provided at the front end of the slider. The material box is used to store construction materials and tools, which is convenient for construction workers to carry and use.

[0010] In a preferred embodiment, the material box is fixed to the sliding block by a plurality of second bolts, and handles are fixedly provided on the outer walls on both sides of the material box to facilitate construction workers to manually push the material box to move.

[0011] In a preferred embodiment, handrails are fixedly provided on both sides of the front end of the frame, and the two handrails are respectively arranged on both sides of the material box to prevent the two handrails from hindering the movement of the material box.

[0012] In a preferred embodiment, a plurality of bumps are processed on the top surface of each pedal to increase the friction of the pedal surface.

[0013] In a preferred embodiment, a bracket is provided on the mounting plate located at the top of the frame, a winch and a battery are fixedly provided on the top of the bracket, the winch and the battery are fixed to the bracket by a plurality of third bolts, a steel wire rope is wound around the winch, one end of the steel wire rope is fixed to the material box, and the material box is moved by pulling the winch and the steel wire rope, which saves time and effort to use.

[0014] Technical effects and advantages of the utility model:

[0015] The utility model fixes two mounting plates at the top and bottom of the slope first, and then uses a protractor and a pointer to measure the inclination angle of the frame, so that multiple pedals in the frame are kept horizontal. After tightening the nuts on the threaded rods, construction workers can climb up and down with the help of the multiple pedals, and use the step method to blast at super-high slopes. The material box and the winch are used to pull the material box to move, so as to assist the construction workers in moving the material box, which saves time and effort. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is the overall structural front view of the utility model;

[0018] Figure 3 It is a partial schematic diagram of the utility model;

[0019] Figure 4 It is a partial schematic diagram of the utility model;

[0020] Figure 5 It is a schematic diagram of the material box and the slider of the utility model.

[0021] The reference numerals are: 1, frame; 2, partition; 3, pedal; 4, fixing assembly; 5, first bolt; 6, through hole; 7, protractor; 8, pointer; 9, slide; 10, slider; 11, material box; 12, second bolt; 13, handle; 14, handrail; 15, bump; 16, bracket; 17, winch; 18, battery; 19, third bolt; 20, wire rope;

[0022] 401, mounting plate; 402, groove; 403, threaded rod; 404, nut. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Refer to the instruction manual Figure 1-5 The utility model provides a step method construction platform for super-high slope blasting excavation, comprising a frame 1, a partition 2 is fixedly arranged inside the frame 1, a plurality of pedals 3 are fixedly arranged between the two sides of the partition 2 and the frame 1, the plurality of pedals 3 are evenly distributed on the partition 2, and a plurality of protrusions 15 are processed on the top surface of each pedal 3 to improve the friction force on the surface of the pedal 3;

[0025] Next, a fixing assembly 4 is provided at the top and bottom of the frame 1, and the fixing assembly 4 includes a mounting plate 401. A groove 402 is provided on one side of the two mounting plates 401 close to the frame 1. A threaded rod 403 is fixedly passed through the top and bottom of the frame 1. Both ends of the threaded rod 403 pass through the inner walls of both sides of the groove 402 and extend to the outside of the mounting plate 401. The outer walls of the two threaded rods 403 are threadedly connected with nuts 404. The nuts 404 are in contact with the outer walls of the mounting plates 401 and are used to fix the threaded rods 403.

[0026] In addition, multiple first bolts 5 are passed through the top of the two mounting plates 401 for fixing the mounting plates 401, protractors 7 are fixedly sleeved on the two threaded rods 403, pointers 8 are fixedly provided on the inner walls of one side of the two grooves 402, and the pointers 8 cooperate with the protractors 7 to measure the inclination angle of the frame 1, and handrails 14 are fixedly provided on both sides of the front end of the frame 1.

[0027] When in use, the construction workers first fix the two mounting plates 401 at the top and bottom of the slope with the help of the first bolts 5, then adjust the angle of the frame 1, and use the protractor 7 and the pointer 8 to measure the inclination angle of the frame 1, so that the multiple pedals 3 in the frame 1 remain horizontal, and then tighten the nuts 404 on the threaded rods 403. After the threaded rods 403 are firmly fixed, the construction workers can climb up and down with the help of the multiple pedals 3 in the frame 1, which is convenient for the construction workers to use the step method for blasting at super-high slopes. In addition, handrails 14 are provided on both sides of the frame 1. When the construction workers walk on the frame 1, they can tie their safety ropes to the handrails 14 to improve safety.

