Horizontal joint shear-resistant connection node of precast concrete box-type house
By using bellows, shear anchors and shear joints in horizontal joints of precast concrete buildings, the friction and compressive stress of joints are enhanced, and the production difficulty and cost of increasing shear reinforcement in the prior art is solved. Problem, achieving higher shear bearing capacity and simplified construction and installation.
Patent Information
- Application Number
- CN202420418103.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The prior art when dealing with the shearing effect of horizontal joints in precast concrete buildings, additional shearing steel bars are added to enhance the shearing load-bearing capacity, resulting in increased production difficulty and cost, and the construction and installation are complex, making it difficult to effectively solve the shearing effect of seams. question.
Using bellows, shear anchors and shear joints, the friction at the joint position is enhanced, and the compressive stress is transmitted using shear screws and tension nuts, instead of additional shear reinforcement bars to bear the shear load on the joints, simplifying the installation process , and fill gaps by filling the slurry to improve the overall shear bearing capacity.
It effectively enhances the shear bearing capacity of the joints, reduces the number of additional shear steel bars, simplifies the component production and construction installation process, and improves the overall shear bearing capacity.
Smart Images

Figure CN222009218U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a connection node, in particular to a prefabricated concrete box-type house horizontal joint shear-resistant connection node, belonging to the technical field of assembled concrete buildings. Background Art
[0002] As the number of domestic construction workers continues to decrease, and the country continues to pay attention to resource conservation and environmental protection, more and more projects in the construction industry use prefabricated construction technology. Unlike cast-in-place construction technology, prefabricated construction technology uses prefabricated concrete components to be installed on site. Therefore, how to ensure the connection nodes between prefabricated components on the construction site has become a key project in construction quality control.
[0003] The horizontal joint of the prefabricated shear wall panel is located in the middle of the upper and lower wall panels, and serves to connect the upper and lower wall panels. The treatment method and effect of the node at this location directly determine the bearing capacity and safety performance of the entire wall panel or even the entire building, so it is the top priority among all types of nodes. Generally speaking, the horizontal joint of the prefabricated shear wall panel mainly bears the effects of bending and shearing, and the shearing effect of the horizontal joint in the bottom reinforcement area of the building is particularly obvious.
[0004] At present, for the bending resistance of horizontal joints of wall panels, the cross-sectional area of the disconnected longitudinal force-bearing steel bars between layers can be appropriately increased, and then connected by sleeve grouting to solve the problem; but for the shear resistance of joints, since the cross-sectional area of the steel bars accounts for a very small proportion of the joint cross-section, it is necessary to add a large number of additional shear steel bars to resist the shear resistance of the joints only by increasing the cross-sectional area of the steel bars. Each shear steel bar needs to be connected by sleeve grouting, which not only increases the production difficulty and processing cost of prefabricated components, but also brings many additional processes to the installation of prefabricated wall panels at the construction site. Utility Model Content
[0005] In view of this, the utility model provides a precast concrete box-type house horizontal joint shear connection node, which can enhance the friction force at the joint position through the shear connector, thereby enhancing the shear bearing capacity of the joint, reducing the number of additional shear steel bars, reducing the difficulty and cost of component production, and simplifying the installation process at the construction site.
[0006] The technical solution of the utility model is: a prefabricated concrete box-type house horizontal joint shear-resistant connection node, comprising: a corrugated pipe, a shear-resistant anchor and a shear-resistant connector;
[0007] The lower end of the bellows is closed and the upper end is open; the bellows is pre-buried in the lower structure, and the upper end opening is flush with the top surface of the lower structure;
[0008] The shear-resistant anchor is embedded in the upper prefabricated wall panel, and includes a steel drawer structure and anchor steel bars symmetrically arranged on the left and right sides of the steel drawer structure;
[0009] The shear-resistant connector is connected to the upper prefabricated wall panel and the lower structure through a shear-resistant screw rod.
