Arch rib high-altitude welding operation platform
By designing a combined structure of hanging basket beam and bottom operating platform, the safety risks and efficiency problems of high-altitude operations of arch rib welding of large span steel structure arch bridges are solved, providing a stable operating environment, and improving welding quality and construction efficiency.
Patent Information
- Application Number
- CN202323453450.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-18
AI Technical Summary
During the welding process of arch rib sections of large-span steel structure arch bridges, there are problems such as high safety risks in high altitude operations, difficulty in controlling welding quality and linear accuracy, and low efficiency.
A high-altitude welding operation platform including hanging basket beam, bottom operating platform and cage hanging basket structure was designed to provide a stable operating space and a safe welding environment. Through the combined structure of hanging basket beam and bottom platform, we ensure welding personnel. Welding operations can be carried out safely and conveniently in high altitude environments.
Improve welding quality and efficiency, reduce safety hazards in high altitude operations, provide sufficient operating space and a stable platform, ensure linear control accuracy of welding, and simplify the construction process, suitable for welding, coating and subsequent repair of arch ribs. Operation.
Smart Images

Figure CN222008648U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel arch bridge construction, in particular to an arch rib high-altitude welding work platform. Background Art
[0002] With the rapid development of my country's economy, the requirements for transportation are increasing day by day. Steel structure bridges play an irreplaceable role as important infrastructure. In particular, large-span steel structure arch bridges are favored by people for their unique structure and beautiful shape, and are widely used in the construction of highway transportation infrastructure. The large-span steel tube concrete arch bridge adopts the construction technology of installing the arch ribs with a cable hoisting system and then pouring concrete in the tube. Among them, the dangerous high-altitude operations such as butt welding and painting of the arch rib segments have always been a major problem in on-site construction. Various construction units are constantly seeking safe, effective and convenient arch rib welding operation platforms to ensure the safety of the arch rib segments in butt welding and painting operations.
[0003] During the installation and welding of arch rib segments, there are many problems such as high safety risk of high-altitude operation, difficulty in controlling welding quality and linear accuracy, and low welding efficiency. The purpose of the utility model is to solve the above-mentioned shortcomings and provide an arch rib high-altitude welding operation platform. Utility Model Content
[0004] The utility model provides an arch rib high-altitude welding work platform, which aims to provide a welding work platform that solves the problems of inconvenient manual operation and insufficient operating space during butt welding of arch rib segments, while improving the installation efficiency of the arch rib and ensuring the welding quality of the weld of the under-filled section.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] An arch rib high-altitude welding work platform comprises a hanging basket crossbeam, a bottom construction work platform and a cage-type hanging basket structure. A supporting ear plate is centrally arranged on the hanging basket crossbeam; a group of cage-type hanging basket structures are arranged on each side of the hanging basket crossbeam, and the two groups of cage-type hanging basket structures are connected into one by a bottom construction work platform arranged at the bottom.
[0007] The bottom construction work platform is a platform frame structure formed by a bottom first cross beam, a bottom second cross beam, a bottom longitudinal beam and a hanging basket bottom plate; the bottom first cross beam and the bottom second cross beam are arranged in parallel and spaced apart, and the two ends of the two bottom longitudinal beams are respectively vertically connected to the two ends of the bottom first cross beam and the bottom second cross beam, and the hanging basket bottom plate is arranged on the platform frame structure.
[0008] The cage-type hanging basket structure has two groups, each group includes a welding platform entrance and a cage-type hanging basket internal ladder; the welding platform entrance is welded above the hanging basket cross beam, and the cage-type hanging basket internal ladder is welded below the hanging basket cross beam.
[0009] Each group of welding platform entrances is surrounded by a first guardrail handrail, a second guardrail handrail, a first guardrail column, a second guardrail column, and a second guardrail steel bar;
[0010] The first guardrail handrail and the second guardrail handrail are connected to the first guardrail column and the second guardrail column, the second guardrail steel bar is arranged between the first guardrail column and the second guardrail column, the first guardrail column is connected to the hanging basket cross beam, and the second guardrail column is connected to the longitudinal cantilever beam.
