Connection structure of existing river-crossing bridge and newly-built dike

Through the coordination of prefabricated parts and connecting structures, the rapid and efficient construction of cross-river bridges and new embankment connection structures and flood backflow protection are achieved, solving the problems of cumbersome construction and flood damage in the existing technology, and improving the construction period and installation stability are improved .

CN222008624UActive Publication Date: 2024-11-15SHIJIAZHUANG HU FU ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420082784.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-13
Publication Date
2024-11-15
Estimated Expiration
2034-01-13

AI Technical Summary

Technical Problem

The existing cross-river bridge and the new embankment connection structure are complicated during construction, affecting normal passage, and are prone to damage due to flooding, making it difficult to build and use quickly and efficiently.

Method used

Prefabricated parts and connecting structures are adopted, including bridge connection prefabricated parts, highway connection prefabricated parts, split prefabricated parts, connecting prefabricated parts, fixed frames, fixed steel bars, high-strength bolts, extruded metal rods and fixed conical columns, through large motors and rotations The gear drives the gate to prevent flooding.

Benefits of technology

The rapid and efficient construction of the cross-river bridge and the newly built embankment connection structure has been achieved, shortening the construction period, reducing traffic impact, and effectively preventing backflow damage during flooding, improving the practicality and stability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008624U_ABST
    Figure CN222008624U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of embankment engineering, particularly relates to a connecting structure of an existing river-crossing bridge and a newly-built embankment, and aims to solve the problems that an existing mounting structure is complicated, is difficult to construct quickly and efficiently, and is easily influenced by flood during subsequent use. One side of the bridge body is connected with a newly-built dike, a bridge connecting prefabricated part is fixedly installed at one end of the bridge body, one side of the bridge connecting prefabricated part is fixedly installed on the newly-built dike, and one side of the newly-built dike is connected with a road body. The two sides of the bridge connecting prefabricated part and the two sides of the road connecting prefabricated part are each fixedly provided with a flow dividing prefabricated part, one side of each flow dividing prefabricated part is fixedly provided with a connecting prefabricated part, and the multiple connecting prefabricated parts are each provided with a plurality of connecting structures. The structure can be constructed quickly and efficiently, and can effectively prevent the prefabricated part from being damaged due to the fact that the prefabricated part is backward flown during the flood period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of embankment engineering, in particular to a connection structure between an existing river-spanning bridge and a newly built embankment. Background Art

[0002] Embankment engineering refers to water retaining structures built along rivers, canals, lakes, coasts or the edges of flood-carrying areas, flood-diversion areas and reclamation areas. Embankments can be divided into river embankments, river embankments, lake embankments, sea embankments and embankments in low-lying areas of reservoirs and flood storage areas according to their construction locations; they can be divided into main embankments, branch embankments, sub-embankments, remote embankments, separation embankments, flood-carrying embankments, flood-control embankments, embankments and wave-breaking embankments according to their functions; they can be divided into earth embankments, stone embankments, earth-stone mixed embankments and concrete flood control walls according to their building materials; flood bridges are simple ordinary bridges built on rivers. If the water level rises slightly, the bridge deck can be flooded over. On secondary roads, if the bridge crosses a river with a large difference in height between the normal water level and the flood level and is not navigable, and the flood time is short and traffic is allowed to be temporarily interrupted, the bridge elevation can be designed according to the normal water level, and water is allowed to flood over the bridge deck during floods;

[0003] However, the connection structure between the existing river-spanning bridge and the newly built embankment is quite cumbersome to construct, which not only affects normal traffic, but also easily affects the construction period of the embankment. In addition, the installation structure is complex and difficult to construct quickly and efficiently. At the same time, the existing connection structure is easily affected by floods during subsequent use, and the backflow of floods causes damage to its interior. Therefore, it is urgent to design a connection structure between the existing river-spanning bridge and the newly built embankment that is easy to build and connect and is less affected by floods.

[0004] The information disclosed in this background technology section is only intended to increase the understanding of the overall background of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to a person skilled in the art. Utility Model Content

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A connection structure between an existing cross-river bridge and a newly built embankment comprises a bridge body, one side of the bridge body is connected to the newly built embankment, one end of the bridge body is fixedly installed with a bridge connection prefabricated part, and the top of the bridge connection prefabricated part is fixedly installed with two protective shells; one side of the bridge connection prefabricated part is fixedly installed on the newly built embankment, one side of the newly built embankment is connected to a highway body, one end of the highway body is fixedly installed with a highway connection prefabricated part, both sides of the bridge connection prefabricated part and the highway connection prefabricated part are fixedly installed with diversion prefabricated parts, and one side of multiple diversion prefabricated parts is fixedly installed with connecting prefabricated parts; multiple connecting prefabricated parts are provided with multiple connecting structures, the connecting structures include two fixed frames, fixed steel bars and multiple high-strength bolts, both sides of the connecting prefabricated parts are clamped and installed with fixed frames, one side of the two fixed frames is fixedly installed with multiple high-strength bolts, and the inner sides of the two fixed frames are fixedly installed with the same fixed steel bar.

