Overwater pile foundation construction platform
By setting up mud circulation devices and drilling devices in the water pile foundation construction platform, the steel casing height is ensured to be consistent, the problem of impacted drilling efficiency is solved, and stable mud circulation and drilling efficiency are achieved.
Patent Information
- Application Number
- CN202420297454.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-18
AI Technical Summary
The existing drilling scheme results in the height of the steel casing which affects the pressure difference between mud and water, and changes in the mud ratio. The drilling slag cannot rise through the mud, affecting the drilling efficiency.
Design a water pile foundation construction platform, including cofferdam, lower platform and upper platform. A mud circulation device is installed on the lower platform to connect to the steel casing to ensure that the height of the steel casing is consistent with the lower platform, and connect to the upper platform through steel pipe piles. drilling device to prevent mud from mixing with river water.
The pressure difference between the mud and water at the bottom of the steel casing is ensured, the mud ratio is prevented, and the drilling efficiency is improved.
Smart Images

Figure CN222008897U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field, in particular to an above-water pile foundation construction platform. Background Art
[0002] When building a bridge over a navigable inland river, the drilling platform will be set up at a high height, and the mud circulation device and the drilling device will be located on the drilling platform. This will make the existing drilling plan impossible to implement, because the height of the steel casing needs to be flush with the drilling platform to cooperate with the mud circulation device on the drilling platform to circulate the mud. However, if the height of the steel casing is too high, the height of the mud will also increase, thereby affecting the pressure difference between the mud and water inside the steel casing. The mud will break through the steel casing and mix with the river water, causing the mud ratio to change, and the drill cuttings cannot be lifted by the mud, affecting the drilling efficiency. Utility Model Content
[0003] Therefore, the technical problem to be solved by the utility model is that the existing drilling scheme will cause the height of the steel casing to be too high, thereby affecting the pressure difference between the mud and water at the bottom of the steel casing, causing the mud ratio to change, and the drill cuttings cannot be raised by the mud, affecting the drilling efficiency, thereby providing an above-water pile foundation construction platform.
[0004] In order to solve the above problems, the utility model provides an above-water pile foundation construction platform, comprising:
[0005] A cofferdam is arranged on the riverbed, wherein a plurality of steel casings are arranged inside the cofferdam, wherein the steel casings are perpendicular to the riverbed, and one end of the steel casings is inserted into the riverbed;
[0006] A lower platform is fixedly arranged in the cofferdam, the lower platform and the other end of the steel casing are located at the same height, a mud circulation device is arranged on the lower platform, and the mud circulation device is respectively connected to the steel casing;
[0007] The upper platform is arranged above the lower platform through steel pipe piles. A drilling device is arranged on the upper platform, and the drill bit of the drilling device extends into any one of the steel casings.
[0008] Furthermore, both ends of the lower platform are fixedly connected to the side walls of the cofferdam via connecting pieces.
[0009] Furthermore, a corbel is also provided on the connecting piece.
[0010] Furthermore, a guardrail is provided on the lower platform.
[0011] Furthermore, a hanging steel wire rope is provided on the guardrail.
[0012] Furthermore, the lower platform is connected to the upper platform via a cage ladder.
[0013] Furthermore, the cofferdam is provided with a support beam, and the support beam is located below the lower platform.
[0014] Furthermore, the steel pipe piles are arranged outside the cofferdam.
[0015] Furthermore, anti-fall chains are provided at both ends of the connecting piece, and both ends of the anti-fall chains are fixedly connected to the connecting piece and the top end of the cofferdam respectively.
[0016] The utility model has the following advantages:
[0017] The utility model discloses an above-water pile foundation construction platform, wherein a lower platform is built in a cofferdam, a mud circulation device is arranged on the lower platform, the mud circulation device and the drilling device are arranged on the upper platform and the lower platform respectively, so that the height of the steel casing is consistent with the lower platform, the pressure difference between the mud and the water at the bottom of the steel casing can be ensured, and the mud can be prevented from breaking through the steel casing and mixing with the river water, causing the mud ratio to change and the drill cuttings to be unable to be lifted by the mud, and further, the drilling efficiency is ensured. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 This is a structural schematic diagram of an above-water pile foundation construction platform in an embodiment of the utility model;
[0020] Figure 2 for Figure 1 A magnified view of part A;
[0021] Description of reference numerals:
[0022] 1. Cofferdam; 2. Steel casing; 3. Lower platform; 4. Upper platform; 5. Drilling device; 6. Connectors; 7. Corbel; 8. Cage ladder; 9. Support beam; 10. Steel pipe piles; 11. Anti-fall chain. DETAILED DESCRIPTION
[0023] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0025] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0026] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0027] like Figure 1 and Figure 2 As shown, this embodiment discloses an above-water pile foundation construction platform, including: a cofferdam 1, a lower platform 3 and an upper platform 4. The cofferdam 1 is arranged on the riverbed, and a plurality of steel casings 2 are arranged inside the cofferdam 1, the steel casings 2 are perpendicular to the riverbed, and one end of the steel casings 2 is inserted into the riverbed. The lower platform 3 is fixedly arranged inside the cofferdam 1, and the lower platform 3 and the other end of the steel casing 2 are located at the same height, and a mud circulation device is arranged on the lower platform 3, and the mud circulation device is respectively connected to the steel casing 2; the upper platform 4 is arranged above the lower platform 3 through a steel pipe pile 10, and a drilling device 5 is arranged on the upper platform 4, and the drill bit of the drilling device 5 extends into any steel casing 2.
