Formwork erecting structure for building constructional column decoration-free concrete construction
By using a combination structure of bamboo glue template, square wood, connecting shaft and built-in stretching in the construction form, combined with the adjustment components of rubber suction cup and screw rod, the problem of inconvenience in disassembly and assembly of existing construction formwork is solved, and strength and flexibility are achieved Double improvement of sex.
Patent Information
- Application Number
- CN202323358710.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-11
AI Technical Summary
The existing prefabricated building construction formwork is inconvenient when disassembling and assembly, lacks flexibility, and the integrated structure loses flexibility while enhancing the connection strength.
A supporting mold structure for factory building structural columns without decoration is designed, using bamboo glue formwork to disassemble and movable connection between square wood and connecting shaft, combined with built-in stretching and rounded corner structure, and is connected by threaded bolts and screw holes. Enhance the overall strength of the template and facilitate easy removal through the adjustment components of the rubber suction cup and screw.
It significantly improves the flexibility and overall strength of the construction formwork, avoids the cracking of the bamboo glue formwork, simplifies the disassembly process, enhances the strength of the connecting embedded end, and facilitates construction and disassembly.
Smart Images

Figure CN222009591U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction formwork, and more specifically, the utility model relates to a formwork structure for the construction of a factory building structural column without decoration of concrete. Background Art
[0002] A construction formwork is a tool used to pour concrete to form a beam-shaped or block-shaped structure. The advantage of an assembled concrete construction formwork is that its own structure is simple and it is convenient to disassemble. However, most of the existing assembled buildings are integral structures, which can increase the connection strength, but lose the overall flexibility. Therefore, it is inconvenient to disassemble and assemble. Based on this, it is necessary to provide a construction formwork that can enhance the connection strength and stability while being convenient to disassemble. Content of the Utility Model
[0003] The purpose of the utility model is to provide a formwork structure for the construction of a factory building structural column without decoration of concrete to solve the problems raised in the above background art.
[0004] To achieve the above purpose, the utility model provides the following technical solution: a formwork structure for the construction of a factory building structural column without decoration of concrete, including a formwork body, and an adjusting component is detachably and movably connected to the outer side wall of the formwork body;
[0005] The adjusting component is set as a first component, and the first component includes a connecting shaft, a square timber and a first bolt;
[0006] The formwork body includes a bedrock, a bamboo glue formwork is fixedly arranged on one side of the bedrock, square timbers are arranged on the non-bedrock sides of the longitudinal section of the bamboo glue formwork, a plurality of connecting shafts are detachably connected between the outer wall of the bamboo glue formwork and the square timbers, screw holes are opened at the joints of the square timbers and the bamboo glue formwork with the connecting shafts, and the square timbers, the bamboo glue formwork and the connecting shafts are fixed by the threaded connection of the first bolt and the screw holes. A plurality of built-in tension bars are arranged in a grid cross pattern inside the bamboo glue formwork.
[0007] In a preferred embodiment, the cross-sectional shape of the bamboo glue formwork is "C" shaped, and the tension bars are preset inside the bamboo glue formwork. A fillet structure bar is arranged at the inner wall corner of the bamboo glue formwork.
[0008] In a preferred embodiment, a plurality of exposed joint decorative strips are adhesively bonded at equal intervals on the side surface of the bamboo glue formwork.
[0009] In a preferred embodiment, the connecting shaft is made of a wooden structure, and the built-in tension bar is made of alloy steel.
[0010] In a preferred embodiment, both the fillet structure bar and the exposed joint decorative strip are made of PVC material.
[0011] In a preferred embodiment, the adjustment assembly further comprises a second component, and the second component is used to replace the first component;
[0012] The second component includes two panels installed at the top and bottom ends of the bamboo plastic formwork, one end of the two panels is detachably connected with an adjustment plate, and the connection between the panels and the adjustment plate is threadedly connected by a plurality of second bolts.
[0013] In a preferred embodiment, a plurality of rubber suction cups are movably connected to the side surface of the bamboo rubber template, a screw rod is connected to the outer wall of the rubber suction cup, and threaded adjustment holes threadably connected to the screw rod are provided on the enclosure plate and the adjustment plate.
