Roadbed consolidation waterproof structure
By laying steel mesh, waterproof fabric and waterproof mortar layer on the surface of the roadbed base, and combining waterproof partitions and reinforcement structures, the immersion and settlement of the roadbed in rainwater-prone areas is solved, the waterproofness and stability of the roadbed are improved, and the The service life of the road surface.
Patent Information
- Application Number
- CN202420619096.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-28
AI Technical Summary
The existing roadbed structure is prone to soaking and settlement in rainwater-prone areas, resulting in loosening and collapse of the roadbed, affecting driving safety. The existing waterproofing measures cannot effectively discharge rainwater during rainfall, resulting in softening and settlement of the roadbed.
The waterproof layer consisting of steel mesh, waterproof fabric and waterproof mortar layer is laid on the surface of the roadbed base, and waterproof partitions and reinforcement structures are set on both sides. The waterproof mortar layer is inclined to divert rainwater. The waterproof partition connects the roadbed base through anchorage to prevent penetration and Deformation, reinforcement plates and sealing plates are used to support and isolate the external water accumulation.
Effectively prevent rainwater from penetration and accumulation of water, improve the waterproofness and stability of the roadbed, avoid settlement and cracking, and extend the service life and durability of the road surface.
Smart Images

Figure CN222008509U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road construction, in particular to a roadbed consolidation waterproof structure. Background Art
[0002] Roadbed refers to the foundation of the track or road surface, and the main function of the roadbed is to provide the necessary conditions for track or road surface laying and train or vehicle operation, and to bear the static and dynamic loads of the track and locomotive vehicles or road surface and traffic loads, while transmitting and diffusing the loads deep into the foundation;
[0003] However, the drainage effect of the usual roadbed is very poor during actual use. When it rains, rainwater will sink into the roadbed, soaking the roadbed and even causing the roadbed to loosen. In addition, the stability of the roadbed support is poor, and it is prone to collapse after long-term use, affecting driving safety.
[0004] The existing application number is CN202320244935.9, which is a waterproof roadbed structure, including a roadbed base, inner baffles symmetrically arranged on the left and right sides of the roadbed base, and outer baffles arranged on the outside of the inner baffles, a top baffle, the top baffle is arranged on the outside of the upper end of the roadbed base, and the top baffles are arranged at equal intervals on the upper end of the inner baffle, a fixed connecting column, the fixed connecting column is used to auxiliary support the outer baffle, and the lower end of the fixed connecting column is penetrated and connected with a fixed connecting pin for positioning, and a limiting mechanism, the limiting mechanism is arranged at the upper end of the fixed connecting column.
[0005] Although the above technical solution has a certain waterproof effect, can prevent the roadbed from being soaked by ground water seepage, and can drain rainwater through the drainage grooves, in rainy areas, when it rains, rainwater will still seep into the roadbed, and the waterproof grid cloth laid between the roadbed and the ground and the baffles on both sides will prevent the rainwater that has seeped into the roadbed from being discharged outward, so that the roadbed will still be soaked in rainwater, softening the roadbed, causing the roadbed to settle, and affecting subsequent road construction. Utility Model Content
[0006] Therefore, in order to solve the above-mentioned shortcomings, the utility model provides a roadbed consolidation waterproof structure, including
[0007] Roadbed base;
[0008] A waterproof layer, which is laid on the upper surface of the roadbed substrate; and
[0009] A waterproof partition is arranged on both sides of the roadbed substrate, a drainage ditch is arranged on the top of the waterproof partition, a removable cover plate is arranged on the upper part of the drainage ditch, and mesh holes are opened on the surface of the cover plate for rainwater to pass through;
[0010] The waterproof layer comprises
[0011] A steel mesh, which is laid on the upper surface of the roadbed substrate;
[0012] A waterproof work fabric, which is laid on the steel mesh; and
[0013] A waterproof mortar layer is laid on the upper surface of the waterproof fabric, and the upper surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides.
[0014] Furthermore, the waterproof partition is formed by pouring waterproof concrete.
[0015] The utility model lays a waterproof layer composed of a steel mesh, a waterproof work cloth and a waterproof mortar layer on the surface of a roadbed base body, which can prevent rainwater from penetrating into the roadbed base body during rainfall, soaking the roadbed base body, causing the roadbed to soften and cause it to settle. The surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides, which can guide the flow of rainwater and divert it into the drainage ditch to avoid the formation of water accumulation on the surface of the waterproof layer and erosion of the waterproof layer. Waterproof partitions are arranged on both sides of the roadbed base body to prevent the water accumulated in the outer section of the roadbed base body from penetrating into the roadbed base body, thereby further improving the waterproofness of the roadbed. At the same time, the waterproof partitions can support and reinforce the roadbed base body, which can effectively prevent the base body from deforming outwards and settling and cracking when the roadbed is consolidated and stressed, thereby improving the stability and firmness of the roadbed base body.
