Detachable anti-floating pull rod

By designing a detachable floating-resistant pull rod, the problem of low material usage and construction efficiency of anti-floating measures in the construction of inorganic composite core molds is solved, and the effect of reducing costs and improving efficiency is achieved.

CN221989683UActive Publication Date: 2024-11-12SUZHOU ZHONGJIN JIANGHAI CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420586425.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-12
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The existing anti-float measures have problems with low material usage and construction efficiency in the construction of inorganic composite core molds in large warehouses, especially because the vertical wires have increased the material usage and the construction space is small, resulting in low construction efficiency.

Method used

A removable anti-floating rod is designed, including a circular end cap, end cap side plate, anti-floating rod and steel ring. It can be disassembled and reused after concrete hardening, reducing the amount of material used by hooks and threads. And improve construction efficiency.

Benefits of technology

The removable floating-resistant lever reduces construction cost by 10% to 20%, improves construction efficiency by 20% to 30%, and can perform construction operations more conveniently due to its simple structure and detachability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989683U_ABST
    Figure CN221989683U_ABST
Patent Text Reader

Abstract

The utility model discloses a detachable anti-floating pull rod which comprises an annular end cap bottom plate, a circular end cap top plate located at the upper end of the end cap bottom plate, an end cap side plate used for connecting the end cap bottom plate and the end cap top plate and an end cap rib arranged on the inner wall of the end cap side plate, and the end cap rib is arranged in the radial direction of the end cap top plate. The end cap rib is connected with an anti-floating pull rod, the end, away from the end cap rib, of the anti-floating pull rod is connected with a steel ring, and the anti-floating pull rod is detachably connected with the end cap rib and the steel ring. The detachable anti-floating pull rod is mainly composed of the end cap, the detachable anti-floating pull rod body, the steel ring and the nut, the structure is simple, the detachable anti-floating pull rod body, the steel ring and the nut can be recycled after concrete is hardened, and the construction cost is reduced by 10%-20%; one end of the detachable anti-floating pull rod is connected with an end cap, the other end of the detachable anti-floating pull rod is connected with a scaffold at the bottom of a formwork, the detachable anti-floating pull rod has the advantages of simple construction process, convenience in operation and the like, and the construction efficiency can be improved by 20-30%.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a detachable anti-floating pull rod. Background Art

[0002] In order to ensure the safety and practicality of large warehouse structures, and taking into account the deadweight and economy of the floor, inorganic composite core mold hollow floor slabs have been gradually used in the construction of large warehouses in recent years.

[0003] The inorganic composite core formwork hollow floor slab is mainly composed of rib beams, core formwork, panel and bottom plate. Since the bulk density of the core formwork is much smaller than that of concrete, anti-floating measures need to be taken for the core formwork when pouring concrete to ensure that the core formwork does not float up during the concrete pouring process, and at the same time ensure that the thickness of the panel and bottom plate meets the design requirements.

[0004] At present, there are many forms of anti-floating measures for core molds. In the literature [Application and practice of cast-in-place concrete hollow floor with polystyrene foam material filling strips in underground garages [J]. Sichuan Construction], it is proposed to set up anti-floating steel bars with a diameter of 12mm, and connect the anti-floating steel bars with the bottom steel bars of the slab using tension bars. The literature [Construction technology of cast-in-place concrete hollow floor of super high-rise building [J]. Brick] also proposed a construction scheme of setting two full-length anti-floating steel bars with a diameter of 10mm in parallel on the top of the core mold, and using No. 14 iron wire to tighten and fix the anti-floating steel bars and the bottom steel bars of the slab at a spacing of 600mm×600mm. There are many similar studies on the construction scheme of setting anti-floating steel bars. The literature [Research and application of the positioning and anti-floating system of the inner mold of cast-in-place concrete hollow floor [J]. Building safety] proposed two construction schemes: anti-floating compression bars and positioning anti-floating integrated brackets, and compared the economic benefits of the two construction schemes. Finally, it was concluded that the positioning anti-floating integrated bracket has higher construction efficiency and economic benefits. In summary, the current measures for anti-floating construction of hollow floor core molds mainly use anti-floating compression reinforcement.

