Auxiliary positioning and guiding device for bar planting of concrete column
By setting up a reinforcement auxiliary positioning guide device on the concrete column, precise positioning is achieved using scale lines and infrared rangefinders, and combining movable clamps and hydraulic push rods to improve mobility and stability, the inaccurate positioning of the reinforcement in secondary structures is solved. and the problem of low construction efficiency reduces safety risks and costs.
Patent Information
- Application Number
- CN202420352451.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-26
AI Technical Summary
During construction, the secondary structure planting tendons are inaccurate, have low construction efficiency, high safety risks, and large labor investment, resulting in increased costs.
A concrete column reinforcement auxiliary positioning guide device is designed, including the left vertical plate, the first crossbar, the distance measuring structure and the right vertical plate. The precise positioning is achieved using the scale line and the infrared rangefinder, and the movable clamp and hydraulic push rod are used to achieve precise positioning. Improve mobility and stability, and install anti-slip rubber pads in the drill bit position to prevent slippage.
The precise positioning of secondary structure planting tendons is achieved, construction efficiency is improved, safety risks and manpower investment are reduced, costs are reduced, and the accuracy of point coordinates is enhanced.
Smart Images

Figure CN221989914U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of secondary structure construction equipment, in particular to a concrete column reinforcement planting auxiliary positioning guide device. Background Art
[0002] The amount of secondary structure reinforcement work in construction projects is huge. At present, the drilling of secondary structure reinforcement holes is generally done by first arranging a worker to use a tape measure to measure the horizontal and vertical distances to determine the point, and then another worker directly drills the reinforcement holes on the column (beam). The measurement workload is large, the numerical accuracy is greatly affected by the quality of the personnel, and the drill bit is prone to slip when it contacts the wall, which poses a safety risk, low construction efficiency, high labor input, and increased construction costs.
[0003] In order to improve the efficiency of secondary structure rebar drilling, reduce construction risks, reduce manpower investment, reduce construction costs, and enhance numerical accuracy, a secondary structure rebar auxiliary positioning and guiding device is needed, which can complete the positioning and drilling of rebar holes by one person, and at the same time can reduce the safety risks caused by the drill bit slipping on the wall, and can also improve construction efficiency, reduce cost investment, and improve the accuracy of point coordinates. It has the characteristics of convenient operation and strong on-site adaptability.
[0004] Therefore, a concrete column reinforcement auxiliary positioning and guiding device is proposed to solve the above problems. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a concrete column reinforcement planting auxiliary positioning guide device to solve the problems of inaccurate positioning and low construction efficiency during secondary reinforcement planting.
[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is: a concrete column anchor bar auxiliary positioning guide device, comprising a left vertical plate, a first cross bar, a distance measuring structure and a right vertical plate;
[0007] The left vertical plate is set on the left side of the concrete column;
[0008] The right vertical plate is set on the right side of the concrete column;
[0009] A first crossbar, the left end of which is connected to the left vertical plate, the right end of which is connected to the right vertical plate, and the first crossbar is provided with scale lines;
[0010] The distance measuring structure comprises a storage box, a pointer and an infrared distance meter; the storage box is slidably arranged on the first cross bar; the pointer is arranged on the right side of the storage box and points to the scale line; the infrared distance meter is arranged in the storage box and is used to measure the vertical height of the anchor hole.
[0011] As a further technical solution of the above scheme, a first movable clamp is fixedly provided on one side of the storage box, and the first movable clamp includes a sleeve, a pressing block and a compression spring; the sleeve is connected to the storage box, the pressing block is sleeved in the sleeve, and is connected to the bottom of the sleeve through the compression spring; the side walls of the pressing block and the sleeve are provided with long strip through holes, and the first cross bar passes through the long strip through holes of the pressing block and the sleeve, and is respectively fixed at the upper and lower ends of the two long strip through holes, and when the pressing block is pressed, a channel is formed so that the sleeve drives the storage box to move on the first cross bar.
[0012] As a further technical solution of the above scheme, it also includes a second cross bar and a second movable clamp; the structure of the second cross bar is the same as that of the first cross bar, and is located below the first cross bar; the second movable clamp has the same structure as the first movable clamp and is arranged on the second cross bar.
[0013] As a further technical solution of the above solution, a hydraulic push rod is provided on the first cross bar, and a telescopic rod of the hydraulic push rod is connected to the storage box to drive the storage box to move along the first cross bar.
[0014] As a further technical solution of the above solution, a third movable clamp is also included. The third movable clamp has the same structure as the first movable clamp. The third movable clamp is fixedly connected to the right vertical plate to drive the right vertical plate to move on the first crossbar.
[0015] As a further technical solution of the above solution, it also includes a positioning sleeve, which is arranged on the right side of the storage box and is used to install a drilling drill bit for installing the rebar planting hole.
[0016] As a further technical solution of the above solution, anti-slip rubber pads are provided on the right side of the left vertical plate and the left side of the right vertical plate.