[0014] Technical effects and advantages of the utility model:
[0015] 1. When the utility model is in use, the concrete block pouring work is carried out by cooperating with the bamboo glue formwork. At this time, the fusion of concrete and built-in tie bars can further enhance the strength of the block concrete. At the same time, the rounded corners are used to limit the concrete, which can play a role in passivating the concrete corners and facilitate demoulding. At the same time, the overall strength of the construction formwork can be enhanced by cooperating with the square wood through the connecting shaft to avoid the cracking of the bamboo glue formwork. When disassembling, only the first bolt needs to be taken out to disassemble the square wood and the connecting shaft. Compared with the integral connection structure in the prior art, the above operation can not only enhance the connection and embedding end of the construction formwork, but also facilitate disassembly, so the use flexibility of the construction formwork can be significantly enhanced;
[0016] 2. The utility model can also enhance the overall strength of the construction formwork and facilitate disassembly through an adjusting component that cooperates with the formwork body. When in use, concrete can be poured through the bamboo glue formwork in combination with chamfered corners and built-in tensioning bars. At the same time, the two panels and the adjustment plate are threadedly fixed by the second bolt, and then the rubber suction cup is adsorbed on the side surface of the bamboo glue formwork, and then the rubber suction cup, the panel and the adjustment plate are connected by a screw rod, so that the bamboo glue formwork, the panel and the adjustment plate can be connected and fixed. When disassembling, only the second bolt and the screw rod need to be taken out to disassemble the panel and the adjustment plate. Compared with the integral connection structure in the prior art, the above structure can not only enhance the connection strength, but also facilitate the disassembly of the construction formwork, thereby significantly enhancing the flexibility of use of the construction formwork. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a plan view of the formwork body structure of the utility model;
[0018] Figure 2 This is a plan view of the formwork body structure of the utility model;
[0019] Figure 3 It is a structural plan view of the formwork body and adjustment components of the utility model.
[0020] The reference numerals are: 1 supporting mold body, 2 adjusting component;
[0021] 11 bamboo glue formwork, 12 connecting shaft, 13 square wood, 14 first bolt, 15 internal tensioning rod;
[0022] 111 bedrock, 112 rounded corner structural strips, 121 exposed seam decorative strips;
[0023] 21 abutment plate, 22 adjustment plate, 23 second bolt;
[0024] 211 rubber suction cup, 212 screw rod. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Embodiment 1:
[0027] See also Figure 1-2 The utility model provides a formwork structure for decoration-free concrete construction of factory building structural columns, comprising a formwork body 1, and an outer side wall of the formwork body 1 is detachably connected with an adjustment component 2;
[0028] The adjustment assembly 2 is provided as a first component, and the first component comprises a connecting shaft 12, a square wood 13 and a first bolt 14;
[0029] The formwork body 1 includes a bedrock 111, a bamboo glue formwork 11 is fixedly arranged on one side of the bedrock 111, square wood 13 is arranged on the non-bedrock 111 side of the longitudinal section of the bamboo glue formwork 11, a plurality of connecting shafts 12 are detachably connected between the outer wall of the bamboo glue formwork 11 and the square wood 13, screw holes are arranged at the connection between the square wood 13 and the bamboo glue formwork 11 and the connecting shaft 12, the square wood 13 and the bamboo glue formwork 11 and the connecting shaft 12 are fixed by a first bolt 14 and a threaded connection with the screw hole, and a plurality of internal tension bars 15 are arranged in a grid-cross pattern inside the bamboo glue formwork 11;
[0030] Specifically, the formwork body 1 provided can not only enhance the overall strength of the construction formwork and extend its service life, but also facilitate the disassembly of the construction formwork as needed. Therefore, the flexibility of using the construction formwork can be significantly enhanced. When in use, first, the square timber 13 is preliminarily connected and fixed to the bamboo plywood formwork 11 through the connecting shaft 12. Then, by screwing a number of first bolts 14 into the screw holes, the square timber 13, the connecting shaft 12 and the bamboo plywood formwork 11 can be further fixed, thereby enhancing the overall strength of the construction formwork. Then, the concrete is poured into the bamboo plywood formwork 11 and fixed to the built-in tension bars 15. Through the above structure, while enhancing the overall strength of the construction formwork, it is also convenient for disassembly. Therefore, the flexibility of using the construction formwork can be significantly enhanced;
