Cooling water recycling system for angle iron galvanizing

By setting up heat exchangers and compensation components in the angle iron galvanizing system, heating the galvanized solution with cooling water and compensating the water temperature through high-temperature waste gas, the problems of cooling water resources and heating of additional energy are solved, and efficient galvanized solution is achieved Heating and resource savings.

CN221992505UActive Publication Date: 2024-11-12JIANGSU GUODIAN NEW ENERGY EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323564183.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-12
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

During the galvanizing process of angle iron galvanizing, the temperature of cooling water cannot be effectively utilized after the temperature of the cooling water rises, resulting in waste of resources, and the galvanizing solution requires additional energy to heat, affecting efficiency.

Method used

A cooling water recycling system for angle iron galvanizing is designed. By setting a heat exchanger and compensation component between the cooling pool and the galvanized solution storage tank, the galvanized solution is extracted by a water pump and heated the galvanized solution through the heat exchanger. The compensation component includes Compensation box and water storage tank, heat water with high-temperature exhaust gas to stabilize the water temperature and reduce additional energy use.

Benefits of technology

Effectively utilize the waste heat of cooling water, reduce dependence on additional energy, improve the efficiency of heating of galvanized solutions, and save resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221992505U_ABST
    Figure CN221992505U_ABST
Patent Text Reader

Abstract

The utility model relates to a cooling water recycling system for angle iron galvanization, and belongs to the field of circulating devices, the cooling water recycling system for angle iron galvanization comprises a cooling pool for cooling angle iron and a plurality of storage pools for storing a galvanization solution, each storage pool is internally provided with a heat exchanger, and each heat exchanger is connected with a water inlet pipe and a water outlet pipe; one end of the cooling pond is connected with a water pumping pipe, the other end of the cooling pond is connected with a water return pipe, a water pump is arranged on the water pumping pipe, each water inlet pipe is communicated with one end, far away from the cooling pond, of the water pumping pipe, each water outlet pipe is communicated with one end, far away from the cooling pond, of the water return pipe, and a compensation assembly for compensating water temperature is arranged between the water pumping pipe and the water return pipe. The water pump pumps water in the cooling pool into the water pumping pipe so as to convey the water into the heat exchangers of the storage pools, when the water temperature in the water pumping pipe does not meet the heating requirement of the galvanizing solution, the compensation assembly can compensate the water temperature in the water pumping pipe so as to stably heat the galvanizing solution, the step of additionally using energy to heat the galvanizing solution is omitted, and the heating efficiency is improved. And water in the cooling tank is effectively utilized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of circulation devices, and in particular to a cooling water recycling system for angle iron galvanizing. Background Art

[0002] After the angle iron is manufactured, it usually needs to be galvanized on the surface to make it suitable for strong corrosive environments such as strong acid and alkaline mist.

[0003] In the process of galvanizing the angle iron, it is usually necessary to add a galvanizing solution to the zinc liquid at about 500°C to improve the galvanizing efficiency of the angle iron, and the galvanizing solution needs to be heated and then passed into the galvanizing pool filled with zinc liquid. After galvanizing, the angle iron needs to be cooled in a cooling pool filled with clean water to complete the galvanizing process of the angle iron. In addition, some high-temperature exhaust gas is easily generated during the galvanizing process, which needs to be purified and treated.

[0004] In the actual galvanizing process, the galvanizing solution needs to use additional energy for heating, and the temperature of the clean water in the cooling pool rises after heat exchange with the angle iron. At this time, the clean water with increased temperature cannot be effectively utilized, which easily causes waste of resources, so it needs to be improved. Utility Model Content

[0005] In order to improve the above problems, the present application provides a cooling water recycling system for angle iron galvanizing.

