Underground post-cast strip structure capable of performing dry construction operation
By setting up plastic pads and under-belt water-stop steel plate components on the bottom layer of the rear pouring belt, the pollution problem caused by groundwater entry is solved, the dry construction and construction quality is improved, additional cleaning work is reduced, and the waterproof layer is ensured. stability.
Patent Information
- Application Number
- CN202420534835.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-19
AI Technical Summary
During construction, the underground post-pouring belt is difficult to prevent groundwater from entering when it is not closed, resulting in pollution of reserved steel bars and steel plate water stops, affecting the construction quality, and additional cleaning and rust removal work is required.
Plastic pads and bottom water stop steel plate components are installed on the bottom layer of the rear pouring belt. Both ends of the bottom water stop steel plate components are anchored into the basement floor, and a deformable wrinkle structure is set to ensure that the steel plate is connected to the bottom plate, prevent groundwater from entering and passing through Welding to form a continuous steel plate belt to fix the steel frame.
Dry construction has been realized, groundwater pollution is avoided, rust removal is reduced, the construction quality of the post-pouring belt and the stability of the waterproof layer are improved, and the construction environment and quality improvement are ensured.
Smart Images

Figure CN221989396U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an underground post-casting strip structure capable of dry construction. Background Art
[0002] With the rapid development of the domestic economy, oversized buildings continue to emerge. When the length of the building basement floor structure exceeds the maximum spacing of the expansion joint, a through construction post-cast strip with a width of 0.8m~1m is generally set every 30m~40m to reduce the impact of temperature and concrete shrinkage on the structure; the closure time of the post-cast strip should be delayed by more than 45 days for the secondary pouring of concrete in the strip.
[0003] In general, before the post-casting belt is poured, it is necessary to ensure the waterproof quality of the post-casting belt and the cleanliness of the belt. Because the post-casting belt is not closed, it is difficult to ensure that the waterproof layer under the belt is not damaged under the action of groundwater, causing water to accumulate in the post-casting belt, polluting the exposed reserved steel bars, steel plate waterstops and construction joints, affecting the construction quality. In the later stage, when the post-casting belt is constructed for the second time, wet construction operations are required. Before pouring concrete, the reserved steel bars and steel plate waterstops need to be rusted, the debris in the belt needs to be cleaned, and the accumulated water in the belt needs to be drained before pouring the post-casting belt concrete. Summary of the invention
[0004] The utility model aims to provide an underground post-cast strip structure for the construction of a building, which can improve the waterproof quality under the strip, provide conditions for dry construction operations, avoid groundwater from entering the strip and accumulating water, and pollute the reserved steel bars and steel plate waterstop in the strip, and can carry out dry construction operations.
[0005] The underground post-casting belt structure of the utility model capable of dry construction is realized as follows:
[0006] The underground post-cast strip structure of the dry construction operation is realized as follows, including a plastic pad set on the concrete cushion layer of the bottom layer of the post-cast strip, a waterstop steel plate assembly set on the plastic pad and anchored at both ends into the basement floor structure on both sides of the post-cast strip, a waterstop steel plate assembly on the post-cast strip located on both sides of the waterstop steel plate assembly and between the basement floor structures on both sides, and a steel frame fixed between the waterstop steel plates on the two post-cast strips, the waterstop steel plate assembly under the belt is provided with wrinkles that can be deformed under tension and compression, and vertically arranged water retaining plates are provided on both sides of the waterstop steel plate assembly under the belt corresponding to the basement floor structure on both sides of the post-cast strip.
[0007] During construction, first level the original soil under the base plate to the elevation. After pouring the concrete cushion layer and passing the inspection, the construction team will lay out the lines and position the plastic pads under the lower waterstop steel plate assembly, and verify that their positions are accurate.
[0008] A lower waterstop steel plate assembly is placed on the plastic pad, and both ends of the waterstop steel plate of the lower waterstop steel plate assembly are welded into a continuous waterstop steel plate, and the continuous lower waterstop steel plate assembly is fixed with steel bars.
[0009] After the waterstop steel plate assembly under the belt is accepted, the lower layer of the basement floor steel mesh will be tied. After completion, the waterstop steel plate assembly on the post-pouring belt will be installed and fixed with steel bars. The waterstop steel plates will be welded into a continuous steel plate strip.
[0010] After the water-stop steel plate assembly on the post-casting strip is accepted, the upper steel mesh of the basement floor is tied, and the steel bars and the post-casting strip are accepted as qualified. Then the basement floor structure concrete outside the post-casting strip is poured. The concrete inside the strip is left empty, and the construction water and a small amount of slurry in the strip are removed and covered for protection to ensure that the strip is clean. The concrete in the strip is poured for the second time more than 45 days after pouring.
[0011] The utility model adopts a water-stop steel plate under the belt, and when pouring the concrete of the basement floor structure outside the belt, the water-stop steel plate under the belt is connected with the basement floor, so that groundwater cannot enter the belt to produce water accumulation, thereby avoiding contamination of the reserved steel bars and steel plate water-stop belt in the belt, thereby preventing rust caused by the intrusion of water accumulation, and eliminating the need to perform the rust removal work required by the prior art, thereby realizing the dry construction operation of the underground post-cast belt;
[0012] By setting wrinkles on the water-stop steel plate under the belt, the water-stop steel plate under the belt can adapt to the tension generated during the basement floor forming process through deformation, thereby ensuring the stability of the underground post-casting belt structure and ensuring the final smooth completion of the underground post-casting belt, thereby improving the construction quality of the post-casting belt.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. It can carry out dry construction work, improve the construction environment and ensure the construction quality;
[0015] 2. Prevent groundwater from entering the belt and accumulating water, which will pollute the reserved steel bars and steel plate waterstops in the belt, and cause additional work such as rust removal of the reserved steel bars and steel plate waterstops;
[0016] 3. Improve the construction quality of the post-cast strip to avoid failure of the waterproof layer after it is put into use, resulting in water leakage and affecting its use. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the underground post-casting belt structure capable of dry construction operation of the utility model;
[0018] Figure 2 It is a schematic diagram of the lower water stop steel plate assembly;
[0019] Figure 3 This is a schematic diagram of the structure of the waterstop steel plate on the post-casting zone.
