Hoop for protecting static pressure precast pile head

By using arc-shaped steel plates and combined structures to protect bolts and nuts in the static prefabricated pile head protection hoop, the problem of bolts and nuts being easily loosened and corroded in the prior art is solved, and higher firmness and convenience are achieved. Installation and use.

CN222008913UActive Publication Date: 2024-11-15FU JIAN ER JIAN JIAN SHE JI TUAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420604323.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-15
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

In the existing static prefabricated pile heads, bolts and nuts are easily loosened by collisions, and are easily corroded by air after long-term use, affecting the firmness of the clamp.

Method used

Fixed with the first half-arch steel plate and the second half-arch steel plate, the bolts and nuts are protected from collision and corrosion through a combined structure of the cover body, the clamp block and the clamp slot, the tie rod and the compression spring. Set up positioning blocks and lighting to improve installation convenience and visibility.

Benefits of technology

Effectively prevent bolts and nuts from loosening and corrosion, improve the firmness of the clamp, and improve the convenience and safety of use through lighting and anti-slip marks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008913U_ABST
    Figure CN222008913U_ABST
Patent Text Reader

Abstract

The utility model discloses a hoop for protecting a pile head of a static pressure precast pile, which belongs to the technical field of hoops for protecting the pile head of the static pressure precast pile and comprises a first semi-arc-shaped steel plate and a second semi-arc-shaped steel plate which are used for protecting the pile head of the static pressure precast pile, and the second semi-arc-shaped steel plate is arranged at the rear end of the first semi-arc-shaped steel plate. The first semi-arc-shaped steel plate and the second semi-arc-shaped steel plate are fixed through two bolts and two nuts, and the two sides of the first semi-arc-shaped steel plate and the two sides of the second semi-arc-shaped steel plate are each provided with a cover body. The first semi-arc-shaped steel plate and the second semi-arc-shaped steel plate are fixed on the pile head of the static pressure precast pile through the bolt and the nut, and the bolt and the nut are wrapped by the cover body, so that the bolt and the nut can be prevented from loosening due to collision and can be prevented from being corroded by rainwater, and the service life of the static pressure precast pile is prolonged. The cover body is clamped and fixed through the clamping block and the clamping groove, the pull ring is pulled to drive the clamping block to move out of the clamping groove, then the cover body can be pulled out, the structure is simple, and mounting and dismounting are very convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of a static pressure prefabricated pile head protection clamp, and belongs to a clamp for protecting a static pressure prefabricated pile head. Background Art

[0002] Static pressure precast piles are a common form of pile foundation. The construction process includes setting out the pile position, precasting the pile tip or dry mixing concrete, placing the pile driver in place, hammering the outer tube to sink the rammed tube to the designed depth, pulling out the outer tube and pouring the rammed and expanded concrete, and pulling out the inner rammed tube. During the construction process, it is necessary to pay attention to controlling the slump of concrete and the speed of pulling out the tube to avoid necking and soil squeezing effects. Static pressure piles: Advantages: Completely avoid the vibration, noise and pollution caused by hammering piles, so there are advantages such as no damage to the piles, no noise, no vibration, no impact, and no pollution during construction.

[0003] For example, the prior art publication number CN206521753U is a clamp for protecting the pile heads of bored cast-in-place piles and static pressure precast piles. This utility model can enhance the cutting efficiency of the drill bit on the pebble soil layer, ensure the smooth drilling, and effectively reduce the wear of the spiral blades, thereby extending the service life of the spiral blades.

[0004] However, the above-mentioned prior art still has the following problems when used: the existing static pressure precast pile static pressure precast pile head protection clamp is usually fixed with bolts and nuts, and the bolts and nuts are directly exposed to the outside and are easily loosened by collision, and the bolts and nuts will be corroded by air after long-term use, which will affect the firmness of the clamp. Based on this, the utility model provides a static pressure precast pile head protection clamp which can protect the bolts and nuts. Utility Model Content