[0017] Compared with the prior art, the utility model has the following advantages and beneficial effects: the utility model is fixed on the concrete column by the left vertical plate and the right vertical plate, and the horizontal height and the vertical height are respectively obtained by the scale line and the infrared rangefinder, so as to realize the precise positioning of the secondary structure reinforcement and improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a front structural schematic diagram of the utility model.
[0019] Figure 2 It is a schematic structural diagram of the first movable clamp.
[0020] Figure 3 It is a structural schematic diagram of another embodiment of the utility model.
[0021] The meanings of the numbers in the figure are as follows: left vertical plate-1; first horizontal bar-2; distance measuring structure-3; storage box-31; pointer-32; infrared distance meter-33; positioning sleeve-34; first movable clamp-4; sleeve-41; pressing block-42; compression spring-43; second horizontal bar-5; second movable clamp-6; hydraulic push rod-7; third movable clamp-8; right vertical plate-9; anti-slip rubber pad-10. DETAILED DESCRIPTION
[0022] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the accompanying drawings in the embodiments of the utility model, so as to have a further understanding of the concept of the utility model, the technical problems solved, the technical features constituting the technical solutions and the technical effects brought about.
[0023] like Figure 1-2 As shown, the utility model is a concrete column reinforcement auxiliary positioning guide device, comprising a left vertical plate 1, a first cross bar 2, a distance measuring structure 3 and a right vertical plate 9;
[0024] A left vertical plate 1 is arranged on the left side of the concrete column;
[0025] A right vertical plate 9 is arranged on the right side of the concrete column;
[0026] A first crossbar 2, the left end of which is connected to the left vertical plate 1, and the right end of which is connected to the right vertical plate 9, and a scale line is provided on the first crossbar 2;
[0027] The distance measuring structure 3 includes a storage box 31, a pointer 32 and an infrared distance meter 33; the storage box 31 is slidably arranged on the first cross bar 2; the pointer 32 is arranged on the right side of the storage box 31 and points to the scale line; the infrared distance meter 33 is arranged in the storage box 31 and is used to measure the vertical height of the anchor hole; the positioning sleeve 34 is arranged on the right side of the storage box 31 and is used to install the drilling bit for the anchor hole.
[0028] When using the device, firstly, the left vertical plate 1 and the right vertical plate 9 are respectively arranged on the left and right sides of the concrete column, and the left vertical plate 1 and the right vertical plate 9 are connected by the first cross bar 2 to form an installation base; the operator moves the storage box 31 on the first cross bar 2, and at this time, the pointer 32 moves on the first cross bar 2 to point to different scale lines, and the horizontal position of the anchor hole can be obtained, and the infrared rangefinder 33 is started, and the infrared rangefinder 33 can obtain the vertical height of the anchor hole.
[0029] like Figure 1As shown, as a preferred embodiment, a first movable clamp 4 is fixedly provided on one side of the storage box 31, and the first movable clamp 4 includes a sleeve 41, a pressing block 42 and a compression spring 43; the sleeve 41 is connected to the storage box 31, the pressing block 42 is sleeved in the sleeve 41, and is connected to the bottom of the sleeve 41 through the compression spring 43; the side walls of the pressing block 42 and the sleeve 41 are both provided with long strip through holes, the first cross bar 2 passes through the long strip through holes of the pressing block 42 and the sleeve 41, and is respectively fixed at the upper and lower ends of the two long strip through holes, and when the pressing block 42 is pressed, a channel is formed so that the sleeve 41 drives the storage box 31 to move on the first cross bar 2. In this embodiment, when it is necessary to move, the pressing block 42 is pressed down. At this time, the long strip through holes of the pressing block 42 and the sleeve 41 form a channel, and the storage box 31 can move freely on the first cross bar 2. When it is moved to the construction position, the pressing block 42 is released, and the pressing block 42 and the sleeve 41 are respectively pressed against the first cross bar 2 to form a stable structure to complete the fixation.
[0030] like Figure 1 As shown, as a preferred embodiment, it also includes a second crossbar 5 and a second movable clamp 6; the structure of the second crossbar 5 is the same as that of the first crossbar 2, and is located below the first crossbar 2; the second movable clamp 6 is the same as the structure of the first movable clamp 4, and is arranged on the second crossbar 5. In this embodiment, the second crossbar 5 and the second movable clamp 6 are arranged, the second crossbar is arranged below the first crossbar 2, and the second movable clamp 6 is connected to the lower part of the storage box 31. The storage box 31 is driven to move by the first movable clamp 4 and the second movable clamp 6, which is more stable.
[0031] like Figure 3 As shown, as a preferred embodiment, a hydraulic push rod 7 is provided on the first cross bar 2, and the telescopic rod of the hydraulic push rod 7 is connected to the storage box 31, driving the storage box 31 to move along the first cross bar 2. In this embodiment, the first cross bar 2 serves as the installation base of the hydraulic push rod 7. When it needs to be moved, the hydraulic push rod 7 is started. Since the hydraulic push rod 7 is fixedly connected to the storage box 31, the storage box 31 can move freely on the first cross bar 2.