[0006] The present application provides a cooling water recycling system for angle iron galvanizing, which adopts the following technical solution:

[0007] A cooling water recycling system for galvanizing angle irons comprises a cooling pool for cooling the angle irons and a plurality of storage pools for storing galvanizing solutions, each of the storage pools being provided with a heat exchanger, the heat exchanger being connected with a water inlet pipe and a water outlet pipe, one end of the cooling pool being connected with a water pumping pipe and the other end being connected with a water return pipe, the water pumping pipe being connected with a water pump, each of the water inlet pipes being connected with an end of the water pumping pipe away from the cooling pool, each of the water outlet pipes being connected with an end of the water return pipe away from the cooling pool, and a compensation component for compensating for water temperature being provided between the water pumping pipe and the water return pipe.

[0008] By adopting the above technical solution, the water pump extracts water from the cooling pool and transports the water to the water pumping pipe, and the water is then transported to each heat exchanger through each water inlet pipe to heat the galvanizing solution through the heat exchanger. The water after heat exchange then enters the return pipe through each water outlet pipe, so that the water after heat exchange re-enters the cooling pool from the return pipe. When the temperature in the water pumping pipe does not meet the heating demand of the galvanizing solution, the compensation component starts and compensates the water temperature in the water pumping pipe, so that the water transported to the heat exchanger heats the galvanizing solution more stably, reducing the step of using additional energy to heat the galvanizing solution, effectively utilizing the cooling water of the angle iron, and saving some resources.

[0009] Preferably, the compensation component includes a compensation tank and a water storage tank, the compensation tank and the water storage tank are connected via a connecting pipe, the water storage tank is connected to a pumping pipe via the compensation pipe, a first control valve is provided on the compensation pipe, one end of the compensation tank away from the connecting pipe is connected to a return pipe via a shunt pipe, a second control valve is provided on the shunt pipe, a heating pipeline is provided in the compensation tank, and the heating pipeline is externally connected to high-temperature exhaust gas.

[0010] By adopting the above technical solution, the water discharged from the outlet pipe enters the return pipe. At this time, the second control valve is opened, so that part of the water in the return pipe enters the compensation tank from the shunt pipe. The heating pipeline in the compensation tank passes high-temperature exhaust gas to heat the water entering the compensation tank, and the heated water enters the water storage tank. When it is necessary to compensate the water temperature in the pumping pipe, the first control valve is started to connect the water storage tank and the pumping pipe. At this time, the heated water in the water storage tank can enter the pumping pipe to balance the water temperature in the pumping pipe, so as to heat the galvanizing solution more stably for the hot water transported to the heat exchanger, and effectively utilize the cooling water of the angle iron.

[0011] Preferably, the water pumping pipe is connected to a return pipe, and the end of the return pipe away from the water pumping pipe is connected to the water storage tank. The connection between the return pipe and the water pumping pipe is arranged on the side of the water pumping pipe away from the cooling pool. A third control valve is provided on the return pipe, and a blocking valve is provided at the end of the water pumping pipe away from the cooling pool.

[0012] By adopting the above technical solution, when the water temperature in the water pumping pipe does not meet the heating requirement of the galvanizing solution, the third control valve is opened to connect the return pipe, and the blocking valve is closed to prevent the water in the water pumping pipe from entering each water inlet pipe. At this time, the water in the water pumping pipe can enter the water storage tank, and the water in the water storage tank can adjust the water temperature in the water pumping pipe, so that the water entering the heat exchanger later can heat the galvanizing solution more stably.

[0013] Preferably, a fourth control valve is provided on the connecting pipe, a first thermocouple is provided in the connecting pipe, and the first thermocouple is arranged on a side of the fourth control valve close to the compensation box.

[0014] By adopting the above technical solution, after part of the water in the return pipe enters the compensation tank, the second control valve is closed, and the fourth control valve is in a closed state. The heating pipeline in the compensation tank is externally connected to the high-temperature exhaust gas so that the heat of the high-temperature exhaust gas is transferred to the water in the compensation tank. In the process of high-temperature exhaust gas exchanging heat with the water in the compensation tank, part of the water in the compensation tank enters the connecting pipe, and the first thermocouple measures the water temperature in the connecting pipe. When the water temperature in the connecting pipe reaches the set value, the fourth control valve is opened, so that the connecting pipe connects the compensation tank and the water storage tank, so that the water in the water storage tank can more stably compensate for the water temperature in the pumping pipe.

