Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

742results about How to "Faster turnaround" patented technology

Die for building materials products and preparation method thereof

The invention discloses a die for building materials products and a preparation method thereof. The die provided by the invention contains a preformed female die and is prepared by the following steps of: cleaning the female die by an air pump, coating a mold releasing agent on the surface of the female die, uniformly laying a silica gel surface layer on the surface of the female die coated with the mold releasing agent to form a nonstick material surface layer, placing a bar of angle iron at each long side of the die; successively laying a silica gel bonding coat and a layer of gauze on the silica gel surface layer after its gelation, laying an epoxy resin bonding layer and a layer of glass fiber grid cloth after coagulation of the silica gel bonding layer to form a bonding layer; laying an insulation plate and flat iron on the bonding layer, pressing tightly by using a steel plate and simultaneously installing seal section bars at the four corners of the die; laying epoxy resin mortar on the surface of the insulation plate to form a light filling layer; laying a layer of glass fiber biaxial cloth on the light filling layer, and laying an epoxy adhesive coat on the glass fiber biaxial cloth to form a hard base material. The die provided by the invention has a simple structure, is easy to demould, and can be used to effectively guarantee the quality of moulded products. In the meantime, the preparation method provided by the invention is convenient to operate, requires low cost, and is easy to maintain.
Owner:ENERGY EFFICIENCY TECH

Aluminum alloy material and production method of cast-rolling stock of decorative strip of same

The invention relates to a 3004 aluminum alloy material and a production method of a cast-rolling stock of a decorative strip of the 3004 aluminum alloy material. The compositions of the aluminum alloy material comprise smaller than or equal to 0.25 percent of Si, 0.20 to 0.60 percent of Fe, 0.10 to 0.15 percent of Cu, 1.0 to 1.20 percent of Mn, 0.85 to 1.25 percent of Mg, smaller than or equal to 0.05 percent of Ti, and the remaining amount of Al. The production method comprises the steps of smelting, refining, on-line degassing, grain refinement, filtration, cast rolling, and the like; during the smelting, 50 percent to 60 percent of electrolytic aluminum liquid and the rest of aluminum alloy waste materials are mixed and smelted; the compositions except Mg are added to the mixture; and after the steps of powder injection refining, slag skimming, magnesium ingot adding, furnace turning-down and refining are conducted, the stock of the strip is cast-rolled. A product of the production method has even and steady chemical compositions and can satisfy the mechanical property requirements of subsequent rolling, so that the yield of subsequent rolling is increased; by using the aluminum alloy waste materials as raw materials, the raw materials are saved; by directly adding the electrolytic aluminum liquid, gas loss in the melting process is reduced, and burning loss in the waste material melting process can also be decreased; and by using a cast-rolling manner to replace a hot-rolling manner, the process is simplified and the production cost is greatly reduced.
Owner:沁阳市鼎建建设发展有限公司

A construction method for the communication channel of the broken stratum in the shield tunnel crossing the river

The invention relates to a construction method for an underground tunnel, in particular to a construction method for a river-crossing shield tunnel crushed stratum communication channel, which is used for solving the problems of failure of stratum reinforcement, long working period, high cost, poor quality and the like existing in the construction process of the conventional river-crossing shieldtunnel crushed stratum communication channel. The method comprises the following steps of: determining the position of the communication channel; before opening, performing pre-grouting to integrallyconsolidate broken rock outside the excavation outline of the communication channel; forming a high-strength waterproof curtain; before excavation, performing stress conversion; drilling and partitioning to remove a left line pipe sheet, brushing the top, performing tunnel excavation with a combined damping burst technology, and timbering; and drilling and partitioning to remove a right line pipesheet, brushing the top, and performing second lining construction by adopting a combination template. Due to the adoption of the construction method, water seepage is avoided after excavation, the technology is advanced, the blank of a communication channel pre-grouting technology is fulfilled, the working period is short, the mechanical degree is high, the process is simple, construction is environmentally-friendly, collapse is avoided, and over-excavation is greatly lowered; and the method has a wide application range.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1