[0028] Specifically, the cofferdam 1 is set on the riverbed, and the cofferdam 1 can surround the construction area to prevent the river water from entering the construction area. There are multiple steel casings 2 in the cofferdam 1, and the multiple steel casings 2 are arranged at intervals. One end of the steel casing 2 is set in the riverbed, and the drill bit of the drilling device 5 can extend into the steel casing 2 and drill holes in the riverbed. The lower platform 3 is fixedly set in the cofferdam 1, and the other end of the steel casing 2 is at the same height as the lower platform 3. The lower platform 3 is provided with a mud circulation device, and the mud circulation device is connected to the multiple steel casings 2, so as to ensure the circulation of mud. The upper platform 4 is set above the lower platform 3 through the steel pipe pile 10, and the upper platform 4 is provided with a drilling device 5. The drill bit of the drilling device 5 faces any steel casing 2 and can extend into the steel casing 2 to drill holes. When drilling, the mud in the steel casing 2 is rolled through the mud circulation device, so that the gravel generated by drilling is brought out of the steel casing 2.
[0029] Furthermore, the steel pipe pile 10 is arranged outside the cofferdam 1, one end of the steel pipe pile 10 is fixedly connected to the upper platform 4, and the other end is fixed in the riverbed.
[0030] Further, both ends of the lower platform 3 are fixedly connected to the side walls of the cofferdam 1 through connectors 6. Preferably, in the present application, the connector 6 is an H-shaped steel purlin.
[0031] Furthermore, a corbel 7 is provided on the connecting member 6 .
[0032] Specifically, Figure 2 As shown, a corbel 7 is fixedly provided on the lower side of the connecting member 6 , and the corbel 7 is fixedly connected to the top of the cofferdam 1 , thereby improving the strength and supporting force of the connecting member 6 .
[0033] Further, such as Figure 2 As shown, anti-fall chains 11 are also provided at both ends of the connecting member 6, and the two ends of the anti-fall chain 11 are respectively fixedly connected to the connecting member 6 and the top of the cofferdam 1, and the anti-fall chain 11 can further improve the strength and supporting force of the connecting member 6.
[0034] Further, such as Figure 1 As shown, a guardrail is provided on the lower platform 3.
[0035] Further, such as Figure 1 As shown, a hanging wire rope is provided on the guardrail.
[0036] Further, such as Figure 1 As shown, the lower platform 3 is connected to the upper platform 4 via a cage ladder 8.
[0037] Further, such as Figure 1 As shown, a support beam 9 is provided in the cofferdam 1, and the support beam 9 is located below the lower platform 3. Both ends of the support beam 9 can be connected to the two side walls of the cofferdam 1 respectively, thereby improving the strength and supporting force of the cofferdam 1.
[0038] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. An above-water pile foundation construction platform, It is characterized in that include: A cofferdam (1) is arranged on a riverbed, wherein a plurality of steel casings (2) are arranged inside the cofferdam (1), wherein the steel casings (2) are perpendicular to the riverbed, and one end of the steel casings (2) is inserted into the riverbed; A lower platform (3) is fixedly arranged in the cofferdam (1), the lower platform (3) and the other end of the steel casing (2) are located at the same height, and a mud circulation device is arranged on the lower platform (3), and the mud circulation device is respectively connected to the steel casing (2); The upper platform (4) is arranged above the lower platform (3) through steel pipe piles (10). A drilling device (5) is arranged on the upper platform (4), and the drill bit of the drilling device (5) extends into any one of the steel casings (2).
2. The water pile foundation construction platform according to claim 1, Features: Both ends of the lower platform (3) are fixedly connected to the side walls of the cofferdam (1) via connecting pieces (6).
3. The water pile foundation construction platform according to claim 2, Features: A corbel (7) is also provided on the connecting piece (6).
4. The water pile foundation construction platform according to claim 1, Features: The lower platform (3) is provided with a guardrail.
5. The water pile foundation construction platform according to claim 4, Features: The guardrail is provided with a hanging wire rope.
6. The above-water pile foundation construction platform according to any one of claims 1 to 5, Features: The lower platform (3) is connected to the upper platform (4) via a cage ladder (8).
7. The water pile foundation construction platform according to claim 6, Features: The cofferdam (1) has a support beam (9) therein, and the support beam (9) is located below the lower platform (3).
8. The water pile foundation construction platform according to claim 7, Features: The steel pipe piles (10) are arranged outside the cofferdam (1).
9. The water pile foundation construction platform according to claim 2, Features: Anti-fall chains (11) are also provided at both ends of the connecting piece (6), and both ends of the anti-fall chains (11) are fixedly connected to the connecting piece (6) and the top end of the cofferdam (1) respectively.