Wall-attached load conduction construction structure of tower crane
By setting up force-transmission steel beams between the shear walls of the tower crane attached to the wall to form an overall structure, the problem of insufficient load conduction of the tower crane attached to the wall is solved, the safe conduction of load and structural stability are achieved, and the construction cost is reduced. Difficulty.
Patent Information
- Application Number
- CN202420472109.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-12
AI Technical Summary
In super-high-rise buildings, the load bearing requirements for tower cranes attached to walls cannot be met, resulting in the fact that when the structure is weak edge members are used as attachment points, the requirements for tower cranes cannot be met, and the existing reinforcement methods increase construction difficulty and cost.
By providing a force transmission steel beam between the first shear wall and the second shear wall, one end of the force transmission steel beam is fixedly connected to the connecting steel plate of the first shear wall, and the other end is connected to the wall-mounted back of the second shear wall The board is fixedly connected to form an integral structure and share the load to avoid cracking or damage of the attached wall. It is also fixedly connected by embedded casing and through-wall bolts.
Effectively utilize the original structure bearing capacity to ensure the safe conduction of the load attached to the tower crane’s wall, reduce construction costs and difficulty, avoid permanent deformation or damage of the attached wall, and simplify the installation and dismantling process.
Smart Images

Figure CN222007116U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a tower crane attached to a wall load conduction construction structure. Background Art
[0002] When constructing super high-rise buildings, in order to ensure the stability of the building at high altitudes, a frame-core tube structure will be used for construction, and the thickness of the shear wall gradually decreases with the increase in height. The structure of the tower crane attached to the wall cannot meet the load-bearing requirements of the tower crane attached to the wall. In terms of tower crane attachment construction technology, it is mainly to use the steel structure to transmit the force in the horizontal direction and improve the safety of the wall connection, increase the safety of the tower crane operation itself, and reduce the cost of the project. However, in some buildings, due to the constraints of structural design, tower crane attachment, plane layout requirements and many other factors, some buildings need to use weak edge components as tower crane attachment points, but because the attachment points are subjected to less force, they cannot meet the tower crane attachment force requirements.
[0003] The technical solution closest to this application is to add temporary components such as concrete structural columns for reinforcement, and increase the cross-sectional thickness of the components to. After the reinforcement is increased, the bearing capacity of the components can meet the requirements, but for the project using aluminum alloy formwork, increasing the cross-sectional size involves changing the formwork. The removal of the later section increase is easy to damage the original design structure, the construction is difficult, and dust, noise and a large amount of construction waste are generated during the removal process. Utility Model Content
[0004] The utility model aims to provide a tower crane attached to a wall load conduction construction structure to solve the above-mentioned problems in the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tower crane attached wall load conduction construction structure, comprising: a first shear wall, in which a pre-buried sleeve is embedded, and the two ends of the pre-buried sleeve are located outside the two sides of the first shear wall, and the two ends of the pre-buried sleeve are provided with connecting steel plates; a second shear wall, in which a wall-attached back plate is provided on the side close to the first shear wall, and a wall-attached base is provided on the side of the second shear wall away from the first shear wall, and the wall-attached back plate and the wall-attached base are fixedly connected by through-wall bolts; a force-transmitting steel beam is arranged between the first shear wall and the second shear wall, one end of the force-transmitting steel beam is fixedly connected to the first shear wall by the connecting steel plate, and the other end of the force-transmitting steel beam is fixedly connected to the second shear wall by the wall-attached back plate.
[0006] In a preferred embodiment, the embedded sleeves in the first shear wall are arranged horizontally, and three sleeves are arranged at intervals in the vertical direction.
[0007] In a preferred embodiment, the through-wall bolts are arranged horizontally, and three through-wall bolts are arranged at intervals in the vertical direction. One end of the through-wall bolts abuts against the wall-mounted back plate, and the other end of the through-wall bolts passes through the wall-mounted base and is fixedly connected to the wall-mounted base through a nut.
[0008] In a preferred embodiment, the embedded sleeve is arranged in the first shear wall and fixed to the steel mesh in the first shear wall. The embedded sleeve is penetrated by through-wall bolts. Both ends of the through-wall bolts pass through the connecting steel plates located on both sides of the embedded sleeve. The two connecting steel plates are fixedly connected to the first shear wall by nuts and through-wall bolts.