Method for manufacturing prestressed concrete tubular pile

The invention relates to a method for manufacturing a prestressed concrete tubular pile, which belongs to the technical field of building engineering materials. The method comprises the following steps of: weighing silicate cement, composite superfine powder, sand, broken stone, water and composite water reducing agent in a ratio, pouring the weighed sand into a stirrer, adding the weighed silicate cement and the weighed composite superfine powder into the stirrer in turn, stirring the mixture, then adding the weighed water into the stirrer, stirring the mixture to form cement mortar, adding the weighed composite water reducing agent into the stirrer, and finally adding the weighed broken stone into the stirrer to obtain concrete; pouring the concrete into a tubular pile die, tensing steel bars to obtain a pre-stressing force, and centrifugally shaping the concrete to obtain the prestressed concrete tubular pile; and finally curing the prestressed concrete tubular pile by steam. The manufacturing method only needs low-temperature and normal-pressure steam curing, and has the advantages of simple production equipment, convenient process control, safe production and operation, saving of production land, reduction of product cost, improvement of production efficiency, reduction of environmental pollution, high compression-resistant push, good impact toughness, high fracture toughness and good durability.
Owner:深圳市同成新材料科技有限公司

Limited bracket construction method of large-span S-shaped steel box girder

The invention discloses a limited bracket construction method of a large-span S-shaped steel box girder. The steel box girder comprises 14 small sections of prefabricated steel box girders; and the 14small sections of prefabricated steel box girders are assembled into seven large sections at a construction site, and then the seven large sections are hoisted and fixed. The construction method comprises the following specific steps of: prefabricating and assembling the steel box girders, constructing temporary brackets in water, hoisting and positioning steel box girder section blocks, connecting steel box girder interfaces, constructing closure sections and welding the collar extension of the steel box girders. According to the limited bracket construction method, a prefabricated assemblymode is used during construction; a floating crane is used for assembly, so that the occupation and pollution of a water area under a bridge are reduced; the parallel operation of multiple processes speeds up the construction progress and shortens the construction period; the temporary brackets are arranged only at circular seams of large-section girder joints; and the brackets occupy small space,thereby facilitating the navigation under the bridge in the construction state and reducing the influence on the navigation under the lake-across construction bridge and surrounding social environments.
Owner:合肥市公路桥梁工程有限责任公司

Railway station internal and external work control system

The invention discloses a railway station internal and external work control system, which comprises a railway station transport information subsystem, a dispatching exchange, a base station and external work handhold devices, wherein the railway station transport information subsystem is connected with the dispatching exchange in a wired mode; the dispatching exchange is connected with the base station in a wired mode; and the base station is connected with the external work handhold devices in a wireless mode. The railway station transport information subsystem makes operation plans for trains, announces the plans in advance, sends the plans to the external work handhold devices, controls the job processing of external workers according to feedback information received from the external work handhold devices and ensures that all external work handhold devices complete train operation according to dispatching regulations; the dispatching exchange and the base station serve as the transfer stations between the railway station transport information subsystem and the external work handhold devices; and the external work handhold devices execute operation according to the operation plans of the trains, and report operation processing information. When the system is used, the operation efficiency and safety can be improved.
Owner:SINORAIL HONGYUAN BEIJING SOFTWARE TECH

Inventory management method, device and system

The invention provides an inventory management method, a device and a system and relates to the technical field of inventory management. The method comprises steps of acquiring consumption information input by a consumer on a consumption terminal; according to the consumption information, updating preset storage information or a replenishment period; according to the consumption information, actual storage information and the preset storage information, accounting commodity demand information in the replenishment period; and sending the commodity demand information to an inventory management terminal. According to the invention, according to the acquired consumption information of the consumer, the preset storage information or the replenishment period is updated, then by combining the actual storage information, the commodity demand information in the replenishment period is accounted, and finally the inventory management terminal is informed to carry out replenishment according to the commodity demand information, so inventory management effects of proper purchasing, timely replenishment and optimal inventory quantity are achieved and problems of low informatization degree, low management efficiency and poor management effects existing in the current manual inventory management are solved.
Owner:HANGZHOU NAJIE TECH CO LTD

