Connecting device for installing climbing frame on retreating table
By using first-level wall attachments, columns, and connecting components in the climbing formwork installation device, the problem of complex climbing formwork installation was solved, simplifying installation and enabling efficient material turnover in ultra-high-rise construction, thereby reducing construction costs.
Patent Information
- Application Number
- CN202420633449.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-28
AI Technical Summary
The existing climbing scaffolding and external protective frame installation structures are complex and use a lot of materials, resulting in low installation efficiency.
A connection device for installing a climbing scaffold on a platform is provided, including a first horizontal wall attachment, a column, a second horizontal wall attachment, and a connecting component. Stable attachment points are formed by fixing the column, the horizontal wall attachment, and the tie rods. Steel beams, clamping steel channels, and through-wall bolts are used for connection, simplifying the installation process.
In the case of shrinkage of super high-rise structures, it provides attachment points for climbing formwork, simplifies the installation process, improves construction efficiency, reduces costs, and enhances material turnover efficiency.
Smart Images

Figure CN222009564U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a connection device, and in particular to a connection device in which a climbing frame is installed on a retreat platform. Background Art
[0002] During the construction of super-high floors, it is common to build external protective frames, cantilever scaffolding or climbing frames at the floor setbacks. The existing climbing frames and external protective frames have complex installation structures and require a large amount of materials, resulting in low installation efficiency. Utility Model Content
[0003] The embodiment of the present application provides a connection device for mounting a climbing frame on a retreat platform to solve the problems existing in the related art. The technical solution is as follows:
[0004] The embodiment of the present application provides a connection device for mounting a climbing frame on a retreat platform, comprising:
[0005] A first horizontal attached wall, one end of the first horizontal attached wall is connected to the climbing frame, and the first horizontal attached wall is connected to the setback;
[0006] A column, which is installed on the first horizontal wall and is located on one side of the climbing frame;
[0007] A second horizontal attached wall, the second horizontal attached wall is installed on the column, and one end of the second horizontal attached wall away from the column is connected to the climbing frame;
[0008] Two groups of connection components are installed on the first horizontal wall, and the bottom end of the column is connected to one of the groups of connection components.
[0009] In one embodiment, it further includes:
[0010] A first pull rod, one end of which is connected to the top of the column, and the other end of which is connected to a group of connecting components away from the column.
[0011] In one embodiment, it further includes:
[0012] A second pull rod, one end of the second pull rod is connected to one end of the first horizontal wall attached close to the climbing frame, and the other end is connected to the column. The end of the second pull rod connected to the column is located below the second horizontal wall attached.
[0013] In one embodiment, it further includes:
[0014] The third pull rod, one end of the third pull rod is connected to one end of the second horizontal wall-mounted frame connected to the climbing frame, and the other end is connected to the column.
[0015] In one embodiment,
[0016] Both sets of connection components include:
[0017] The steel beam, the column and one end of the first tie rod are respectively mounted on the two steel beams;
[0018] Top hoop channel steel, the top hoop channel steel is installed on the first horizontal attached wall;
[0019] Bottom hoop channel steel, the top of the steel beam is connected to the top hoop channel steel, and the bottom is connected to the bottom hoop channel steel.
[0020] In one embodiment,
[0021] The connection components also include:
[0022] A through-wall screw, both ends of which are respectively connected to the top hoop channel steel and the bottom hoop channel steel.
[0023] In one embodiment,
[0024] The first tie rod comprises:
[0025] Steel pipe;
[0026] Ear plates are connected to both ends of the steel pipe, and the two ends of the steel pipe are respectively connected to the top clamp channel steel and the column through the ear plates.
[0027] In one embodiment,
[0028] Wall-attached supports are installed on the connecting ends of the first horizontal wall-attached wall, the second horizontal wall-attached wall and the climbing frame.
[0029] In one embodiment,
[0030] The top of the column contacts the upper step.
