Heating device for vacuum coating cooling system

By opening installation holes on vacuum coating cooling system equipment and using installation components to fix the heating tube bundles, the problem of difficulty in replacement and repair of existing heating devices is solved, and convenient replacement and maintenance of heating tube bundles is achieved, reducing operating costs and time, and improving Equipment efficiency and service life of heating tube bundles.

CN222007998UActive Publication Date: 2024-11-15ANHUI JIMAT NEW MATERIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420136065.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-19
Publication Date
2024-11-15
Estimated Expiration
2034-01-19

AI Technical Summary

Technical Problem

The existing vacuum coating cooling system heating device and heating pipe are directly installed in the equipment, making it difficult to replace and repair, has low efficiency, and affects operating costs and time.

Method used

Set up installation holes on the equipment, and use installation components to fix the heating tube bundles in the installation holes, including installation discs, flanges, protective covers, sealing gaskets and heating tube bundle brackets, to achieve convenient replacement and maintenance of heating tube bundles.

Benefits of technology

Through the design of the installation components, the replacement and maintenance cost and time of heating tube bundles is significantly reduced, and the efficiency of equipment and the service life of heating tube bundles are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007998U_ABST
    Figure CN222007998U_ABST
Patent Text Reader

Abstract

The utility model discloses a heating device for a vacuum coating cooling system, which comprises an equipment wallboard, a heating tube bundle and a mounting component, the equipment wallboard is provided with a mounting hole, the mounting component is mounted on one side of the equipment wallboard, and the heating tube bundle is arranged in the mounting hole. The heating tube bundle is installed on the installation assembly and penetrates through the installation hole to extend to the other side of the equipment wallboard. The mounting holes are formed in the equipment, and the heating tube bundle is fixed in the mounting holes through the mounting assemblies, so that the heating tube bundle is convenient to maintain and replace, the operation cost is reduced, and the operation time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of conductive film production, in particular to a heating device used in a vacuum coating cooling system. Background Art

[0002] Conductive film is a polymer material with metal plated on the surface. It is widely used in lithium-ion batteries, and is mainly used as a battery current collector in lithium-ion batteries. The most commonly used process for producing conductive films is vacuum evaporation. In vacuum evaporation, the film is wound in the coating equipment, and is coated on the cooling main roller after passing through several roller systems from the unwinding end. After coating, it passes through several roller systems and is rewound at the rewinding end. In order to ensure that the cooling main roller maintains a low temperature during the coating process, a cooling system is required to pass coolant. After coating, the temperature of the cooling main roller is low. If it is directly exposed to the air, the water vapor in the air will condense on the main roller, affecting the subsequent film penetration. Therefore, in order to avoid this situation, the cooling main roller needs to be heated before opening the coating equipment to increase its temperature.

[0003] The existing heating method is to add an electric heating tube in the cooling system. The electric heating tube heats the coolant and then sends it into the cooling main roller to heat the cooling main roller. However, the existing electric heating tube is directly installed in the equipment, which is inconvenient to replace and repair and has low efficiency. Utility Model Content

[0004] In order to overcome the deficiencies of the prior art, the utility model provides a heating device for a vacuum coating cooling system. By opening a mounting hole on the equipment and fixing the heating tube bundle in the mounting hole using a mounting assembly, the maintenance and replacement of the heating tube bundle is facilitated, thereby reducing operating costs and time.

[0005] The technical solution adopted by the utility model to solve its technical problems is:

[0006] A heating device for a vacuum coating cooling system comprises an equipment wall panel, a heating tube bundle and a mounting assembly. The equipment wall panel is provided with a mounting hole. The mounting assembly is mounted on one side of the equipment wall panel. The heating tube bundle is mounted on the mounting assembly and extends through the mounting hole to the other side of the equipment wall panel.

[0007] As a further improvement of the above technical solution, the installation assembly includes a mounting plate, a flange plate and a protective cover. The mounting plate is fixedly mounted on the equipment wall panel, and the protective cover is fixedly mounted on the mounting plate through the flange plate.

[0008] As a further improvement of the above technical solution, a plurality of first connection holes are provided on the mounting plate, and the heating tube bundle is fixed in the first connection holes.

