Building engineering concrete construction device
By designing the concrete construction device for construction projects, and using mobile wheels, push handles and electric push rods to fix and move the pouring pipelines, the problems of high labor intensity and concrete splashing in concrete construction are solved, and the effect of reducing labor intensity and preventing splashing is achieved.
Patent Information
- Application Number
- CN202420646811.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During concrete construction in construction projects, staff need to hold pipes, which are labor-intensive and the concrete is prone to splashing, causing trouble.
A concrete construction device for construction engineering is designed, including shell, moving wheel, push handle, pouring pipeline, pipeline joint, movable pipeline and electric push rod. The pipeline connection is realized through pipeline joints, and the push handle and moving wheel are used to fix and move the pouring pipeline. , electric push rods prevent concrete from splashing and provide power through the battery.
It reduces the labor intensity of staff, prevents concrete splashing, and improves construction efficiency and safety.
Smart Images

Figure CN222009632U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a concrete construction device for construction engineering. Background Art
[0002] A construction project refers to an engineering entity formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. Among them, "buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities.
[0003] During the construction process of a building project, it is often necessary to pour concrete. Currently, a pump truck is usually used to pump concrete. During operation, workers are required to hold pipes for pouring, which is labor-intensive. At the same time, the poured concrete is prone to splash outward, causing trouble to the workers. For this reason, we propose a construction project concrete construction device to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide a construction engineering concrete construction device to solve the problems raised in the above background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A concrete construction device for construction engineering, comprising a shell, the front and back sides of the shell are rotatably connected to moving wheels, the left side of the shell is fixedly connected to two push handles, the inner top wall of the shell is fixedly inlaid with a pouring pipe, the outer surface of the pouring pipe is provided with a control valve, the top of the pouring pipe is fixedly connected to a pipe joint, the outer surface of the pouring pipe is sleeved with a movable pipe, the outer surface of the movable pipe is fixedly connected to a first connecting plate, the upper surface of the first connecting plate is fixedly connected to an electric push rod, the top of the electric push rod is fixedly connected to the inner top wall of the shell, the inner top wall of the shell is fixedly connected to a shell, the inner bottom wall of the shell is fixedly connected to a battery, and the inner side wall of the shell is fixedly installed with a movable plate.
[0007] In a further embodiment, an observation opening is provided on the left side of the shell, and a control switch is fixedly connected to the left side of the shell.
[0008] In a further embodiment, the outer surface of each push handle is fixedly connected with an anti-slip sleeve and a support plate, and the outer surface of each support plate is fixedly connected to the left side surface of the shell.
[0009] In a further embodiment, a maintenance opening is provided on the right side of the shell, and a movable door is hinged on the inner side wall of the maintenance opening.
[0010] In a further embodiment, a protective ring is provided inside the outer shell, and the upper surface of the protective ring is fixedly connected to the bottom end of the movable pipe.
[0011] In a further embodiment, the outer surface of the movable pipe is fixedly connected to a second connecting plate, the upper surface of the second connecting plate is provided with a through hole, the inner wall of the through hole is slidably connected to a vertical rod, the top end of the vertical rod is fixedly connected to the inner top wall of the outer shell, the bottom end of the vertical rod is fixedly connected to a horizontal plate, and the outer surface of the horizontal plate is fixedly connected to the inner side wall of the outer shell.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The device is provided with a pipe joint, by which an external pipe for conveying concrete can be connected, and concrete pouring can be carried out by cooperating with the pouring pipe. A shell is provided, and the pouring pipe can be fixed by cooperating with the shell, the movable wheel and the push handle, and it is convenient for workers to push it to move, thereby avoiding the need for workers to hold the pipe for pouring, reducing the labor intensity of the workers. The movable pipe, the electric push rod and the first connecting plate can cooperate with each other to move the movable pipe downward to the pouring position, so as to prevent concrete from splashing outward and avoid trouble to the workers. A battery is provided, and the battery can be used to provide power for the device, which is convenient for use. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The present invention is a three-dimensional structural schematic diagram of a concrete construction device for construction engineering.
[0015] Figure 2 The present invention is a three-dimensional structural schematic diagram of a side view of a concrete construction device for a construction project.
[0016] Figure 3 It is a three-dimensional structural schematic diagram of a front section view of a concrete construction device for construction engineering.
[0017] Figure 4 It is a three-dimensional structural schematic diagram of a side section view of a concrete construction device for construction engineering.
[0018] In the figure: 1. outer shell; 2. movable wheel; 3. push handle; 4. anti-slip cover; 5. support plate; 6. maintenance port; 7. movable door; 8. pipe joint; 9. casting pipe; 10. control valve; 11. movable pipe; 12. protective ring; 13. observation port; 14. shell; 15. battery; 16. movable plate; 17. second connecting plate; 18. control switch; 19. first connecting plate; 20. electric push rod; 21. through hole; 22. vertical pole; 23. horizontal plate. DETAILED DESCRIPTION
[0019] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-4In the utility model, a construction engineering concrete construction device comprises a shell 1, the front and back sides of the shell 1 are rotatably connected with moving wheels 2, the left side of the shell 1 is fixedly connected with two push handles 3, the inner top wall of the shell 1 is fixedly inlaid with a pouring pipe 9, the outer surface of the pouring pipe 9 is provided with a control valve 10, the top of the pouring pipe 9 is fixedly connected with a pipe joint 8, the outer surface of the pouring pipe 9 is sleeved with a movable pipe 11, the outer surface of the movable pipe 11 is fixedly connected with a first connecting plate 19, the upper surface of the first connecting plate 19 is fixedly connected with an electric push rod 20, the top of the electric push rod 20 is fixedly connected to the inner top wall of the shell 1, the inner top wall of the shell 1 is fixedly connected with a shell 14, the inner bottom wall of the shell 14 is fixedly connected with a battery 15, and the inner side wall of the shell 14 is fixedly installed with a movable plate 16.