[0005] However, in this construction method of setting anti-floating pressure reinforcement, two full-length anti-floating pressure reinforcements on the upper part and four vertical steel wires connecting the bottom steel bars of the plate are required. On the one hand, the anti-floating pressure reinforcements and vertical steel wires increase the material consumption. On the other hand, the presence of rib beams on the side of the core mold leads to a small construction space for the vertical steel wires and low construction efficiency. Therefore, this anti-floating measure needs to be further optimized and improved in terms of material consumption and construction efficiency. Utility Model Content

[0006] The utility model aims to provide a detachable anti-floating pull rod.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a detachable anti-floating rod, comprising an annular end cap bottom plate, a circular end cap top plate located at the upper end of the end cap bottom plate, an end cap side plate for connecting the end cap bottom plate and the end cap top plate, and an end cap rib arranged on the inner wall of the end cap side plate, the end cap rib is arranged along the radial direction of the end cap top plate, the end cap side plate connects the inner circular wall of the end cap bottom plate and the annular outer wall of the end cap top plate, the end cap rib is connected to the anti-floating rod, the end of the anti-floating rod away from the end cap rib is connected to a steel ring, and the anti-floating rod is detachably connected to the end cap rib and the steel ring.

[0008] Furthermore, one end of the anti-floating rod close to the end cap rib is a hook, the inner diameter of the hook is 8-12 mm, the bending angle is 180°, the bending length is 16-22 mm, and the anti-floating rod hooks the end cap rib through the hook.

[0009] Furthermore, a through hole for the anti-floating rod to pass through is opened at the center of the steel ring, and the bottom end of the anti-floating rod is provided with a thread, and a nut is provided at the lower end of the steel ring, and the steel ring is fixed to the anti-floating rod through the nut.

[0010] Furthermore, the diameter of the end cap bottom plate is 80-150 mm, the thickness is 4-8 mm, and the height of the end cap top plate is 50-80 mm.

[0011] Furthermore, the end cap rib is a cylinder, and the cross-sectional diameter of the end cap rib is 6-12 mm; the anti-floating tie rod is a cylinder, and the cross-sectional diameter of the anti-floating tie rod is 6-10 mm.

[0012] Furthermore, the steel ring is composed of two arc-segment steel plates and a straight steel plate, the arc-segment steel plates are welded at both ends of the straight steel plate, the length of the straight steel plate is 60 to 80 mm, the length of the arc steel plate is 40 to 80 mm, the bending angle of the arc steel plate is 30 to 40°, the width of the steel ring is 15 to 25 mm, and the thickness is 5 to 8 mm.

[0013] It can be seen from the above technical solution that the utility model has the following beneficial effects:

[0014] The detachable anti-floating tie rod mainly consists of an end cap, a detachable anti-floating tie rod, a steel ring and a nut, has a simple structure, and the detachable anti-floating tie rod, the steel ring and the nut can be recycled and reused after the concrete hardens, which can reduce the construction cost by 10% to 20%; one end of the detachable anti-floating tie rod is connected to the end cap, and the other end is connected to the scaffolding at the bottom of the formwork, which has the advantages of simple construction process and convenient operation, which can improve the construction efficiency by 20% to 30%. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall installation and use structure of the utility model;

[0016] Figure 2 This is a schematic diagram of disassembling the anti-floating tie rod connection of the utility model;

[0017] Figure 3 This is a schematic diagram of disassembling the anti-floating pull rod and pushing it up according to the utility model;

[0018] Figure 4 This is a schematic diagram of disassembling the anti-floating tie rod and rotating it 90°;

[0019] Figure 5 This is a schematic diagram of the utility model in which the anti-floating pull rod is disassembled and unhooked;

[0020] Figure 6 This is a schematic diagram of the steel ring structure of the utility model;

[0021] Figure 7 This is a detailed construction drawing of a 480mm thick inorganic composite core mold hollow floor slab in Example 1 of the utility model;

[0022] Figure 8 This is a cross-sectional view of a 480 mm thick inorganic composite core mold hollow floor slab 1-1 in Example 1 of the utility model;

[0023] Fig. 9 This is a detailed construction drawing of a 270mm thick inorganic composite core mold hollow floor slab in Example 2 of the utility model;

[0024] Fig.10 This is a cross-sectional view of a 270 mm thick inorganic composite core mold hollow floor slab 1-1 in Example 2 of the utility model.