[0016] Furthermore, the waterproof partition is connected to the roadbed matrix through steel bars, and the two ends of the steel bars are anchored in the waterproof partition and the roadbed matrix respectively. The steel bars are used as anchors, and the steel bars are buried at multiple preset anchor points on the side of the roadbed matrix. The steel bars are exposed to a preset length of the roadbed matrix, and a template is built to cast the partition, thereby achieving a stable connection between the waterproof partition and the roadbed matrix, and preventing the partition from being separated from the roadbed matrix under the action of external stress.
[0017] Furthermore, a crushed stone layer is laid on the upper surface of the waterproof layer. The crushed stone layer can improve the compression and shear resistance of the road surface matrix, making it more stable, thereby ensuring the stability, flatness and durability of the road surface for long-term use. At the same time, the crushed stone layer has good stability and bearing capacity, and can disperse the load to a larger range, thereby reducing the impact of the load on the roadbed matrix, reducing the settlement of the roadbed matrix, enabling it to withstand a larger vehicle load, thereby ensuring the durability and service life of the road surface.
[0018] Furthermore, a reinforcement structure is fixed on the outside of the waterproof partition, and the reinforcement structure supports the waterproof partition on the outside to reinforce the waterproof partition.
[0019] Furthermore, the reinforcement structure includes
[0020] A reinforcing plate, the reinforcing plate being arranged on the outer side of the waterproof partition; and
[0021] The supporting part is arranged obliquely as a whole, one end of the supporting part is connected to the above-mentioned reinforcing plate, and an anchoring hook is arranged at the end of the supporting part away from the reinforcing plate. The anchoring hook can be buried underground to form an anchor with the ground.
[0022] By placing the inner side of the reinforcement plate close to the outer side of the waterproof partition, the anchoring hook at one end of the support part is anchored underground, thereby providing support for the waterproof partition and improving the temperature resistance of the connection between the waterproof partition and the roadbed matrix. The reinforcement plate also has the function of isolating water from the outer side of the waterproof partition, thereby preventing the outer side of the partition from being soaked by accumulated water and causing erosion of the waterproof partition.
[0023] Furthermore, the support portion is a telescopic support rod, one end of which is pivotally connected to the reinforcement plate.
[0024] By extending and retracting the telescopic rod, the inclination angle of the reinforcement plate can be adjusted to adapt to the conditions of the outer side of the waterproof partition with different inclination degrees.
[0025] Furthermore, the reinforcement plate is formed by splicing several baffles.
[0026] Furthermore, several connecting blocks protruding outward are provided on both sides of several baffles, and sockets are opened in the connecting blocks. Connecting grooves for accommodating the connecting blocks are formed between adjacent connecting blocks, and the connecting blocks on one side of the baffle are arranged corresponding to the connecting grooves on the other side of the baffle.
[0027] The connecting block of the baffle is inserted into the connecting groove of the other baffle, and the connecting pin is inserted into the socket in the connecting block connected to the adjacent baffles, so as to realize the connection between the two baffles, which is convenient for installation. By disassembling the reinforcement plate into multiple baffles for assembly, the processability and passenger transport properties of the component are improved. At the same time, after the two baffles are connected, the baffle can be rotated according to the bending condition of the roadbed matrix, so as to adjust the angle between adjacent baffles, thereby improving the close fit with the side of the waterproof partition.
[0028] Furthermore, a fixing hole is provided on the surface of the baffle plate adjacent to the connecting groove;
[0029] The reinforcement structure further comprises a sealing plate, on which a connecting hole is provided corresponding to the fixing hole;
[0030] The sealing plate and the baffle are fixed by inserting the connecting piece in the connecting hole and the fixing hole, and the adjacent baffles can be connected through the sealing plate.
[0031] The sealing plate is fixed at the connection between adjacent baffles. The sealing plate can be made of flexible waterproof materials such as rubber and polymer materials. The sealing plate is tightly attached to the connection surface through a connecting piece to prevent rainwater from penetrating through the connection gap between the baffle and the waterproof partition and causing erosion to the waterproof partition.