[0015] Preferably, the cooling pool is connected with a pressure dividing pipe, one end of the pressure dividing pipe away from the cooling pool is connected with a water pumping pipe, a pressure control valve is provided on the pressure dividing pipe, and a pressure gauge is provided on the water pumping pipe.

[0016] By adopting the above technical solution, when the water pumping pipe transports water from the cooling pool to each water inlet pipe, the pressure gauge detects the pressure in the water pumping pipe. When the detected value of the pressure gauge is high, the pressure control valve is opened, so that the pressure dividing pipe connects the water pumping pipe and the cooling pool to share the pressure in the water pumping pipe, reducing the possibility of damage due to excessive pressure in the water pumping pipe, so that the water pumping pipe can transport water to each heat exchanger more stably.

[0017] Preferably, an on-off valve for controlling the on-off of the cooling pool and the water pumping pipe is provided on the side of the water pumping pipe close to the cooling pool, and a second thermocouple is provided in the water pumping pipe, and the second thermocouple is arranged on the side of the on-off valve close to the cooling pool.

[0018] By adopting the above technical solution, in the process of water in the cooling pool cooling the angle iron, part of the water enters the water pumping pipe, and the second thermocouple detects the water temperature in the water pumping pipe. When the detection value of the second thermocouple reaches the set value, the on-off valve is opened, and the water pump is started to extract water from the cooling pool to transport the water that meets the temperature standard to each heat exchanger, thereby providing convenience for the heat exchanger to heat the galvanizing solution more stably.

[0019] Preferably, the heating pipeline includes a first spiral coil and a second spiral coil, the first spiral coil and the second spiral coil are connected through a matching pipe, and the first spiral coil is externally connected to high-temperature exhaust gas.

[0020] By adopting the above technical solution, when it is necessary to compensate the water temperature of the water in the water pumping pipe, the first spiral coil is introduced with high-temperature exhaust gas from the outside, and the high-temperature exhaust gas then enters the second spiral coil through the matching pipe. At this time, the high-temperature exhaust gas in the first spiral coil, the matching pipe and the second spiral coil can heat the water in the compensation tank, so that the heated water compensates the water temperature of the water in the water pumping pipe. At the same time, under the action of the first spiral coil and the second spiral coil, the retention time of the high-temperature exhaust gas in the compensation tank is increased, so that the high-temperature exhaust gas can heat the water in the compensation tank more stably.

[0021] Preferably, a mixing assembly is provided in the water tank, and the mixing assembly includes a first rotating shaft, a second rotating shaft and a driving member, the first rotating shaft and the second rotating shaft are both rotatably connected in the water tank, a plurality of stirring blades are coaxially fixed on the first rotating shaft and the second rotating shaft, and the driving member is arranged on the water tank, and the driving member is used to control the first rotating shaft and the second rotating shaft to rotate in opposite directions.

[0022] By adopting the above technical solution, when the water in the water pumping pipe does not reach the set temperature, the water in the water pumping pipe enters the water storage tank through the return pipe. The driving member starts and controls the first rotating shaft and the second rotating shaft to rotate in opposite directions, and the first rotating shaft and the second rotating shaft control the respective stirring blades at corresponding positions to rotate to speed up the mixing of the two waters of different temperatures. When the water temperature reaches the set value, the water in the water storage tank can re-enter the water pumping pipe to heat the galvanizing solution.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. By setting up a pumping pipe and a water pump, the water pump draws the water reaching the set temperature in the cooling pool into the pumping pipe, and then transports the water reaching the set temperature to each heat exchanger to heat the galvanizing solution, thereby reducing the step of using additional energy to heat the galvanizing solution, effectively utilizing the water reaching the set temperature in the cooling pool, and saving some resources;

[0025] 2. By setting a compensation component, the compensation component compensates the water temperature in the pumping pipe so that the water transported to each heat exchanger can heat the galvanizing solution more stably;

[0026] 3. By setting the first spiral coil and the second spiral coil, the residence time of the high-temperature exhaust gas in the compensation box is increased, so that the high-temperature exhaust gas can heat the water in the compensation box more stably, thereby providing convenience for the subsequent more stable compensation of the water temperature in the pumping pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the present application;

[0028] Figure 2 This is a structural schematic diagram of the first embodiment of the present application for reflecting the positional relationship between the heating pipeline and the compensation box;

[0029] Figure 3 It is a structural diagram of the second embodiment of the present application, which is used to reflect the positional relationship between the mixing component and the water tank.