[0031] In one embodiment,
[0032] The first horizontal attached wall is arranged in parallel with the second horizontal attached wall, and the length of the second horizontal attached wall is shorter than the length of the first horizontal attached wall.
[0033] The advantages or beneficial effects of the above technical solution include at least:
[0034] The columns, the first horizontal attached wall and the second horizontal attached wall are fixed by connecting components. In the case of structural shrinkage in super-high-rise buildings, attachment points for the climbing frame are provided at the structural shrinkage points. Climbing frame attachment space is provided for super-high-rise floors, which facilitates the installation of the climbing frame on the setbacks of super-high floors, thereby improving material turnover during construction. The operation is simple and convenient, which improves construction efficiency while reducing construction costs and increasing profits.
[0035] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present application will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.
[0037] Figure 1 It is a schematic diagram of the structure of the utility model;
[0038] In the figure: 100, connecting device; 101, first pull rod; 102, second pull rod; 103, third pull rod;
[0039] 110, first level attached wall;
[0040] 120, pillar;
[0041] 130, second level attached wall;
[0042] 140. Connecting assembly; 141. Steel beam; 142. Top hoop channel steel; 143. Bottom hoop channel steel;
[0043] 150. Wall mount. DETAILED DESCRIPTION
[0044] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present application. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0045] Figure 1 FIG. 1 is a structural diagram of a connection device 100 for mounting a climbing frame on a retreat platform according to an embodiment of the present application. Figure 1 As shown, the connection device 100 may include:
[0046] A first horizontal attached wall 110, one end of the first horizontal attached wall 110 is connected to the climbing frame, and the first horizontal attached wall 110 is connected to the setback;
[0047] A column 120, wherein the column 120 is installed on the first horizontal wall 110, and the column 120 is located at one side of the climbing frame;
[0048] A second horizontal attached wall 130, the second horizontal attached wall 130 is installed on the column 120, and one end of the second horizontal attached wall 130 away from the column 120 is connected to the climbing frame;
[0049] Two groups of connection components 140 are installed on the first horizontal wall 110 , and the bottom end of the column 120 is connected to one of the groups of connection components 140 .
[0050] In this embodiment, the first horizontal wall 110 is installed on the setback, and the column 120, the first horizontal wall 110 and the second horizontal wall 130 are fixed by the connecting assembly 140. The climbing frame is fixed to the ends of the first horizontal wall 110 and the second horizontal wall 130 by welding, which serves as the attachment point of the setback position of the climbing frame.
[0051] The column 120, the first horizontal attached wall 110 and the second horizontal attached wall 130 are fixed by the connecting assembly 140. When the structure of the super-high-rise building shrinks, an attachment point of the climbing frame is provided at the location of the structural shrinkage, and a climbing frame attachment space is provided for the super-high-rise building, so that the climbing frame can be easily installed on the super-high-rise building step-down platform, thereby improving the material turnover during construction, making the operation simple and convenient, improving the construction efficiency, reducing the construction cost and increasing the benefits;
[0052] It should be noted that the column 120 is a 4.5m special column 120, which is composed of a 10mm steel plate, an 80mm×80mm×6mm angle steel, and an M32 through-wall screw. The 80mm×80mm×6mm angle steel is used as the four corners, and the 10mm steel plate is welded every 300mm on each surface to form a whole, and the M32 through-wall bolts work together with other components;
[0053] The second horizontal attached wall 130 and the first horizontal attached wall 110 are welded by two No. 10 channel steels, wherein a 6mm thick steel plate reinforcement is welded every 300mm, and the ends are fixed to the climbing frame attached wall by welding, and are formed into a whole by cooperating with other assemblies through M32 through-wall bolts;
[0054] M32 through-wall screws include: M32mm*400mm; spring washers: M33; pads: 100mm×100mm×10mm or 180mm×100mm×10mm steel plates; 2 M32 through-wall screws are installed at each location, and the threads should protrude from the nuts by no less than 3 threads during installation.
