Electromagnetic compatibility and electromagnetic interference pre-simulation test system

By designing an electromagnetic compatibility electromagnetic interference pre-simulation test system, the problems of tight electromagnetic interference testing resources and high costs of electronic consumer products are solved, and efficient approval and cost savings of electromagnetic interference certification are achieved.

CN221993565UActive Publication Date: 2024-11-12SHENZHEN ADDX INNOVATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420439114.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-11-12
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

In the prior art, electronic consumer products have tight electromagnetic interference testing resources, lack of laboratory resources, high testing costs, and tight time for positioning problems, making it difficult to pass the certification at one time, and making multiple appointments is required, which is time-consuming and laborious.

Method used

Design an electromagnetic compatibility electromagnetic interference pre-simulation test system, including shielded darkroom, rotary table of the equipment under test, receiving antenna, signal amplifier, spectrum analyzer and PC computer, discover and rectify most possible problems through pre-simulation tests, and improve electromagnetic Interfere with the possibility of passing certification in one go, saving time and manpower, and reducing testing costs.

Benefits of technology

Through the pre-simulation test system, electromagnetic interference problems can be discovered and rectified in a timely manner, improved electromagnetic interference certification pass rate, saved time and manpower, and reduced testing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221993565U_ABST
    Figure CN221993565U_ABST
Patent Text Reader

Abstract

The utility model particularly relates to an electromagnetic compatibility and electromagnetic interference pre-simulation test system. The system comprises a shielding darkroom; the tested equipment rotary table is arranged in the shielding darkroom along the vertical direction; the tested equipment is arranged on the tested equipment rotary table; the receiving antenna lifting platform is arranged in the shielding darkroom along the vertical direction; the receiving antenna rotary table is arranged on the receiving antenna lifting table in the horizontal direction; the receiving antenna is connected to the receiving antenna rotary table and faces the tested equipment so as to receive an electromagnetic signal transmitted by the tested equipment; the signal amplifier is connected with the receiving antenna so as to amplify the electromagnetic signal received by the receiving antenna; the spectrum analyzer is connected with the signal amplifier so as to measure and analyze the electromagnetic signal received by the receiving antenna; and the PC is connected with the tested equipment rotary table, the receiving antenna lifting table and the receiving antenna rotary table so as to control the tested equipment rotary table to rotate, the receiving antenna lifting table to lift and the receiving antenna rotary table to rotate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of electromagnetic compatibility and electromagnetic interference testing of electronic consumer products, and specifically relates to an electromagnetic compatibility and electromagnetic interference pre-simulation testing system. Background Art

[0002] Electromagnetic interference (RE) testing of electronic consumer products is an important item in electromagnetic compatibility (EMC) testing.

[0003] For electromagnetic interference testing, only certified laboratories have complete testing capabilities and can output recognized certification reports. Currently, laboratory resources are tight, and electromagnetic interference testing often requires paid appointments, which are expensive. Once a problem occurs, it is time-consuming and difficult to locate the problem at the test site, and it is not convenient to make corrections. It is often difficult to pass the electromagnetic interference certification in one go, and multiple appointments with laboratories for electromagnetic interference testing are required, which is time-consuming, laborious, and costly. In view of this, this application is filed. Utility Model Content

[0004] The purpose of this application is to provide an electromagnetic compatibility electromagnetic interference pre-simulation test system, so as to be able to perform electromagnetic interference pre-simulation tests on electronic consumer products, timely discover and rectify most possible problems, increase the possibility of passing electromagnetic interference certification in one go, save time, save manpower, and reduce the cost of electromagnetic interference testing.

[0005] The technical solution of this application is:

[0006] An electromagnetic compatibility electromagnetic interference pre-simulation test system, comprising:

[0007] Shielded darkroom;

[0008] The turntable of the device under test is set in the vertical direction in the shielded darkroom;

[0009] The device under test is arranged on a turntable of the device under test;

[0010] The receiving antenna lifting platform is arranged in the vertical direction in the shielded darkroom;

[0011] The receiving antenna turntable is arranged in the horizontal direction on the receiving antenna lifting platform;

[0012] A receiving antenna, connected to the receiving antenna turntable and facing the device under test, so as to be able to receive the electromagnetic signal emitted by the device under test;

[0013] The signal amplifier is arranged outside the shielded darkroom and connected to the receiving antenna so as to amplify the electromagnetic signal received by the receiving antenna;

[0014] A spectrum analyzer is set outside the shielded darkroom and connected to a signal amplifier so as to be able to measure and analyze the electromagnetic signal received by the receiving antenna;

[0015] The PC is set up outside the shielded darkroom and connected to the turntable of the device under test, the receiving antenna lifting platform, and the receiving antenna turntable, so as to control the rotation of the turntable of the device under test, the lifting of the receiving antenna lifting platform, and the rotation of the receiving antenna turntable.

[0016] According to at least one embodiment of the present application, the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system further includes:

[0017] A near-field probe is set in a shielded darkroom and faces the device under test so as to receive electromagnetic signals emitted by the device under test;

[0018] The signal amplifier is connected to the near-field probe so as to amplify the electromagnetic signal received by the near-field probe, and the spectrum analyzer can measure and analyze the electromagnetic signal received by the near-field probe.

