Single batten hoisting structure

By designing a single-piece strip hoisting structure, using components such as cranes, vertical rods, channel steel pallets and locking parts, vertical lifting and lowering of strips is achieved, and it is difficult to clamp the spreader in the prior art. The problem of vertical laying improves construction efficiency and safety.

CN222006995UActive Publication Date: 2024-11-15BEIJING URBAN CONSTR SIXTH GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420442271.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-11-15
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

In the prior art, it is difficult to lower the strip vertically with clamping spreaders, resulting in low construction efficiency and certain construction risks.

Method used

A single-piece strip hoisting structure is designed, including a crane, a lifting platform, a vertical rod, a channel steel pallet, a locking member and a diagonal brace. It is connected by a lifting ring and a crane, and the channel steel pallet drags the bottom of the strip. The vertical rod serves as a support, and the oblique support strengthens stability. The locking member locks the baffle on both sides. The L-shaped lock rod can be separated by rotating and Z-shaped lock rod pushing out, realizing the vertical lifting and lowering of the strip.

Benefits of technology

It improves construction efficiency, simplifies structure, facilitates turnover, avoids adjustments to the direction of the strips, and reduces construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222006995U_ABST
    Figure CN222006995U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a single batten hoisting structure which comprises a crane, a hoisting platform arranged at the bottom of the crane and a plurality of battens arranged at the top of the hoisting platform, the lifting appliance is arranged between the crane and the lifting platform and comprises a vertical rod, a lifting ring arranged at one end of the vertical rod in the length direction, a channel steel supporting plate arranged at the other end of the vertical rod in the length direction and a locking piece arranged on the vertical rod, and a lifting rope is arranged between the lifting ring and the crane. A U-steel supporting plate is arranged on the vertical rod, an inclined strut is arranged between the U-steel supporting plate and the vertical rod, a batten is attached to one side of the vertical rod, the batten extends into a locking piece, the locking piece is used for limiting transverse displacement of the batten, after the batten is locked through the locking piece, the batten can be vertically hoisted and vertically put down, the placing direction of the batten does not need to be adjusted after the batten is put down, and manpower is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a single-piece strip board hoisting structure. Background Art

[0002] At present, in order to expand the land use area and service life, construction companies are paying more and more attention to underground buildings. Now many buildings have turned from no basement to multi-story basement. A waterproof protective layer of the basement exterior wall will be built on the outside of the basement exterior wall, but the underground space is limited, and masonry work in a narrow space has certain construction difficulties. Therefore, lightweight partition wall strips can be used as the waterproof protective layer of the basement exterior wall. The lightweight partition wall strips need to be hoisted, and the hoisting of the strips often requires the aid of clamping hoists. In related technologies, the hoisting of the strips is often carried out by clamping hoists, but the clamping hoists generally place the strips flat when hoisting. The strips need to be erected again during construction, which reduces construction efficiency and has certain construction risks. Therefore, the utility model is born. Utility Model Content

[0003] The present application provides a single-piece slat hoisting structure to solve the problem that it is difficult for a clamping hanger to lower the slat vertically.

[0004] In order to solve the above technical problems, the present application provides a single-piece slat lifting structure, including: a crane, a lifting platform arranged at the bottom of the crane and a plurality of wooden planks arranged at the top of the lifting platform; a lifting device between the crane and the lifting platform, the lifting device including a vertical rod, a lifting ring arranged at one end of the vertical rod in the length direction, a channel steel support plate arranged at the other end of the vertical rod in the length direction, and a locking member arranged on the vertical rod, a lifting rope is arranged between the lifting ring and the crane, a diagonal brace is arranged between the channel steel support plate and the vertical rod, a slat is attached to one side of the vertical rod, the slat extends into the locking member, and the locking member is used to limit the lateral displacement of the slat.

[0005] In some embodiments of the present application, the locking member includes a horizontal plate connected to the vertical rod, a first channel steel baffle plate arranged at one end of the horizontal plate in the length direction, a first sleeve arranged at the other end of the horizontal plate in the length direction, and a second sleeve arranged on one side of the first sleeve, a Z-shaped locking rod is arranged in the first sleeve, an L-shaped locking rod is arranged in the second sleeve, a second channel steel baffle plate is arranged at the outer end of the Z-shaped locking rod, the Z-shaped locking rod is slidably connected to the first sleeve, and the L-shaped locking rod is rotatably connected to the second sleeve.

[0006] In some embodiments of the present application, an M20 nut is fixed to the outer end of one side of the L-shaped locking rod close to the second sleeve, which is used to limit the displacement between the L-shaped locking rod and the second sleeve.

[0007] In some embodiments of the present application, the length of the connecting end between the diagonal brace and the vertical rod is 100 mm.