[0005] To this end, the utility model provides a clamp for protecting the pile head of a static pressure prefabricated pile, so as to solve the problem in the prior art that the clamp has low firmness due to the bolts and nuts being easily subject to collision.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] The clamp for protecting the head of a static pressure prefabricated pile comprises a first semi-arc steel plate and a second semi-arc steel plate for protecting the head of the static pressure prefabricated pile, and the second semi-arc steel plate is arranged at the rear end of the first semi-arc steel plate, the first semi-arc steel plate and the second semi-arc steel plate are fixed by two bolts and two nuts, both sides of the first semi-arc steel plate and the second semi-arc steel plate are provided with a cover body, both sides of the first semi-arc steel plate and the second semi-arc steel plate are provided with a slot, the cover body is inserted into the slot, the first semi-arc steel plate and the second semi-arc steel plate are provided with two circular grooves on the side close to each other, each circular groove is provided with a clamping assembly, the clamping assembly comprises a clamping block, and the plurality of clamping blocks are respectively arranged in the plurality of circular grooves, the outer walls on the front and rear sides of the two cover bodies are provided with clamping grooves adapted to the clamping blocks, and the clamping blocks are clamped with the clamping grooves.

[0008] Furthermore, each card block is fixed with a pull rod at one end away from the card slot, and a compression spring is sleeved on the pull rod. One end of the compression spring is fixed to the card block, and the other end of the compression spring is fixed to the inner wall of the circular groove. The compression spring is used to push the card block to engage with the card slot, thereby ensuring that the card block is always engaged with the card slot.

[0009] Furthermore, two receiving grooves are provided on the side away from each other of the first semi-arc steel plate and the second semi-arc steel plate, and a plurality of pull rods extend into the plurality of receiving grooves respectively at one end away from the clamping block, so that the pull rods are protected by the receiving grooves to avoid being exposed and collided.

[0010] Furthermore, each pull rod is movably provided with a pull ring at one end away from the block, so that the staff can pull the pull rod to move and adjust the position of the block.

[0011] Furthermore, a dust plug is inserted into each storage slot, and the dust plug is arranged on the outside of the pull ring to seal the storage slot to prevent dust and debris from clogging the storage slot.

[0012] Furthermore, a lighting lamp is fixedly embedded on one side of the two covers that is away from each other. The lighting lamp emits light, which can serve as a warning at night and facilitate the staff to check the position of the pile head of the static pressure precast pile.

[0013] Furthermore, positioning blocks are fixedly provided on both sides of the rear end of the first semi-arc steel plate, and positioning grooves matching the positioning blocks are opened on both sides of the front end of the second semi-arc steel plate. The positioning blocks are inserted into the positioning grooves. With the help of the cooperation between the positioning blocks and the positioning grooves, it is convenient for workers to quickly install the first semi-arc steel plate and the second semi-arc steel plate.

[0014] Furthermore, the inner wall surface of the first semi-arc steel plate and the inner wall surface of the second semi-arc steel plate are both processed with anti-slip patterns to increase the friction between the inner wall surface of the first semi-arc steel plate and the inner wall surface of the second semi-arc steel plate.

[0015] The utility model has the following advantages:

[0016] 1. The utility model fixes the first semi-arc steel plate and the second semi-arc steel plate on the pile head of the static pressure prefabricated pile by bolts and nuts, and wraps the bolts and nuts with a cover body, so as to prevent the bolts and nuts from being loosened due to collision, and also prevent the bolts and nuts from being corroded by rainwater, and uses a clamping block and a clamping groove to clamp and fix the cover body, and pulls the pull ring to drive the clamping block to move out of the clamping groove, so as to pull out the cover body, which has a simple structure and is very convenient to install and disassemble.

[0017] 2. By cooperating with the positioning block and the positioning groove, it is convenient for the staff to quickly align the first semi-arc steel plate and the second semi-arc steel plate and stick them together for use, and the lighting lamp is used to emit light, which can not only serve as a warning at night, but also make it convenient for the staff to check the position of the static pressure prefabricated pile head. At the same time, the inner wall surface of the first semi-arc steel plate and the inner wall surface of the second semi-arc steel plate are processed with anti-slip patterns, so as to improve the friction between the first semi-arc steel plate and the second semi-arc steel plate when they contact the static pressure prefabricated pile head. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0019] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0020] Figure 1 The overall structural diagram provided by the utility model;

[0021] Figure 2 A structural diagram of the cover body, the first semi-arc steel plate and the second semi-arc steel plate provided by the utility model;

[0022] Figure 3 A cross-sectional view of a first semi-arc steel plate provided by the utility model;

[0023] Figure 4 Provided for the utility model Figure 3 Enlarged view of part A in the middle;

[0024] Figure 5 This is a schematic diagram of the second semi-arc steel plate provided by the utility model.

