Scaffold for building construction

By installing fixed rods, hooks, slide rods and other transportation mechanisms on the scaffolding, efficient and safe material transportation is achieved, and the problem of inconvenient material transportation in the existing technology is solved, and construction efficiency and safety are improved.

CN222009517UActive Publication Date: 2024-11-15哈尔滨地铁集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323592542.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-15
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

Existing scaffolding cannot conveniently and quickly transport the materials on the ground to high-altitude operating platforms during construction, resulting in workers needing to climb up and down frequently to replenish materials or tools, affecting efficiency and safety.

Method used

A conveying mechanism including a fixed rod, hook, slider, slider, mounting frame and pallet is designed. Through the cooperation of hook and slider, the pallet can move obliquely along the slider to achieve rapid material transportation, and can Use electric hoist to assist in transportation.

Benefits of technology

It realizes the rapid and stable delivery of goods and tools on high-altitude scaffolding, reduces the number of ladders for workers, improves construction efficiency and safety, and the installation and disassembly process is simple and convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009517U_ABST
    Figure CN222009517U_ABST
Patent Text Reader

Abstract

The utility model discloses a scaffold for building construction, which comprises a supporting scaffold, one side of the supporting scaffold is provided with a conveying mechanism for conveniently conveying goods, the conveying mechanism comprises a fixing rod, a hook, a sliding rod, a sliding block, a mounting frame and a tray, the fixing rod is fixedly arranged on the surface of the outer side of the supporting scaffold, and the fixing rod is fixedly arranged on the surface of the outer side of the supporting scaffold. A hook is arranged on the outer side surface of the fixing rod in a clamped mode, a sliding rod is fixedly arranged on one side of the surface of the hook, the outer side surface of the sliding rod is movably sleeved with a sliding block, a mounting frame is fixedly arranged at the upper end of the sliding block, and a tray is fixedly arranged at the upper end of the mounting frame. According to the utility model, the conveying mechanism is additionally arranged, so that when a worker at the upper end of a scaffold lacks materials or tools, the tool can be conveniently and quickly conveyed from the lower end, and the worker does not need to climb up and down the scaffold.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of scaffolds, in particular to a scaffold used for building construction. Background Art

[0002] Scaffolding is one of the common construction equipment in the prior art. Scaffolding can be used as an operating platform for workers during high-altitude construction, making it convenient to carry out various construction operations.

[0003] For example, when painting the exterior walls of a building, construction workers need to use scaffolding to paint the height of the building wall; at this time, during the painting construction, construction workers may need to add paint or putty powder or need to temporarily use other tools; and the scaffolding structure in the prior art can only play a basic supporting function and cannot conveniently and quickly transport the materials on the ground to the upper end of the scaffolding; therefore, in view of this problem, a scaffolding for building construction needs to be improved. Utility Model Content

[0004] The purpose of the utility model is to provide a scaffold for building construction to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a scaffold for construction, comprising a supporting scaffold, a transport mechanism for conveniently transporting goods is arranged on one side of the supporting scaffold, the transport mechanism comprises a fixed rod, a hook, a sliding rod, a slider, a mounting frame, and a pallet, a fixed rod is fixedly arranged on the outer surface of the supporting scaffold, a hook is clamped on the outer surface of the fixed rod, a sliding rod is fixedly arranged on one side of the hook surface, a sliding rod is movably sleeved on the outer surface of the sliding rod, a mounting frame is fixedly arranged on the upper end of the sliding block, and a pallet is fixedly arranged on the upper end of the mounting frame.

[0006] Preferably, a first guardrail is fixedly provided on the upper end of the supporting scaffolding, and the safety of the workers at the upper end of the supporting scaffolding can be improved by the first guardrail.

[0007] Preferably, a stabilizing rod is fixedly provided on the surface of the supporting scaffold, and the stability of the entire device can be improved by the stabilizing rod.

[0008] Preferably, a stabilizing frame is fixedly provided at the lower end of the supporting scaffold, and the stability of the entire supporting scaffold can be improved by the stabilizing frame.

[0009] Preferably, a second guardrail is fixedly provided on the upper end of the pallet, and the second guardrail can facilitate the goods to fall from the upper end of the pallet when moving.

[0010] Preferably, a through groove is provided on the surface of the pallet, through which a rope can be conveniently passed, so that the staff can pull the pallet upward by the rope; and the device can also be provided with an electric hoist at the upper end of the supporting scaffolding, and then the electric hoist can drive the pallet to move obliquely upward along the slide bar by winding the rope; such a device can be operated by manpower or by an electric hoist, which can be selected according to needs.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. When it is necessary to frequently transport materials or tools to the supporting scaffolding, the device can be expanded as needed to install a transport mechanism on one side of the supporting scaffolding. Then, the rope can be easily passed through the through groove, so that the staff can use the rope to pull the tray to move diagonally upward along the slide bar. In this way, when facing some higher scaffoldings, when the workers at the upper end of the scaffolding are short of materials or tools, the tools can be transported up from the lower end conveniently and quickly, thus saving the workers from climbing up and down the scaffolding.

[0013] 2. When the utility model is used, the installation process of the entire transport mechanism is extremely convenient. The installation can be completed by simply setting the hook on the outer surface of the fixed rod. When disassembly is required, the hanging rod is lifted upward to separate the transport mechanism from the supporting scaffold. The entire installation and disassembly process is extremely simple, which is convenient for promotion and use.