[0008] In some embodiments of the present application, the channel steel support plate is 10# channel steel, the length of the channel steel support plate is 600mm, the vertical rod is a φ20 hollow circular tube, and the length of the vertical rod is 2800mm.

[0009] In some embodiments of the present application, the horizontal plate is 100*50mm square steel, and the first sleeve and the second sleeve are φ20mm hollow circular tubes.

[0010] Compared with the prior art, the utility model has the following characteristics and beneficial effects:

[0011] The utility model can lift the slats on the lifting platform through the crane, drag the bottom of the slats through the channel steel support plate, use the vertical rod as a support on one side of the slats, connect it with the crane through a lifting ring, strengthen the stability of the lifting device through the diagonal brace, lock the channel steel baffles on both sides with the slats through the locking parts, and when installing and disassembling, only the L-shaped locking rod needs to be rotated, and the Z-shaped locking rod can be pushed outward to separate the locking part and the slats, and the device can lift and put down the slats vertically. The square board slats are used as the construction requirements of the basement exterior wall insulation layer. There is no need to adjust the direction of the slats, and only the position of the slats needs to be fine-tuned, which improves the construction efficiency. The structure is simple and easy to turn around. Popularization and use can produce better results. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the overall structure of the embodiment of the utility model;

[0013] Figure 2 It is a side view schematic diagram of the overall structure of the embodiment of the utility model;

[0014] Figure 3 It is a schematic top view of the overall structure of an embodiment of the utility model;

[0015] Figure 4 It is a schematic diagram of the structure of a hoisting platform according to an embodiment of the utility model.

[0016] In the figure, 100, lifting platform; 110, wooden plank; 200, lifting device; 210, vertical rod; 220, lifting ring; 230, channel steel support plate; 240, locking member; 241, horizontal plate; 242, first channel steel baffle plate; 243, first sleeve; 244, second sleeve; 245, Z-shaped locking rod; 246, L-shaped locking rod; 247, second channel steel baffle plate; 250, diagonal brace; 300, slat. DETAILED DESCRIPTION

[0017] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0018] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0019] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0020] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0021] like Figure 1-4 As shown, according to some embodiments of the present application, a single-piece slat lifting structure includes: a crane, a lifting platform 100 arranged at the bottom of the crane and a plurality of wooden planks 110 arranged at the top of the lifting platform 100; a hanger 200 between the crane and the lifting platform 100, the hanger 200 includes a vertical rod 210, a lifting ring 220 arranged at one end of the vertical rod 210 in the length direction, a channel steel support plate 230 arranged at the other end of the vertical rod 210 in the length direction, and a locking member 240 arranged on the vertical rod 210, a lifting rope is arranged between the lifting ring 220 and the crane, a diagonal brace 250 is arranged between the channel steel support plate 230 and the vertical rod 210, a slat 300 is attached to one side of the vertical rod 210, the slat 300 extends into the locking member 240, and the locking member 240 is used to limit the lateral displacement of the slat 300.

[0022] According to some embodiments of the present application, the locking member 240 includes a horizontal plate 241 connected to the vertical rod 210, a first channel steel baffle 242 arranged at one end of the horizontal plate 241 in the length direction, a first sleeve 243 arranged at the other end of the horizontal plate 241 in the length direction, and a second sleeve 244 arranged on one side of the first sleeve 243, a Z-shaped locking rod 245 is arranged in the first sleeve 243, an L-shaped locking rod 246 is arranged in the second sleeve 244, a second channel steel baffle 247 is arranged at the outer end of the Z-shaped locking rod 245, the Z-shaped locking rod 245 is slidably connected to the first sleeve 243, and the L-shaped locking rod 246 is rotatably connected to the second sleeve 244.

[0023] It should be noted here that the locking member 240 has a simple structure and can realize the rapid installation of the hanger 200 and the slat 300 and vertical lifting, so that the slat 300 can be placed in a small construction space. At the same time, there is no need to add any structure to the slat 300 itself, no need to open holes, and no need to install lifting ears, thereby ensuring the integrity of the slat 300.

[0024] According to some embodiments of the present application, an M20 nut is fixed to the outer end of one side of the L-shaped locking rod 246 close to the second sleeve 244 to limit the displacement between the L-shaped locking rod 246 and the second sleeve 244 .

[0025] According to some embodiments of the present application, the length of the connecting end between the diagonal brace 250 and the vertical rod 210 is 100 mm.

[0026] According to some embodiments of the present application, the channel steel support plate 230 is a 10# channel steel, the length of the channel steel support plate 230 is 600 mm, the vertical rod 210 is a φ20 hollow circular tube, and the length of the vertical rod 210 is 2800 mm.