[0010] Preferably: the steel drawer structure in the shear-resistant anchor comprises: a steel bottom plate, a steel side plate, a steel top plate and a steel back plate;
[0011] The steel side plates, steel top plate and steel back plate are all rectangular steel plates; the two opposite sides of the steel back plate are welded with steel side plates vertically connected thereto, and the steel top plate vertically connected thereto is welded between the two steel side plates on the top of the steel back plate, thereby forming a dustpan-shaped structure; the lower open end of the dustpan-shaped structure is welded to the steel bottom plate;
[0012] The length of the steel bottom plate is greater than that of the steel top plate, and the dustpan-shaped structure is welded at the middle position of the upper end surface of the steel bottom plate, so that cantilever structures are formed on the left and right sides of the steel bottom plate, and a group of anchor steel bars is welded on each cantilever structure;
[0013] A through hole for the shear-resistant connector to pass through is provided in the middle of the steel bottom plate.
[0014] Preferably, the anchoring steel bar is an L-shaped structure, the horizontal portion of the anchoring steel bar is welded to the steel bottom plate, and the vertical portion is spread outward relative to the steel back plate to form an inclined portion.
[0015] Preferably, the angle between the inclined portion of the anchoring steel bar and the steel bottom plate is 45°.
[0016] Preferably, the shear-resistant connector comprises a shear-resistant screw, an anchor nut, a tension nut and a tension pad;
[0017] The shear screw passes through the through hole on the steel bottom plate of the shear anchor, the lower end of the shear screw is threadedly connected to the anchor nut, and the upper end of the shear screw is threadedly connected to the tension pad and the tension nut in turn;
[0018] When the shear-resistant connector connects the upper prefabricated wall panel and the lower structure, the tension pad is pressed tightly against the upper surface of the steel bottom plate; the lower end of the shear-resistant screw is located in the corrugated pipe filled with grouting material.
[0019] Preferably, the horizontal gap between the upper prefabricated wall panel and the lower structure is filled with mortar.
[0020] Preferably: an annular rubber gasket is placed around the top opening of the bellows, and the center hole of the rubber gasket is aligned with the center hole of the bellows; the rubber gasket is used to isolate the slurry.
[0021] Beneficial effects:
[0022] (1) The shear connection node of the utility model enhances the friction force at the joint position (after the grouting material in the corrugated pipe solidifies, the anchor nut at the lower part of the shear connection piece is anchored at the bottom, and by tightening the tensioning nut, a compressive stress in addition to the deadweight of the upper prefabricated wall panel can be applied. As the compressive stress increases, the friction force at the joint position will also increase), thereby enhancing the shear bearing capacity of the joint, reducing the number of additional shear reinforcement bars, reducing the difficulty and cost of component production, and simplifying the installation process at the construction site.
[0023] (2) In the shear-resistant connection node of the utility model, the mortar is filled in the horizontal gap between the upper prefabricated wall panel and the lower structure, which plays the role of filling the horizontal gap. At the same time, after hardening, it can transfer the pressure between the upper prefabricated wall panel and the lower structure, thereby increasing the horizontal shear resistance of the joint position.
[0024] (3) In the shear connector of the utility model, the shear load of the joint is borne by the shear screw instead of the additional shear steel bar. At the same time, the preload applied by the tensioning nut is used to increase the contact pressure between the upper prefabricated wall panel and the lower structure, so that more surrounding concrete interfaces participate in shear resistance, thereby improving the shear bearing capacity of the entire joint.
[0025] (4) In the shear-resistant connection node of the utility model, in the horizontal joint of the precast concrete box-type house, an annular rubber gasket is placed around the top opening of the corrugated pipe, which can play a role in isolating the surrounding mortar. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a front view of the horizontal joint shear-resistant connection node of the utility model;
[0027] Figure 2 It is a side view of the horizontal joint shear connection node of the utility model;
[0028] Figure 3 is a front view of the shear anchor;
[0029] Figure 4 is a side view of a shear anchor;
[0030] Figure 5 This is a schematic diagram of the structure of the shear connector.
[0031] Among them: 1-corrugated pipe; 2-shear anchor; 3-shear connector; 4-slurry; 5-rubber gasket; 6-grouting material; 7-lower structure; 8-upper prefabricated wall panel;
[0032] 21-steel bottom plate; 22-anchor steel bars; 23-steel side plates; 24-steel top plate; 25-steel back plate;
[0033] 31-shear screw; 32-anchor nut; 33-tensioning nut; 34-tensioning pad. DETAILED DESCRIPTION
[0034] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0035] The present embodiment provides a precast concrete box-type house horizontal joint shear connection node, which, on the one hand, can enhance the friction force at the joint position to enhance the shear bearing capacity of the joint, reduce the number of additional shear steel bars, and reduce the difficulty and cost of component production; on the other hand, it can simplify the installation process at the construction site.
