Device for removing foam filler in dividing seam of concrete protective layer
By designing a concrete protective layer segmentation joint removal device including a double-mouth frame, steel cone and spiral needle, the problems of low and incomplete cleaning efficiency in the prior art are solved, and the foam in the concrete segmentation joint is achieved quickly. Smooth removal, suitable for construction projects.
Patent Information
- Application Number
- CN202420569268.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The prior art problems of low working efficiency and incomplete cleaning when cleaning plastic foam fillers in the partition joints of the concrete protective layer.
A removal device including a double-mouthed frame, steel cone, U-shaped drum and spiral needle is designed. The partition joint is inserted through the steel cone, and the combination of the U-shaped drum and the T-shaped push rod can be quickly squeezed and brought out. Plastic foam and carry out the foam through a spiral needle.
It realizes rapid removal of foam in concrete split joints, improves construction efficiency, simplifies operations, is suitable for construction projects, and ensures the normal progress of the next process.
Smart Images

Figure CN222009623U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a device for removing fillers in concrete split joints, in particular to a device for removing plastic foam fillers in split joints of concrete protective layers. Background Art
[0002] A large area of concrete protective layer is set on the roof surface of high-rise buildings. In order to overcome the defect that the concrete protective layer is easily cracked due to thermal expansion and contraction caused by temperature changes, when pouring the concrete protective layer, plastic foam strips are placed to construct dividing joints of the concrete protective layer. After the concrete protective layer is cured, the plastic foam strips are taken out to form dividing joints, and weather-resistant glue is filled in the dividing joints to provide space for the expansion and contraction of the concrete protective layer. In the prior art, workers use steel bars to make simple hooks and remove the plastic foam strips by manual operation, but there are problems such as low cleaning efficiency and incomplete cleaning of the foam in the dividing joints. Summary of the invention
[0003] The utility model provides a device for removing foam fillers in a concrete protective layer split joint, which solves the technical problems of low cleaning efficiency and incomplete foam cleaning in the split joint in the prior art.
[0004] The utility model solves the above technical problems through the following technical solutions:
[0005] A device for removing foam fillers in the dividing joints of a concrete protective layer comprises a double-shaped frame and a steel cone, wherein a left U-shaped roller bracket is arranged on the lower cross beam of the left U-shaped frame of the double-shaped frame, and a left U-shaped roller is movably arranged on the left U-shaped roller bracket, a right U-shaped roller bracket is arranged on the lower cross beam of the right U-shaped frame of the double-shaped frame, and a right U-shaped roller is movably arranged on the right U-shaped roller bracket, a pair of bolt through holes are arranged in the middle of the lower cross beam of the double-shaped frame, and connecting bolts are connected to a steel cone seat plate after passing through the bolt through holes, and a steel cone is fixedly connected to the lower bottom surface of the steel cone seat plate; a T-shaped push rod is connected to the middle of the upper end of the double-shaped frame.
[0006] A steel sleeve is movably sleeved on the steel cone, and a pricking needle is arranged on the outer vertical surface of the steel sleeve. The pricking needle arranged on the outer vertical surface of the steel sleeve is spirally arranged along the central axis of the steel sleeve.
[0007] The left U-shaped roller and the right U-shaped roller are movably arranged on the top surface of the concrete protective layer, the steel cone is inserted in the separation gap, and the separation gap is filled with plastic foam.