[0055] like Figure 1 As shown, in one embodiment, it also includes:
[0056] The first pull rod 101 has one end connected to the top of the column 120 , and the other end connected to a group of connecting components 140 away from the column 120 .
[0057] The second pull rod 102 has one end connected to the first horizontal wall 110 close to the climbing frame, and the other end connected to the column 120 . The end of the second pull rod 102 connected to the column 120 is located below the second horizontal wall 130 .
[0058] The third pull rod 103 has one end connected to one end of the second horizontal wall attachment 130 connected to the climbing frame, and the other end connected to the column 120 .
[0059] In this embodiment,
[0060] The first tie rod 101, part of the first horizontal wall 110 and the column 120 form a right triangle structure;
[0061] The second tie rod 102, part of the first horizontal wall attachment 110 and part of the column 120 form a right triangle structure;
[0062] The third tie rod 103, the second horizontal attached wall 130 and part of the first horizontal attached wall 110 form a right triangle structure;
[0063] The first horizontal attached wall 110 and the second horizontal attached wall 130 are secondarily fixed by using the first tie rod 101 , the second tie rod 102 and the third tie rod 103 to ensure the stability of the first horizontal attached wall 110 and the second horizontal attached wall 130 .
[0064] like Figure 1 As shown, in one embodiment,
[0065] Both sets of connection components 140 include:
[0066] The steel beam 141, the column 120 and one end of the first tie rod 101 are respectively mounted on the two steel beams 141;
[0067] A top hoop channel steel 142, wherein the top hoop channel steel 142 is installed on the first horizontal attached wall 110;
[0068] The bottom hoop channel steel 143 , the top of the steel beam 141 is connected to the top hoop channel steel 142 , and the bottom is connected to the bottom hoop channel steel 143 .
[0069] The connection assembly 140 further includes:
[0070] The through-wall screw rod has two ends connected to the top hoop channel steel 142 and the bottom hoop channel steel 143 respectively.
[0071] In this embodiment, the steel beam 141 is used to fix the column 120 and the first horizontal wall 110 through the top clamp channel steel 142, the bottom clamp channel steel 143 and the M32 through-wall bolts;
[0072] During the installation process, the column 120 and one end of the first tie rod 101 are respectively installed on the two steel beams 141, and fixed to the column 120 and one end of the first tie rod 101 by the top clamp channel steel 142. The top clamp channel steel 142 and the bottom clamp channel steel 143 are connected by M34 through-wall bolts to fix the steel beam 141. At the same time, the connection between the first tie rod 101 and the column 120 is tightened to ensure the stability of the connection; strengthen the connection stability between the attached scaffolding and the main structure, provide attachment space for the contraction structure position of the super-high-rise floor, facilitate the application of the climbing frame, simple and convenient operation, improve construction efficiency, reduce construction costs, increase benefits, and can be promoted on a large scale.
[0073] like Figure 1 As shown, in one embodiment,
[0074] The first tie rod 101 comprises:
[0075] Steel pipe;
[0076] Ear plates are connected to both ends of the steel pipe, and the two ends of the steel pipe are respectively connected to the top clamp channel steel 142 and the column 120 through the ear plates.
[0077] In this embodiment, both ends of the steel pipe are connected to the column 120 and the first horizontal wall 110 through ear plates, which facilitates the installation of the steel pipe;
[0078] Furthermore, the second tie rod 102 and the third tie rod 103 are both installed on the first horizontal attached wall 110, the second horizontal attached wall 130 and the column 120 by connecting the two ends of the ear plate and the steel pipe.
[0079] In one embodiment,
[0080] Wall mounting supports 150 are installed on the connection ends of the first horizontal wall mounting 110, the second horizontal wall mounting 130 and the climbing frame.