[0036] like Figure 1 and Figure 2 As shown, the horizontal joint shear connection node includes: a corrugated pipe 1, a shear anchor 2 and a shear connector 3. The corrugated pipe 1 is a metal corrugated pipe with a closed lower end and an open upper end, which is pre-buried in the lower structure 7, and the upper end opening of the corrugated pipe 1 is flush with the top surface of the lower structure 7; the length of the corrugated pipe 1 is a set value, and before the upper prefabricated wall panel 8 is installed in place, the center hole of the corrugated pipe 1 should be ensured to be in a cavity state.
[0037] In the horizontal joint of the precast concrete box-type house, an annular rubber gasket 5 is placed around the top opening of the corrugated pipe 1; the central hole of the rubber gasket 5 is aligned with the central hole of the corrugated pipe 1; the rubber gasket 5 is made of rubber made of high elastic material, and the whole is a circular ring with a notch on one side (the notch is provided to allow excess slurry to overflow from the notch when the shear connector 3 is installed after grouting), the inner diameter of the circular ring is larger than the inner diameter of the corrugated pipe 1, and its thickness is slightly larger than the width of the horizontal joint between the upper precast wall panel 8 and the lower structure 7; the side of the rubber gasket 5 with the notch faces the inner side of the wall; the rubber gasket 5 is arranged between the upper precast wall panel 8 and the lower structure 7, and is arranged around the periphery of the corrugated pipe 1, mainly playing the role of isolating the surrounding slurry 4.
[0038] The lower structure 7 may be a bottom foundation or a lower prefabricated wall panel.
[0039] like Figure 3 and Figure 4As shown, the shear anchor 2 is a welded part, including: a steel bottom plate 21, a steel side plate 23, a steel top plate 24, a steel back plate 25 and an anchoring steel bar 22; wherein the steel side plate 23, the steel top plate 24 and the steel back plate 25 are all rectangular steel plates, and the edges are welded to form a dustpan shape (i.e., the two sides of the steel back plate 25 are welded to the steel side plates 23 vertically connected thereto, and the top two steel side plates 23 at the top of the steel back plate 25 are welded to the steel top plate 24 vertically connected thereto); then, the whole is welded to the steel bottom plate 21 to form a drawer shape (i.e., the lower open end of the formed dustpan-shaped structure is welded to the steel bottom plate 21); the length of the steel bottom plate 21 is greater than the length of the steel top plate 24, and the dustpan-shaped structure is welded to the middle position of the upper end surface of the steel bottom plate 21. A through hole is provided in the middle position of the steel bottom plate 21, and the aperture of the through hole is slightly larger than the diameter of the shear screw 31 in the shear connector 3.
[0040] Since the length of the steel bottom plate 21 is greater than the length of the steel top plate 24, a cantilever structure is formed on the left and right sides of the steel bottom plate 21 (such as Figure 1 As shown, in this embodiment, the length direction of the horizontal seam is the left-right direction), and a group of anchor steel bars 22 are welded on each cantilever structure; as an example, 2 or 3 anchor steel bars 22 are welded on each cantilever structure, and the anchor steel bars 22 on both sides are symmetrically arranged relative to the center line of the steel bottom plate 21. The anchor steel bar 22 is an L-shaped steel bar made of HRB400 grade steel bars. The horizontal portion of the anchor steel bar 22 is welded to the steel bottom plate 21, and the vertical portion is expanded outward relative to the steel back plate 25 to form an inclined portion, and the preferred opening angle is 45° (that is, the angle between the inclined portion of the anchor steel bar 22 and the steel bottom plate 21 is 45°).
[0041] The shear anchor 2 is embedded and anchored in the bottom inner side of the upper prefabricated wall panel 8, wherein the lower surface of the steel bottom plate 21 is flush with the lower surface of the upper prefabricated wall panel 8, and the side where the steel back plate 25 is located faces the outer side of the upper prefabricated wall panel 8; the width of the steel bottom plate 21 is the same as the width of the steel top plate 24 (the width here refers to the dimension along the thickness direction of the upper prefabricated wall panel 8), and the side opening of the dustpan-shaped structure formed by welding the steel side plate 23, the steel top plate 24 and the steel back plate 25 is flush with the inner side of the upper prefabricated wall panel 8, serving as the operating port of the shear connector 3.