[0028] Refer to the instruction manual Figure 1-5, through holes 6 are provided on the tops of the two mounting plates 401, and the through holes 6 are provided on one side of the plurality of first bolts 5. The through holes 6 are provided on the mounting plates 401 to facilitate construction workers to carry the mounting plates 401. A slide groove 9 is provided on the outer wall of the front end of the partition plate 2, and a slider 10 is provided in the slide groove 9. A material box 11 is provided at the front end of the slider 10, and the material box 11 is used to store materials and tools for construction, so that construction workers can carry and use it conveniently;

[0029] In addition, the material box 11 is fixed to the slider 10 by a plurality of second bolts 12. Handles 13 are fixedly provided on the outer walls of both sides of the material box 11 to facilitate the construction personnel to manually push the material box 11 to move. Two handrails 14 are respectively provided on both sides of the material box 11 to prevent the two handrails 14 from hindering the movement of the material box 11.

[0030] Moreover, a bracket 16 is provided on the mounting plate 401 located at the top of the frame 1, and a winch 17 and a battery 18 are fixedly provided on the top of the bracket 16. The winch 17 and the battery 18 are fixed to the bracket 16 by a plurality of third bolts 19. A steel wire rope 20 is wound around the winch 17, and one end of the steel wire rope 20 is fixed to the material box 11. The material box 11 is pulled to move by means of the winch 17 and the steel wire rope 20, which saves time and effort in use.

[0031] By setting a material box 11 on the slider 10, the material box 11 is used to store materials and tools for construction. With the help of the slider 10 sliding in the slide groove 9, it is convenient for construction workers to grab the handle 13 to drive the material box 11 to move, and a bracket 16 can be set on the top of the mounting plate 401, and the winch 17 on the bracket 16 is used to reel in the wire rope 20 to pull the material box 11 to move, thereby assisting construction workers to move the material box 11.

[0032] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A step method construction platform for super-high slope blasting excavation, comprising a frame (1), characterized in that: A partition (2) is fixedly provided inside the frame (1), and a plurality of pedals (3) are fixedly provided between both sides of the partition (2) and the frame (1), and the plurality of pedals (3) are evenly distributed on the partition (2); The frame (1) is provided with a fixing assembly (4) at the top and bottom, the fixing assembly (4) comprising a mounting plate (401), the two mounting plates (401) are provided with a groove (402) on one side close to the frame (1), the top and bottom of the frame (1) are fixed with a threaded rod (403) passing through, the two ends of the threaded rod (403) pass through the inner walls of the groove (402) on both sides and extend to the outside of the mounting plate (401), the outer walls of the two threaded rods (403) are threadedly connected with nuts (404), the nuts (404) are in contact with the outer walls of the mounting plates (401) and are used to fix the threaded rods (403); A plurality of first bolts (5) penetrate through the tops of the two mounting plates (401) for fixing the mounting plates (401).

2. The step method construction stand for super high slope blasting excavation according to claim 1, characterized in that: A through hole (6) is provided on the top of each of the two mounting plates (401), and the through hole (6) is provided on one side of the plurality of first bolts (5).

3. The step method construction stand for super high slope blasting excavation according to claim 1, characterized in that: A protractor (7) is fixedly sleeved on each of the two threaded rods (403), and a pointer (8) is fixedly mounted on the inner wall of one side of each of the two grooves (402). The pointer (8) cooperates with the protractor (7) to measure the inclination angle of the frame (1).

4. The step method construction stand for super high slope blasting excavation according to claim 1, characterized in that: A slide groove (9) is provided on the outer wall of the front end of the partition plate (2), a slider (10) is slidably arranged in the slide groove (9), and a material box (11) is provided at the front end of the slider (10).

5. The step method construction stand for super high slope blasting excavation according to claim 4, characterized in that: The material box (11) and the slide block (10) are fixed by a plurality of second bolts (12), and handles (13) are fixedly provided on the outer walls on both sides of the material box (11).

6. The step method construction stand for super high slope blasting excavation according to claim 4, characterized in that: Handrails (14) are fixedly provided on both sides of the front end of the frame (1), and the two handrails (14) are respectively provided on both sides of the material box (11).

7. The step method construction stand for super high slope blasting excavation according to claim 1, characterized in that: The top surface of each pedal (3) is processed with a plurality of protrusions (15) for increasing the friction force of the surface of the pedal (3).

8. The step method construction stand for super high slope blasting excavation according to claim 4, characterized in that: A bracket (16) is provided on a mounting plate (401) located at the top of the frame (1), a winch (17) and a battery (18) are fixedly provided on the top of the bracket (16), the winch (17) and the battery (18) are fixed to the bracket (16) by a plurality of third bolts (19), a steel wire rope (20) is wound around the winch (17), one end of the steel wire rope (20) is fixed to the material box (11), so as to facilitate pulling the material box (11).