[0031] In this embodiment: The cross-sectional shape of the bamboo plywood formwork 11 is in a "C" shape, and the tension bars 15 are preset inside the bamboo plywood formwork 11. A fillet structure strip 112 is provided at the inner wall corner of the bamboo plywood formwork 11;
[0032] Specifically, the connection between the bedrock 111 and the bamboo plywood formwork 11 can not only save materials, but also enhance the connection strength of the construction formwork. The fillet structure strip 112 is used to blunt the corners of the massive concrete to meet the pouring requirements;
[0033] In this embodiment: A number of exposed joint decorative strips 121 are adhesively bonded at equal intervals on the side surface of the bamboo plywood formwork 11;
[0034] Specifically, the exposed joint decorative strips 121 are used to decorate the massive concrete and achieve an aesthetic effect;
[0035] In this embodiment: The connecting shaft 12 is made of wood, and the built-in tension bars 15 are made of alloy steel;
[0036] Specifically, the wooden connecting shaft 12 can not only facilitate the connection with the bamboo plywood formwork 11, but also reduce the self-weight and facilitate disassembly. The built-in tension bars 15 made of alloy steel can be integrated with the concrete to enhance the strength and integrity of the concrete and prevent the concrete from cracking under stress during use;
[0037] In this embodiment: Both the fillet structure strip 112 and the exposed joint decorative strip 121 are made of PVC material;
[0038] Specifically, the fillet structure strip 112 made of PVC material can not only save the construction cost, but also facilitate the separation from the concrete.
[0039] Embodiment 2:
[0040] According to Figure 3 As shown, the distinguishing feature of this embodiment from Embodiment 1 is that the adjusting assembly 2 further includes a second component, and the second component is used to replace the first component;
[0041] The second component includes two panels 21 installed at the top and bottom ends of the bamboo plastic template 11, one end of the two panels 21 is detachably connected to an adjustment plate 22, and the connection between the panels 21 and the adjustment plate 22 is threadedly connected by a plurality of second bolts 23;
[0042] Specifically, when pouring concrete, firstly, the second bolt 23 is threadedly connected to connect and fix the panel 21 and the adjustment plate 22 to the bamboo glue template 11, then the plurality of rubber suction cups 211 are adsorbed to the bamboo glue template 11, and then the screw rod 212 is threadedly connected to further connect and fix the panel 21 and the adjustment plate 22 to the bamboo glue template 11, thereby enhancing the overall strength of the construction template, and then the concrete is poured in the bamboo glue template 11. When disassembling, only the second bolt 23 and the screw rod 212 need to be taken out to disassemble the panel 21 and the adjustment plate 22;
[0043] In this embodiment: a plurality of rubber suction cups 211 are movably connected to the side surface of the bamboo rubber template 11, a screw rod 212 is connected to the outer wall of the rubber suction cup 211, and a threaded adjustment hole threadedly connected to the screw rod 212 is provided on the enclosure 21 and the adjustment plate 22;
[0044] Specifically, the bamboo rubber template 11, the enclosure 21, and the adjustment plate 22 can be threadedly fixed by the rubber suction cup 211 and the screw rod 212, thereby enhancing the overall strength of the construction template and facilitating disassembly;
[0045] In this embodiment: a plurality of threaded adjustment holes are respectively provided on the surfaces of the two enclosing plates 21 and the adjustment plate 22, the enclosing plates 21 and the adjustment plate 22 are fixed by the second bolts 23, and the screw rod 212 is threadedly connected inside the threaded adjustment holes;
[0046] Specifically, by threading the second bolt 23 and the screw rod 212 respectively, not only can the overall strength of the construction template be enhanced, the bamboo glue template 11 can be enclosed and fixed, but also the disassembly is convenient.