[0009] As a further improvement of the above technical solution, the two end surfaces of the flange are respectively provided with a first sealing groove and a second sealing groove, a first sealing gasket is provided in the first sealing groove, the first sealing gasket is in contact with the protective cover, and a second sealing gasket is provided in the second sealing groove, the second sealing gasket is in contact with the mounting plate.

[0010] As a further improvement of the above technical solution, a third sealing groove is provided on the equipment wall panel, a third sealing gasket is provided in the third sealing groove, and the third sealing gasket is connected between the equipment wall panel and the mounting plate.

[0011] As a further improvement of the above technical solution, the installation assembly includes a flange base and a sealing disk, the flange base is fixedly installed on the equipment wall panel, and the sealing disk is fixedly installed on the flange base.

[0012] As a further improvement of the above technical solution, a plurality of second connection holes are provided on the flange base, and the heating tube bundle is fixed in the second connection holes.

[0013] As a further improvement of the above technical solution, a cable interface is provided on the flange base, and the cable interface is connected to the flange base.

[0014] As a further improvement of the above technical solution, a fourth sealing groove is provided on the equipment wall panel, a fourth sealing gasket is provided in the fourth sealing groove, and the fourth sealing gasket is connected between the equipment wall panel and the flange base.

[0015] As a further improvement of the above technical solution, it also includes a heating tube bundle bracket, which is fixedly installed on the equipment wall panel and is used to support the heating tube bundle.

[0016] The beneficial effects of the utility model are as follows: the utility model provides a heating device for a vacuum coating cooling system, by opening a mounting hole on the equipment and fixing the heating tube bundle in the mounting hole using a mounting assembly, which facilitates maintenance and replacement of the heating tube bundle and reduces operating costs and time. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0018] Figure 1 It is a structural schematic diagram of a heating device for a vacuum coating cooling system provided by the first embodiment of the utility model;

[0019] Figure 2 It is an exploded view of a heating device for a vacuum coating cooling system provided by the first embodiment of the utility model;

[0020] Figure 3It is a cross-sectional view of a heating device for a vacuum coating cooling system provided by the first embodiment of the utility model;

[0021] Figure 4 It is a structural schematic diagram of the installation disk of the first embodiment of the utility model;

[0022] Figure 5 It is a structural schematic diagram of a flange according to the first embodiment of the utility model;

[0023] Figure 6 It is a structural schematic diagram of a heating device for a vacuum coating cooling system provided by the second embodiment of the utility model;

[0024] Figure 7 It is an exploded view of a heating device for a vacuum coating cooling system provided by the second embodiment of the utility model;

[0025] Figure 8 It is a structural schematic diagram of a flange base according to the second embodiment of the utility model.

[0026] Figure numerals: 1. Equipment wall panel; 11. Mounting hole; 12. Third sealing groove; 13. Third sealing gasket; 14. Fourth sealing groove; 15. Fourth sealing gasket; 2. Heating tube bundle; 3. Mounting assembly; 31. Mounting plate; 311. First connecting hole; 32. Flange plate; 321. First sealing groove; 322. Second sealing groove; 33. Protective cover; 34. First sealing gasket; 35. Second sealing gasket; 36. Flange base; 361. Second connecting hole; 37. Sealing plate; 4. Heating tube bundle bracket; 5. Cable interface. DETAILED DESCRIPTION

[0027] The following will be combined with the embodiments and drawings to clearly and completely describe the concept, specific structure and technical effects of the utility model, so as to fully understand the purpose, characteristics and effects of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, other embodiments obtained by technicians in this field without creative work are all within the scope of protection of the utility model. In addition, all the connection / connection relationships involved in the patent do not refer to the direct connection of components, but refer to the fact that according to the specific implementation situation, a better connection structure can be formed by adding or reducing connection accessories. For example, fixed connection / fixed installation can be selected according to the needs of screw connection, bolt connection, pin connection, key connection, bonding, mortise and tenon connection, welding, riveting and other methods. For example, detachable connection can be selected according to the needs of screw connection, bolt connection, threaded connection, snap connection, mortise and tenon connection, Velcro connection and other methods. The various technical features in the creation of the utility model can be combined interactively without conflicting with each other.

