Anchor cable tensioning platform structure
By designing the anchor cable tensioning platform structure for the overall lifting, the problems of time-consuming and labor-intensive installation and safety hazards in the existing technology are solved, fast moving and efficient slope support are achieved, and the operation efficiency and platform stability are improved. It is suitable for Slope and foundation pit engineering.
Patent Information
- Application Number
- CN202420400477.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-02
AI Technical Summary
The installation of existing anchor cable tensioning platforms is time-consuming and labor-intensive, the removal of the frame pipe takes a long time, the utilization rate of the frame is not high, the investment is large, and there are safety hazards when operating at high places.
A anchor cable tensioning platform structure was designed, and a frame structure formed by an integral lifting and welded steel structure, including frame body, up and down crawling passage, operating platform, top lifting device and wall connecting structure, realizing the integration of the operating platform and the equipment. The hoisting integration simplifies the erection and demolition process.
It realizes fast moving and safe slope support, reduces the installation and demolition time, improves the working efficiency and the stability and safety of the platform. It is suitable for slope and foundation pit support projects, with simple and easy-to-get materials and construction operations. Strong, lightweight and convenient.
Smart Images

Figure CN222008957U_ABST
Abstract
Description
Technical field:
[0001] The utility model relates to the technical field of anchor cable construction of a slope support structure, in particular to the technical field of anchor cable tensioning, and specifically, is an anchor cable tensioning platform structure. Background technology:
[0002] Anchor cable construction is a common slope support structure at present. In the prior art, the anchor cable tensioning platform is often erected with double-row scaffolding, which involves high-altitude operations, and the platform erection is time-consuming and labor-intensive. Therefore, the above-mentioned prior art has the following disadvantages: the erection and dismantling of the rack pipe takes a long time, and the scaffolding board is laid for paving, the tensioning operation time is relatively short, the utilization rate of the erection rack is not high, and the investment is relatively large. Summary of the invention:
[0003] The purpose of the utility model is to provide a tensioning platform for operation and to integrate the hoisting operation of the tensioning device so as to solve the above-mentioned technical problems existing in the prior art.
[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
[0005] The utility model provides an anchor cable tensioning platform structure, which comprises a frame body, an upper and lower crawling passage, an operating platform, a top hoisting device and a wall connection structure; the frame body is welded into a frame structure by columns and horizontal connecting rods, the horizontal connecting rods comprise a bottom horizontal connecting rod, a first-layer operating platform horizontal connecting rod and a top horizontal connecting rod, and three types of horizontal connecting rods correspondingly arranged above and below are arranged in parallel above and below and both ends are fixed on the corresponding columns; the upper and lower crawling passages are fixed on the corresponding columns and fixedly connected with the corresponding horizontal connecting rods; the operating platform is arranged inside the frame body and has several layers; the top hoisting device comprises a top horizontal longitudinal storage rod, a lifting ring and an electric lifting device, the lifting ring is arranged on the top of the column, the top horizontal longitudinal storage rod is vertically fixed on the top horizontal connecting rod arranged horizontally on the top, and the electric lifting device is fixed on the top horizontal longitudinal storage rod; the wall connection structure comprises a platform structure wall connection lap joint and a horizontal longitudinal frame pipe, the platform structure wall connection lap joint is fixedly arranged on the corresponding column, and the platform structure wall connection lap joint is connected to the slope through the horizontal longitudinal frame pipe.
[0006] The overall cross-section of the anchor cable tensioning platform structure is 1.6*1.6m, the height is 6m, and it is a U-shaped straight tube structure.
[0007] The frame is welded together by 4 columns and 4 bottom horizontal connecting rods each 50cm away from the bottom structure, a first-layer operating platform horizontal connecting rod 400cm away from the bottom structure, and a top horizontal connecting rod, all of which are made by welding; wherein diagonal braces are arranged between the first-layer operating platform horizontal connecting rods and the bottom horizontal connecting rods arranged up and down on the left and right sides to form a stable triangle; the diagonal braces are made of steel pipes with a length of 3.65m and a diameter of 50mm and are welded obliquely between the first-layer operating platform horizontal connecting rods and the bottom horizontal connecting rods arranged up and down on the left and right sides.