[0042] The shear connector 3 is connected to the upper prefabricated wall panel 8 and the lower structure 7 by bolts and grouting material anchoring to achieve the transmission of shear stress. Figure 5As shown, the shear connector 3 includes: a shear screw 31, an anchor nut 32, a tensioning nut 33 and a tensioning pad 34; the outer diameter of the shear screw 31 is smaller than the aperture of the corrugated pipe 1. When the shear connector 3 connects the upper prefabricated wall panel 8 and the lower structure, the shear screw 31 passes through the through hole on the steel bottom plate 21 in the shear anchor 2, the anchor nut 32 is screwed into the bottom of the shear screw 31, and the tensioning pad 34 and the tensioning nut 33 are screwed into the top in sequence, so that the tensioning pad 34 is pressed against the upper surface of the steel bottom plate 21; the lower end of the shear screw 31 (i.e., the end with the anchor nut 32 suspended) is located in the corrugated pipe 1, and the corrugated pipe 1 is filled with grouting material 6, and the injection height of the grouting material 6 is slightly greater than the height of the corrugated pipe 3. Screwing the tensioning nut 33 can apply sufficient compressive stress to the steel bottom plate 21.
[0043] The mortar 4 is used to fill the horizontal gap between the upper prefabricated wall panel 8 and the lower structure 7. Specifically, the mortar 4 is evenly spread on the top of the lower structure 7, avoiding the top surface and the inner area of the rubber gasket 5. The mortar 4 uses fine aggregate mortar, and the water content should not be too large to ensure that it does not flow when applied on the top of the lower structure 7. After the upper prefabricated wall panel 8 is installed in place, it mainly plays the role of filling the horizontal gap. At the same time, after hardening, it transmits the pressure between the upper prefabricated wall panel 8 and the lower structure 7, thereby increasing the horizontal shear resistance of the joint position.
[0044] The installation process of the horizontal joint shear connection node is as follows:
[0045] (1) When the lower structure 7 is a cast-in-place foundation, the corrugated pipe 1 should be fixed in the lower structure 7 before the foundation concrete is poured (such as by erecting steel bars or hanging and fixing them at the bottom of the bridge rod); when the lower structure is a prefabricated wall panel component, the corrugated pipe 1 should be fixed on the component production mold before the prefabricated component is made to ensure that the top opening of the corrugated pipe 1 is flush with the top surface of the prefabricated wall panel; check that the inside of the corrugated pipe 1 remains in a cavity state to prevent debris from entering the groove of the corrugated pipe 1;
[0046] (2) placing a rubber gasket 5 around the corrugated pipe 1, aligning the ring of the rubber gasket 5 with the center hole of the corrugated pipe 1, and facing the side of the rubber gasket 5 with the notch toward the inner side of the wall;
[0047] (3) When the upper prefabricated wall panel 8 is lifted to a set height (e.g., 500 mm) from the ground, the shear screw 31 of the shear connector 3 is passed through the through hole on the steel bottom plate 21 in the shear anchor 2, that is, the lower end of the shear screw 31 extends out of the steel bottom plate 21, and the upper end is located inside the shear anchor 2; the anchor nut 32 is screwed into the bottom of the shear screw 31, and the tension pad 34 and the tension nut 33 are screwed into the top of the shear anchor 2 from the operating port in sequence to ensure that the exposed size of the shear screw 31 meets the shear anchoring requirements;
[0048] (4) Mix fine stone mortar slurry 4, and evenly spread the slurry 4 on the top of the lower structure 7, avoiding the top surface and inner area of the rubber gasket 5;
[0049] (5) Mix high-strength grouting material 6 and pour the grouting material 6 into the groove of the corrugated pipe 1. The pouring height is slightly greater than the top surface height of the corrugated pipe 1;
[0050] (6) Place the upper prefabricated wall panel 8 at the corresponding position of the lower structure 7 according to the positioning, ensure that the lower part of the shear connector 3 is inserted into the corrugated pipe 1 (when the shear connector 3 is inserted, the excess grouting material overflows from the gap of the rubber gasket 5), and adjust the tensioning nut 33 from the operation port so that the shear screw 31 is inserted into the corrugated pipe 1 to a depth that meets the requirements;
[0051] (7) After the grouting material 6 solidifies and hardens, use a torque wrench to rotate the tensioning nut 33 from the operation port so that the tensioning nut 33 applies sufficient compressive stress to the steel base plate 21, and then use masonry mortar to seal the injection operation port.