[0020] Explanation of the reference numerals: A-bottom layer of post-cast strip; B-concrete cushion layer; C-post-cast strip; D-structural surface of sedimentation tank; 1-plastic pad; 2-water-stop steel plate assembly under the strip; 201-curved shape; 3-water-stop steel plate assembly on the post-cast strip; 4-steel skeleton; 5-wrinkle; 6-water retaining plate; 7-steel bar. DETAILED DESCRIPTION
[0021] Now, in conjunction with the accompanying drawings and embodiments, the underground post-casting belt structure of the utility model capable of dry construction is further described in detail:
[0022] As shown in the figure, the underground post-casting belt structure of the utility model that can be used for dry construction is realized as follows:
[0023] It includes a plastic pad 1 arranged on the concrete cushion layer B of the bottom layer A of the post-cast strip, a waterstop steel plate assembly 2 arranged on the plastic pad 1 and anchored at both ends into the basement floor structure D on both sides of the post-cast strip C, a waterstop steel plate assembly 3 on the post-cast strip located on both sides of the waterstop steel plate assembly 2 and between the basement floor structures D on both sides, and a steel frame 4 fixed between the waterstop steel plates 3 on the two post-cast strips, the waterstop steel plate assembly 2 is provided with wrinkles 5 that can be deformed when subjected to tension or compression, and vertically arranged water retaining plates 6 are provided on both sides of the waterstop steel plate assembly 2 corresponding to the basement floor structures D on both sides of the post-cast strip C.
[0024] Preferably, the wrinkle 5 is an inverted U-shaped structure located in the middle of the lower water-stop steel plate assembly 2.
[0025] Preferably, the lower water-stop steel plate assembly 2 is in a downward curved shape, and both ends of the lower water-stop steel plate assembly 2 are in a curved shape 201. By adopting the curved shape at both ends, the two ends of the lower water-stop steel plate assembly 2 can be firmly anchored and fixed on the basement floor structure D on both sides of the post-cast strip.
[0026] Preferably, both sides of the water retaining plate 6 and both side surfaces of the water stop steel plate assembly 3 on the post-cast strip are fixedly connected with steel bars 7 so as to be firmly fixed and anchored to the basement floor structure D on both sides of the post-cast strip through the steel bars.
[0027] During construction, first level the original soil under the base plate to the elevation. After pouring the concrete cushion layer B and passing the acceptance inspection, the construction team will lay out and position the plastic pad 1 under the lower water-stop steel plate assembly 2, and verify that its position is accurate.
[0028] A lower waterstop steel plate assembly 2 is placed on the plastic pad 1, and both ends of the waterstop steel plate of the lower waterstop steel plate assembly 2 are welded into a continuous waterstop steel plate, and the continuous lower waterstop steel plate assembly is fixed with steel bars.
[0029] After the water-stop steel plate assembly 2 under the belt is accepted, the lower steel mesh of the basement floor structure D is tied. After completion, the water-stop steel plate assembly 3 on the post-casting belt is installed and fixed with steel bars. The water-stop steel plates are welded into continuous steel plate strips.
[0030] After the water-stop steel plate assembly 3 on the post-casting strip is accepted, the upper steel mesh of the basement floor structure D is tied, and the steel bars and the post-casting strip are accepted as a whole. After the acceptance is qualified, the concrete of the basement floor structure D outside the post-casting strip is poured. The concrete inside the strip is left empty, and the construction water and a small amount of slurry in the strip are removed and covered for protection to ensure that the strip is clean. The concrete in the strip is poured for the second time more than 45 days after pouring.
Claims
1. An underground post-casting strip structure capable of dry construction, characterized in that: It includes a plastic pad set on the concrete cushion layer of the bottom layer of the post-cast strip, a waterstop steel plate assembly set on the plastic pad and anchored at both ends into the basement floor structure on both sides of the post-cast strip, a waterstop steel plate assembly on the post-cast strip located on both sides of the waterstop steel plate assembly and between the basement floor structures on both sides, and a steel frame fixed between the waterstop steel plates on the two post-cast strips. The waterstop steel plate assembly under the belt is provided with wrinkles that can be deformed under tension or compression, and vertically arranged water retaining plates are provided on both sides of the waterstop steel plate assembly under the belt corresponding to the basement floor structure on both sides of the post-cast strip.
2. The underground post-casting strip structure capable of dry construction according to claim 1 is characterized in that: The corrugation is an inverted U-shaped structure located in the middle of the waterstop steel plate assembly under the belt.
3. The underground post-casting strip structure capable of dry construction according to claim 1 or 2, characterized in that: The lower water-stop steel plate assembly is in a downward curved shape, and both ends of the lower water-stop steel plate assembly are in a curved shape.
4. The underground post-casting strip structure capable of dry construction according to claim 1 or 2, characterized in that: Both sides of the water retaining plate and both side surfaces of the water stop steel plate assembly on the post-cast strip are fixedly connected with steel bars.