Waterproof joint for construction of large-section underground excavation tunnel without dismantling temporary middle partition wall
By using construction waterproof nodes that do not remove the temporary middle partition wall during the tunnel excavation process, and using materials such as I-steel, water-stop steel plates to form a waterproof system, the problem of temporary support cutting off disturbances to soil in traditional methods is solved. Improve construction safety and quality, extend construction length and reduce material use.
Patent Information
- Application Number
- CN202420775356.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-04-15
AI Technical Summary
During the tunnel excavation process, traditional practices require the temporary middle partition wall to be cut in sections before the construction of the second lining, resulting in multiple disturbances to the surrounding soil during the initial support process, posing a major safety hazard.
The construction waterproof nodes without removing the temporary middle partition walls are adopted, including I-steel, water-stop steel plate, slow-expanded water-stop layer, non-cured water-stop layer, waterproof layer, geotextile buffer layer, mortar surface layer, waterproof mortar layer and sealing The layer, through the combination and welding of these materials, forms a complete waterproof system, avoiding the removal of temporary support.
It effectively reduces the settlement of ground structures, increases construction safety, extends construction length, reduces the risk of material investment and water leakage at construction joints, improves construction quality and progress, and achieves economic benefits.
Smart Images

Figure CN221990399U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rail transportation, in particular to a waterproof node for constructing a large-section dark-dig tunnel without dismantling a temporary intermediate partition wall. Background Art
[0002] During tunnel excavation, the secondary lining can provide support to stabilize the surrounding soil, prevent collapse and landslides, and ensure construction safety. Therefore, the construction process and quality of the secondary lining are particularly important. The traditional lining method is: before the construction of the secondary lining, the temporary middle partition is cut off in sections, a waterproof layer is applied, and then the steel bars are tied for concrete pouring. If the geological conditions are poor and there are many surrounding risk sources, the risk sources have been disturbed many times during the initial support construction. If the traditional method of cutting off temporary supports is still adopted during the construction of the secondary lining, there will be great safety hazards. Utility Model Content
[0003] Therefore, the technical problem to be solved by the utility model is to overcome the defects in the prior art, thereby providing a waterproof node for constructing a large-section dark-excavated tunnel without dismantling the temporary middle partition wall.
[0004] A waterproof node for constructing a large-section dark-excavated tunnel without removing a temporary intermediate partition wall, comprising: an I-beam, a water-stopping steel plate, a first slow-expansion water-stopping layer, a non-solidified water-stopping layer, a second slow-expansion water-stopping layer, a waterproof layer, a geotextile buffer layer, a mortar finishing layer, a waterproof mortar layer, a sealing layer and a steel frame;
[0005] A mortar finishing layer, a geotextile buffer layer and a waterproof layer are arranged in sequence from bottom to top above the primary support surface. One end of the I-beams arranged in pairs passes through the waterproof layer and extends into the geotextile buffer layer. A non-solidified waterstop layer is arranged between the two I-beams, and the non-solidified waterstop layer extends to the upper surface of the mortar finishing layer. A steel frame is arranged inside the non-solidified waterstop layer. A second slow-expansion waterstop layer is arranged at the connection between the I-beam and the waterproof layer. The waterstop steel plate penetrates the I-beam and a first slow-expansion waterstop layer is arranged at the connection between the two. The other end of the I-beam is in contact with the second lining surface. A groove is arranged below the second lining surface, and a sealing layer and a waterproof mortar layer are arranged inside the groove.
[0006] Furthermore, the waterstop steel plates are two galvanized steel plates of the same specification, and the two galvanized steel plates are welded.
[0007] Furthermore, the galvanized steel sheet is in an E-shape.
[0008] Furthermore, the two galvanized steels are welded by carbon dioxide shielded welding, the weld height is not less than 8mm, and the welding points are treated with rust prevention.
[0009] Furthermore, the thickness of the galvanized steel sheet is 5 mm.
[0010] Furthermore, the first slow expansion water-stopping layer and the second slow expansion water-stopping layer are both slow expansion water-stopping pastes.
[0011] Furthermore, the waterproof mortar layer is a polymer waterproof mortar.
[0012] Furthermore, the sealing layer is a two-component polysulfide sealing paste.
[0013] Furthermore, the non-solidified water-stop layer is a rubberized asphalt non-solidified waterproof layer.