[0011] The internal ladder of the cage-type hanging basket includes a first ladder cage column, a second ladder cage column, a first guardrail steel bar, a step steel bar and a back cage steel bar; the first ladder cage column is arranged in two groups, and multiple groups of step steel bars are arranged between the two groups of first ladder cage columns; the second ladder cage column is arranged in two groups, and a back cage steel bar is connected between the two groups of second ladder cage columns; multiple groups of first guardrail steel bars are evenly arranged between the first ladder cage columns and the second ladder cage columns.
[0012] The upper end of the first cage column of the cage-type hanging basket internal ladder is connected to the hanging basket crossbeam, and the upper end of the second cage column is welded to the longitudinal cantilever beam; the lower ends of the first cage column and the second cage column are connected to the bottom longitudinal beam of the bottom construction work platform.
[0013] Two groups of third guardrail steel bars are arranged between the two groups of cage-type hanging basket internal ladders, and the two ends of one group of guardrail steel bars are respectively connected to the two first ladder cage columns on the relatively inner sides of the two groups of cage-type hanging basket internal ladders, and the two ends of the other group of guardrail steel bars are respectively connected to the two second ladder cage columns on the relatively inner sides of the two groups of cage hanging basket internal ladders.
[0014] Waterproof end sealing plates are arranged at both ends of the hanging basket cross beam.
[0015] Beneficial effects:
[0016] The utility model provides an arch bridge arch rib underfilled section welding construction operation platform, which can weld the arch rib welding operation platform on the arch rib before the arch rib is hoisted. After the hoisting is in place and fine-tuned, the welding personnel can enter the operation platform and have enough operating space to weld the weld, which can ensure the welding quality of the main arch rib force-bearing components; in the arch rib butt segment ring welding process, it can not only ensure the welding quality of the weld, but also overcome the difficulties brought by high-altitude welding operations, eliminate the safety hazards during high-altitude welding operations, reduce the difficulties brought by traditional climbing operations, ensure the safety of construction personnel, and after the welding is completed, the platform can be reserved for subsequent weld repair, grinding, repainting and other operations, achieving multiple goals at one stroke. The operation platform has a simple structure and is easy to process. It provides a stable operation platform for welding personnel to perform a large amount of welding work at high altitude, while solving the risks of high-altitude operations and the problem of high-altitude throwing. The platform provides a large operating space for operators, and workers can move safely and freely during welding operations, which improves the welding quality, effectively guarantees the linear control accuracy, and accelerates the construction efficiency; it can ensure the welding quality and progress. The utility model can fully ensure the structural stability of the platform body by arranging cage-type hanging baskets on both sides of the platform body. During use, the brackets on both sides are distributed on both sides of the arch bridge segment to be welded, so as to facilitate workers to carry out construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a left view of the structure of the utility model;
[0018] Figure 2 It is a rear view of the structure connected with the main chord tube of the utility model;
[0019] Figure 3 It is a front view of the structure of the connection between the utility model and the main chord tube;
[0020] Figure 4 This is a schematic diagram of the bottom structure of the utility model;
[0021] In the figure:
[0022] 1-hanging basket crossbeam, 2-longitudinal cantilever beam, 3-first ladder cage column, 4-second ladder cage column, 5-bottom longitudinal beam, 6-first guardrail steel bar, 7-second guardrail steel bar, 8-first guardrail handrail, 9-first guardrail column, 10-second guardrail column, 11-second guardrail handrail, 12-step steel bar, 13-third guardrail steel bar, 14-back cage steel bar, 15-bottom first crossbeam, 16-end cover plate, 17-support ear plate, 18 bottom second crossbeam, 19-hanging basket bottom plate, 20-main chord tube. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Example
[0025] Figure 1-4 This embodiment provides an arch rib high-altitude welding work platform, which adopts an integral frame-type steel basket structure, including a basket cross beam 1, a bottom construction work platform and a cage-type basket structure. The basket cross beam 1 is centrally provided with a support ear plate 17, and the support ear plate 17 is connected to the arch rib of the main chord tube 20; a group of cage-type basket structures are respectively arranged on both sides of the basket cross beam 1, and the two groups of cage-type basket structures are connected into one by a bottom construction work platform arranged at the bottom.
[0026] The connecting surface between the support ear plate 17 and the arch rib of the main chord tube 20 is a matching arc, which increases the contact surface with the arch rib.