[0025] In the figure: end cap bottom plate 1, end cap top plate 2, end cap side plate 3, end cap rib 4, anti-floating tie rod 5, steel ring 6, arc steel plate 610, straight steel plate 620, nut 7, rib beam 8, rib beam stirrups 9, upper plate 10, upper plate steel bar 11, inorganic composite core mold 12, bottom mold plate 13, plate bottom steel bar pad 14, core mold bottom pad 15, lower plate steel bar 16, secondary keel 17. DETAILED DESCRIPTION

[0026] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0028] See also Figure 1 and Figure 6 The utility model provides a detachable anti-floating rod, comprising an end cap bottom plate 1, an end cap top plate 2, an end cap side plate 3, an end cap rib 4, an anti-floating rod 5 and a steel ring 6. The end cap bottom plate 1 is annular, the end cap top plate 2 is arranged at the upper end of the end cap bottom plate, is coaxially arranged with the end cap bottom plate, and the end cap top plate 2 is circular, the end cap side plate 3 connects the inner circular wall of the end cap bottom plate and the circular outer wall of the end cap top plate, the end cap bottom plate 1, the end cap top plate 2, and the end cap side plate 3 are welded into one, similar to a hat structure, the end cap rib 4 is arranged on the inner wall of the end cap side plate, and the end cap rib 4 is arranged along the radial direction of the end cap top plate 2, the end cap rib 4 is connected with the anti-floating rod 5, and the anti-floating rod 5 is away from the end cap One end of the rib 4 is connected to a steel ring 6, and the end of the anti-floating rod 5 close to the end cap rib 4 is a hook, the inner diameter of the hook is 8-12 mm, the bending angle is 180°, and the bending length is 16-22 mm. The anti-floating rod 5 hooks the end cap rib 4 through the hook, so that the anti-floating rod 5 and the end cap rib 4 are a detachable connection structure, and a through hole for the anti-floating rod 5 to pass through is opened at the center of the steel ring 6. The diameter of the through hole is 1-2 mm larger than the diameter of the anti-floating rod, and the bottom end of the anti-floating rod 5 is provided with a thread, and a nut 7 is provided at the lower end of the steel ring, and the steel ring 6 is fixed on the anti-floating rod 5 through the nut 7, so that the anti-floating rod 5 and the steel ring 6 are a detachable connection structure

[0029] The end cap bottom plate 1 has a diameter of 80 to 150 mm and a thickness of 4 to 8 mm, and the end cap top plate 2 has a height of 50 to 80 mm.

[0030] The end cap rib 4 is a cylinder, and the cross-sectional diameter of the end cap rib 4 is 6-12 mm. The anti-floating tie rod 5 is a cylinder, and the cross-sectional diameter of the anti-floating tie rod 5 is 6-10 mm.

[0031] The steel ring 6 is composed of two arc-segment steel plates 610 and a straight steel plate 620. The arc-segment steel plates 610 are welded at both ends of the straight steel plate 620. The length of the straight steel plate is 60 to 80 mm, the length of the arc steel plate is 40 to 80 mm, the bending angle of the arc steel plate is 30 to 40°, the width of the steel ring 6 is 15 to 25 mm, and the thickness is 5 to 8 mm.

[0032] How to use: reserve a hole in the center of the inorganic composite core mold. The diameter of the hole should be 5mm to 10mm larger than the outer diameter of the anti-floating tie rod hook. When installing the anti-floating tie rod, hook one end of the anti-floating tie rod on the end cap rib, and then pass the anti-floating tie rod through the reserved hole of the inorganic composite core mold. Drill holes on the floor bottom template according to the installation position, place the core mold bottom pad, continue to pass the anti-floating tie rod through the bottom template and use the steel ring and nut to fix it to the secondary keel at the bottom of the template, pour the floor concrete, and after the concrete is completely hardened, unscrew the nut of the anti-floating tie rod, remove the steel ring, push the anti-floating tie rod upward, and then rotate 90° and pull it down to complete the decoupling of the top of the anti-floating tie rod from the end cap rib. Figure 2-5 As shown, the anti-floating tie rod is then taken out from the inorganic composite core mold, and finally the hole is sealed with grouting material.