[0030] Explanation of reference numerals: 1. cooling pool; 11. water pump; 111. water pump; 112. return pipe; 113. third control valve; 114. blocking valve; 115. pressure gauge; 116. on-off valve; 117. second thermocouple; 12. return pipe; 13. pressure dividing pipe; 131. pressure control valve; 2. storage pool; 21. heat exchanger; 211. water inlet pipe; 212. water outlet pipe; 3. compensation assembly; 31. compensation tank; 311. diverter pipe; 312. second control valve; 32. water storage Box; 321, compensation pipe; 322, first control valve; 33, connecting pipe; 331, fourth control valve; 332, first thermocouple; 34, heating pipeline; 341, first spiral coil; 342, second spiral coil; 343, matching pipe; 4, mixing assembly; 41, first rotating shaft; 42, second rotating shaft; 43, driving member; 431, motor; 432, first gear; 433, second gear; 44, stirring blade; 45, first reversing gear; 46, second reversing gear. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-3 This application is described in further detail.

[0032] Embodiment 1:

[0033] The first embodiment of the present application discloses a cooling water recycling system for angle iron galvanizing. Figure 1 A cooling water recycling system for angle iron galvanizing includes a cooling pool 1 for cooling the angle iron and a plurality of storage pools 2 for storing galvanizing solution. A plurality of heat exchangers 21 are provided in each storage pool 2, and each heat exchanger 21 is connected with a water inlet pipe 211 and a water outlet pipe 212. One end of the cooling pool 1 is connected with a pumping pipe 11, and the other end is connected with a return pipe 12, and a water pump 111 is provided on the pumping pipe 11. Each water inlet pipe 211 is connected with the pumping pipe 11, and each water outlet pipe 212 is connected with the return pipe 12.

[0034] The water in the cooling pool 1 cools the angle iron, and when the water temperature in the cooling pool 1 reaches the set value, the water pump 111 starts and pumps the water in the cooling pool 1 into the pumping pipe 11, and then transports it from the pumping pipe 11 to each water inlet pipe 211, so that the heat exchanger 21 heats the galvanizing solution at the corresponding position, realizing the function of utilizing the water in the cooling pool 1 that reaches the set temperature, and effectively utilizing the waste heat of the water in the cooling pool 1. The water heated to the galvanizing solution then enters the return pipe 12 from the outlet pipe 212, and the return pipe 12 transports the water back to the cooling pool 1, which, on the one hand, realizes the function of cooling the water in the cooling pool 1, and on the other hand, facilitates the subsequent heating of the galvanizing solution.

[0035] Reference Figure 1 and Figure 2 A compensation assembly 3 for compensating water temperature is provided between the water pumping pipe 11 and the water return pipe 12. The compensation assembly 3 includes a compensation tank 31 and a water storage tank 32. The compensation tank 31 and the water storage tank 32 are connected through a connecting pipe 33. The water storage tank 32 is connected to the water pumping pipe 11 through a compensation pipe 321. A first control valve 322 is provided on the compensation pipe 321. One end of the compensation tank 31 away from the connecting pipe 33 is connected to the water return pipe 12 through a shunt pipe 311. A second control valve 312 is provided on the shunt pipe 311.

[0036] A heating pipeline 34 is provided in the compensation tank 31. The heating pipeline 34 includes a first spiral coil 341 and a second spiral coil 342. The first spiral coil 341 and the second spiral coil 342 are arranged opposite to each other in the compensation tank 31. The first spiral coil 341 and the second spiral coil 342 are connected through a matching pipe 343. One end of the first spiral coil 341 away from the matching pipe 343 is externally connected to high-temperature exhaust gas. The arrangement of the first spiral coil 341 and the second spiral coil 342 increases the retention time of the high-temperature exhaust gas in the compensation tank 31, thereby improving the heating efficiency of the high-temperature exhaust gas on the water in the compensation tank 31.