[0027] According to some embodiments of the present application, the horizontal plate 241 is 100*50mm square steel, and the first sleeve 243 and the second sleeve 244 are φ20mm hollow circular tubes.

[0028] According to some embodiments of the present application, four persons are required to cooperate in the lifting operation, including a signalman, one person is responsible for transporting the partition wall slats 300 with the lifting device 200 at the top of the foundation pit, and two persons are responsible for the installation on the working surface; the special lifting device 200 is installed on the slats 300 and the lifting is performed after confirming that the connection is tight. When lifting off the ground, it is necessary to prevent the corners of the slats 300 from being damaged; the slats 300 are slowly lifted by a tower crane, and when the bottom edge of the board rises to 50 cm from the ground, a slight pause is made, and the hanging is checked again to see whether it is firm and whether the slats 300 are contaminated or damaged. If there is any problem, it must be dealt with immediately. After confirmation, it is continued to be lifted so that it is slowly approached to the installation working surface; during the lifting process, care must be taken not to collide with the underground outer wall to prevent damage to the roll; after arriving at the designated location, the slats 300 are slowly lowered, and when they are 100 mm away from the control line, the plumbs on both sides of the wall are aligned with the control line on the ground, the slats 300 are slowly lowered to the ground, and then the fixing measures on the lifting device 200 are manually released and the slats 300 are lifted and installed in place.

[0029] In summary, the utility model relates to the technical field of building construction, and discloses a single-piece slat lifting structure, comprising: a crane, a lifting platform arranged at the bottom of the crane and a plurality of wooden planks arranged on the top of the lifting platform; a lifting device between the crane and the lifting platform, the lifting device comprising a vertical rod, a lifting ring arranged at one end of the vertical rod in the length direction, a channel steel support plate arranged at the other end of the vertical rod in the length direction, and a locking member arranged on the vertical rod, a lifting rope is arranged between the lifting ring and the crane, a diagonal brace is arranged between the channel steel support plate and the vertical rod, a slat is attached to one side of the vertical rod, the slat extends into the locking member, and the locking member is used to limit the lateral displacement of the slat, after the locking member locks the slat, the slat can be lifted vertically and put down vertically, and there is no need to adjust the placement direction of the slat after putting it down, thus saving manpower.

[0030] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A single-piece strip board hoisting structure, comprising: A crane, a lifting platform (100) arranged at the bottom of the crane, and a plurality of wooden planks (110) arranged at the top of the lifting platform (100); characterized in that a sling (200) between the crane and the lifting platform (100), the sling (200) comprising a vertical rod (210), a lifting ring (220) arranged at one end of the vertical rod (210) in the length direction, a channel steel support plate (220) arranged at the other end of the vertical rod (210) in the length direction 30), and a locking member (240) arranged on the vertical rod (210), a lifting rope is arranged between the lifting ring (220) and the crane, a diagonal brace (250) is arranged between the channel steel support plate (230) and the vertical rod (210), a strip board (300) is attached to one side of the vertical rod (210), and the strip board (300) extends into the locking member (240), and the locking member (240) is used to limit the lateral displacement of the strip board (300).

2. A single-piece strip board hoisting structure according to claim 1, characterized in that: The locking member (240) includes a horizontal plate (241) connected to the vertical rod (210), a first channel steel baffle (242) arranged at one end of the horizontal plate (241) in the length direction, a first sleeve (243) arranged at the other end of the horizontal plate (241) in the length direction, and a second sleeve (244) arranged on one side of the first sleeve (243), a Z-shaped locking rod (245) is arranged in the first sleeve (243), an L-shaped locking rod (246) is arranged in the second sleeve (244), and a second channel steel baffle (247) is arranged at the outer end of the Z-shaped locking rod (245), the Z-shaped locking rod (245) is slidably connected to the first sleeve (243), and the L-shaped locking rod (246) is rotationally connected to the second sleeve (244).

3. A single-piece strip board hoisting structure according to claim 2, characterized in that: An M20 nut is fixed to the outer end of one side of the L-shaped locking rod (246) close to the second sleeve (244) to limit the displacement between the L-shaped locking rod (246) and the second sleeve (244).

4. A single-piece strip board hoisting structure according to claim 1, characterized in that: The length of the connection end between the diagonal brace (250) and the vertical rod (210) is 100 mm.

5. The single-piece strip board hanging structure according to claim 1, characterized in that: The channel steel support plate (230) is a 10# channel steel, and the length of the channel steel support plate (230) is 600 mm. The vertical rod (210) is a φ20 hollow circular tube, and the length of the vertical rod (210) is 2800 mm.

6. A single-piece strip board hoisting structure according to claim 2, characterized in that: The transverse plate (241) is a 100*50 mm square steel, and the first sleeve (243) and the second sleeve (244) are φ20 mm hollow circular tubes.