[0007] Specifically, a ramp prefabricated part is fixedly installed on one side of multiple connecting prefabricated parts, a corresponding straight road prefabricated part is fixedly installed on one side of multiple ramp prefabricated parts, and multiple lighting groups are fixedly installed on the inner sides of multiple straight road prefabricated parts, which can provide lighting for pedestrians and vehicles inside the prefabricated parts, thereby reducing the occurrence of accidents.

[0008] Specifically, a gate groove is opened on the top of the bridge connection prefabricated part, a gate is slidably installed on the inner wall of the gate groove, and spur racks are fixedly installed on both sides of the gate, which helps to drive the gate to move through the spur racks.

[0009] Specifically, large motors are fixedly installed on the inner walls of the two protective shells, and rotating gears are rotatably installed on the inner walls of the two protective shells. The output shafts of the two large motors are connected to the corresponding rotating gears, and one side of the two rotating gears is meshed with the corresponding spur racks, which helps the two rotating gears drive the spur racks to move.

[0010] Specifically, receivers are fixedly mounted on the inner walls of the two protective shells, and the two receivers are connected to the corresponding large motor circuits, which helps to control the corresponding large motors through the two receivers.

[0011] Specifically, two positioning holes are provided at both ends of the multiple fixed steel bars, corresponding extruded metal rods are slidably installed in the multiple positioning holes, and two fixed conical columns are clamped and installed on both sides of the multiple extruded metal rods, so that the corresponding fixed conical columns can be controlled by the extruded metal rods.

[0012] Specifically, limiting holes are provided on both sides of the plurality of fixed steel bars, and the plurality of fixed conical columns are slidably installed in the corresponding limiting holes, so that the plurality of fixed conical columns can be popped out and fixed on the corresponding prefabricated parts.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The utility model provides a connection structure between an existing river-spanning bridge and a newly built embankment, which can be constructed quickly and efficiently. Through the cooperation of prefabricated parts and connection structures, the connection can be quickly completed, which shortens the construction period and also minimizes the impact on surrounding traffic.

[0015] The utility model provides a connection structure between an existing river-spanning bridge and a newly built embankment, which can effectively prevent the connection section from being flooded back during floods and causing damage to prefabricated parts, thereby increasing the practicability and stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following will briefly introduce the drawings required for the implementation or the prior art description. Obviously, the drawings described below are only exemplary, and the structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions that can be implemented in the utility model, so they have no technical substantive significance, and any structural modification, change in proportional relationship or adjustment of size.

[0017] Figure 1 A three-dimensional structural schematic diagram of a connection structure between an existing river-crossing bridge and a newly built embankment proposed by the utility model;

[0018] Figure 2 This is a three-dimensional structural schematic diagram of a connection prefabricated part, a fixed frame, fixed steel bars, high-strength bolts, an extruded metal rod and a fixed tapered column of a connection structure of an existing river-crossing bridge and a newly built embankment proposed by the utility model;

[0019] Figure 3 A three-dimensional structural schematic diagram of a fixed frame, fixed steel bars, high-strength bolts, extruded metal rods and fixed tapered columns of a connection structure between an existing river-crossing bridge and a newly built embankment proposed by the utility model;

[0020] Figure 4 A partial cross-sectional schematic diagram of a top view of a connection structure between an existing river-spanning bridge and a newly built embankment proposed by the utility model;

[0021] Figure 5 for Figure 4 Enlarged view of point A in the middle.