[0032] The utility model has the following advantages:
[0033] The utility model lays a waterproof layer composed of a steel mesh, a waterproof work cloth and a waterproof mortar layer on the surface of a roadbed base body, which can prevent rainwater from penetrating into the roadbed base body during rainfall, soaking the roadbed base body, causing the roadbed to soften and cause it to settle. The surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides, which can guide the flow of rainwater and divert it into the drainage ditch to avoid the formation of water accumulation on the surface of the waterproof layer and erosion of the waterproof layer. Waterproof partitions are arranged on both sides of the roadbed base body to prevent the water accumulated in the outer section of the roadbed base body from penetrating into the roadbed base body, thereby further improving the waterproofness of the roadbed. At the same time, the waterproof partitions can support and reinforce the roadbed base body, which can effectively prevent the base body from deforming outwards and settling and cracking when the roadbed is consolidated and stressed, thereby improving the stability and firmness of the roadbed base body.
[0034] Using steel bars as anchors, bury them at multiple preset anchor points on the side of the roadbed matrix, and expose the steel bars to a preset length from the roadbed matrix. Then, build a formwork and cast partitions to achieve a stable connection between the waterproof partition and the roadbed matrix, preventing the partition from separating from the roadbed matrix under the action of external stress.
[0035] The crushed stone layer can improve the compression and shear resistance of the pavement matrix, making it more stable, thereby ensuring the stability, flatness and durability of the pavement in long-term use. At the same time, the crushed stone layer has good stability and bearing capacity, and can disperse the load over a larger range, thereby reducing the impact of the load on the roadbed matrix and reducing the settlement of the roadbed matrix, so that it can withstand greater vehicle loads, thereby ensuring the durability and service life of the pavement.
[0036] By placing the inner side of the reinforcing plate close to the outer side of the waterproof partition, the anchoring hook at one end of the supporting part is anchored underground, thereby forming support for the waterproof partition and improving the temperature resistance of the connection between the waterproof partition and the roadbed substrate. The reinforcing plate also has the function of isolating water from the outer side of the waterproof partition, which can prevent the outer water from soaking the outer side of the partition and causing erosion of the waterproof partition. By retracting the telescopic rod, the inclination angle of the reinforcing plate can be adjusted to adapt to the situation of the outer side of the waterproof partition with different inclination degrees. The connecting block of the baffle is inserted into the connecting groove corresponding to the other baffle, and the connecting pin is inserted into the jack in the connecting block connected to the adjacent baffles, so as to realize the connection between the two baffles, which is easy to install. By disassembling the reinforcing plate into multiple baffles for assembly, the processability and passenger transport properties of the component are improved. At the same time, after the two baffles are connected, the baffle can be rotated according to the bending condition of the roadbed substrate, so as to adjust the angle between the adjacent baffles, so as to improve the close fit with the side of the waterproof partition. The sealing plate is fixed at the connection between adjacent baffles. The sealing plate can be made of flexible waterproof materials such as rubber and polymer materials. The sealing plate is tightly attached to the connection surface through a connecting piece to prevent rainwater from penetrating through the connection gap between the baffle and the waterproof partition and causing erosion to the waterproof partition. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a structural schematic diagram of the roadbed consolidation and waterproofing structure;
[0038] Figure 2 yes Figure 1 The structural schematic diagram of the reinforcement structure in the roadbed waterproof structure shown;
[0039] Figure 3 yes Figure 2 a front view of the reinforcement structure shown;
[0040] Figure 4 yes Figure 2 A schematic diagram of the structure of the baffle in the reinforcement structure shown;
[0041] Figure 5 yes Figure 4 An enlarged schematic diagram of the local structure at A in the baffle shown;
[0042] Figure 6 yes Figure 3 Schematic diagram of the structure of the sealing plate in the reinforcement structure shown. DETAILED DESCRIPTION
[0043] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0044] In this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises", or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0045] As described in the background technology, in rainy areas, when it rains, rainwater will still seep into the roadbed, and the waterproof grid cloth laid between the roadbed and the ground and the baffles on both sides of it will prevent the rainwater that has seeped into the roadbed from being discharged outward, thereby still causing the roadbed to be soaked in rainwater, causing the roadbed to soften, resulting in roadbed settlement, and affecting subsequent road construction.
[0046] Embodiment 1:
[0047] Therefore, in order to solve the technical problems existing in the prior art, this embodiment provides a roadbed consolidation waterproof structure, such as Figure 1 As shown, the roadbed consolidation waterproof structure includes
[0048] Roadbed base 500;
[0049] A waterproof layer 600, which is laid on the upper surface of the roadbed substrate 500; and
[0050] A waterproof partition 200 is provided on both sides of the roadbed substrate 500. A drainage ditch 200 is provided on the top of the waterproof partition 200. A cover plate 400 is removably provided on the upper part of the drainage ditch 200. The surface of the cover plate 400 is provided with mesh holes for rainwater to pass through.