[0023] An observation port 13 is provided on the left side of the shell 1, and a control switch 18 is fixedly connected to the left side of the shell 1. The observation port 13 is convenient for the staff to check the pouring status of the concrete, and the device can be controlled by the control switch 18. The outer surface of each push handle 3 is fixedly connected with an anti-slip sleeve 4 and a support plate 5, and the outer surface of each support plate 5 is fixedly connected to the left side of the shell 1. The anti-slip sleeve 4 can increase the friction of the surface of the push handle 3, which is convenient for use. An inspection port 6 is provided on the right side of the shell 1, and a movable door 7 is hinged on the inner wall of the inspection port 6. The inspection port 6 is convenient for maintenance of the internal components of the shell 1.
[0024] A protective ring 12 is provided inside the shell 1, and the upper surface of the protective ring 12 is fixedly connected to the bottom end of the movable pipe 11. The protective ring 12 can protect the bottom of the movable pipe 11 and improve its service life. The outer surface of the movable pipe 11 is fixedly connected to a second connecting plate 17, and a through hole 21 is provided on the upper surface of the second connecting plate 17. The inner wall of the through hole 21 is slidably connected to a vertical rod 22. The top of the vertical rod 22 is fixedly connected to the inner top wall of the shell 1, and the bottom end of the vertical rod 22 is fixedly connected to a horizontal plate 23. The outer surface of the horizontal plate 23 is fixedly connected to the inner side wall of the shell 1. The second connecting plate 17, the through hole 21 and the vertical rod 22 can fix the movable pipe 11, so that its lifting and lowering movement is smoother.
[0025] The working principle of the utility model is:
[0026] When in use, the device can be moved using the push handle 3 and the movable wheel 2. After reaching the use position, the pouring pipe 9 can be connected to the external concrete transport pipe through the pipe joint 8. Then, starting the electric push rod 20 can push the first connecting plate 19 and the movable pipe 11 downward to make them close to the pouring position. Then, opening the control valve 10, concrete can be poured through the pouring pipe 9 and the movable pipe 11. During the pouring process, the push handle 3 and the movable wheel 2 can also be used to conveniently move its position.
[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0028] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A concrete construction device for construction engineering, characterized in that: The invention comprises a shell (1), the front and back sides of the shell (1) are both rotatably connected to movable wheels (2), the left side of the shell (1) is fixedly connected to two push handles (3), the inner top wall of the shell (1) is fixedly inlaid with a pouring pipe (9), the outer surface of the pouring pipe (9) is provided with a control valve (10), the top end of the pouring pipe (9) is fixedly connected to a pipe joint (8), the outer surface of the pouring pipe (9) is sleeved with a movable pipe (11), the outer surface of the movable pipe (11) is fixedly connected to a first connecting plate (19), the upper surface of the first connecting plate (19) is fixedly connected to an electric push rod (20), the top end of the electric push rod (20) is fixedly connected to the inner top wall of the shell (1), the inner top wall of the shell (1) is fixedly connected to a shell body (14), the inner bottom wall of the shell body (14) is fixedly connected to a storage battery (15), and the inner side wall of the shell body (14) is fixedly installed with a movable plate (16).
2. A construction engineering concrete construction device according to claim 1, characterized in that: An observation opening (13) is provided on the left side of the housing (1), and a control switch (18) is fixedly connected to the left side of the housing (1).
3. A construction engineering concrete construction device according to claim 1, characterized in that: The outer surface of each push handle (3) is fixedly connected to an anti-slip sleeve (4) and a support plate (5), and the outer surface of each support plate (5) is fixedly connected to the left side surface of the outer shell (1).
4. A construction engineering concrete construction device according to claim 1, characterized in that: The right side of the housing (1) is provided with an inspection opening (6), and the inner side wall of the inspection opening (6) is hinged with a movable door (7).
5. A construction engineering concrete construction device according to claim 1, characterized in that: A protective ring (12) is provided inside the outer shell (1), and the upper surface of the protective ring (12) is fixedly connected to the bottom end of the movable pipe (11).
6. A construction engineering concrete construction device according to claim 1, characterized in that: The outer surface of the movable pipe (11) is fixedly connected to a second connecting plate (17); a through hole (21) is provided on the upper surface of the second connecting plate (17); a vertical rod (22) is slidably connected to the inner wall of the through hole (21); the top end of the vertical rod (22) is fixedly connected to the inner top wall of the outer shell (1); the bottom end of the vertical rod (22) is fixedly connected to a horizontal plate (23); and the outer surface of the horizontal plate (23) is fixedly connected to the inner side wall of the outer shell (1).