[0009] In a preferred embodiment, the force-transmitting steel beam is an H-shaped steel beam, one end of which is fixedly connected to the connecting steel plate, and the other end of the force-transmitting steel beam is fixedly connected to the wall-attached back plate, and two lifting ears are arranged above the middle of the force-transmitting steel beam.
[0010] In a preferred embodiment, the outer side of the wall-attached back plate is flush with the outer side of the second shear wall.
[0011] Compared with the prior art, the utility model has the following characteristics and beneficial effects:
[0012] The utility model sets a force transmission steel beam between the first shear wall and the second shear wall, and one end of the force transmission steel beam is fixedly connected to the connecting steel plate on the first shear wall, and the other end of the force transmission steel beam is fixedly connected to the wall back plate in the second shear wall, so that the force transmission steel beam, the first shear wall and the second shear wall form a whole, and the load of the tower crane wall is transmitted to the other shear wall through the force transmission steel beam, so that the two walls bear the load together, and the bearing capacity of the original structure is fully utilized, so that the wall body at the tower crane wall does not have cracks, permanent deformation or damage that affect the function or safety of the tower crane. And under the premise of ensuring safety and not affecting the use function of the building, the cost is reduced as much as possible, and the installation and removal are convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0014] FIG1 is a schematic diagram of a first shear wall structure of the present utility model;
[0015] Figure 2 It is a schematic diagram of the second shear wall structure of the utility model;
[0016] Figure 3 It is an overall schematic diagram of the utility model.
[0017] In the figure: 1-first shear wall, 2-second shear wall, 3-embedded casing, 4-connecting steel plate, 5-attached wall back plate, 6-attached wall base, 7-through-wall bolts, 8-force-transmitting steel beam, 9-lifting hanging ears. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the utility model are described clearly and completely below. The embodiments of the utility model and all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] Embodiment 1:
[0020] See Example Figure 1 As shown in Figure 3, a load transmission construction structure of a tower crane attached to a wall of the utility model comprises a first shear wall 1, in which an embedded sleeve 3 is embedded. The embedded sleeve 3 in the first shear wall 1 is arranged horizontally, and three sleeves are arranged at intervals in the vertical direction. The embedded sleeve 3 is arranged in the first shear wall 1 and fixed to the steel mesh in the first shear wall 1. Both ends of the embedded sleeve 3 are located outside the two sides of the first shear wall, and connecting steel plates 4 are arranged at both ends of the embedded sleeve 3. Through-wall bolts 7 are passed through the embedded sleeve 3. Both ends of the through-wall bolts 7 pass through the connecting steel plates 4 located on both sides of the embedded sleeve. The two connecting steel plates 4 are fixedly connected to the first shear wall 1 by nuts and through-wall bolts 7.
[0021] A wall-attached back plate 5 is provided on one side of the second shear wall 2 close to the first shear wall 1, and the outer side of the wall-attached back plate 5 is arranged flush with the outer side of the second shear wall 2. A wall-attached base 6 is provided on the outer side of the second shear wall 2 away from the first shear wall 1. The wall-attached back plate 5 of the second shear wall 2 is fixedly connected to the wall-attached base 6 by through-wall bolts 7. The through-wall bolts 7 are arranged horizontally, and three of them are arranged at intervals in the vertical direction. One end of the through-wall bolt 7 is abutted against the wall-attached back plate 5, and the other end of the through-wall bolt 7 passes through the wall-attached base 6 and is fixedly connected to the wall-attached base 6 by a nut.
[0022] A force transmission steel beam 8 is arranged between the first shear wall 1 and the second shear wall 2. The force transmission steel beam 8 is an H-shaped steel beam, one end of which is fixedly connected to the connecting steel plate 4. The force transmission steel beam 8 is fixedly connected to the first shear wall 1 through the connecting steel plate 4. The other end of the force transmission steel beam 8 is fixedly connected to the wall-attached back plate 5. The force transmission steel beam 8 is fixedly connected to the second shear wall 2 through the wall-attached back plate 5. Two lifting ears 9 are arranged above the middle of the force transmission steel beam 8.