[0014] The beneficial effects of the technical solution of the utility model are:
[0015] This node solves the problem of multiple disturbances to the surrounding soil during the removal of the support, effectively reduces the settlement of ground structures, increases construction safety, and protects the risk source. Since the temporary partition wall is not cut off in sections before the second lining construction, the construction length can be extended, the construction joints are reduced, and the input of materials such as water stop strips and grouting pipes at the construction joints is reduced, reducing the probability of water leakage at the construction joints. During the construction, quality, safety, progress and other aspects were effectively controlled, shortening the construction period and achieving good economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is a schematic diagram of the construction site of this waterproof node;
[0018] Figure 2 for Figure 1 Side view of the middle A area;
[0019] Figure 3 for Figure 1 Side view of the middle B area;
[0020] Figure 4 for Figure 1 Top view of the middle A area;
[0021] Figure 5 This is a schematic diagram when the water-stop steel plate is not welded;
[0022] Figure 6 This is a schematic diagram of the water-stop steel plate after welding.
[0023] Description of reference numerals:
[0024] 1-I-steel; 2-waterstop steel plate; 3-first slow expansion waterstop layer;
[0025] 4- non-solidified water-stop layer; 5- second slow expansion water-stop layer; 6- waterproof layer;
[0026] 7-geotextile buffer layer; 8-mortar finishing layer; 9-primary support surface;
[0027] 10-secondary lining surface; 11-waterproof mortar layer; 12-sealing layer;
[0028] 13-section steel frame. DETAILED DESCRIPTION
[0029] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0033] See also Figures 1 to 4A waterproof node for constructing a large-section dark-excavated tunnel without removing a temporary intermediate partition wall, comprising: an I-beam 1, a water-stopping steel plate 2, a first slow-swelling water-stopping layer 3, a non-solidifying water-stopping layer 4, a second slow-swelling water-stopping layer 5, a waterproof layer 6, a geotextile buffer layer 7, a mortar finishing layer 8, a waterproof mortar layer 11, a sealing layer 12 and a steel frame 13;
[0034] A mortar finishing layer 8, a geotextile buffer layer 7 and a waterproof layer 6 are arranged in sequence from bottom to top above the primary support surface 9. One end of the I-beam 1 arranged in pairs passes through the waterproof layer 6 and extends into the geotextile buffer layer 7. A non-solidified water-stop layer 4 is arranged between the two I-beams 1, and the non-solidified water-stop layer 4 extends to the upper surface of the mortar finishing layer 8. A steel frame 13 is arranged inside the non-solidified water-stop layer 4. A second slow-expansion water-stop layer 5 is arranged at the connection between the I-beam 1 and the waterproof layer 6. The water-stop steel plate 2 penetrates the I-beam 1 and a first slow-expansion water-stop layer 3 is arranged at the connection between the two. The other end of the I-beam 1 is in contact with the secondary lining surface 10. A groove is arranged below the secondary lining surface 10, and a sealing layer 12 and a waterproof mortar layer 11 are arranged inside the groove.
[0035] See also Figure 5 and Figure 6 The water-stop steel plate 2 is two galvanized steel plates of the same specification, and the two galvanized steels are welded. The shape of the galvanized steel plate is E-shaped. The two galvanized steels are welded by carbon dioxide shielded welding. The weld height is not less than 8mm, and the welding points are treated with rust prevention. The thickness of the galvanized steel plate is 5mm, which can be adjusted according to actual needs.
[0036] The first slow expansion water-stopping layer 3 and the second slow expansion water-stopping layer 5 are both slow expansion water-stopping pastes;
[0037] The waterproof mortar layer 11 is a polymer waterproof mortar; the sealing layer 12 is a two-component polysulfide sealing paste; and the non-curing water-stop layer 4 is a rubberized asphalt non-curing waterproof layer.