[0028] Example 1

[0029] Please refer to Figure 1 A heating device for a vacuum coating cooling system comprises an equipment wall panel 1, a heating tube bundle 2, a heating tube bundle bracket 4 and a mounting assembly 3. The equipment wall panel 1 is provided with a mounting hole 11. The mounting assembly 3 is mounted on one side of the equipment wall panel 1. The heating tube bundle 2 is mounted on the mounting assembly 3 and extends through the mounting hole 11 to the other side of the equipment wall panel 1. The heating end of the heating tube bundle 2 is plugged into the equipment through the mounting hole 11 and contacts with the coolant for heating the coolant. One end of the heating tube bundle bracket 4 is fixedly mounted on the equipment wall panel 1 by screws, and the other end is provided with an arc-shaped support ring, which is supported at the bottom of the middle section of the heating tube bundle 2 to prevent the heating tube bundle 2 from bending and damage.

[0030] like Figure 2 As shown, a third sealing groove 12 is provided on the equipment wall panel 1, and the third sealing groove 12 is concentrically arranged on the outer periphery of the mounting hole 11. A third sealing gasket 13 is provided in the third sealing groove 12, and the third sealing gasket is connected between the equipment wall panel 1 and the mounting plate 31, and fits tightly with the surface of the mounting plate 31 to prevent leakage of coolant.

[0031] like Figures 2 to 5 As shown, the installation assembly 3 includes a mounting plate 31, a flange plate 32 and a protective cover 33. The mounting plate 31 is fixedly mounted on the equipment wall plate 1. The mounting plate 31 is provided with a plurality of first connection holes 311. The heating tube bundle 2 is inserted into the mounting hole 11 and fixed in the first connection holes 311. The two end surfaces of the flange plate 32 are respectively provided with a first sealing groove 321 and a second sealing groove 322. A first sealing gasket 34 is provided in the first sealing groove 321. The first sealing gasket 34 contacts the protective cover 33 and is used to seal the gap between the protective cover 33 and the flange plate 32. A second sealing gasket 35 is provided in the second sealing groove 322. The second sealing gasket 35 contacts the mounting plate 31 and is used to seal the gap between the mounting plate 31 and the flange plate 32, thereby further enhancing the sealing performance of the equipment. The protective cover 33 is fixedly mounted on the mounting plate 31 by screws through the flange plate 32, so as to protect the heating tube bundle 2 from the external environment.

[0032] In the utility model, the installation component 3 is arranged outside the equipment wall panel 1, and the equipment wall panel 1 is provided with an installation hole 11. The heating tube bundle 2 is sealed and installed on the installation plate 31. When the coolant needs to be heated, the heating end of the heating tube bundle 2 is inserted into the equipment through the installation hole 11 to contact the coolant. When the heating tube bundle 2 needs to be replaced or repaired, the heating tube bundle 2 can be directly taken out of the equipment through the installation component 3. Compared with the existing heating tube bundle 2 directly installed in the equipment, the installation hole 11 is opened on the equipment wall panel 1, and the installation component 3 is used to insert the heating tube bundle 2 into the equipment to heat the coolant, which makes it easier to replace and repair the heating tube bundle 2. The heating tube bundle bracket 4 is fixedly installed inside the equipment wall panel 1 to support the heating tube bundle 2. Compared with the existing cantilever installation of the heating tube bundle, the heating tube bundle 2 is prevented from bending and damage, and the service life is increased.

[0033] Example 2

[0034] Please refer to Figure 6 A heating device for a vacuum coating cooling system includes an equipment wall panel 1, a heating tube bundle 2 and a mounting assembly 3. The equipment wall panel 1 is provided with a mounting hole 11. The mounting assembly 3 is mounted on one side of the equipment wall panel 1. The heating tube bundle 2 is mounted on the mounting assembly 3 and extends through the mounting hole 11 to the other side of the equipment wall panel 1.

[0035] like Figure 2 As shown, a third sealing groove 12 is provided on the equipment wall panel 1, and a fourth sealing groove 14 is provided on the equipment wall panel 1. The fourth sealing groove 14 is concentrically arranged on the outer periphery of the mounting hole 11, and a fourth sealing gasket 15 is arranged in the fourth sealing groove 14. The fourth sealing gasket 15 is connected between the equipment wall panel 1 and the flange base 36, and is tightly fitted with the surface of the flange base 36 to prevent leakage of the coolant.