[0037] The water after heat exchange in the heat exchanger 21 enters the return pipe 12 from the outlet pipe 212 at the corresponding position. At this time, the second control valve 312 is opened, so that part of the water in the return pipe 12 enters the compensation tank 31. The first spiral coil 341 then passes the high-temperature exhaust gas into the compensation tank 31, and the high-temperature exhaust gas enters the second spiral coil 342 from the matching pipe 343. At this time, the high-temperature exhaust gas in the first spiral coil 341, the matching pipe 343 and the second spiral coil 342 can heat the water in the compensation tank 31, and the heated water enters the water storage tank 32 from the connecting pipe 33. The high-temperature exhaust gas after heat exchange is discharged from the compensation tank 31 from the second spiral coil 342, and the temperature of the high-temperature exhaust gas after heat exchange is reduced, which provides convenience for subsequent treatment of exhaust gas. When the water temperature in the pumping pipe 11 is lower than the set temperature, the first control valve 322 is opened, so that the compensation pipe 321 connects the pumping pipe 11 and the water storage tank 32, and the water in the water storage tank 32 enters the pumping pipe 11 to compensate for the water temperature in the pumping pipe 11, so that the water entering the heat exchanger 21 can heat the galvanizing solution at the corresponding position more stably.

[0038] Reference Figure 1 The pumping pipe 11 is connected with a return pipe 112, and one end of the return pipe 112 away from the pumping pipe 11 is connected with the water storage tank 32, and the connection between the return pipe 112 and the pumping pipe 11 is arranged on the side of the pumping pipe 11 away from the cooling pool 1. A third control valve 113 is arranged on the return pipe 112, and a blocking valve 114 is arranged on the end of the pumping pipe 11 away from the cooling pool 1.

[0039] Since the pumping pipe 11 is damaged by temperature when delivering water that meets the temperature standard, when the water temperature in the return pipe 112 is low, the blocking valve 114 is in a closed state, the third control valve 113 is in an open state, and the water in the pumping pipe 11 can enter the water storage tank 32 through the return pipe 112, so that the water with a lower temperature is mixed with the water with a higher temperature in the water storage tank 32. After the mixing is completed, the third control valve 113 is closed, the blocking valve 114 and the first control valve 322 are opened, and the water in the water storage tank 32 can enter the pumping pipe 11 from the compensation pipe 321, so as to deliver the water that meets the standard to each heat exchanger 21, thereby providing convenience for the heat exchanger 21 to heat the galvanizing solution more stably.

[0040] Reference Figure 1 A fourth control valve 331 is disposed on the connecting pipe 33 , a first thermocouple 332 is disposed in the connecting pipe 33 , and the first thermocouple 332 is disposed on a side of the fourth control valve 331 close to the compensation tank 31 .

[0041] When the compensation tank 31 heats the water entering the compensation tank 31, part of the water enters the connecting pipe 33, and the fourth control valve 331 is in a closed state. When the detection value of the first thermocouple 332 reaches the set value, the fourth control valve 331 is opened, and the water in the compensation tank 31 can enter the water storage tank 32 from the connecting pipe 33 for storage, so that the water in the water storage tank 32 can perform temperature compensation on the water in the pumping pipe 11.

[0042] Reference Figure 1 The cooling pool 1 is connected with a pressure dividing pipe 13, and one end of the pressure dividing pipe 13 away from the cooling pool 1 is connected with the water pumping pipe 11. A pressure control valve 131 is provided on the pressure dividing pipe 13, and a pressure gauge 115 is provided on the water pumping pipe 11. An on-off valve 116 for controlling the on-off of the cooling pool 1 and the water pumping pipe 11 is provided on the side of the water pumping pipe 11 close to the cooling pool 1, and a second thermocouple 117 is provided in the water pumping pipe 11, and the second thermocouple 117 is provided on the side of the on-off valve 116 close to the cooling pool 1.