[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] Example 1

[0035] The floor slab of a certain construction project adopts inorganic composite core mold hollow floor slab, such as Figure 7 and 8 As shown, the thickness of the hollow floor is 480mm, the size of the core mold 12 is 500mm×500mm×300mm, the core mold is solid polystyrene, and the surface is glass fiber mesh and anti-cracking mortar. In order to facilitate the pre-buried pipeline, the bottom of the core mold is cut corners, the horizontal length of the cut corners is 150mm, and the vertical length of the cut corners is 50mm. The upper plate 10 of the core mold is 110mm thick, the lower plate is 70mm thick, and the size of the rib beam 8 is 120mm×480mm.

[0036] According to the above-mentioned design method, the components of the detachable anti-floating tie rod system are designed. The design results are shown in Table 1:

[0037] Table 1 Design results of various components of detachable anti-floating tie rods for 480mm thick inorganic composite core hollow slab

[0038]

[0039] 1. Make the end cap: The end cap is made of Q235 steel, the outer diameter of the end cap bottom plate is 110mm, the inner diameter of the end cap bottom plate is 50mm, the end cap height is 60mm, the end cap thickness is 7mm, and the end cap rib diameter is 10mm. The end cap rib is welded to the end cap bottom plate, and one end of the detachable anti-floating tie rod hook is hooked on the end cap rib during construction.

[0040] 2. Make the anti-floating tie rod: The anti-floating tie rod is made of Q235 steel, and its diameter is 8mm. One end of the anti-floating tie rod is a hook with an inner diameter of 11mm, a hook angle of 180°, and a hook length of 25mm. The other end of the anti-floating tie rod is threaded.

[0041] 3. Make the steel ring: The steel ring is made of Q235 steel. The steel ring consists of a straight section in the middle and two arc sections. The length of the straight section is 60mm, the length of the arc section is 40mm, the angle of the arc section is 30°, the width of the steel ring is 20mm, and the thickness is 6mm. The diameter of the hole in the center of the steel ring is 9mm.

[0042] 4. Reserve the center hole of the inorganic composite core mold: Use an electric drill to drill a hole in the center of the inorganic composite core mold with a hole diameter of 35mm.

[0043] 5. Set up scaffolding:

[0044] 1) Calculate the constant load based on the total thickness of the floor, the spacing between the inner molds, the thickness of the cast-in-place floor at the top and bottom of the inner molds, and the specific position of the plane, and calculate the stability of the formwork-related materials and uprights;

[0045] 2) The floor formwork is made of 18mm wooden plywood, and the secondary keel 17 is made of 50mm*100mm wooden square with a spacing of 200mm. The main keel uses 3 Steel pipe, spacing 900mm. The surface of the wood is planed to ensure the flatness of the joint surface with the template;

[0046] 3) Formwork support selection For the 900mm spacing of the buckle bowl steel pipe scaffold, the vertical pole spacing is arranged at 900mm*900mm, and wooden blocks should be placed on the bottom of the vertical poles. The pad width should be no less than 200mm, the thickness should be 55mm, the length should be no less than 2000mm, and a sweeping pole should be provided. The vertical pole extension must be butt-jointed, and overlapping is strictly prohibited;

[0047] 4) When the height-to-width ratio of the full-height frame is greater than 2 or 2.5, the frame should be rigidly connected to the structural columns around and in the middle. The width of each scissor brace should not be less than 4 spans and should not be less than 6m. The angle should be controlled between 45° and 60°, and the bottom should be tightly pressed against the ground;

[0048] 5) The vertical poles of the hidden beam formwork support should be denser, with a spacing of 1 / 2 times the template support spacing, and the support should be set on the center line of the hidden beam. The horizontal bar spacing is 900mm, and except for the reserved safety passage, other parts cannot be missing horizontal bars;

[0049] 6) The early removal support pole is provided with an adjustable top support and an adjustable base below. The late removal support pole is provided with an early removal head and an adjustable support below.