[0047] Working principle: When in use, before pouring concrete, the utility model first connects several connecting shafts 12 and bamboo glue formwork 11, and then screws the first bolt 14 into the screw hole to fix the square wood 13 and the bamboo glue formwork 11, thereby enhancing the connection strength of the construction formwork. Subsequently, concrete is poured into the bamboo glue formwork 11. At this time, the built-in tensioning rod 15 is mixed with the concrete, thereby enhancing the strength of the block concrete. When disassembling, only the first bolt 14 needs to be taken out from the screw hole to disassemble the bamboo glue formwork 11, the connecting shaft 12 and the square wood 13. The above-mentioned structures cooperate with each other, not only the overall strength of the construction formwork can be enhanced, but also it is easy to disassemble, thereby significantly improving the flexibility of use of the construction formwork.
[0048] When in use, before pouring concrete, the utility model firstly adsorbs several rubber suction cups 211 around the bamboo glue formwork 11, then uses the second bolt 23 to connect the enclosure 21 and the adjustment plate 22 to the bamboo glue formwork 11, and then uses the screw rod 212 to be threadedly connected to the inside of the threaded adjustment hole. The bamboo glue formwork 11 can be connected to the enclosure 21 and the adjustment plate 22 at the same time through the rubber suction cup 211, thereby enhancing the overall strength of the construction formwork. When pouring, it is only necessary to pour concrete inside the bamboo glue formwork 11. When disassembling, it is only necessary to take out the second bolt 23 and the screw rod 212 to disassemble the bamboo glue formwork 11, the rubber suction cup 211, the enclosure 21 and the adjustment plate 22. The above-mentioned structures cooperate with each other, not only the overall strength of the construction formwork can be enhanced, but also disassembly is convenient, thereby significantly enhancing the flexibility of use of the construction formwork.
[0049] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0050] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0051] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A formwork structure for decoration-free concrete construction of factory building structural columns, comprising a formwork body (1), characterized in that: A regulating component (2) is detachably and movably connected to the outer side wall of the formwork body (1); The regulating component (2) is set as a first component, and the first component includes a connecting shaft (12), a square timber (13) and a first bolt (14); The formwork body (1) includes a bedrock (111). One side of the bedrock (111) is fixedly provided with a bamboo plywood formwork (11). Square timbers (13) are arranged on the non-bedrock (111) sides of the longitudinal section of the bamboo plywood formwork (11). A plurality of connecting shafts (12) are detachably connected between the outer wall of the bamboo plywood formwork (11) and the square timbers (13). Screw holes are formed at the joints of the square timbers (13), the bamboo plywood formwork (11) and the connecting shafts (12). The square timbers (13), the bamboo plywood formwork (11) and the connecting shafts (12) are fixed by screwing the first bolts (14) into the screw holes. A plurality of built-in tension bars (15) are arranged in a grid-crossing manner inside the bamboo plywood formwork (11).
2. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 1 is characterized by: The cross-sectional shape of the bamboo plywood formwork (11) is in an inverted "C" shape, and the tension bars (15) are arranged in a preset manner inside the bamboo plywood formwork (11). Rounded corner structural strips (112) are arranged at the inner wall corners of the bamboo plywood formwork (11).
3. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 2 is characterized by: A plurality of exposed joint decorative strips (121) are adhesively connected at equal intervals on the side surface of the bamboo plywood formwork (11).
4. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 1 is characterized by: The connecting shaft (12) is made of a wooden structure, and the built-in tension bar (15) is made of alloy steel.
5. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 3 is characterized by: Both the rounded corner structural strip (112) and the exposed joint decorative strip (121) are made of PVC.
6. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 1 is characterized by: The regulating component (2) further includes a second component, and the second component is used to replace the first component; The second component includes two enclosing plates (21) installed at the top and bottom ends of the bamboo plywood formwork (11). One end of the two enclosing plates (21) is detachably connected to an adjusting plate (22). The joints of the enclosing plates (21) and the adjusting plate (22) are screwed through a plurality of second bolts (23).
7. The formwork structure for decoration-free concrete construction of factory building structural columns according to claim 6 is characterized by: A plurality of rubber suction cups (211) are movably connected to the side surface of the bamboo plywood formwork (11). A lead screw (212) is connected to the outer wall of the rubber suction cup (211). Thread adjusting holes for screwing the lead screw (212) are formed on both the enclosing plates (21) and the adjusting plate (22).