[0043] When the water in the cooling pool 1 cools the angle iron, part of the water enters the water pumping pipe 11, and the on-off valve 116 and the pressure control valve 131 are both in a closed state. When the detection value of the second thermocouple 117 reaches the set value, the on-off valve 116 is opened, the pressure control valve 131 is still in a closed state, and the water pump 111 is started to transport the water with the temperature reaching the standard to each heat exchanger 21, and the heat exchanger 21 can heat the galvanizing solution at the corresponding position, effectively utilizing the waste heat of the water used to cool the angle iron.

[0044] During the process of conveying water through the water pumping pipe 11, the pressure gauge 115 detects the pressure in the water pumping pipe 11 in real time. When the pressure in the water pumping pipe 11 exceeds the set value, the pressure control valve 131 opens, so that the pressure dividing pipe 13 connects the cooling pool 1 and the water pumping pipe 11. At this time, part of the water in the cooling pool 1 can enter the water pumping pipe 11 from the pressure dividing pipe 13, reducing the pressure on the water pumping pipe 11 and the possibility of damage to the water pumping pipe 11, thereby facilitating the water pumping pipe 11 to convey water with a temperature that meets the standard in a relatively stable manner.

[0045] The implementation principle of the first embodiment of the present application is as follows: the water pumping pipe 11 transports the water in the cooling pool 1 that has cooled the angle iron to each water inlet pipe 211, providing a heat source for each heat exchanger 21, so that the heat exchanger 21 heats the galvanizing solution at the corresponding position, and the compensation component 3 compensates the water temperature in the water pumping pipe 11 to transport water that meets the temperature standard to each heat exchanger 21, effectively utilizing the waste heat of the water after cooling the angle iron, reducing the step of using additional resources to heat the galvanizing solution, and saving some resources.

[0046] Embodiment 2:

[0047] Reference Figure 3, which is different from the first embodiment of the present application in that: a mixing assembly 4 is provided in the water storage tank 32, and the mixing assembly 4 includes a first rotating shaft 41, a second rotating shaft 42 and a driving member 43, the first rotating shaft 41 and the second rotating shaft 42 are both rotatably connected in the water storage tank 32, and the driving member 43 is provided on the water storage tank 32 and controls the first rotating shaft 41 and the second rotating shaft 42 to rotate in opposite directions. A plurality of stirring blades 44 are fixed on the first rotating shaft 41 and the second rotating shaft 42.

[0048] The driving member 43 includes a motor 431, a first gear 432 and a second gear 433. The motor 431 is arranged on the water tank 32. The first rotating shaft 41 and the second rotating shaft 42 both extend out of the water tank 32. The first gear 432 is coaxially arranged on the first rotating shaft 41 outside the water tank 32. The second gear 433 is coaxially arranged on the second rotating shaft 42 outside the water tank 32. The first reversing gear 45 and the second reversing gear 46 are rotatably connected to the water tank 32. The first reversing gear 45 and the second reversing gear 46 are meshed with each other. The side of the first reversing gear 45 away from the second reversing gear 46 is meshed with the first gear 432, and the side of the second reversing gear 46 away from the first reversing gear 45 is meshed with the second gear 433. The output end of the motor 431 is coaxially fixed to the first rotating shaft 41 outside the water tank 32.

[0049] The implementation principle of the second embodiment of the present application is as follows: after the water with substandard temperature enters the water storage tank 32, the motor 431 starts and drives the first rotating shaft 41 to rotate, and the first rotating shaft 41 then drives the first reversing gear 45, the second reversing gear 46 and the second gear 433 to rotate in sequence, so that the second gear 433 and the first gear 432 rotate in opposite directions, and at this time, the first rotating shaft 41 and the second rotating shaft 42 rotate in opposite directions. The first rotating shaft 41 and the second rotating shaft 42 drive the stirring blades 44 at the corresponding positions to rotate, which speeds up the mixing speed of the two waters with different temperatures, so that the water in the water storage tank 32 is transported to the pumping pipe 11 more quickly, thereby further facilitating the heat exchanger 21 to heat the galvanizing solution.