[0008] The frame structure is made of welded steel pipes, the columns are made of hollow steel pipes with a length of 6m, a diameter of 80mm and a wall thickness of 3mm, the horizontal connecting rods of the first-level operating platform and the bottom horizontal connecting rods are both made of hollow steel pipes with a diameter of 80mm and a wall thickness of 3mm, and the top horizontal connecting rod is made of a frame pipe with a diameter of 48mm.
[0009] The top horizontal longitudinal storage rod adopts a frame tube with a diameter of 48 mm, and is cross-connected with a top horizontal connecting rod arranged transversely on the top by fasteners.
[0010] A column bottom bracket is arranged at the bottom of each column. The column bottom bracket is made of a steel plate with a thickness of 20 mm and is welded and fixed to the column.
[0011] The up and down crawling passage comprises a ladder bar, a ladder pole and a ladder protective cover. The ladder pole and the corresponding column are arranged in parallel. The ladder bar and the ladder protective cover are fixed on the corresponding column at one end and the other end on the ladder pole. The ladder bar is fixedly connected with the corresponding horizontal connecting rod; the ladder bars are evenly arranged and made of threaded steel with a diameter of 14 cm and a length of 80 cm. The interval between two adjacent ladder bars is 25 cm; the ladder protective cover is a semicircular guardrail made of round steel with a diameter of 10 cm, which is evenly arranged. The semicircular guardrail is set at an interval of 40 cm, starting from the bottom 1.6m to the top.
[0012] The operating platform is arranged in three layers in parallel, with a layer spacing of 40 cm. The distance between the top operating platform and the top horizontal connecting rod is 1.2 m. Each layer of the operating platform is paved with a 5 cm thick scaffolding board. The first layer of the operating platform uses the horizontal connecting rod of the first layer of the operating platform as the bottom beam; the second and third layers of the operating platform both use the horizontal longitudinal beam of the operating platform as the bottom beam; the horizontal longitudinal beam of the operating platform is fixedly arranged between the columns on the left and right sides of the frame, and the horizontal longitudinal beam of the operating platform is made of L-shaped steel with a specification of 5 cm*5 cm; scaffolding boards are placed on the bottom beams of each layer of the operating platform.
[0013] Each of the columns is provided with a platform structure wall joint at a position 5m away from the bottom. The platform structure wall joint adopts a frame pipe with a diameter of 48mm and a length of 35cm. Each platform structure wall joint is welded to the corresponding column and reinforced with round steel with a diameter of 10mm for welding and stability. The platform structure wall joint is connected to the slope by welding on the horizontal longitudinal frame pipe.
[0014] The lifting ring is a detachable lifting ring, and each column top is provided with a lifting ring; the electric lifting device adopts an electric small hoisting machine, and the electric small hoisting machine is fixed on the top horizontal longitudinal storage rod through a fastener.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] 1. When the slope needs to be tensioned in time, the utility model adopts overall hoisting and can be moved quickly, responding to the safety requirement of supporting first and then excavating, and is suitable for slope support projects and foundation pit support projects.
[0017] 2. Compared with the traditional method of directly erecting and dismantling double-row scaffolding, the utility model adopts steel structure welding to form a whole, the working platform is integrated, and the working tools are integrated, which is convenient for the overall rapid lifting and moving, and speeds up the construction work.
[0018] 3. The utility model is an integral structure with effective anti-overturning and mobility, which effectively ensures the stability and safety of the platform. The platform elevation can be laid by laying scaffolding boards of different layers (three layers in total) welded on the columns, and the operating elevation can be appropriately adjusted according to the actual needs of the site.
[0019] 4. All the material components in the slope anchoring structure of the utility model are conventional material components in engineering, and the structure of the components is simple. The required material components are relatively easy to obtain and manufacture, the construction operability is strong, and it has strong practicality.
[0020] 5. The utility model has the characteristics of light weight, lightweight and convenient. Description of the drawings:
[0021] Figure 1 It is a front elevation schematic diagram of the utility model;
[0022] Figure 2 It is a side elevation schematic diagram of the utility model.
[0023] Reference numerals in the figures:
[0024] 1-column, 2-top horizontal connecting rod, 3-top horizontal longitudinal storage rod, 4-first-layer operating platform horizontal connecting rod, 5-operating platform horizontal longitudinal beam, 6-ladder cross bar, 7-ladder protective cover, 8-column bottom support, 9-platform structure wall connection piece, 10-lifting ring, 11-electric small winch machinery, 12-diagonal brace, 13-bottom horizontal connecting rod, 14-ladder pole. Specific implementation method:
[0025] The present invention is further described below in conjunction with specific implementation methods. The specific implementation methods are further descriptions of the principles of the present invention and do not limit the present invention in any way. Technologies identical or similar to the present invention do not exceed the scope of protection of the present invention.