[0014] 3. The utility model uses the pallet 7 to transport goods; the goods are transported up and down, and compared with the manual delivery method, the conveying capacity of the device is undoubtedly larger; more goods can be transported at one time, and it is more stable and less likely to fall out of the hands. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall structure of a scaffold used in building construction according to the utility model;

[0016] Figure 2 This is an overall structural view of a supporting scaffold in a scaffold used for building construction according to the utility model;

[0017] Figure 3 This is a three-view drawing of the overall structure of a transport mechanism in a scaffold used in building construction according to the utility model;

[0018] Figure 4 The utility model is a scaffolding used for building construction Figure 3 Magnified view at A in the middle.

[0019] In the figure: 1. supporting scaffold; 2. fixing rod; 3. hook; 4. sliding rod; 5. slider; 6. mounting frame; 7. tray; 8. first guardrail; 9. second guardrail; 10. stabilizing rod; 11. stabilizing frame; 12. through groove. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-4 The utility model provides a technical solution: a scaffold for construction, comprising a supporting scaffold 1, one side of the supporting scaffold 1 is provided with a transport mechanism for conveniently transporting goods, the transport mechanism comprises a fixed rod 2, a hook 3, a slide bar 4, a slider 5, a mounting frame 6, and a pallet 7, the outer surface of the supporting scaffold 1 is fixedly provided with a fixed rod 2, the outer surface of the fixed rod 2 is engaged with a hook 3, one side of the surface of the hook 3 is fixedly provided with a slide bar 4, the outer surface of the slide bar 4 is movably sleeved with a slide bar 5, the upper end of the slide bar 5 is fixedly provided with a mounting frame 6, and the upper end of the mounting frame 6 is fixedly provided with a pallet 7.

[0022] A first guardrail 8 is fixedly provided on the upper end of the supporting scaffold 1, and the first guardrail 8 can improve the safety of the workers on the upper end of the supporting scaffold 1;

[0023] The surface of the supporting scaffold 1 is fixedly provided with a stabilizing rod 10, and the stabilizing rod 10 can improve the stability of the entire device;

[0024] A stabilizing frame 11 is fixedly provided at the lower end of the supporting scaffold 1, and the stabilizing frame 11 can improve the stability of the entire supporting scaffold 1;

[0025] A second guardrail 9 is fixedly provided on the upper end of the pallet 7, and the second guardrail 9 can facilitate the goods to fall from the upper end of the pallet 7 when moving;

[0026] The surface of the tray 7 is provided with a through groove 12, through which a rope can be conveniently passed, so that the staff can pull the tray 7 upward by the rope; and the device can also be provided with an electric hoist at the upper end of the supporting scaffold 1, and then the electric hoist can drive the tray 7 to move obliquely upward along the slide bar 4 by winding the rope; in this way, the device can be manpower or electric hoist, which can be selected according to needs.

[0027] Working principle: When using this device, the supporting scaffold 1 is used in the same way as a traditional scaffold; and when it is necessary to frequently transport materials or tools to the supporting scaffold 1, this device can be expanded as needed to install a transport mechanism on one side of the supporting scaffold 1; then the through slot 12 can be used to conveniently pass the rope, so that it is convenient for the staff to pull the tray 7 along the slide bar 4 to move obliquely upwards through the rope; in this way, when facing some higher scaffolds, when the workers at the upper end of the scaffold are short of materials or tools, the tools can be conveniently and quickly transported up from the lower end, thus saving the workers from climbing up and down the scaffold;

[0028] When the device is used, the pallet 7 is used to transport the goods; the goods are transported up and down, and compared with the manual delivery method, the delivery capacity of the device is undoubtedly greater; more goods can be transported at one time, and it is more stable and less likely to lose the goods;

[0029] Moreover, when the device is used, the installation process of the entire transport mechanism is extremely convenient. The installation can be completed by simply sleeve the hook 3 on the outer surface of the fixing rod 2. When disassembly is required, the hanging rod is lifted upward to separate the transport mechanism from the supporting scaffold 1. The entire installation and disassembly process is extremely simple, which is convenient for promotion and use.

[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A scaffold for building construction, comprising a supporting scaffold (1), characterized in that: A transport mechanism for conveniently transporting goods is arranged on one side of the supporting scaffold (1), and the transport mechanism comprises a fixed rod (2), a hook (3), a sliding rod (4), a slider (5), a mounting frame (6), and a pallet (7). The outer surface of the supporting scaffold (1) is fixedly provided with a fixed rod (2), the outer surface of the fixed rod (2) is provided with a hook (3) in a snap-fitting manner, one side of the surface of the hook (3) is fixedly provided with a sliding rod (4), the outer surface of the sliding rod (4) is movably sleeved with a slider (5), the upper end of the slider (5) is fixedly provided with a mounting frame (6), and the upper end of the mounting frame (6) is fixedly provided with a pallet (7).

2. A scaffold for building construction according to claim 1, characterized in that: A first guardrail (8) is fixedly provided on the upper end of the supporting scaffold (1).

3. A scaffold for building construction according to claim 1, characterized in that: A stabilizing rod (10) is fixedly arranged on the surface of the supporting scaffold (1).

4. A scaffold for building construction according to claim 1, characterized in that: A stabilizing frame (11) is fixedly arranged at the lower end of the supporting scaffold (1).

5. A scaffold for building construction according to claim 1, characterized in that: A second guardrail (9) is fixedly provided on the upper end of the tray (7).

6. A scaffold for building construction according to claim 1, characterized in that: A through groove (12) is provided on the surface of the tray (7).