[0019] According to at least one embodiment of the present application, in the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system, the receiving antenna and the near-field probe are connected to the signal amplifier through a radio frequency cable, and the radio frequency cable is set to penetrate the side wall of the shielded darkroom.

[0020] According to at least one embodiment of the present application, in the above-mentioned electromagnetic compatibility and electromagnetic interference pre-simulation test system, the signal amplifier is connected to the spectrum analyzer through a radio frequency cable.

[0021] According to at least one embodiment of the present application, in the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system, the PC is connected to the turntable of the device under test, the receiving antenna lifting platform, and the receiving antenna turntable through a USB cable, and the USB cable is set through the side wall of the shielded darkroom.

[0022] This application has at least the following beneficial technical effects:

[0023] Provide an electromagnetic compatibility electromagnetic interference pre-simulation test system, which can perform pre-simulation tests on the equipment under test before the formal electromagnetic interference test, so as to timely discover and rectify most possible problems, improve the possibility of one-time passing of electromagnetic interference certification, save time, save manpower, and reduce the cost of electromagnetic interference testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a schematic diagram of an electromagnetic compatibility and electromagnetic interference pre-simulation test system provided in an embodiment of the present application;

[0025] in:

[0026] 1- shielded darkroom; 2- turntable for the device under test; 3- device under test; 4- lifting platform for receiving antenna; 5- turntable for receiving antenna; 6- receiving antenna; 7- signal amplifier; 8- spectrum analyzer; 9- PC; 10- near-field probe.

[0027] In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. In addition, the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. DETAILED DESCRIPTION

[0028] In order to make the technical solution and advantages of the present application clearer, the technical solution of the present application will be described in further detail in detail and in detail with reference to the accompanying drawings. It can be understood that the specific embodiments described here are only partial embodiments of the present application, which are only used to explain the present application, not to limit the present application. It should be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, and other related parts can refer to the general design.

[0029] In addition, unless otherwise defined, the technical terms or scientific terms used in the description of this application shall have the usual meanings understood by those of ordinary skill in the art to which this application belongs. The words used in the description of this application to indicate orientation are only used to indicate relative directions or positional relationships. When the absolute position of the described object changes, its relative positional relationship may also change accordingly. The word "include" used in the description of this application indicates that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, but does not exclude other elements or objects.

[0030] In addition, it should be noted that, unless otherwise clearly specified and limited, the words "installation", "connection" and similar terms used in the description of this application should be understood in a broad sense. For example, the connection can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. Technical personnel in the field can understand its specific meaning in this application according to the specific circumstances.

[0031] like Figure 1 As shown, the electromagnetic compatibility electromagnetic interference pre-simulation test system includes:

[0032] Shielded darkroom 1, used to provide the environment required for electromagnetic interference testing;

[0033] The device under test turntable 2 is arranged in the vertical direction in the shielded darkroom 1;

[0034] The device under test 3 is arranged on the device under test turntable 2;

[0035] The receiving antenna lifting platform 4 is arranged in the vertical direction in the shielding darkroom 1;

[0036] The receiving antenna rotating platform 5 is arranged horizontally on the receiving antenna lifting platform 4;

[0037] A receiving antenna 6 is connected to the receiving antenna turntable 5 and faces the device under test 3 so as to be able to receive the far-field electromagnetic signal emitted by the device under test 3;

[0038] The signal amplifier 7 is arranged outside the shielded darkroom 1 and connected to the receiving antenna 6 so as to amplify the electromagnetic signal received by the receiving antenna 6;

[0039] A spectrum analyzer 8 is provided outside the shielded darkroom 1 and connected to the signal amplifier 7 so as to be able to measure and analyze the electromagnetic signal received by the receiving antenna 6;

[0040] The PC 9 is arranged outside the shielded darkroom 1 and connected to the device under test turntable 2, the receiving antenna lifting platform 4 and the receiving antenna turntable 5 so as to control the rotation of the device under test turntable 2, the lifting of the receiving antenna lifting platform 4 and the rotation of the receiving antenna turntable 5.

[0041] Before the formal electromagnetic interference test is performed on the device under test 3, the electromagnetic compatibility electromagnetic interference pre-simulation test system disclosed in the above embodiment can be used for pre-simulation test, so as to timely discover and rectify most possible problems, improve the possibility of passing the electromagnetic interference certification in one go, save time, save manpower, and reduce the cost of electromagnetic interference testing. The specific process can be referred to as follows:

[0042] The PC 9 controls the rotation of the device under test turntable 2, thereby driving the device under test 3 to rotate;

[0043] The PC 9 controls the lifting and lowering of the receiving antenna lifting platform 4 and the rotation of the receiving antenna rotating platform 5, so as to drive the lifting and rotating of the receiving antenna 6 and adjust the horizontal polarization and vertical polarization directions;

[0044] The receiving antenna 6, the signal amplifier 7 and the spectrum analyzer 8 are used to receive, measure and analyze the electromagnetic signal emitted by the device under test 3, find the frequency points exceeding the standard, analyze the problem of the device under test 3 and make corrections.