[0027] like Figure 4 As shown, the bottom construction work platform is a platform frame structure formed by a bottom first cross beam 15, a bottom second cross beam 18, a bottom longitudinal beam 5 and a hanging basket bottom plate 19; the bottom first cross beam 15 and the bottom second cross beam 18 are arranged in parallel and spaced apart, and the two ends of the two bottom longitudinal beams 5 are respectively vertically connected to the two ends of the bottom first cross beam 15 and the bottom second cross beam 18, and the hanging basket bottom plate 19 is arranged on the platform frame structure to form a platform working space.
[0028] like Figure 1-3 As shown, there are two groups of cage-type hanging basket structures, each group includes a welding platform entrance and a cage-type hanging basket internal ladder; the welding platform entrance is welded above the hanging basket cross beam 1, and the cage-type hanging basket internal ladder is welded below the hanging basket cross beam 1.
[0029] Each group of welding platform entrances is enclosed by the first guardrail handrail 8, the second guardrail handrail 11, the first guardrail column 9, the second guardrail column 10 and the second guardrail steel bar 7, which can ensure the safety of personnel entering the welding platform.
[0030] The first guardrail handrail 8 and the second guardrail handrail 11 are connected to the first guardrail column 9 and the second guardrail column 10, the second guardrail steel bar 7 is arranged between the first guardrail column 9 and the second guardrail column 10, the first guardrail column 9 is connected to the hanging basket cross beam 1, and the second guardrail column 10 is connected to the longitudinal cantilever beam 2.
[0031] The internal ladder of the cage hanging basket includes a first cage column 3, a second cage column 4, a first guardrail steel bar 6, a step steel bar 12 and a back cage steel bar 14; the first cage column 3 is arranged in two groups, and multiple groups of step steel bars 12 are arranged between the two groups of cage columns 3; the second cage column 4 is arranged in two groups, and the two groups of cage columns 4 are connected with back cage steel bars 14, and the second cage column 4 and the back cage steel bar 14 are connected to form a strong and reliable back cage; multiple groups of first guardrail steel bars 6 are evenly arranged between the first cage column 3 and the second cage column 4, so that a personnel up and down passage is formed, which can fully ensure that the construction personnel can safely enter the bottom construction work platform.
[0032] The upper end of the first cage column 3 of the internal ladder of the cage-type hanging basket is connected to the hanging basket cross beam 1, and the upper end of the second cage column 4 is welded to the longitudinal cantilever beam 2; the lower ends of the first cage column 3 and the second cage column 4 are connected to the bottom longitudinal beam 5 of the bottom construction work platform.
[0033] like Figure 2 As shown, two groups of third guardrail steel bars 13 are arranged between the two groups of cage-type hanging basket internal ladders, two ends of one group of guardrail steel bars 13 are connected to two groups of first ladder cage columns 3 on the relatively inner side of the cage-type hanging basket internal ladder, and two ends of the other group of guardrail steel bars 13 are connected to two groups of second ladder cage columns 4 on the relatively inner side of the cage-type hanging basket internal ladder, to provide safety protection for construction workers working on the bottom construction platform.
[0034] Waterproof end sealing plates 16 are provided at both ends of the hanging basket cross beam 1 to improve the corrosion resistance of the device.
[0035] During on-site construction, the arch rib of the arch bridge includes an arch rib steel pipe; the arch rib steel pipe includes two upper chord pipes and two lower chord pipes, the two upper chord pipes are arranged opposite to each other and connected by a "M"-shaped wind brace, the two lower chord pipes are arranged opposite to each other and connected by a "M"-shaped wind brace, and the two "M"-shaped wind braces are connected in the middle by a scissor brace. An upper chord pipe and a lower chord pipe located on the same side are connected by the arch rib diagonal web rod; in the steps, each upper chord pipe is fixed with an arch rib high-altitude welding work platform, and each lower chord pipe is fixed with an arch rib high-altitude welding work platform.
[0036] In actual use: After the welding personnel weld the hanging basket into shape on the bridge deck, they weld the steel hanging basket and the arch rib into a whole on the unfilled section of the arch rib hoisting area. When the cable crane hoists the arch rib to the corresponding position, measurement and fine adjustment begin. After meeting the designed elevation, the welding personnel enter the hanging basket from the entrance of the arch rib high-altitude welding work platform, follow the ladder to the bottom operating construction platform, and start welding the welds of the unfilled section of the arch rib.