[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cooling water recycling system for angle iron galvanizing, characterized in that: The invention comprises a cooling pool (1) for cooling angle irons and a plurality of storage pools (2) for storing galvanizing solution. Each storage pool (2) is provided with a heat exchanger (21). The heat exchanger (21) is connected to a water inlet pipe (211) and a water outlet pipe (212). One end of the cooling pool (1) is connected to a water pump (11) and the other end is connected to a water return pipe (12). The water pump (11) is connected to a water pump (111). Each of the water inlet pipes (211) is connected to an end of the water pump (11) away from the cooling pool (1). Each of the water outlet pipes (212) is connected to an end of the water return pipe (12) away from the cooling pool (1). A compensation component (3) for compensating for water temperature is provided between the water pump (11) and the water return pipe (12).

2. A cooling water recycling system for angle iron galvanizing according to claim 1, characterized in that: The compensation component (3) comprises a compensation tank (31) and a water storage tank (32); the compensation tank (31) and the water storage tank (32) are connected via a connecting pipe (33); the water storage tank (32) is connected to a water pumping pipe (11) via a compensation pipe (321); a first control valve (322) is provided on the compensation pipe (321); an end of the compensation tank (31) away from the connecting pipe (33) is connected to a return pipe (12) via a shunt pipe (311); a second control valve (312) is provided on the shunt pipe (311); a heating pipeline (34) is provided in the compensation tank (31); and the heating pipeline (34) is externally connected to high-temperature exhaust gas.

3. A cooling water recycling system for angle iron galvanizing according to claim 2, characterized in that: The water pumping pipe (11) is connected to a return pipe (112); one end of the return pipe (112) away from the water pumping pipe (11) is connected to a water storage tank (32); a connection between the return pipe (112) and the water pumping pipe (11) is arranged on a side of the water pumping pipe (11) away from the cooling pool (1); a third control valve (113) is arranged on the return pipe (112); and a blocking valve (114) is arranged on one end of the water pumping pipe (11) away from the cooling pool (1).

4. A cooling water recycling system for angle iron galvanizing according to claim 2, characterized in that: A fourth control valve (331) is provided on the connecting pipe (33), a first thermocouple (332) is provided in the connecting pipe (33), and the first thermocouple (332) is arranged on a side of the fourth control valve (331) close to the compensation tank (31).

5. The cooling water recycling system for angle iron galvanizing according to claim 1 is characterized in that: The cooling pool (1) is connected to a pressure dividing pipe (13), one end of the pressure dividing pipe (13) away from the cooling pool (1) is connected to a water pumping pipe (11), a pressure control valve (131) is provided on the pressure dividing pipe (13), and a pressure gauge (115) is provided on the water pumping pipe (11).

6. The cooling water recycling system for angle iron galvanizing according to claim 1 is characterized in that: An on-off valve (116) for controlling the on-off of the cooling pool (1) and the water pumping pipe (11) is provided on the side of the water pumping pipe (11) close to the cooling pool (1), and a second thermocouple (117) is provided in the water pumping pipe (11), and the second thermocouple (117) is arranged on the side of the on-off valve (116) close to the cooling pool (1).

7. The cooling water recycling system for angle iron galvanizing according to claim 2 is characterized in that: The heating pipeline (34) comprises a first spiral coil (341) and a second spiral coil (342); the first spiral coil (341) and the second spiral coil (342) are connected via a matching pipe (343); and the first spiral coil (341) is externally connected to high-temperature exhaust gas.

8. The cooling water recycling system for angle iron galvanizing according to claim 2 is characterized in that: A mixing assembly (4) is provided in the water tank (32), and the mixing assembly (4) comprises a first rotating shaft (41), a second rotating shaft (42) and a driving member (43). The first rotating shaft (41) and the second rotating shaft (42) are both rotatably connected in the water tank (32), and a plurality of stirring blades (44) are coaxially fixed on the first rotating shaft (41) and the second rotating shaft (42). The driving member (43) is provided on the water tank (32), and is used to control the first rotating shaft (41) and the second rotating shaft (42) to rotate in opposite directions.