[0036] In this embodiment, the heating device may further include a heating tube bundle bracket, one end of which is fixedly mounted on the equipment wall panel 1 by screws, and the other end is provided with an arc-shaped support ring, which is supported at the bottom of the middle section of the heating tube bundle to prevent the heating tube bundle from bending and damage. (The heating tube bundle bracket is not shown in the figure)

[0037] like Figure 7 As shown, the mounting assembly 3 includes a flange base 36 and a sealing disk 37. The sealing disk 37 is fixedly mounted on the flange base 36 by screws. The flange base 36 is fixedly mounted on the equipment wall panel 1 by screws. A plurality of second connecting holes 361 are provided on the flange base 36. One end of the heating tube bundle 2 is fixed in the second connecting hole 361, and the other end is inserted into the equipment through the mounting hole 11.

[0038] The flange base 36 is provided with a cable interface 5, which is in communication with the flange base 36, so that the cable can be easily connected to the flange base 36. Compared with the existing wiring in the deep pit of the base, the cable interface 5 is convenient for wiring and directly connected to the equipment, which is easy to operate.

[0039] In the present invention, the installation assembly 3 is arranged outside the equipment wallboard 1, and the equipment wallboard 1 is provided with an installation hole 11. The heating tube bundle 2 is sealed and installed in the flange base 36. When the coolant needs to be heated, the heating end of the heating tube bundle 2 is inserted into the equipment through the installation hole 11 to contact the coolant. When the heating tube bundle 2 needs to be replaced or repaired, the heating tube bundle 2 can be directly taken out of the equipment through the installation assembly 3. Compared with the existing method of directly installing the heating tube bundle in the equipment, the method of opening the installation hole 11 on the equipment wallboard 1 and inserting the heating tube bundle 2 into the equipment to heat the coolant is more convenient for replacing and repairing the heating tube bundle 2.

[0040] The above is a specific description of the preferred implementation of the utility model, but the invention of the utility model is not limited to the described embodiments. Technical personnel familiar with the field can also make various equivalent deformations or substitutions without violating the spirit of the utility model. These equivalent deformations or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A heating device for a vacuum coating cooling system, characterized in that: The device comprises an equipment wall panel, a heating tube bundle and a mounting assembly. The equipment wall panel is provided with a mounting hole. The mounting assembly is mounted on one side of the equipment wall panel. The heating tube bundle is mounted on the mounting assembly and extends through the mounting hole to the other side of the equipment wall panel.

2. The heating device for a vacuum coating cooling system according to claim 1, characterized in that: The mounting assembly comprises a mounting plate, a flange plate and a protective cover. The mounting plate is fixedly mounted on the equipment wall panel, and the protective cover is fixedly mounted on the mounting plate via the flange plate.

3. The heating device for a vacuum coating cooling system according to claim 2, characterized in that: The installation plate is provided with a plurality of first connection holes, and the heating tube bundle is fixed in the first connection holes.

4. The heating device for a vacuum coating cooling system according to claim 2, characterized in that: The two end surfaces of the flange are respectively provided with a first sealing groove and a second sealing groove, the first sealing groove is provided with a first sealing gasket, the first sealing gasket is in contact with the protective cover, the second sealing gasket is provided in the second sealing groove, the second sealing gasket is in contact with the mounting plate.

5. The heating device for a vacuum coating cooling system according to claim 4, characterized in that: The equipment wall panel is provided with a third sealing groove, a third sealing gasket is provided in the third sealing groove, and the third sealing gasket is connected between the equipment wall panel and the mounting plate.

6. The heating device for a vacuum coating cooling system according to claim 1, characterized in that: The mounting assembly comprises a flange base and a sealing disk. The flange base is fixedly mounted on the equipment wall panel, and the sealing disk is fixedly mounted on the flange base.

7. The heating device for a vacuum coating cooling system according to claim 6, characterized in that: The flange base is provided with a plurality of second connection holes, and the heating tube bundle is fixed in the second connection holes.

8. The heating device for a vacuum coating cooling system according to claim 7, characterized in that: The flange base is provided with a cable interface, and the cable interface is communicated with the flange base.

9. The heating device for a vacuum coating cooling system according to claim 8, characterized in that: The equipment wall panel is provided with a fourth sealing groove, a fourth sealing gasket is provided in the fourth sealing groove, and the fourth sealing gasket is connected between the equipment wall panel and the flange base.

10. The heating device for a vacuum coating cooling system according to claim 1, characterized in that: It also includes a heating tube bundle bracket, which is fixedly mounted on the equipment wall panel and is used to support the heating tube bundle.