[0025] In the figure: 1, first semi-arc steel plate; 2, second semi-arc steel plate; 3, bolt; 4, nut; 5, cover; 6, slot; 7, circular groove; 8, snap-on assembly; 9, storage groove; 10, pull ring; 11, dust plug; 12, lighting lamp; 13, positioning block; 14, positioning groove;

[0026] 801, card block; 802, card slot; 803, pull rod; 804, compression spring. DETAILED DESCRIPTION

[0027] The following is a specific embodiment of the present invention. People familiar with the technology can easily understand the other advantages and functions of the present invention from the contents disclosed in this specification. Obviously, the described embodiment is a part of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] Refer to the instruction manual Figure 1-5 The utility model provides a clamp for protecting the head of a static pressure precast pile, comprising a first semi-arc steel plate 1 and a second semi-arc steel plate 2 for protecting the head of the static pressure precast pile, wherein the second semi-arc steel plate 2 is arranged at the rear end of the first semi-arc steel plate 1, the first semi-arc steel plate 1 and the second semi-arc steel plate 2 are fixed by two bolts 3 and two nuts 4, a cover body 5 is arranged on both sides of the first semi-arc steel plate 1 and the second semi-arc steel plate 2, and a slot 6 is opened on both sides of the first semi-arc steel plate 1 and the second semi-arc steel plate 2, and the cover body 5 is inserted into the slot 6;

[0029] Next, two circular grooves 7 are provided on the side close to the first semi-arc steel plate 1 and the second semi-arc steel plate 2, and a clamping assembly 8 is provided in each circular groove 7. The clamping assembly 8 includes a clamping block 801, and a plurality of clamping blocks 801 are respectively provided in a plurality of circular grooves 7. The outer walls on both the front and rear sides of the two cover bodies 5 are provided with clamping grooves 802 adapted to the clamping blocks 801, and the clamping blocks 801 are clamped with the clamping grooves 802;

[0030] In addition, a pull rod 803 is fixedly provided at the end of each block 801 away from the slot 802, and a compression spring 804 is sleeved on the pull rod 803. One end of the compression spring 804 is fixed to the block 801, and the other end of the compression spring 804 is fixed to the inner wall of the circular groove 7. The compression spring 804 is utilized to push the block 801 to engage with the slot 802, thereby ensuring that the block 801 is always engaged with the slot 802. A pull ring 10 is movably provided at the end of each pull rod 803 away from the block 801, so that the staff can pull the pull rod 803 to move.

[0031] When installing the clamp, the staff first sticks the first semi-arc steel plate 1 and the second semi-arc steel plate 2 on the head of the static pressure prefabricated pile, and uses bolts 3 and nuts 4 to fix the first semi-arc steel plate 1 and the second semi-arc steel plate 2 together, and then the staff inserts the two covers 5 into the slots 6 on both sides of the first semi-arc steel plate 1 and the second semi-arc steel plate 2 respectively, and uses the covers 5 to wrap the bolts 3 and nuts 4, so as to prevent the bolts 3 and nuts 4 from being loosened due to collision, and at the same time, prevent the bolts 3 and nuts 4 from being corroded by rainwater.

[0032] The block 801 is engaged with the slot 802 to fix the cover body 5. When the staff needs to remove the cover body 5, they only need to pull the pull ring 10 to drive the block 801 to move out of the slot 802 to pull out the cover body 5. When reinstalling, the block 801 is inserted into the slot 802 under the elastic force of the compression spring 804 to fix the cover body 5. The structure is simple and it is very convenient to install and disassemble.

[0033] Refer to the instruction manual Figure 1-5 , a dust plug 11 is inserted into each storage groove 9, and the dust plug 11 is arranged outside the pull ring 10, which is used to seal the storage groove 9 to prevent dust and debris from clogging the storage groove 9. A lighting lamp 12 is fixedly embedded on the side away from the two cover bodies 5, which is used to emit light to serve as a warning;

[0034] In addition, positioning blocks 13 are fixedly provided on both sides of the rear end of the first semi-arc steel plate 1, and positioning grooves 14 matching the positioning blocks 13 are provided on both sides of the front end of the second semi-arc steel plate 2. The positioning blocks 13 are inserted into the positioning grooves 14. With the cooperation of the positioning blocks 13 and the positioning grooves 14, it is convenient for the staff to quickly install the first semi-arc steel plate 1 and the second semi-arc steel plate 2.