[0026] See also Figure 1-Figure 2 The utility model provides an anchor cable tensioning platform structure, the overall cross section of the anchor cable tensioning platform structure is 1.6*1.6m, the height is 6m, and it is a U-shaped straight tube structure. The platform structure includes a frame, an upper and lower crawling channel, an operating platform, a top hoisting device, and a wall connection structure.
[0027] The frame is welded together by columns 1 and horizontal connecting rods to form a frame structure. The horizontal connecting rods include bottom horizontal connecting rods 13, first-layer operating platform horizontal connecting rods 4, and top horizontal connecting rods 2. These three types of horizontal connecting rods corresponding to each other are arranged in parallel and fixed on the corresponding columns 1 at both ends. The frame is welded together by 4 columns 1 and 4 bottom horizontal connecting rods 13 50cm away from the bottom structure, first-layer operating platform horizontal connecting rods 4 400cm away from the bottom structure, and top horizontal connecting rods 2. They are all made by welding. Among them, diagonal braces 12 are arranged between the first-layer operating platform horizontal connecting rods 4 and the bottom horizontal connecting rods 13 arranged on the left and right sides to form a stable triangle. The diagonal braces 12 are welded between the first-layer operating platform horizontal connecting rods 4 and the bottom horizontal connecting rods 13 arranged on the left and right sides. The length of the steel pipe is 3.65m and the diameter is 50mm. The frame structure is welded from steel pipes. The column 1 is made of a hollow steel pipe with a length of 6m, a diameter of 80mm, and a wall thickness of 3mm. The horizontal connecting rod 4 of the first-level operating platform and the bottom horizontal connecting rod 13 are both made of hollow steel pipes with a diameter of 80mm and a wall thickness of 3mm. The top horizontal connecting rod 2 is made of a frame pipe with a diameter of 48mm. A column bottom bracket 8 is provided at the bottom of each column 1. The column bottom bracket 8 is made of a steel plate with a thickness of 20mm and is welded and fixed to the column 1 to form a stable and effective foundation.
[0028] The operating platform is arranged inside the frame and has several layers. The operating platform in this embodiment has three layers arranged in parallel from top to bottom, with a layer spacing of 40 cm. The top layer (i.e. the third layer) operating platform is 1.2 m away from the top horizontal connecting rod 2, and each layer of the operating platform is paved with 5 cm thick scaffolding boards; the first layer of the operating platform uses the first layer of the operating platform horizontal connecting rod 4 four meters away from the bottom as the bottom beam; the second and third layers of the operating platform both use the operating platform horizontal longitudinal beam 5 as the bottom beam; the operating platform horizontal longitudinal beam 5 is fixedly arranged between the columns 1 on the left and right sides of the frame, and the operating platform horizontal longitudinal beam 5 uses L-shaped steel with a specification of 5 cm*5 cm; scaffolding boards are placed on the bottom beams of each layer of the operating platform.
[0029] The up and down crawling passage is fixedly welded on the corresponding column 1, and is welded and connected with the corresponding horizontal connecting rod as a reinforcement point to form a climbing passage. The up and down crawling passage includes a ladder cross bar 6, a ladder upright 14 and a ladder protective cover 7. The ladder upright 14 is arranged in parallel with the corresponding column 1. The ladder cross bar 6 and the ladder protective cover 7 are welded and fixed on the corresponding column 1 at one end and welded and fixed on the ladder upright 14 at the other end. The ladder cross bar 6 is welded and fixed with the corresponding horizontal connecting rod. The ladder cross bar 6 is evenly arranged and made of threaded steel with a diameter of 14cm and a length of 80cm. The interval between two adjacent ladder cross bars 6 is 25cm. The ladder protective cover 7 is a protective device for up and down passage. It is a semicircular guardrail made of round steel with a diameter of 10cm. It is evenly arranged. The semicircular guardrail is set at an interval of 40cm, starting from the bottom 1.6m to the top. The five-step climbing steel bars on the first-level operating platform are simple and removable parts.
