Punching equipment for constructional engineering
By introducing a clamping plate and spring structure into the drilling equipment to fix the raw materials, the problem of shaking and displacement of the raw materials during the drilling process is solved, realizing high-precision drilling and debris collection and cleaning, and improving the stability and working efficiency of the equipment.
Patent Information
- Application Number
- CN202420623599.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the drilling process of raw materials, the rotation speed of the drill rod can cause the raw materials to shake and shift, resulting in deviations in drilling accuracy.
A drilling device for construction engineering has been designed, including a clamping plate and a spring structure. The raw material is fixed by the elasticity of the clamping plate, and the combination of a slide groove and a sliding connection reduces shaking. The device collects debris by setting a material drop hole and a waste guide hole in the bearing plate, protects the debris with an electric push rod and a protective transparent sleeve, and cleans the debris with a cleaning brush.
It effectively fixes raw materials, reduces drilling deviation, improves accuracy, and keeps the equipment clean by collecting and cleaning debris.
Smart Images

Figure CN222003754U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction engineering, in particular to a drilling device for construction engineering. Background Art
[0002] When constructing a building, a large amount of raw materials are needed for production and construction. During the production process of raw materials, since raw materials of different sizes are needed, the raw materials need to be cut and punched to form finished products and put into the building structure for construction.
[0003] At present, in the process of punching holes in raw materials, the raw materials need to be placed on the surface of the punching equipment, and then the punching equipment is started to perform a punching operation on the raw materials to form a complete finished product, which is then put into the building structure.
[0004] In the current prior art, when drilling holes in raw materials, the raw materials are placed on the surface of a support plate and are affected by the rotation speed of the drill rod during the drilling process, causing the raw materials to shake and shift, which in turn causes deviations in the drilling accuracy of the raw materials. Utility Model Content
[0005] In order to make up for the deficiencies of the prior art and solve at least one problem raised in the background technology, a drilling device for construction engineering is proposed.
[0006] The technical solution adopted by the utility model to solve its technical problems is: the punching equipment for construction engineering described in the utility model includes a collection box; a bearing plate is fixedly connected to the top of the collection box; the end of the collection box is fixedly connected to a frame; a driving device is fixedly connected to the top of the frame; a drill rod is installed at the output end of the driving device; a slide groove is opened inside the bearing plate; a clamping plate is slidably connected inside the slide groove; a spring is fixedly connected to the end of the clamping plate, and the other end of the spring is fixedly connected to the inner wall of the slide groove; a protective pad is fixedly connected to the side wall of the clamping plate.
[0007] Preferably, a waste guide hole is provided inside the carrier plate; a material drop hole is provided inside the carrier plate; a support frame is fixedly connected to the inner side wall of the waste guide hole, and the other end of the support frame is fixedly connected to the inner side wall of the collection box.
[0008] Preferably, an electric push rod is fixedly connected to the bottom of the frame; a protective transparent cover is fixedly connected to the bottom of the electric push rod, and the drill rod is rotatably connected to the inside of the protective transparent cover.
[0009] Preferably, a guide rod is fixedly connected to the end of the drill rod; a cleaning brush is fixedly connected to the bottom of the guide rod, and a plurality of cleaning brushes are provided.
[0010] Preferably, a scraper is slidably connected to the inner wall of the collection box; a pull rod is fixedly connected to the end of the scraper; a handle is fixedly connected to the end of the pull rod; and a discharge hole is opened at the end of the collection box.
[0011] Preferably, a protective plate is fixedly connected to the inner side wall of the protective transparent cover and arranged in a circular array; a protective ring is fixedly connected to the bottom of the protective transparent cover and the end of the protective ring is in a circular ring shape.
[0012] The beneficial effects of the utility model are as follows:
[0013] 1. The utility model describes a drilling device for construction engineering, which places raw materials on the top of a supporting plate, presses downward, squeezes the clamping plate, and causes the clamping plate to open to both sides to squeeze the spring to generate elastic force. When the raw materials are placed, the clamping plate is clamped and fixed by the elastic force generated by the spring, and then the driving device is started to drive the drill rod to the bottom to perform drilling operations on the raw materials, so that the raw materials are clamped and fixed by the clamping plate, thereby reducing the problem of subsequent shaking causing the drilling to deviate.
[0014] 2. The punching equipment for construction engineering described in the utility model has drop holes and waste guide holes opened inside the bearing plate, so that the debris generated by the punching falls into the inside of the collection box through the drop holes and the waste guide holes. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model will be further described below in conjunction with the accompanying drawings.