[0035] Moreover, the inner wall surface of the first semi-arc steel plate 1 and the inner wall surface of the second semi-arc steel plate 2 are processed with anti-slip grooves to improve the friction between the inner wall surface of the first semi-arc steel plate 1 and the inner wall surface of the second semi-arc steel plate 2;

[0036] By arranging a positioning block 13 on the first semi-arc steel plate 1 and utilizing the positioning block 13 to cooperate with the positioning groove 14, it is convenient for the staff to quickly align the first semi-arc steel plate 1 and the second semi-arc steel plate 2 and use them together, and lighting lamps 12 are arranged on the two cover bodies 5. The lighting lamps 12 emit light, which can not only serve as a warning at night, but also facilitate the staff to check the position of the static precast pile head. At the same time, the inner wall surface of the first semi-arc steel plate 1 and the inner wall surface of the second semi-arc steel plate 2 are processed with anti-slip patterns, so as to improve the friction between the first semi-arc steel plate 1 and the second semi-arc steel plate 2 when they contact the static precast pile head.

[0037] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.

Claims

1. A hoop for protecting the head of a static precast pile, comprising a first semi-arc steel plate (1) and a second semi-arc steel plate (2) for protecting the head of the static precast pile, wherein the second semi-arc steel plate (2) is arranged at the rear end of the first semi-arc steel plate (1), and is characterized in that: The first semi-arc-shaped steel plate (1) and the second semi-arc-shaped steel plate (2) are fixed by two bolts (3) and two nuts (4); Both sides of the first semi-arc steel plate (1) and the second semi-arc steel plate (2) are provided with covers (5); both sides of the first semi-arc steel plate (1) and the second semi-arc steel plate (2) are provided with slots (6); the covers (5) are inserted into the slots (6); and two circular grooves (7) are provided on the sides of the first semi-arc steel plate (1) and the second semi-arc steel plate (2) that are close to each other; A snap-fit ​​assembly (8) is provided in each circular groove (7), the snap-fit ​​assembly (8) comprising a snap-fit ​​block (801), a plurality of snap-fit ​​blocks (801) being respectively provided in the plurality of circular grooves (7), and snap-fit ​​grooves (802) matching the snap-fit ​​blocks (801) are provided on the outer walls on both the front and rear sides of the two cover bodies (5), the snap-fit ​​blocks (801) being snap-fitted with the snap-fit ​​grooves (802).

2. The clamp for protecting the head of a static pressure prefabricated pile according to claim 1 is characterized by: A pull rod (803) is fixedly provided at one end of each clamping block (801) away from the clamping slot (802), and a compression spring (804) is sleeved on the pull rod (803). One end of the compression spring (804) is fixed to the clamping block (801), and the other end of the compression spring (804) is fixed to the inner wall of the circular slot (7).

3. The clamp for protecting the head of a static pressure prefabricated pile according to claim 2 is characterized by: Two receiving grooves (9) are provided on the side away from each other of the first semi-arc steel plate (1) and the second semi-arc steel plate (2), and the ends of the plurality of pull rods (803) away from the clamping block (801) extend into the plurality of receiving grooves (9) respectively.

4. The clamp for protecting the head of a static pressure prefabricated pile according to claim 2 is characterized by: Each pull rod (803) is movably provided with a pull ring (10) at one end away from the clamping block (801), so as to facilitate the pulling rod (803) to move.

5. The clamp for protecting the head of a static pressure prefabricated pile according to claim 2 is characterized by: A dust plug (11) is inserted into each storage groove (9), and the dust plug (11) is arranged on the outside of the pull ring (10) and is used to seal the storage groove (9).

6. The clamp for protecting the head of a static pressure prefabricated pile according to claim 1 is characterized by: A lighting lamp (12) is fixedly embedded on one side of the two cover bodies (5) which is away from each other, and is used to emit light to serve as a warning.

7. The clamp for protecting the head of a static pressure prefabricated pile according to claim 1 is characterized by: Positioning blocks (13) are fixedly provided on both sides of the rear end of the first semi-arc steel plate (1), and positioning grooves (14) adapted to the positioning blocks (13) are provided on both sides of the front end of the second semi-arc steel plate (2), and the positioning blocks (13) are inserted into the positioning grooves (14).

8. The clamp for protecting the head of a static pressure prefabricated pile according to claim 1 is characterized by: The inner wall surface of the first semi-arc steel plate (1) and the inner wall surface of the second semi-arc steel plate (2) are both processed with anti-slip grooves, which are used to increase the friction between the inner wall surface of the first semi-arc steel plate (1) and the inner wall surface of the second semi-arc steel plate (2).