[0030] The top hoisting device includes a top horizontal longitudinal rod 3, a lifting ring 10, and an electric lifting device. The lifting ring 10 is set on the top of the column 1. The lifting ring 10 is a detachable lifting ring used for the lifting of the entire platform. Each column 1 is provided with a lifting ring 10 on the top. The top horizontal longitudinal rod 3 uses a frame pipe with a diameter of 48 mm, and is cross-connected with the top horizontal connecting rod 2 arranged horizontally at the top by fasteners. The top horizontal longitudinal rod 3 is vertically fixed on the top horizontal connecting rod 2 arranged horizontally at the top. The electric lifting device is fixed on the top horizontal longitudinal rod 3. The electric lifting device uses an electric small winch 11 as a vertical lifting machinery for facilities such as jacks and an auxiliary operation during tensioning. The electric small winch 11 is fixed on the top horizontal longitudinal rod 3 through fasteners. The electric small winch 11 is electrically controlled and is used to hoist the tensioning equipment and instruments to the platform and to assist in fixing the tensioning equipment during the tensioning process.
[0031] The wall connection structure includes a platform structure wall connection lap joint 9 and a horizontal longitudinal frame pipe. The platform structure wall connection lap joint 9 is fixedly arranged on the corresponding column 1. Each of the four columns 1 is provided with a platform structure wall connection lap joint 9 at a position 5m away from the bottom. The platform structure wall connection lap joint 9 adopts a frame pipe with a diameter of 48mm and a length of 35cm. Each platform structure wall connection lap joint 9 is welded to the corresponding column 1, and a round steel with a diameter of 10mm is used for welding reinforcement and stability; in the later stage, the platform structure wall connection lap joint 9 is connected to the slope by welding on the horizontal longitudinal frame pipe to form a wall connection structure to ensure the safety of the working platform.
[0032] The operating steps in the specific implementation process are as follows: the first step is to use a crane to lift the lifting ring 10 set on the anchor cable tensioning platform structure to the lower excavation position of the anchor cable that needs to be tensioned, and pad the square wood under the column bottom support 8, and then connect it to the slope through the wall structure to form a wall structure to ensure the stability of the integral platform; the second step is to climb up the anchor cable tensioning platform structure and observe whether the elevation of the anchor cable tensioning platform structure is appropriate. Under normal circumstances, the wooden footboards are placed on the first layer (the elevation of the excavation surface of each layer has been agreed with the excavation team during the early handover that the elevation of the excavation surface is 4m below the eaves of the anchor pier). If the elevation platform needs to be adjusted, the wooden footboards are transferred to the second or third layer; the third step is to remove two pieces of the scaffolding board in the middle after the platform elevation is determined, and use an electric small winch 11 to electrically control the tensioning equipment to the anchor pier for tensioning operations, and finally form a fast and smooth tensioning operation mode.
Claims
1. An anchor cable tensioning platform structure, characterized by: The platform structure comprises a frame, an up-and-down crawling passage, an operating platform, a top hoisting device, and a wall connection structure; the frame is welded together into a frame structure by columns (1) and horizontal connecting rods, the horizontal connecting rods comprising a bottom horizontal connecting rod (13), a first-layer operating platform horizontal connecting rod (4), and a top horizontal connecting rod (2); three types of horizontal connecting rods corresponding to each other are arranged in parallel and both ends are fixed to the corresponding columns (1); the up-and-down crawling passages are fixed to the corresponding columns (1) and are fixedly connected to the corresponding horizontal connecting rods; the operating platform is arranged inside the frame, and a plurality of The top lifting device comprises a top horizontal longitudinal placement rod (3), a lifting ring (10), and an electric lifting device. The lifting ring (10) is arranged at the top of the column (1). The top horizontal longitudinal placement rod (3) is vertically fixedly arranged on a top horizontal connecting rod (2) arranged transversely on the top. The electric lifting device is fixed on the top horizontal longitudinal placement rod (3). The wall connection structure comprises a platform structure wall connection lap joint (9) and a horizontal longitudinal frame pipe. The platform structure wall connection lap joint (9) is fixedly arranged on the corresponding column (1). The platform structure wall connection lap joint (9) is connected to the slope through the horizontal longitudinal frame pipe.
2. The anchor cable tensioning platform structure according to claim 1, characterized in that: The overall cross-section of the anchor cable tensioning platform structure is 1.6*1.6m, the height is 6m, and it is a U-shaped straight tube structure.