[0023] Embodiment 2:
[0024] The specific installation steps of this utility model are as follows:
[0025] Step 1: Workers bury the embedded sleeve 3 in the first shear wall 1, weld the embedded sleeve 3 to the steel mesh in the first shear wall 1 to achieve positioning and fixation, and check the positioning deviation of the embedded sleeve 3. After acceptance, the formwork support is used for concrete pouring to complete the construction of the first shear wall 1;
[0026] Step 2: After the formwork is removed, the concrete at this part is cured. After the rebound test, it is confirmed that the concrete strength reaches more than 75% of the design requirement, and the two connecting steel plates 4 are connected by through-wall bolts 7 and nuts;
[0027] Step 3: First, weld the wall-attached back plate 5 and the three through-wall bolts 7 together, connect the other ends of the three through-wall bolts 7 to the wall-attached base 6, and then bury them in the second shear wall 2, check the connection quality and positioning deviation, and after acceptance, perform formwork support and pour concrete to complete the construction of the second shear wall 2;
[0028] Step 4: Use a tower crane to set the force-transmitting steel beam 8 near the first shear wall 1 and the second shear wall 2 in advance, use a hand winch to lift the steel beam to the specified position through the lifting lug 9 on the force-transmitting steel beam 8, weld one end of the force-transmitting steel beam 8 to the wall-attached back plate 5, and bolt the other end of the force-transmitting steel beam 8 to the connecting steel plate 4. Then check the welding quality and positioning deviation. If they meet the requirements of the plan, paint the device for protection. After the load transfer structure is installed, install it on the wall with a tower crane.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tower crane attached to a wall load transfer construction structure, characterized in that: include: A first shear wall (1), wherein a pre-buried sleeve (3) is embedded in the first shear wall (1), two ends of the pre-buried sleeve (3) are located outside two sides of the first shear wall (1), and connecting steel plates (4) are provided at both ends of the pre-buried sleeve (3); A second shear wall (2), wherein a wall-attaching back plate (5) is arranged on a side of the second shear wall (2) close to the first shear wall (1), and a wall-attaching base (6) is arranged on a side of the second shear wall (2) away from the first shear wall (1), wherein the wall-attaching back plate (5) and the wall-attaching base (6) are fixedly connected by through-wall bolts (7); A force transmission steel beam (8), wherein the force transmission steel beam (8) is arranged between the first shear wall (1) and the second shear wall (2), one end of the force transmission steel beam (8) is fixedly connected to the first shear wall (1) via a connecting steel plate (4), and the other end of the force transmission steel beam (8) is fixedly connected to the second shear wall (2) via a wall-attached back plate (5).
2. The tower crane attached to the wall load conduction construction structure according to claim 1 is characterized in that: The embedded sleeves (3) in the first shear wall (1) are arranged horizontally, and three of them are arranged at intervals in the vertical direction.
3. The load transfer construction structure of tower crane attached to wall according to claim 2 is characterized in that: The through-wall bolts (7) are arranged horizontally, and three of them are arranged at intervals in the vertical direction. One end of the through-wall bolt (7) abuts against the wall-attached back plate (5), and the other end of the through-wall bolt (7) passes through the wall-attached base (6) and is fixedly connected to the wall-attached base (6) via a nut.
4. The load transfer construction structure of tower crane attached to wall according to claim 3 is characterized in that: The embedded sleeve (3) is arranged in the first shear wall (1) and fixed to the steel mesh in the first shear wall (1); a through-wall bolt (7) is passed through the embedded sleeve (3); both ends of the through-wall bolt (7) pass through connecting steel plates (4) located on both sides of the embedded sleeve; the two connecting steel plates (4) are fixedly connected to the first shear wall (1) by nuts and through-wall bolts (7).
5. The load transfer construction structure of tower crane attached to wall according to claim 4 is characterized in that: The force-transmitting steel beam (8) is an H-shaped steel beam, one end of which is fixedly connected to the connecting steel plate (4), and the other end of the force-transmitting steel beam (8) is fixedly connected to the wall-attached back plate (5). Two lifting lugs (9) are provided above the middle of the force-transmitting steel beam (8).
6. The load transfer construction structure of tower crane attached to wall according to claim 5 is characterized in that: The outer side of the wall-attached back plate (5) is arranged flush with the outer side of the second shear wall (2).