[0037] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0038] In addition, the descriptions of "first", "second", etc. in the present invention are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.
[0039] The above is only a preferred embodiment of the utility model. The utility model will not be limited to these embodiments shown in this article, but should conform to the widest range consistent with the principles and novel features disclosed in this article. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the utility model still fall within the scope of the technical solution of the utility model.
Claims
1. An arch rib high-altitude welding work platform, comprising a hanging basket crossbeam (1), a bottom construction work platform and a cage hanging basket structure, Features: A supporting ear plate (17) is arranged in the center of the hanging basket cross beam (1); a group of cage-type hanging basket structures are arranged on both sides of the hanging basket cross beam (1), and the two groups of cage-type hanging basket structures are connected into one by a bottom construction work platform arranged at the bottom.
2. According to the arch rib high-altitude welding work platform described in claim 1, Features: The bottom construction work platform is a platform frame structure formed by a bottom first cross beam (15), a bottom second cross beam (18), a bottom longitudinal beam (5) and a hanging basket bottom plate (19); the bottom first cross beam (15) and the bottom second cross beam (18) are arranged in parallel and spaced apart, the two ends of the two bottom longitudinal beams (5) are respectively vertically connected to the two ends of the bottom first cross beam (15) and the bottom second cross beam (18), and the hanging basket bottom plate (19) is arranged on the platform frame structure.
3. According to the arch rib high-altitude welding work platform described in claim 1, Features: The cage-type hanging basket structure has two groups, each group comprising a welding platform entrance and a cage-type hanging basket internal ladder; the welding platform entrance is welded above the hanging basket cross beam (1), and the cage-type hanging basket internal ladder is welded below the hanging basket cross beam (1).
4. According to claim 3, an arch rib high-altitude welding work platform, Features: Each group of welding platform entrances comprises a first guardrail handrail (8), a second guardrail handrail (11), a first guardrail post (9), a second guardrail post (10) and a second guardrail steel bar (7); The first guardrail handrail (8) and the second guardrail handrail (11) are connected to the first guardrail column (9) and the second guardrail column (10), the second guardrail steel bar (7) is arranged between the first guardrail column (9) and the second guardrail column (10), the first guardrail column (9) is connected to the hanging basket cross beam (1), and the second guardrail column (10) is connected to the longitudinal cantilever beam (2).
5. According to claim 3, an arch rib high-altitude welding work platform, Features: The internal ladder of the cage hanging basket comprises a first cage column (3), a second cage column (4), a first guardrail steel bar (6), a step steel bar (12) and a back cage steel bar (14); the first cage columns (3) are arranged in two groups, and a plurality of step steel bars (12) are arranged between the two groups of first cage columns (3); the second cage columns (4) are arranged in two groups, and a back cage steel bar (14) is connected between the two groups of second cage columns (4); and a plurality of first guardrail steel bars (6) are evenly arranged between the first cage columns (3) and the second cage columns (4).
6. According to claim 5, an arch rib high-altitude welding work platform, Features: The upper end of the first cage column (3) of the internal ladder of the cage-type hanging basket is connected to the hanging basket crossbeam (1), and the upper end of the second cage column (4) is welded to the longitudinal cantilever beam (2); the lower ends of the first cage column (3) and the second cage column (4) are connected to the bottom longitudinal beam (5) of the bottom construction work platform.
7. According to claim 6, an arch rib high-altitude welding work platform, Features: Two groups of third guardrail steel bars (13) are arranged between the two groups of cage-type hanging basket internal ladders, two ends of one group of guardrail steel bars (13) are respectively connected to two first ladder cage uprights (3) on the relatively inner sides of the two groups of cage-type hanging basket internal ladders, and two ends of the other group of guardrail steel bars (13) are respectively connected to two second ladder cage uprights (4) on the relatively inner sides of the two groups of cage-type hanging basket internal ladders.
8. According to claim 1, an arch rib high-altitude welding work platform, Features: Waterproof end sealing plates (16) are provided at both ends of the hanging basket crossbeam (1).