3. The anchor cable tensioning platform structure according to claim 1 is characterized in that: The frame is welded together by four columns (1) and four bottom horizontal connecting rods (13) each 50 cm away from the bottom structure, a first-layer operating platform horizontal connecting rod (4) 400 cm away from the bottom structure, and a top horizontal connecting rod (2), all of which are made by welding; wherein an oblique brace (12) is arranged between the first-layer operating platform horizontal connecting rods (4) and the bottom horizontal connecting rods (13) arranged up and down on the left and right sides to form a stable triangle; the oblique brace (12) is made of a steel pipe with a length of 3.65 m and a diameter of 50 mm and is welded between the first-layer operating platform horizontal connecting rods (4) and the bottom horizontal connecting rods (13) arranged up and down on the left and right sides.
4. The anchor cable tensioning platform structure according to claim 1, characterized in that: The frame structure is made of welded steel pipes. The columns (1) are made of hollow steel pipes with a length of 6m, a diameter of 80mm and a wall thickness of 3mm. The horizontal connecting rods (4) of the first-layer operating platform and the bottom horizontal connecting rods (13) are both made of hollow steel pipes with a diameter of 80mm and a wall thickness of 3mm. The top horizontal connecting rod (2) is made of a frame pipe with a diameter of 48mm.
5. The anchor cable tensioning platform structure according to claim 1, characterized in that: The top horizontal longitudinal storage rod (3) is made of a frame pipe with a diameter of 48 mm, and is cross-connected with the top horizontal connecting rod (2) arranged transversely on the top by fasteners.
6. The anchor cable tensioning platform structure according to claim 1, characterized in that: A column bottom bracket (8) is provided at the bottom of each column (1). The column bottom bracket (8) is made of a steel plate with a thickness of 20 mm and is welded and fixed to the column (1).
7. The anchor cable tensioning platform structure according to claim 1, characterized in that: The up-and-down crawling passage comprises a ladder cross bar (6), a ladder upright (14) and a ladder protective cover (7). The ladder upright (14) and the corresponding column (1) are arranged in parallel. The ladder cross bar (6) and the ladder protective cover (7) are fixed on the corresponding column (1) at one end and fixed on the ladder upright (14) at the other end. The ladder cross bar (6) is fixedly connected with the corresponding horizontal connecting rod. The ladder cross bars (6) are evenly arranged and made of threaded steel with a diameter of 14 cm and a length of 80 cm. The interval between two adjacent ladder cross bars (6) is 25 cm. The ladder protective cover (7) is a semicircular guardrail made of round steel with a diameter of 10 cm. It is evenly arranged. The semicircular guardrail is arranged at an interval of 40 cm, starting from the bottom 1.6 m to the top.
8. The anchor cable tensioning platform structure according to claim 1, characterized in that: The operating platform is arranged in three layers in parallel, with a layer spacing of 40 cm, a top operating platform and a top horizontal connecting rod (2) having a spacing of 1.2 m, and each layer of the operating platform is paved with a 5 cm thick scaffolding board; the first layer of the operating platform uses the first layer of the operating platform horizontal connecting rod (4) as the bottom beam; the second layer and the third layer of the operating platform both use the operating platform horizontal longitudinal beam (5) as the bottom beam; the operating platform horizontal longitudinal beam (5) is fixedly arranged between the columns (1) on the left and right sides of the frame, and the operating platform horizontal longitudinal beam (5) uses an L-shaped steel with a specification of 5 cm*5 cm; and a scaffolding board is placed on the bottom beam of each layer of the operating platform.
9. The anchor cable tensioning platform structure according to claim 1, characterized in that: Each of the columns (1) is provided with a platform structure wall connection lap joint (9) at a position 5m away from the bottom. The platform structure wall connection lap joint (9) adopts a frame pipe with a diameter of 48mm and a length of 35cm. Each platform structure wall connection lap joint (9) is welded to the corresponding column (1) and is welded and reinforced with round steel with a diameter of 10mm. The platform structure wall connection lap joint (9) is connected to the slope by welding on the horizontal longitudinal frame pipe.
10. The anchor cable tensioning platform structure according to claim 1, characterized in that: The lifting ring (10) is a detachable lifting ring, and each column (1) is provided with a lifting ring (10) on its top; the electric lifting device adopts an electric small hoisting machine (11), and the electric small hoisting machine (11) is fixed to the top horizontal longitudinal storage rod (3) through fasteners.