[0081] In this embodiment, the wall-mounted support 150 plays a certain supporting role on the connection between the first horizontal wall 110, the second horizontal wall 130 and the climbing frame. The wall-mounted support 150 is respectively connected to the climbing frame and the first horizontal wall 110 and the second horizontal wall 130 to ensure the stability of the connection between the first horizontal wall 110, the second horizontal wall 130 and the climbing frame.
[0082] like Figure 1 As shown, in one embodiment,
[0083] The top end of the column 120 contacts the upper step.
[0084] In this embodiment, the top of the column 120 may support the upper step-down platform or may not contact the upper step-down platform. When the top of the column 120 contacts the upper step-down platform, it provides a certain supporting force to the upper step-down platform, thereby ensuring the stability of the step-down platform.
[0085] In one embodiment,
[0086] The first horizontal attached wall 110 and the second horizontal attached wall 130 are disposed in parallel, and the length of the second horizontal attached wall 130 is smaller than the length of the first horizontal attached wall 110 .
[0087] In this embodiment, the first horizontal wall 110 and the second horizontal wall 130 are arranged in parallel, and the length of the second horizontal wall 130 is smaller than the length of the first horizontal wall 110 to ensure that the column 120 is vertically connected to the first horizontal wall 110, and is adapted through the first pull rod 101, the second pull rod 102 and the third pull rod 103 to ensure the stability of the connection between the first horizontal wall 110 and the second horizontal wall 130 and the climbing frame.
[0088] The functions of each module in each device of the embodiment of the present utility model can refer to the corresponding description in the above method, which will not be repeated here.
[0089] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.
[0090] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0091] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A connection device for mounting a climbing frame on a retreat platform, characterized in that: A first horizontal attached wall, one end of which is connected to the climbing frame, and the first horizontal attached wall is connected to the setback; A column, wherein the column is installed on the first horizontal wall and the column is located on one side of the climbing frame; A second horizontal attached wall, the second horizontal attached wall is installed on the column, and one end of the second horizontal attached wall away from the column is connected to the climbing frame; Two groups of connection components are installed on the first horizontal wall, and the bottom end of the column is connected to one of the groups of connection components.
2. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: Also includes: A first pull rod, one end of which is connected to the top of the column, and the other end of which is connected to a group of the connecting components away from the column.
3. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: Also includes: A second pull rod, one end of the second pull rod is connected to one end of the first horizontal wall attached close to the climbing frame, and the other end is connected to the column. The end of the second pull rod connected to the column is located below the second horizontal wall attached.
4. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: Also includes: A third pull rod, one end of which is connected to one end of the second horizontal wall-mounted frame connected to the climbing frame, and the other end of which is connected to the column.
5. The connection device for mounting a climbing frame on a retreat platform according to claim 2, characterized in that: Both sets of connection components include: Steel beams, the column and one end of the first tie rod are respectively mounted on two of the steel beams; A top hoop channel steel, wherein the top hoop channel steel is installed on the first horizontal attached wall; Bottom hoop channel steel, the top of the steel beam is connected to the top hoop channel steel, and the bottom is connected to the bottom hoop channel steel.
6. The connection device for mounting a climbing frame on a retreat platform according to claim 5, characterized in that: The connection component also includes: A through-wall screw rod, both ends of which are respectively connected to the top hoop channel steel and the bottom hoop channel steel.
7. The connection device for mounting a climbing frame on a retreat platform according to claim 6, characterized in that: The first pull rod comprises: Steel pipe; Ear plates, the ear plates are connected to both ends of the steel pipe, and the two ends of the steel pipe are respectively connected to the top clamp channel steel and the column through the ear plates.
8. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: Wall-attached supports are installed on the connecting ends of the first horizontal wall-attached wall, the second horizontal wall-attached wall and the climbing frame.
9. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: The top end of the column is in contact with the upper retreat platform.
10. The connection device for mounting a climbing frame on a retreat platform according to claim 1, characterized in that: The first horizontal attached wall is arranged in parallel with the second horizontal attached wall, and the length of the second horizontal attached wall is shorter than the length of the first horizontal attached wall.