Warehoused stereo garage and control method for parking, fetching and delivering vehicles

The invention discloses a warehoused stereo garage. A garage architecture body has at least one layer of structure, wherein each layer comprises a carrying channel and a plurality of parking positions arranged on two sides of the carrying channel; and a lifter is matched with an inlet of the carrying channel of more than two layers. The warehoused stereo garage is characterized in that two longitudinal groove tracks are respectively arranged on the carrying channel of each layer; two transverse groove tracks are respectively arranged at every two oppositely-arranged parking positions on two sides of the carrying channel; two longitudinal groove tracks are arranged on a lifting platform of the lifter; a carrying cart for parking the vehicle is arranged at each parking position; and the invention also provides a control method for parking, fetching and delivering the vehicles. The warehoused stereo garage has the advantages of reasonable structure, high automatic degree, capabilities of reducing the height of parking position, reducing the volume of the garage, accelerating the turning of the vehicles which are stored and fetched, saving the storing time and the like. The warehoused stereo garage can be widely applied to the warehousing of the vehicles of automobile manufacturers and distributers and storage of the vehicles in airports, docks, stations, hotels, residential areas, sports and amusement places and the like.
Owner:缴润利

Super plasticizer for precast concrete component

The invention relates to a super plasticizer for a precast concrete component, and the super plasticizer is prepared by carrying out free radical copolymerization reaction on monomer a, monomer b, monomer c and monomer d in an aqueous medium, and adding alkali compound into the reaction product for neutralization, wherein the molar ratio among the monomer a, the monomer b, the monomer c and the monomer d is 1.0:(5.0-16.0):(1.0-4.0):(2.0-6.0). Compared with the traditional high efficiency water reducing agent, the admixture has the characteristics that (1) the early hydration of the cement is obviously improved, the compression strength of the concrete is improved, and especially the early strength is improved; (2) the problem of slump loss caused by polyether long side chain belt can be greatly improved, so that the slump loss resistance of the concrete is improved, and the requirements of pumping pipe pile concrete can be met; and (3) under the condition of low amount of admixture, the super plasticizer for the precast concrete component has remarkable dispersing performance, slump-retaining capability and enhancement effect, is especially remarkable in early enhancement effect, is very remarkable in the early enhancement effect at the room temperature or low temperature, and is stable in later strength increment, thus being conductive to accelerating the turnover of templates, and accelerating the construction progress.
Owner:JIANGSU SOBUTE NEW MATERIALS +1

Sintered light-weight environment-friendly brick produced from electroplating sludge and manufacture method thereof

The invention relates to a sintered light-weight environment-friendly brick produced from electroplating sludge and a manufacture method thereof. The sintered light-weight environment-friendly brick is characterized by being prepared by adopting electroplating sludge, base waste sludge, furnace slag, refuse ash, calcium oxide, calcium sulfate, sodium carbonate, boric acid, ferrous sulfate, magnesium sulfate, Li macromolecular heavy metal trapping agent and water are adopted as raw materials; and the manufacture method comprises the following steps of: mixing and stirring the raw materials in a biaxial mixer to be in a moisture state; extruding into rectangular bars by a vacuum sludge extruder; cutting and forming by a blank cutter; manufacturing light-weight environment-friendly brick blanks of electroplating sludge under the pressure of 20-30 MPa; and conveying the formed and naturally dried light-weight environment-friendly brick blanks into a tunnel kiln to roast and manufacture light-weight environment-friendly brick products. Air laying bricks and pavement bricks in different specifications can also be manufactured by the raw materials of the invention, and the product has the advantages and the effects of light weight, great strength, zero pollution, low cost and good benefits.
Owner:清远绿由环保科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products