[0022] In the figure: 1. Bridge body; 2. Highway body; 3. New embankment; 4. Protective shell; 5. Large motor; 6. Rotating gear; 7. Receiver; 8. Gate; 9. Diversion prefabricated parts; 10. Ramp prefabricated parts; 11. Straight road prefabricated parts; 12. Highway connection prefabricated parts; 13. Bridge connection prefabricated parts; 14. Lighting set; 15. Connection prefabricated parts; 16. Fixed frame; 17. Fixed steel bars; 18. High-strength bolts; 19. Extruded metal rods; 20. Fixed tapered columns; 21. Straight racks. Implementation

[0023] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of the present invention. In the following detailed description, for ease of explanation, many specific details are described to provide a comprehensive understanding of the embodiments of the present invention. However, it is obvious that one or more embodiments may also be implemented without these specific details. In addition, in the following description, descriptions of known structures and technologies are omitted to avoid unnecessary confusion of the concepts of the present invention.

[0024] Reference Figure 1-5 A structure for connecting an existing river-crossing bridge with a newly built embankment, comprising a bridge body 1, one side of the bridge body 1 is connected to a newly built embankment 3, one end of the bridge body 1 is fixedly installed with a bridge connection prefabricated component 13, and the top of the bridge connection prefabricated component 13 is fixedly installed with two protective shells 4; one side of the bridge connection prefabricated component 13 is fixedly installed on the newly built embankment 3, one side of the newly built embankment 3 is connected to a highway body 2, one end of the highway body 3 is fixedly installed with a highway connection prefabricated component 12, the bridge connection prefabricated component 13 and Diversion prefabricated parts 9 are fixedly installed on both sides of the highway connection prefabricated part 12, and connection prefabricated parts 15 are fixedly installed on one side of multiple diversion prefabricated parts 9; multiple connection prefabricated parts 15 are provided with multiple connection structures, and the connection structures include two fixed frames 16, fixed steel bars 17 and multiple high-strength bolts 18. Fixed frames 16 are clamped and installed on both sides of the connection prefabricated parts 15, and multiple high-strength bolts 18 are fixedly installed on one side of the two fixed frames 16, and the same fixed steel bar 17 is fixedly installed on the inner side of the two fixed frames 16.

[0025] In this embodiment, a ramp prefabricated part 10 is fixedly installed on one side of the plurality of connecting prefabricated parts 15, a corresponding straight track prefabricated part 11 is fixedly installed on one side of the plurality of ramp prefabricated parts 10, and a plurality of lighting lamp groups 14 are fixedly installed on the inner sides of the plurality of straight track prefabricated parts 11.

[0026] In this embodiment, a gate groove is provided at the top of the bridge connection prefabricated component 13 , a gate 8 is slidably mounted on the inner wall of the gate groove, and spur racks 21 are fixedly mounted on both sides of the gate 8 .

[0027] In this embodiment, large motors 5 are fixedly mounted on the inner walls of the two protective shells 4, and rotating gears 6 are rotatably mounted on the inner walls of the two protective shells 4. The output shafts of the two large motors 5 are connected to the corresponding rotating gears 6, and one side of the two rotating gears 6 is meshed with corresponding spur racks 21.

[0028] In this embodiment, receivers 7 are fixedly mounted on the inner walls of the two protective shells 4 , and the two receivers 7 are both connected to the corresponding large motor 5 circuits.

[0029] In this embodiment, two positioning holes are provided at both ends of the plurality of fixed steel bars 17, corresponding extruded metal rods 19 are slidably installed in the plurality of positioning holes, and two fixed conical columns 20 are clamped and installed on both sides of the plurality of extruded metal rods 19.

[0030] In this embodiment, limiting holes are provided on both sides of the plurality of fixed steel bars 17, and the plurality of fixed conical columns 20 are slidably installed in the corresponding limiting holes.

[0031] Working principle: During construction, after the construction of the newly built embankment 3 is initially completed, the specific data of the prefabricated parts are determined through measurement and calculation of the terrain, and then the prefabricated parts are made. Subsequently, the bridge connection prefabricated parts 13 are installed at the connection between the bridge body 1 and the newly built embankment 3, and the highway connection prefabricated parts 12 are installed at the connection between the highway body 2 and the newly built embankment 3. The bridge connection prefabricated parts 13 and the highway connection prefabricated parts 12 are installed with corresponding diversion prefabricated parts 9 on both sides, which effectively relieves traffic pressure, and can distinguish between positive and negative lanes, and reduce the occurrence of accidents. Subsequently, the ramp prefabricated parts 10 and the straight road prefabricated parts 11 are installed according to the actual terrain. All prefabricated parts are connected by connecting prefabricated parts 15. When connecting the prefabricated parts, the workers first put a plurality of fixed frames 16 into The fixed parts are fixed, and then high-strength bolts 18 are used to penetrate the fixed frame 16. After the initial connection is completed, the fixed steel bars 17 are hammered in to tightly connect the prefabricated parts on both sides of the connected prefabricated parts 15. Then, multiple extruded metal rods 19 are squeezed, and the multiple extruded metal rods 19 are squeezed to move toward the inside of the fixed steel bars 17, causing pressure on the corresponding multiple fixed conical columns 20, so that they pop out and are fixed in the prefabricated parts to prevent them from falling off. When the flood period is approaching, the corresponding large motors 5 are started by remote control of the two receivers 7. The two large motors 5 are started to drive the corresponding rotating gears 6 to rotate. The two rotating gears 6 rotate to drive the corresponding spur racks 21 to move. The two spur racks 21 move and drive the same gate 8 to fall, closing the bridge connection prefabricated parts 13 to prevent flood backflow.