[0045] In some optional embodiments, the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system further includes:

[0046] A near-field probe 10 is arranged in the shielded darkroom 1 and faces the device under test 3 so as to receive electromagnetic signals emitted by the device under test 3;

[0047] The signal amplifier 7 is connected to the near-field probe 10 so as to amplify the electromagnetic signal received by the near-field probe 10 . The spectrum analyzer 8 is capable of measuring and analyzing the electromagnetic signal received by the near-field probe 10 .

[0048] A pre-simulation test is performed using the electromagnetic compatibility electromagnetic interference pre-simulation test system disclosed in the above embodiment. After the out-of-standard frequency point is determined, the near-field probe 10 can replace the receiving antenna 6 to receive the electromagnetic signal emitted by the device under test 3. The signal amplifier 7 and spectrum analyzer 8 are used to measure and analyze the electromagnetic signal, and the source of electromagnetic interference in the device under test 3 is finely checked to improve the ability and efficiency of locating problems.

[0049] In some optional embodiments, in the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system, the receiving antenna 6 and the near-field probe 10 are wired to the signal amplifier 7 via a radio frequency cable, and the radio frequency cable is set to penetrate the side wall of the shielded darkroom 1 to improve the anti-electromagnetic interference capability of the signal transmission.

[0050] In some optional embodiments, in the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system, the signal amplifier 7 is wired to the spectrum analyzer 8 via a radio frequency cable to improve the anti-electromagnetic interference capability of signal transmission.

[0051] In some optional embodiments, in the above-mentioned electromagnetic compatibility electromagnetic interference pre-simulation test system, the PC computer 9 is connected to the turntable 2 of the device under test, the receiving antenna lifting platform 4, and the receiving antenna turntable 5 via a USB cable, and the USB cable is arranged to penetrate the side wall of the shielded darkroom 1 to improve the anti-electromagnetic interference capability of the signal transmission.

[0052] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other. In the absence of conflict, the embodiments in this application and the technical features in the embodiments can be combined with each other to obtain new embodiments.

[0053] So far, the technical solution of the present application has been described in conjunction with the preferred embodiments shown in the accompanying drawings. Those skilled in the art should understand that the scope of protection of the present application is obviously not limited to these specific embodiments. Without departing from the principles of the present application, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the scope of protection of the present application.

Claims

1. An electromagnetic compatibility electromagnetic interference pre-simulation test system, It is characterized in that include: Shielded darkroom (1); The device under test turntable (2) is arranged in a vertical direction in the shielded darkroom (1); The device under test (3) is arranged on the device under test turntable (2); A receiving antenna lifting platform (4) is arranged in a vertical direction in the shielded darkroom (1); A receiving antenna rotating platform (5) is arranged in a horizontal direction on the receiving antenna lifting platform (4); A receiving antenna (6) connected to the receiving antenna turntable (5) and facing the device under test (3) so as to be able to receive electromagnetic signals emitted by the device under test (3); A signal amplifier (7) is arranged outside the shielded darkroom (1) and connected to the receiving antenna (6) so as to be able to amplify the electromagnetic signal received by the receiving antenna (6); A spectrum analyzer (8) is arranged outside the shielded darkroom (1) and connected to the signal amplifier (7) so as to be able to measure and analyze the electromagnetic signal received by the receiving antenna (6); The PC (9) is arranged outside the shielded darkroom (1) and is connected to the device under test turntable (2), the receiving antenna lifting platform (4), and the receiving antenna turntable (5) so as to control the rotation of the device under test turntable (2), the lifting of the receiving antenna lifting platform (4), and the rotation of the receiving antenna turntable (5).

2. The electromagnetic compatibility and electromagnetic interference pre-simulation test system according to claim 1, It is characterized in that Also includes: A near-field probe (10) is arranged in the shielded darkroom (1) and faces the device under test (3) so as to be able to receive an electromagnetic signal emitted by the device under test (3); The signal amplifier (7) is connected to the near-field probe (10) so as to be able to amplify the electromagnetic signal received by the near-field probe (10), and the spectrum analyzer (8) is able to measure and analyze the electromagnetic signal received by the near-field probe (10).

3. The electromagnetic compatibility and electromagnetic interference pre-simulation test system according to claim 2, It is characterized in that The receiving antenna (6) and the near-field probe (10) are connected to the signal amplifier (7) via a radio frequency cable, and the radio frequency cable is arranged to penetrate the side wall of the shielded darkroom (1).

4. The electromagnetic compatibility and electromagnetic interference pre-simulation test system according to claim 2, It is characterized in that The signal amplifier (7) is connected to the spectrum analyzer (8) via a radio frequency cable.

5. The electromagnetic compatibility and electromagnetic interference pre-simulation test system according to claim 2, It is characterized in that The PC computer (9) is connected to the device under test turntable (2), the receiving antenna lifting platform (4), and the receiving antenna turntable (5) via a USB cable, and the USB cable is arranged to penetrate the side wall of the shielded darkroom (1).