[0032] like Figure 1 As shown, as a preferred embodiment, it also includes a third movable clamp 8, which has the same structure as the first movable clamp 4. The third movable clamp 8 is fixedly connected to the right vertical plate 9, driving the right vertical plate 9 to move on the first crossbar 2. In this embodiment, when the right vertical plate 9 is installed, the third movable clamp 8 can be set to drive the right vertical plate 9 to move, and when the right vertical plate 9 moves to clamp the right end of the concrete column, it can adapt to concrete columns of different widths.
[0033] like Figure 1As shown, as a preferred embodiment, it also includes a positioning sleeve 34, which is arranged on the right side of the storage box 31 and is used to install a drilling bit for installing the anchor hole. When the positioning sleeve 34 is set, it is in the same horizontal position as the infrared rangefinder 33 and the same vertical position as the pointer 32. The position of the positioning sleeve 34 is the position of the secondary anchor hole. Drilling can be achieved by installing a drilling bit on the positioning sleeve 34. During drilling, due to the stable connection between the left vertical plate 1, the right vertical plate 9 and the first cross bar 2, the positioning sleeve 34 can also be limited. The positioning is accurate when drilling and there is no slippage, which reduces the safety risk. As a preferred embodiment, a protective cover can also be hinged on the storage box 31. When drilling, the protective cover is lowered to shield and prevent the internal objects from being contaminated by dust.
[0034] like Figure 1 As shown, as a preferred embodiment, the right side of the left vertical board 1 and the left side of the right vertical board 9 are both provided with anti-skid rubber pads 10. The anti-skid rubber pads 10 are provided on the left vertical board 1 and the right vertical board 9, and the anti-skid rubber pads 10 are in contact with the side wall of the concrete column, increasing friction and preventing sliding.
[0035] The words “connection” and “fixation” appearing in the description of the present invention may refer to fixed connection, processing and forming, welding, or mechanical connection. The specific meanings of the above terms in the present invention shall be understood according to the specific circumstances.
[0036] In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., which indicate the orientation or position relationship, are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying a specific orientation that the device or element referred to must have, and therefore cannot be understood as a limitation on the present invention.
[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.
Claims
1. A concrete column reinforcement auxiliary positioning guide device, characterized in that: It comprises a left vertical plate (1), a first crossbar (2), a distance measuring structure (3) and a right vertical plate (9); A left vertical plate (1), arranged on the left side of the concrete column; A right vertical plate (9), arranged on the right side of the concrete column; A first crossbar (2), the left end of which is connected to the left vertical plate (1), and the right end of which is connected to the right vertical plate (9), and the first crossbar (2) is provided with scale marks; The distance measuring structure (3) comprises a storage box (31), a pointer (32) and an infrared distance meter (33); the storage box (31) is slidably arranged on the first crossbar (2); the pointer (32) is arranged on the right side of the storage box (31) and points to the scale line; the infrared distance meter (33) is arranged in the storage box (31) and is used to measure the vertical height of the reinforcing bar hole.
2. A concrete column reinforcement auxiliary positioning and guiding device as claimed in claim 1, characterized in that: A first movable clamp (4) is fixedly provided on one side of the storage box (31), and the first movable clamp (4) comprises a sleeve (41), a pressing block (42) and a compression spring (43); the sleeve (41) is connected to the storage box (31), the pressing block (42) is sleeved in the sleeve (41), and is connected to the bottom of the sleeve (41) via the compression spring (43); the side walls of the pressing block (42) and the sleeve (41) are both provided with long strip through holes, the first cross bar (2) passes through the long strip through holes of the pressing block (42) and the sleeve (41), and is respectively pressed against the upper and lower ends of the two long strip through holes to be fixed, and when the pressing block (42) is pressed, a channel is formed so that the sleeve (41) drives the storage box (31) to move on the first cross bar (2).
3. A concrete column reinforcement auxiliary positioning guide device as claimed in claim 2, characterized in that: It also comprises a second crossbar (5) and a second movable clamp (6); the structure of the second crossbar (5) is the same as that of the first crossbar (2), and is located below the first crossbar (2); the second movable clamp (6) is the same as that of the first movable clamp (4), and is arranged on the second crossbar (5).
4. The auxiliary positioning and guiding device for anchoring reinforcement in concrete columns according to claim 1, characterized in that: A hydraulic push rod (7) is provided on the first cross bar (2), and a telescopic rod of the hydraulic push rod (7) is connected to the storage box (31), driving the storage box (31) to move along the first cross bar (2).
5. The auxiliary positioning and guiding device for anchoring reinforcement in concrete column according to claim 2, characterized in that: It also includes a third movable clamp (8), which has the same structure as the first movable clamp (4). The third movable clamp (8) is fixedly connected to the right vertical plate (9) to drive the right vertical plate (9) to move on the first crossbar (2).
6. The auxiliary positioning and guiding device for anchoring reinforcement in concrete columns according to claim 1, characterized in that: It also includes a positioning sleeve (34) which is arranged on the right side of the storage box (31) and is used to install a drilling bit for drilling the reinforcing bar planting holes.
7. The auxiliary positioning and guiding device for anchoring reinforcement in concrete columns according to claim 1, characterized in that: The right side of the left vertical plate (1) and the left side of the right vertical plate (9) are both provided with anti-slip rubber pads (10).