[0050] 6. Install the template:

[0051] 1) After the scaffolding is erected, the beam bottom formwork and beam side formwork are supported according to the platform horizontal control line, and then the wooden keel and floor formwork are installed;

[0052] 2) The irregular templates should be planed and corrected with a woodworking plane to facilitate template installation and make the templates tightly connected. The sides of the planed or cut wooden templates should be painted with epoxy resin paint to prevent the wooden templates from absorbing water and swelling, which would affect their normal turnover;

[0053] 3) When installing the formwork, it should be laid from one side. The later installed formwork must be tightly pressed against the earlier installed formwork, and all the sides of the plate joints are pasted with adhesive sponge strips to ensure that there is no leakage when vibrating the concrete, so that the poured concrete is solid inside and smooth outside, with good quality;

[0054] 4) When laying the formwork, nail it firmly around the edges and at the joints, and try to use fewer or no nails in the middle to facilitate formwork removal. The formwork must be firmly supported and tightened to prevent it from tipping over;

[0055] 5) During the construction of frame beams and hollow slabs, the arch is 0.3%. When the arch is large-span, the transition at the periphery and corner fold lines of the floor slab should be considered. The amount of arch should be slightly lower than the normal amount, and the formwork support should be uniformly erected according to the bottom elevation of the slab.

[0056] 7. Laying out and positioning on the template: After the template is installed and passed the acceptance, the reserved openings, embedded pipelines, bottom steel bars, hidden beams, rib beams, secondary structure columns and core mold installation positions will be positioned and marked on the template.

[0057] 8. Tie the steel bars at the bottom of beams, hidden beams, rib beams and slabs: According to the thickness of the beam and slab protective layer, place the steel bar protective layer pads at the bottom of beams, hidden beams, rib beams and slab steel bars on the template with the lines drawn. Tie the steel bars of beams, hidden beams and rib beams first, then place the slab bottom steel bars on the top of the longitudinal bars at the bottom of beams, hidden beams and rib beams, and finally tie the slab bottom steel bars with beams, hidden beams and rib beams with wire.

[0058] 9. Reserve openings and pre-buried pipelines: After the bottom layer of steel bars is tied, various water, heating and electricity pipes and boxes are buried, and the reserved opening mold is fixed. In order to reduce the weakening of the floor section by the water, heating and electricity pipes and boxes, the pipes and boxes should be placed at the core mold rib beam or hidden beam position as much as possible. Pipelines with an outer diameter of less than 15mm can also be laid under the core mold, but the pipelines cannot be arranged crosswise to prevent the core mold from being raised and affecting the quality of the poured concrete. Vertical pipelines passing through the floor need to open holes in the template to bury the casing, and the casing must be fixed firmly.

[0059] 10. Install the removable anti-floating tie rod and core mold:

[0060] 1) Before installing the core module, check its appearance one by one. The damage of the block shall not exceed the standard requirements. All holes smaller than the standard shall be sealed and filled;

[0061] 2) During the installation of the core mold, an overhead construction channel should be laid, and it is prohibited to place construction tools and materials directly on the core mold, and construction workers are prohibited from stepping directly on the core mold;

[0062] 3) When installing the anti-floating tie rod, hook one end of the anti-floating tie rod on the rib of the end cap, then pass the anti-floating tie rod through the reserved channel of the inorganic composite core mold, punch a hole on the floor bottom template according to the installation position, place the core mold bottom pad, pass the anti-floating tie rod through the bottom template and fix it to the secondary keel at the bottom of the template with a steel ring and nut;

[0063] 4) After the core mold is installed, it is strictly forbidden to step on it to ensure that the core mold is not offset. Check the core mold position in time to see if it is accurate, and adjust the displaced core mold in time. During the adjustment process, it is forbidden to use pry bars and tools with large force, and the damage to the core mold should be minimized as much as possible.