[0016] Figure 1 It is a stereogram in the utility model;
[0017] Figure 2 It is a cross-sectional view of the utility model;
[0018] Figure 3 It is a structural schematic diagram of the clamping plate in the utility model;
[0019] Figure 4 yes Figure 2 Enlarged view of point A in the middle.
[0020] Legend:
[0021] 1. Collection box; 21. Loading plate; 22. Frame; 23. Drive device; 24. Drill rod; 25. Slide; 26. Clamping plate; 27. Spring; 28. Protective pad; 29. Waste guide hole; 31. Dropping hole; 32. Support frame; 33. Scraper; 34. Pull rod; 35. Pull handle; 36. Discharge hole; 41. Electric push rod; 42. Protective transparent cover; 43. Protective ring; 51. Guide rod; 52. Cleaning brush; 53. Protective plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Specific examples are given below.
[0024] like Figures 1 to 3 As shown, a punching device for construction engineering described in an embodiment of the utility model includes a collection box 1; a bearing plate 21 is fixedly connected to the top of the collection box 1; a frame 22 is fixedly connected to the end of the collection box 1; a driving device 23 is fixedly connected to the top of the frame 22; a drill rod 24 is installed at the output end of the driving device 23; a slide groove 25 is opened inside the bearing plate 21; a clamping plate 26 is slidably connected inside the slide groove 25; a spring 27 is fixedly connected to the end of the clamping plate 26, and the other end of the spring 27 is fixedly connected to the inner side wall of the slide groove 25; A protective pad 28 is fixedly connected to the side wall; during operation, when it is necessary to drill holes in the raw material, the raw material is placed on the top of the supporting plate 21 and pressed downward to squeeze the clamping plate 26, so that the clamping plate 26 opens to both sides to squeeze the spring 27 to generate elastic force. When the raw material is placed, the clamping plate 26 is clamped and fixed by the elastic force generated by the spring 27, and then the driving device 23 is started to drive the drill rod 24 to the bottom to perform drilling operations on the raw material, so that the raw material is clamped and fixed by the clamping plate 26, thereby reducing the problem of subsequent shaking causing the drilling to be offset.
[0025] Further, such as Figure 3 As shown, a waste guide hole 29 is opened inside the carrier plate 21; a drop hole 31 is opened inside the carrier plate 21; a support frame 32 is fixedly connected to the inner wall of the waste guide hole 29, and the other end of the support frame 32 is fixedly connected to the inner wall of the collection box 1; when working, the drop hole 31 and the waste guide hole 29 are opened inside the carrier plate 21, so that the debris generated by punching falls into the inside of the collection box 1 through the drop hole 31 and the waste guide hole 29.
[0026] Further, such as Figure 4As shown, an electric push rod 41 is fixedly connected to the bottom of the frame 22; a protective transparent cover 42 is fixedly connected to the bottom of the electric push rod 41, and the drill rod 24 is rotatably connected to the inside of the protective transparent cover 42; during operation, the protective transparent cover 42 is installed at the end of the drill rod 24. When the drill rod 24 moves toward the bottom, the electric push rod 41 is opened to drive the protective transparent cover 42 to move toward the bottom, so that the protective transparent cover 42 moves with the drill rod 24 to protect the end of the drill rod 24, so that the debris splashed everywhere during the drilling process can be blocked and protected.
[0027] Further, such as Figure 4 As shown, a guide rod 51 is fixedly connected to the end of the drill rod 24; a cleaning brush 52 is fixedly connected to the bottom of the guide rod 51, and a plurality of cleaning brushes 52 are provided; during operation, when the drill rod 24 rotates, the guide rod 51 is driven to rotate, so that when the guide rod 51 rotates, the cleaning brush 52 is driven to rotate happily, so as to clean the debris generated by drilling on the surface of the raw material, and then the debris falls into the inside of the collection box 1 along the waste guide hole 29 and the drop hole 31.
[0028] Further, such as Figure 2 As shown, the inner wall of the collecting box 1 is slidably connected with a scraper 33; the end of the scraper 33 is fixedly connected with a pull rod 34; the end of the pull rod 34 is fixedly connected with a pull handle 35; the end of the collecting box 1 is provided with a discharge hole 36; during operation, when a lot of debris accumulates inside the collecting box 1, the pull handle 35 is pulled to drive the pull rod 34 to slide to the side end, so that the pull rod 34 drives the scraper 33 to slide to the side end, and the internal debris is discharged to the outside through the discharge hole 36.