[0052] The above-mentioned precast concrete box-type house horizontal joint shear connection node is mainly used in the position where the shear stress of the bottom joint is relatively large. The shear screw 31 replaces the additional shear steel bar to bear the joint shear load. At the same time, the preload applied by the tension nut 33 is used to increase the contact pressure between the upper precast wall panel 8 and the lower structure 7, so that more surrounding concrete interfaces participate in shear resistance, thereby improving the shear resistance bearing capacity of the entire joint. This connection node can effectively utilize the shear resistance bearing capacity of the existing concrete interface, so it can greatly reduce the setting of additional steel bars, thereby reducing steel bar investment and simplifying component processing and production and on-site installation processes.
[0053] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.
Claims
1. A prefabricated concrete box-type house horizontal joint shear connection node, characterized in that: include: Bellows, shear anchors and shear connectors; The lower end of the bellows is closed and the upper end is open; the bellows is pre-buried in the lower structure, and the upper end opening is flush with the top surface of the lower structure; The shear-resistant anchor is embedded in the upper prefabricated wall panel, and includes a steel drawer structure and anchor steel bars symmetrically arranged on the left and right sides of the steel drawer structure; The shear-resistant connector is connected to the upper prefabricated wall panel and the lower structure through a shear-resistant screw rod.
2. The prefabricated concrete box-type house horizontal joint shear connection node according to claim 1, characterized in that: The steel drawer structure in the shear-resistant anchor comprises: a steel bottom plate, a steel side plate, a steel top plate and a steel back plate; The steel side plates, steel top plate and steel back plate are all rectangular steel plates; the two opposite sides of the steel back plate are welded with steel side plates vertically connected thereto, and the steel top plate vertically connected thereto is welded between the two steel side plates on the top of the steel back plate, thereby forming a dustpan-shaped structure; the lower open end of the dustpan-shaped structure is welded to the steel bottom plate; The length of the steel bottom plate is greater than that of the steel top plate, and the dustpan-shaped structure is welded at the middle position of the upper end surface of the steel bottom plate, so that cantilever structures are formed on the left and right sides of the steel bottom plate, and a group of anchor steel bars is welded on each cantilever structure; A through hole for the shear-resistant connector to pass through is provided in the middle of the steel bottom plate.
3. The prefabricated concrete box-type house horizontal joint shear connection node according to claim 2, characterized in that: The anchor steel bar is an L-shaped structure, the horizontal portion of the anchor steel bar is welded to the steel bottom plate, and the vertical portion is spread outward relative to the steel back plate to form an inclined portion.
4. The prefabricated concrete box-type house horizontal joint shear connection node according to claim 3, characterized in that: The angle between the inclined portion of the anchor steel bar and the steel bottom plate is 45°.
5. The precast concrete box-type house horizontal joint shear connection node according to any one of claims 2 to 4, characterized in that: The shear-resistant connector comprises: a shear-resistant screw, an anchor nut, a tension nut and a tension pad; The shear screw passes through the through hole on the steel bottom plate of the shear anchor, the lower end of the shear screw is threadedly connected to the anchor nut, and the upper end of the shear screw is threadedly connected to the tension pad and the tension nut in turn; When the shear-resistant connector connects the upper prefabricated wall panel and the lower structure, the tension pad is pressed tightly against the upper surface of the steel bottom plate; the lower end of the shear-resistant screw is located in the corrugated pipe filled with grouting material.
6. The precast concrete box-type house horizontal joint shear connection node according to any one of claims 1 to 4, characterized in that: The horizontal gap between the upper prefabricated wallboard and the lower structure is filled with mortar.
7. The prefabricated concrete box-type house horizontal joint shear connection node according to claim 6, characterized in that: An annular rubber gasket is placed around the top opening of the bellows, and the center hole of the rubber gasket is aligned with the center hole of the bellows; the rubber gasket is used to isolate the slurry.