[0051] Among them, the waterproof layer 600 includes
[0052] A steel mesh, which is laid on the upper surface of the roadbed substrate 500;
[0053] A waterproof work fabric, which is laid on the steel mesh; and
[0054] A waterproof mortar layer is laid on the upper surface of the waterproof fabric, and the upper surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides.
[0055] The waterproof partition 200 is formed by pouring waterproof concrete.
[0056] The utility model lays a waterproof layer composed of a steel mesh, a waterproof work cloth and a waterproof mortar layer on the surface of a roadbed base body, which can prevent rainwater from penetrating into the roadbed base body during rainfall, soaking the roadbed base body, causing the roadbed to soften and cause it to settle. The surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides, which can guide the flow of rainwater and divert it into the drainage ditch to avoid the formation of water accumulation on the surface of the waterproof layer and erosion of the waterproof layer. Waterproof partitions are arranged on both sides of the roadbed base body to prevent the water accumulated in the outer section of the roadbed base body from penetrating into the roadbed base body, thereby further improving the waterproofness of the roadbed. At the same time, the waterproof partitions can support and reinforce the roadbed base body, which can effectively prevent the base body from deforming outwards and settling and cracking when the roadbed is consolidated and stressed, thereby improving the stability and firmness of the roadbed base body.
[0057] In addition, in order to prevent the waterproof partition from being separated from the roadbed matrix under external stress and thus losing its function, such as human impact, squeezing effect of roadbed settlement on the outside, etc. Figure 1 As shown, the waterproof partition 200 in this embodiment is connected to the roadbed matrix 500 through steel bars, and the two ends of the steel bars are anchored in the waterproof partition and the roadbed matrix respectively. The steel bars are used as anchors, and the steel bars are buried at multiple preset anchor points on the side of the roadbed matrix. The steel bars are exposed to a preset length of the roadbed matrix, and a template is built to cast the partition, so as to achieve a stable connection between the waterproof partition and the roadbed matrix, and prevent the partition from being separated from the roadbed matrix under the action of external stress.
[0058] In addition, in this embodiment, a crushed stone layer 700 is laid on the upper surface of the waterproof layer 600. The crushed stone layer can improve the compressive and shear resistance of the road surface matrix, making it more stable, thereby ensuring the stability, flatness and durability of the road surface for long-term use. At the same time, the crushed stone layer has good stability and bearing capacity, and can disperse the load to a larger range, thereby reducing the impact of the load on the roadbed matrix, reducing the settlement of the roadbed matrix, and enabling it to withstand a larger vehicle load, thereby ensuring the durability and service life of the road surface.
[0059] Embodiment 2:
[0060] In order to further improve the connection stability between the waterproof partition and the roadbed matrix, such as Figure 1 As shown, in this embodiment, a reinforcement structure 100 is further fixed on the outside of the waterproof partition 200. The reinforcement structure 100 supports the waterproof partition on the outside to reinforce the waterproof partition.
[0061] like Figure 2 , 3 As shown, the reinforcement structure 100 includes
[0062] A reinforcing plate, the reinforcing plate being disposed on the outer side of the waterproof partition 200; and
[0063] The support part 140 is tilted as a whole, one end of the support part 140 is connected to the reinforcing plate, and an anchoring hook 150 is provided at the end of the support part 140 away from the reinforcing plate. The anchoring hook 150 can be buried underground to form an anchor with the ground.
[0064] By placing the inner side of the reinforcement plate close to the outer side of the waterproof partition, the anchoring hook at one end of the support part is anchored underground, thereby providing support for the waterproof partition and improving the temperature resistance of the connection between the waterproof partition and the roadbed matrix. The reinforcement plate also has the function of isolating water from the outer side of the waterproof partition, thereby preventing the outer side of the partition from being soaked by accumulated water and causing erosion of the waterproof partition.
[0065] In order to improve the application scope of the reinforced structure, such as Figure 2 As shown, the support portion 140 is a telescopic support rod, such as a support rod with a jack structure at the bottom, a hydraulic telescopic rod, a pneumatic telescopic rod, etc. One end of the support portion 140 is pivotally connected to the reinforcement plate.
[0066] By extending and retracting the telescopic rod, the inclination angle of the reinforcement plate can be adjusted to adapt to the conditions of the outer side of the waterproof partition with different inclination degrees.
[0067] In addition, the reinforcement plate in this embodiment is formed by splicing several baffles 110 .