[0029] Further, such as Figure 4 As shown, a protective plate 53 is fixedly connected to the inner wall of the protective transparent cover 42, and is arranged in a circular array; a protective ring 43 is fixedly connected to the bottom of the protective transparent cover 42, and the end of the protective ring 43 is in a circular ring shape; when working, the protective plate 53 is installed inside the protective transparent cover 42, so that the protective plate 53 partially blocks the debris, and the protective ring 43 is fixedly connected to the bottom of the protective transparent cover 42, so that when the protective transparent cover 42 is attached to the surface of the raw material, the protective ring 43 can play a buffering and protective effect.
[0030] Working principle: during operation, when it is necessary to process and drill holes in the raw material, the raw material is placed on the top of the carrying plate 21, and when pressed downward, the clamping plate 26 is squeezed, so that the clamping plate 26 opens to both sides, thereby squeezing the spring 27 to generate elastic force. When the raw material is placed, the clamping plate 26 is clamped and fixed by the elastic force generated by the spring 27, and then the driving device 23 is started to drive the drill rod 24 to the bottom to perform a hole drilling operation on the raw material, so that the raw material is clamped and fixed by the clamping plate 26, thereby reducing the problem of subsequent shaking causing the drilling to deviate; by providing a blanking hole 31 and a waste guide hole 29 inside the carrying plate 21, the debris generated by the drilling can fall into the inside of the collection box 1 through the blanking hole 31 and the waste guide hole 29; by installing a protective transparent cover 42 at the end of the drill rod 24, when the drill rod 24 moves to the bottom, the protective transparent cover 42 is driven to move to the bottom by opening the electric push rod 41, so that the protective The protective transparent cover 42 moves with the drill rod 24 to protect the end of the drill rod 24, so that the debris splashed in all directions during the drilling process can be blocked and protected; when the drill rod 24 rotates, it drives the guide rod 51 to rotate, so that when the guide rod 51 rotates, it drives the cleaning brush 52 to start rotating to clean the debris generated by drilling on the surface of the raw material, and then drops it into the collection box 1 along the waste guide hole 29 and the drop hole 31; when there is a lot of debris accumulated inside the collection box 1, the pull handle 35 is pulled to drive the pull rod 34 to slide to the side end, so that the pull rod 34 drives the scraper 33 to slide to the side end, and the internal debris is discharged to the outside through the discharge hole 36; by installing a protective plate 53 inside the protective transparent cover 42, the protective plate 53 partially blocks the debris, and by fixing a protective ring 43 at the bottom of the protective transparent cover 42, when the protective transparent cover 42 is attached to the surface of the raw material, the protective ring 43 can play a buffering and protective effect.
[0031] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A punching device for construction engineering, comprising a collecting box (1); characterized in that: The top of the collection box (1) is fixedly connected to a bearing plate (21); the end of the collection box (1) is fixedly connected to a frame (22); the top of the frame (22) is fixedly connected to a driving device (23); the output end of the driving device (23) is installed with a drill rod (24); a slide groove (25) is provided inside the bearing plate (21); a clamping plate (26) is slidably connected inside the slide groove (25); a spring (27) is fixedly connected to the end of the clamping plate (26), and the other end of the spring (27) is fixedly connected to the inner side wall of the slide groove (25); and a protective pad (28) is fixedly connected to the side wall of the clamping plate (26).
2. A construction engineering drilling device according to claim 1, characterized in that: A waste guide hole (29) is provided inside the carrier plate (21); a material drop hole (31) is provided inside the carrier plate (21); a support frame (32) is fixedly connected to the inner side wall of the waste guide hole (29), and the other end of the support frame (32) is fixedly connected to the inner side wall of the collection box (1).
3. A construction engineering drilling device according to claim 1, characterized in that: An electric push rod (41) is fixedly connected to the bottom of the frame (22); a protective transparent cover (42) is fixedly connected to the bottom of the electric push rod (41), and the drill rod (24) is rotatably connected to the inside of the protective transparent cover (42).
4. A construction engineering drilling device according to claim 1, characterized in that: A guide rod (51) is fixedly connected to the end of the drill rod (24); a plurality of cleaning brushes (52) are fixedly connected to the bottom of the guide rod (51).
5. The punching equipment for construction engineering according to claim 1, characterized in that: The inner wall of the collection box (1) is slidably connected with a scraper (33); the end of the scraper (33) is fixedly connected with a pull rod (34); the end of the pull rod (34) is fixedly connected with a pull handle (35); and the end of the collection box (1) is provided with a discharge hole (36).
6. A construction engineering drilling device according to claim 3, characterized in that: The inner side wall of the protective transparent cover (42) is fixedly connected with a protective plate (53) arranged in a circular array.
7. A construction engineering drilling device according to claim 3, characterized in that: A protective ring (43) is fixedly connected to the bottom of the protective transparent sleeve (42), and the end of the protective ring (43) is in a circular ring shape.