[0008] The utility model can quickly remove the filling material in the concrete dividing joint, is beneficial to the normal construction of the next process, saves time and labor, is easy to operate, and can be widely used in construction projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a structural schematic diagram of the utility model;
[0010] Figure 2 The utility model is a schematic structural diagram when the filler in the concrete dividing joint is removed. DETAILED DESCRIPTION
[0011] The utility model is described in detail below with reference to the accompanying drawings:
[0012] A device for removing foam fillers in a concrete protective layer split joint comprises a double-shaped frame 1 and a steel cone 8, wherein a left-shaped frame and a right-shaped frame are arranged in parallel, and the lower crossbeams of the two-shaped frames are the same horizontal crossbeam, a left U-shaped roller bracket 2 is arranged on the lower crossbeam of the left-shaped frame of the double-shaped frame 1, a left U-shaped roller 3 is movably arranged on the left U-shaped roller bracket 2, a right U-shaped roller bracket 4 is arranged on the lower crossbeam of the right-shaped frame of the double-shaped frame 1, and a right U-shaped roller 5 is movably arranged on the right U-shaped roller bracket 4, and the double-shaped frame 1 is supported by the left U-shaped roller bracket 2 and the left U-shaped roller 3, and the right U-shaped roller bracket 4 and the right U-shaped roller 5. On the top surface of the concrete protective layer, a pair of bolt penetration holes 6 are arranged in the middle of the lower cross beam of the double-mouthed frame 1. The connecting bolts pass through the bolt penetration holes 6 and are connected to the steel cone seat plate 7. A steel cone 8 is fixedly connected to the lower bottom surface of the steel cone seat plate 7. The steel cone 8 is arranged between the left U-shaped roller 3 and the right U-shaped roller 5. The steel cone 8 forms an angle of 100 degrees with the double-mouthed frame 1. The lower end of the steel cone 8 is inserted into the dividing seam of the concrete protective layer. A T-shaped push rod 11 is connected to the middle of the upper end of the double-mouthed frame 1. By pushing and pulling the T-shaped push rod 11, the double-mouthed frame 1 is moved above the dividing seam of the concrete protective layer, so that the steel cone 8 can pick out the plastic foam 13 filled in the partition seam 12.
[0013] A steel sleeve 9 is movably sleeved on the steel cone 8, and a pricking needle 10 is arranged on the outer vertical surface of the steel sleeve 9. The pricking needle 10 arranged on the outer vertical surface of the steel sleeve 9 is spirally arranged along the central axis of the steel sleeve 9; when the steel cone 8 moves along the partition gap 12, the plastic foam 13 filled in the partition gap 12 is squeezed by the steel cone 8, and as the steel sleeve 9 rotates, it is spirally brought out to the outside of the upper end of the partition gap 12 by the pricking needle 10, making the process of removing the plastic foam 13 smoother.
[0014] The left U-shaped roller 3 and the right U-shaped roller 5 are movably arranged on the top surface of the concrete protective layer, and the steel cone 8 is inserted into the partition 12, and the partition 12 is filled with plastic foam 13; the operator holds the T-shaped push rod 11, sets the double-mouthed frame 1 above the partition 12, and inserts the steel cone 8 into the partition 12, and then pushes the T-shaped push rod 11 forward along the partition 12, and the steel cone 8 cuts and squeezes the plastic foam 13 filled in the partition 12. The steel sleeve 9 rotates, and the cut plastic foam 13 is spirally brought out to the outside of the upper port of the partition 12 by the needle 10, and the two U-shaped rollers roll on the concrete surface, thereby reducing the travel resistance; the components composed of the steel cone seat plate 7 and the steel cone 8 are detachable and replaceable, and can be equipped with steel cones 8 of various specifications to adapt to partitions of different sizes.
Claims
1. A device for removing foam fillers in a concrete protective layer split joint, comprising a double-mouth-shaped frame (1) and a steel cone (8), characterized in that: A left U-shaped roller bracket (2) is arranged on the lower cross beam of the left U-shaped frame of the double U-shaped frame (1), and a left U-shaped roller (3) is movably arranged on the left U-shaped roller bracket (2); a right U-shaped roller bracket (4) is arranged on the lower cross beam of the right U-shaped frame of the double U-shaped frame (1), and a right U-shaped roller (5) is movably arranged on the right U-shaped roller bracket (4); a pair of bolt through holes (6) are arranged in the middle of the lower cross beam of the double U-shaped frame (1), and connecting bolts are connected to the steel cone seat plate (7) after passing through the bolt through holes (6); a steel cone (8) is fixedly connected to the lower bottom surface of the steel cone seat plate (7); and a T-shaped push rod (11) is connected to the middle of the upper end of the double U-shaped frame (1).
2. The device for removing foam fillers in the dividing joints of the concrete protective layer according to claim 1, characterized in that: A steel sleeve (9) is movably sleeved on the steel cone (8), and a pricking needle (10) is arranged on the outer vertical surface of the steel sleeve (9). The pricking needle (10) arranged on the outer vertical surface of the steel sleeve (9) is spirally arranged along the central axis of the steel sleeve (9).
3. A device for removing foam fillers in a concrete protective layer split joint according to claim 1 or 2, characterized in that: The left U-shaped roller (3) and the right U-shaped roller (5) are movably arranged on the top surface of the concrete protective layer, the steel cone (8) is inserted into the separation gap (12), and the separation gap (12) is filled with plastic foam (13).