[0064] 11. Tie up the upper steel bars of the slab: After the core mold is accurately positioned, start tying up the upper steel bars of the slab. Avoid stepping on the core mold when tying up the upper steel bars. The slab steel bars are arranged in two layers and in two directions on the upper part of the rib steel bars and tied up at the intersection with wire.

[0065] 12. Pouring concrete:

[0066] 1) Before pouring concrete, the formwork needs to be cleaned and the formwork and core mold need to be moistened with water;

[0067] 2) It is strictly forbidden to press the construction machinery directly on the core mold during the pouring of concrete. The pump pipe for pumping concrete should be installed from the beam as much as possible. If it is necessary to install the pump pipe from the top of the core mold, a vibration damper, such as a used car tire, should be placed under the concrete pump pipe at the intersection of the longitudinal and transverse rib beams to reduce the impact of the pump pipe on the core mold. When delivering pumped concrete, the drop height difference of the concrete shall not be greater than 500mm;

[0068] 3) When pouring concrete, start from one side in sequence along the span direction of the floor slab, and spread the concrete as evenly as possible to avoid excessive accumulation of concrete in the same position and damage to the core mold;

[0069] 4) The maximum particle size of coarse aggregate for concrete is ≤20mm, and its slump should be 160-180mm. The distribution and vibration should be carried out simultaneously to ensure that the concrete between the ribs is filled fully without accumulated air pockets and bubbles;

[0070] 5) Pour concrete in layers in two times. The height of the first pouring should not exceed 3 / 5 of the core mold height. The second pouring should be done after the concrete is compacted by the vibrating rod.

[0071] 6) When vibrating concrete, ordinary vibrators can be used for the hidden beams or beams, and small inserted vibrators should be strictly used for the rib beams between the core molds. The surface concrete should be vibrated with a flat vibrator. Vibrate each part for about 20 seconds to make the bottom of the core mold dense until there are no bubbles;

[0072] 7) During the concrete pouring and vibration process, the level bar fixed on the core mold should be monitored every 30 minutes using a level. If the elevation deviation exceeds 3mm, it should be corrected immediately according to the emergency plan;

[0073] 8) If the core mold is found to be deformed too much or damaged during the pouring process, support baffle measures should be adopted in time to resist the pressure of concrete on the core mold, and the core mold shall not be filled with concrete;

[0074] 9) If the core mold is found to float during the pouring process, stop vibrating immediately, find out the cause and take timely remedial measures.

[0075] 13. Curing concrete and removing anti-floating tie rods: After the concrete is poured, use a scraper to scrape the surface of the concrete flat and then use a wooden trowel to press and smooth it. After the concrete is finally set, cover it with plastic sheeting and keep it moist to prevent shrinkage cracks; the concrete curing time shall not be less than 14 days; the span of the general hollow floor is greater than 8m. When removing the anti-floating tie rod, the concrete strength grade of the floor shall reach 100% of the design strength grade. First, unscrew the nut of the anti-floating tie rod, then remove the steel ring, push the anti-floating tie rod upward again, and finally rotate 90° and pull it downward to complete the decoupling of the top of the anti-floating tie rod from the end cap rib; then remove the anti-floating tie rod from the inorganic composite core mold, and then seal the hole with grouting material.

[0076] Embodiment 2:

[0077] A building project uses an inorganic composite core mold hollow floor slab Fig. 9 and 10 The hollow floor slab is 270mm thick, the core mold size is 500mm×500mm×150mm, the core mold is solid polystyrene, and the surface is glass fiber mesh and anti-cracking mortar. In order to facilitate the pre-buried pipeline, the bottom of the core mold is cut corners, the horizontal length of the cut corners is 150mm, and the vertical length of the cut corners is 50mm. The upper plate thickness of the core mold is 60mm, the lower plate thickness is 60mm, and the rib beam size is 120mm×270mm.