[0068] like Figure 4 , 5 As shown, several connecting blocks 111 protruding outward are provided on both sides of several baffles, and sockets are provided in the connecting blocks 111. Connecting grooves 112 for accommodating the connecting blocks are formed between adjacent connecting blocks, and the connecting blocks on one side of the baffle are arranged corresponding to the connecting grooves on the other side of the baffle.
[0069] The connecting block of the baffle is inserted into the connecting groove of the other baffle to match it, and the connecting pin is inserted into the socket in the connecting block connecting the adjacent baffles, so as to realize the connection between the two baffles, which is convenient for installation. By disassembling the reinforcement plate into multiple baffles for assembly, the machinability and passenger transport properties of the component are improved. At the same time, after the two baffles are connected, the baffle can be rotated according to the bending condition of the roadbed matrix to adjust the angle between adjacent baffles, thereby improving the fit with the side of the waterproof partition and reducing the gap between the baffle waterproof partition.
[0070] In addition, Figure 5 As shown, a fixing hole 114 is provided on the surface of the baffle plate adjacent to the connecting groove; the reinforcement structure 100 in this embodiment further includes a sealing plate 160, such as Figure 6 As shown, a connecting hole 161 is opened on the sealing plate 160 corresponding to the above-mentioned fixing hole; the sealing plate and the baffle are fixed by inserting a connecting piece in the connecting hole and the fixing hole, and the adjacent baffles can be connected through the sealing plate.
[0071] The sealing plate is fixed at the connection between adjacent baffles. The sealing plate can be made of flexible waterproof materials such as rubber and polymer materials. The sealing plate is tightly attached to the connection surface through a connecting piece to prevent rainwater from penetrating through the connection gap between the baffle and the waterproof partition and causing erosion to the waterproof partition.
[0072] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A roadbed consolidation waterproof structure, characterized in that: include Roadbed base; A waterproof layer, which is laid on the upper surface of the roadbed substrate; and A waterproof partition is arranged on both sides of the roadbed substrate, a drainage ditch is arranged on the top of the waterproof partition, a removable cover plate is arranged on the upper part of the drainage ditch, and mesh holes are opened on the surface of the cover plate for rainwater to pass through; The waterproof layer comprises A steel mesh, which is laid on the upper surface of the roadbed substrate; Waterproof fabric, which is laid on the steel mesh; as well as A waterproof mortar layer is laid on the upper surface of the waterproof fabric, and the upper surface of the waterproof mortar layer is inclined from the center line of the roadbed to both sides.
2. A roadbed consolidation waterproof structure according to claim 1, characterized in that: The waterproof partition is formed by pouring waterproof concrete.
3. A roadbed consolidation waterproof structure according to claim 2, characterized in that: The waterproof partition is connected to the roadbed matrix through steel bars, and two ends of the steel bars are anchored in the waterproof partition and the roadbed matrix respectively.
4. A roadbed consolidation waterproof structure according to claim 1, characterized in that: A crushed stone layer is also laid on the upper surface of the waterproof layer.
5. A roadbed consolidation waterproof structure according to claim 1 or 4, characterized in that: A reinforcement structure is also fixed on the outside of the waterproof partition, and the reinforcement structure supports the waterproof partition on the outside to reinforce the waterproof partition.
6. A roadbed consolidation waterproof structure according to claim 5, characterized in that: The reinforcement structure comprises A reinforcing plate, the reinforcing plate being arranged on the outer side of the waterproof partition; and The supporting part is arranged obliquely as a whole, one end of the supporting part is connected to the above-mentioned reinforcing plate, and an anchoring hook is arranged at the end of the supporting part away from the reinforcing plate. The anchoring hook can be buried underground to form an anchor with the ground.
7. A roadbed consolidation waterproof structure according to claim 6, characterized in that: The support part is a telescopic support rod, one end of which is pivotally connected to the reinforcement plate.
8. A roadbed consolidation waterproof structure according to claim 7, characterized in that: The reinforcement plate is formed by splicing a plurality of baffles.
9. A roadbed consolidation waterproof structure according to claim 8, characterized in that: Several connecting blocks protruding outward are provided on both sides of several baffles, and jacks are provided in the connecting blocks. Connecting grooves for accommodating the connecting blocks are formed between adjacent connecting blocks, and the connecting blocks on one side of the baffle are arranged corresponding to the connecting grooves on the other side of the baffle.
10. A roadbed consolidation waterproof structure according to claim 9, characterized in that: A fixing hole is provided on the surface of the baffle plate adjacent to the connecting groove; The reinforcement structure further comprises a sealing plate, on which a connecting hole is provided corresponding to the fixing hole; The sealing plate and the baffle are fixed by inserting the connecting piece in the connecting hole and the fixing hole, and the adjacent baffles can be connected through the sealing plate.