[0032] The technical progress achieved by the utility model compared with the prior art is that it can be constructed quickly and efficiently, and the connection can be completed quickly through the cooperation of prefabricated parts and connecting structures, which shortens the construction period and minimizes the impact on surrounding traffic. It can also effectively prevent the connecting section from being flooded back during floods and causing damage to the prefabricated parts, thereby increasing the practicality and stability of the device.

Claims

1. A connection structure between an existing river-crossing bridge and a newly built embankment, characterized in that: include: A bridge body (1), one side of the bridge body (1) being connected to a newly built embankment (3), one end of the bridge body (1) being fixedly mounted with a bridge connection prefabricated component (13), and the top of the bridge connection prefabricated component (13) being fixedly mounted with two protective shells (4); One side of the bridge connection prefabricated component (13) is fixedly mounted on the newly built embankment (3); one side of the newly built embankment (3) is connected to a highway main body (2); one end of the highway main body (2) is fixedly mounted with a highway connection prefabricated component (12); both sides of the bridge connection prefabricated component (13) and the highway connection prefabricated component (12) are fixedly mounted with diversion prefabricated components (9); and one side of each of the plurality of diversion prefabricated components (9) is fixedly mounted with a connection prefabricated component (15); A plurality of connection prefabricated parts (15) are each provided with a plurality of connection structures, the connection structures comprising two fixed frames (16), fixed steel bars (17) and a plurality of high-strength bolts (18); the fixed frames (16) are clamped and installed on both sides of the connection prefabricated parts (15); the plurality of high-strength bolts (18) are fixedly installed on one side of the two fixed frames (16); and the same fixed steel bar (17) is fixedly installed on the inner sides of the two fixed frames (16).

2. The connection structure of an existing river-crossing bridge and a newly built embankment according to claim 1 is characterized in that: A ramp prefabricated part (10) is fixedly mounted on one side of the plurality of connection prefabricated parts (15), a corresponding straight track prefabricated part (11) is fixedly mounted on one side of the plurality of ramp prefabricated parts (10), and a plurality of lighting lamp groups (14) are fixedly mounted on the inner sides of the plurality of straight track prefabricated parts (11).

3. The connection structure of an existing river-crossing bridge and a newly built embankment according to claim 1 is characterized in that: A gate groove is provided at the top of the bridge connection prefabricated component (13), a gate (8) is slidably mounted on the inner wall of the gate groove, and spur racks (21) are fixedly mounted on both sides of the gate (8).

4. The connection structure of an existing river-crossing bridge and a newly built embankment according to claim 3 is characterized in that: Large motors (5) are fixedly mounted on the inner walls of the two protective shells (4), rotating gears (6) are rotatably mounted on the inner walls of the two protective shells (4), the output shafts of the two large motors (5) are connected to the corresponding rotating gears (6), and one side of the two rotating gears (6) is meshed with the corresponding spur racks (21).

5. The connection structure of an existing river-crossing bridge and a newly built embankment according to claim 4 is characterized in that: Receivers (7) are fixedly mounted on the inner walls of the two protective shells (4), and the two receivers (7) are connected to the corresponding large motor (5) circuits.

6. The connection structure between an existing river-crossing bridge and a newly built embankment according to claim 1 is characterized in that: Two positioning holes are provided at both ends of the plurality of fixed steel bars (17), corresponding extruded metal rods (19) are slidably installed in the plurality of positioning holes, and two fixed conical columns (20) are clamped and installed on both sides of the plurality of extruded metal rods (19).

7. The connection structure of an existing river-crossing bridge and a newly built embankment according to claim 6 is characterized in that: Limit holes are provided on both sides of the plurality of fixed steel bars (17), and the plurality of fixed conical columns (20) are slidably mounted in the corresponding limit holes.