[0078] According to the above-mentioned design method, the components of the detachable anti-floating tie rod system are designed. The design results are shown in Table 2:

[0079] Table 2 Design results of various components of detachable anti-floating tie rods for 270mm thick inorganic composite core hollow slab

[0080]

[0081]

[0082] 1. Make the end cap: The end cap is made of Q235 steel, the outer diameter of the end cap bottom plate is 90mm, the inner diameter of the end cap bottom plate is 50mm, the end cap height is 40mm, the end cap thickness is 5mm, and the end cap rib diameter is 8mm. The end cap rib is welded to the end cap bottom plate, and one end of the detachable anti-floating tie rod hook is hooked on the end cap rib during construction.

[0083] 2. Make the anti-floating tie rod: The anti-floating tie rod is made of Q235 steel, and its diameter is 6mm. One end of the anti-floating tie rod is a hook with an inner diameter of 10mm, a hook angle of 180°, and a hook length of 20mm. The other end of the anti-floating tie rod is threaded.

[0084] 3. Make the steel ring: The steel ring is made of Q235 steel. The steel ring consists of a straight section in the middle and two arc sections. The length of the straight section is 50mm, the length of the arc section is 40mm, the angle of the arc section is 30°, the width of the steel ring is 15mm, and the thickness is 6mm. The diameter of the hole in the center of the steel ring is 7mm.

[0085] 4. Reserve the center hole of the inorganic composite core mold: Use an electric drill to drill a hole in the center of the inorganic composite core mold with a hole diameter of 25mm.

[0086] 5. The subsequent construction process is similar to that of Example 1 and will not be described here. The main difference between Example 2 and Example 1 is that the different thickness of the hollow slab leads to different core mold sizes, which leads to different buoyancy, and the different buoyancy leads to different sizes of the components and supporting structures of the detachable anti-floating tie rod system. The construction process is different to match the inorganic composite core mold hollow slab structure.

[0087] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A detachable anti-floating tie rod, characterized in that: The invention comprises a circular end cap base plate (1), a circular end cap top plate (2) located at the upper end of the end cap base plate, an end cap side plate (3) for connecting the end cap base plate and the end cap top plate, and an end cap rib (4) arranged on the inner wall of the end cap side plate, wherein the end cap rib (4) is arranged along the radial direction of the end cap top plate (2), the end cap side plate (3) connects the inner circular wall of the end cap base plate and the circular outer wall of the end cap top plate, the end cap rib (4) is connected with an anti-floating rod (5), the end of the anti-floating rod (5) away from the end cap rib (4) is connected with a steel ring (6), and the anti-floating rod (5) is detachably connected to the end cap rib (4) and the steel ring (6).

2. The detachable anti-floating tie rod according to claim 1, characterized in that: One end of the anti-floating rod (5) close to the end cap rib (4) is a hook, the inner diameter of the hook is 8-12 mm, the bending angle is 180°, and the bending length is 16-22 mm. The anti-floating rod (5) hooks the end cap rib (4) through the hook.

3. The detachable anti-floating tie rod according to claim 1, characterized in that: A through hole for the anti-floating rod (5) to pass through is provided at the center of the steel ring (6), and the bottom end of the anti-floating rod (5) is provided with a thread, and a nut (7) is provided at the lower end of the steel ring, and the steel ring (6) is fixed to the anti-floating rod (5) through the nut (7).

4. The detachable anti-floating tie rod according to claim 1, characterized in that: The diameter of the end cap bottom plate (1) is 80 to 150 mm, the thickness is 4 to 8 mm, and the height of the end cap top plate (2) is 50 to 80 mm.

5. The detachable anti-floating tie rod according to claim 1, characterized in that: The end cap rib (4) is a cylinder, and the cross-sectional diameter of the end cap rib (4) is 6 to 12 mm; the anti-floating tie rod (5) is a cylinder, and the cross-sectional diameter of the anti-floating tie rod (5) is 6 to 10 mm.

6. The detachable anti-floating tie rod according to claim 1, characterized in that: The steel ring (6) is composed of two arc-segment steel plates (610) and a straight steel plate (620), the arc-segment steel plates (610) are welded at both ends of the straight steel plate (620), the length of the straight steel plate is 60 to 80 mm, the length of the arc steel plate is 40 to 80 mm, the bending angle of the arc steel plate is 30 to 40°, the width of the steel ring (6) is 15 to 25 mm, and the thickness is 5 to 8 mm.