[0038] The specific process of using this node is as follows: after the primary support surface 9 is processed and accepted, clean the floating dust on its surface, then mix a 20mm mortar plastering layer 8 within a range of 500mm around the I-beam 1, and apply cement-based penetrating crystalline waterproof coating in this range and on the outer surface of the I-beam 1. After the cement-based penetrating crystalline waterproof coating is applied, follow the Figure 2The non-solidified waterproof layer 4 is applied in the middle position, which can be applied by scraping or spraying. The scraping is done with a toothed scraper, and no hollows should appear on the surface of the base layer after painting. When painting the top and facade paints, it is necessary to pay attention to adjusting the viscosity of the paint and no flowing phenomenon should occur. The inside of the non-solidified waterproof layer 4 is a steel frame 13. After the construction of the non-solidified waterproof layer 4 is completed and passed the acceptance, a geotextile buffer layer 7 and a waterproof layer 6 are applied on its surface. The transition part of the waterproof layer 6 and the non-solidified waterproof layer 4 is sealed with a 10cm wide butyl rubber adhesive tape. A 1cm×2cm second slow expansion waterproof layer 5 is set at the junction of the waterproof layer 6 and the non-solidified waterproof layer 4 (the connection between the I-beam 1 and the waterproof layer 6) to enhance the waterproof effect. It is made by stamping with 5mm galvanized steel plate. Figure 5 Medium style water stop steel plate 2, then according to Figure 6 The welding is carried out in the style of the above, and the welding method adopts carbon dioxide shielded welding. The weld height is not less than 8mm. After welding, the welding point should be treated with rust prevention, and the welded water-stop steel plate 2 is connected to the I-beam 1, and a circle of first slow expansion water-stop layer 3 is set at the connection between the two. When the second lining structure concrete is poured, a 20mm deep groove is reserved below the second lining surface 10. After the concrete pouring is completed, the middle partition (I-beam 1) is cut off, and according to Figure 3 The sealing layer 12 and the waterproof mortar layer 11 are applied in a manner.
[0039] This node solves the problem of multiple disturbances to the surrounding soil during the removal of supports, effectively reduces the settlement of ground structures, increases construction safety, and protects risk sources. Since the temporary middle partition is not cut off in sections before the second lining construction, the construction length can be extended (if the length of the water flow section is 6m after the support is removed, the length of the water flow section can be 9m without the support), the construction joints are reduced, and the input of materials such as water stop strips and grouting pipes at the construction joints is reduced, reducing the probability of water leakage at the construction joints. During the construction, quality, safety, progress and other aspects were effectively controlled, shortening the construction period and achieving good economic benefits.
[0040] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.
Claims
1. A large-section dark-excavated tunnel without removing the temporary intermediate wall to construct waterproof nodes. It is characterized in that include: I-beam (1), water-stop steel plate (2), first slow-swelling water-stop layer (3), non-solidified water-stop layer (4), second slow-swelling water-stop layer (5), waterproof layer (6), geotextile buffer layer (7), mortar finishing layer (8), waterproof mortar layer (11), sealing layer (12) and steel frame (13); A mortar finishing layer (8), a geotextile buffer layer (7) and a waterproof layer (6) are sequentially arranged above the primary support surface (9) from bottom to top; one end of the I-beam (1) arranged in pairs passes through the waterproof layer (6) and penetrates into the geotextile buffer layer (7); a non-solidified waterproof layer (4) is arranged between the two I-beams (1), and the non-solidified waterproof layer (4) extends to the upper surface of the mortar finishing layer (8); a steel frame (13) is arranged inside the non-solidified waterproof layer (4); a second slow-expansion waterproof layer (5) is arranged at the connection between the I-beam (1) and the waterproof layer (6); a waterproof steel plate (2) passes through the I-beam (1) and a first slow-expansion waterproof layer (3) is arranged at the connection between the two; the other end of the I-beam (1) contacts the secondary lining surface (10); a groove is arranged below the secondary lining surface (10); a sealing layer (12) and a waterproof mortar layer (11) are arranged inside the groove.
2. According to claim 1, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The water-stop steel plates (2) are two galvanized steel plates of the same specification, and the two galvanized steel plates are welded.
3. According to claim 2, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The galvanized steel sheet is in an E shape.
4. According to claim 2, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The two galvanized steels are welded by carbon dioxide shielded welding, the weld height is not less than 8mm, and the welding points are treated with rust prevention.
5. According to claim 2, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The thickness of the galvanized steel sheet is 5 mm.
6. According to claim 1, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The first slow expansion water-stopping layer (3) and the second slow expansion water-stopping layer (5) are both slow expansion water-stopping pastes.
7. According to claim 1, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The waterproof mortar layer (11) is a polymer waterproof mortar.
8. According to claim 1, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The sealing layer (12) is a two-component polysulfide sealing paste.
9. According to claim 1, the waterproof node of the large-section dark-excavated tunnel is constructed without removing the temporary intermediate partition wall. It is characterized in that The non-solidified water-stopping layer (4) is a rubberized asphalt non-solidified waterproof layer.
