Mechanical method connection channel tunnel portal construction structure

By using a support structure driven by rotatable screws and cylinders in the mechanical method of tunneling channel, the door barrel is moved into the main line tunnel, solving the problems of impact on construction progress and reduced structural strength in traditional methods, achieving more efficient construction and overall support.

CN222010217UActive Publication Date: 2024-11-15HENAN GUOLONG MINERAL CONSTR CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420838300.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2024-11-15
Estimated Expiration
2034-04-22

AI Technical Summary

Technical Problem

The traditional mechanical method of connecting channel door construction method requires the production of composite pipe sheets before the main line tunnel is excavated to the connecting channel position, which will affect the construction progress. Moreover, after the core of the hole door, the concrete pipe sheet structure is easily loosened, affecting the integrity of the main line tunnel.

Method used

Design a mechanical connection channel door construction structure, including a support cylinder fixed to the movable end of the cylinder on the boring machine trolley, and a rotatable screw and a sliding sleeve are provided inside the support cylinder, and the support arm and support are driven by the screw The plate moves outward and tightens the inner wall of the hole door barrel. The cylinder is used to move the hole door barrel into the main line tunnel, as part of the hole door structure, reducing the influence on the structural strength of the main line tunnel pipe sheet.

Benefits of technology

It effectively reduces the impact of the core of the hole door on the structural strength of the main line tunnel pipe sheet, improves construction efficiency and integrity, and avoids the defects caused by the use of composite pipe sheets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222010217U_ABST
    Figure CN222010217U_ABST
Patent Text Reader

Abstract

The utility model provides a mechanical method connection channel tunnel portal construction structure which comprises a supporting cylinder fixedly connected to the movable end of an air cylinder on a heading machine trolley, a rotatable screw rod is arranged in the supporting cylinder and provided with threaded sections with opposite rotating directions, sliding sleeves are screwed on the threaded sections, supporting arms penetrating through the supporting cylinder are hinged to the sliding sleeves, and the supporting arms penetrate through the supporting cylinder. The supporting arms on the adjacent sliding sleeves are hinged in a crossed mode, lifting plates which are connected with each other in an inserted mode are hinged to the ends of the supporting arms, the lifting plates abut against the inner wall of the tunnel portal cylinder, and the tunnel portal cylinder is correspondingly connected with a tunnel portal on the main line tunnel in an inserted mode. The two sliding sleeves are driven to move oppositely through rotation of the screw rod, so that the two lifting plates are driven to move outwards through the supporting arms and are tightly supported on the inner wall of the tunnel portal barrel, then the tunnel portal barrel is moved into a tunnel portal on a main line tunnel through extension of the air cylinder, the tunnel portal barrel is used for supporting the tunnel portal, the tunnel portal barrel becomes a part of a tunnel portal structure, and the tunnel portal barrel is used for supporting the tunnel portal on the main line tunnel. And the influence on the structural strength of the main line tunnel segment after the tunnel portal coring is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction, and in particular to a mechanical method for constructing a tunnel portal of a communication channel. Background Art

[0002] The connecting channel is an emergency channel between the main tunnels. Traditional construction methods are mostly freezing method and mechanical method. The freezing method has cumbersome construction process and high risk. The mechanical method requires the installation of special lining composite segments at the starting and receiving positions of the connecting channel. The composite segment processing process is complicated, and the composite segment needs to be produced before the main tunnel is excavated to the connecting channel position, which can easily have a great impact on the construction progress. The reason for having to use this method is that after the core is taken at the portal of the ordinary concrete segment, the structural integrity of the concrete segment ring where the connecting channel portal is located is destroyed, which can easily cause the remaining concrete segments to loosen and affect the integrity of the main tunnel. Therefore, composite segments must be used for support, which also produces corresponding defects caused by the use of this method. To this end, the invention proposes a mechanical method connecting channel portal construction structure. Utility Model Content

[0003] The purpose of the present application is to propose a mechanical method for the construction structure of a connecting passage portal, which can reduce the impact of portal coring on the structural strength of the main line tunnel segment.

[0004] The embodiment of the present application is implemented as follows:

[0005] The present application provides a mechanical method communication channel portal construction structure, including a support tube fixedly connected to the movable end of a cylinder on a tunnel boring machine trolley, a rotatable screw is provided inside the support tube, the screw has a threaded section with opposite rotation directions, a sliding sleeve is screwed on the threaded section, a support arm passing through the support tube is hinged on the sliding sleeve, the support arms on adjacent sliding sleeves are cross-hinged, and the ends of the support arms are hinged with lifting plates plugged into each other, the lifting plates abut against the inner wall of the portal tube, and the portal tube is correspondingly plugged into the portal on the main line tunnel.

[0006] The present application utilizes the rotation of the screw to drive the two sliding sleeves to move toward each other, thereby driving the two lifting plates to move outward through the support arms and to support them tightly against the inner wall of the portal cylinder, and then moving the portal cylinder into the portal on the main line tunnel through the extension of the cylinder, and using the portal cylinder to support the portal, making the portal cylinder a part of the portal structure, thereby reducing the impact on the structural strength of the main line tunnel segment after coring of the portal.

[0007] In an optional embodiment, the screw and the support cylinder are coaxially arranged.

[0008] In an optional embodiment, a motor is provided at the end of the screw.

[0009] In an optional embodiment, an avoidance groove for the support arm to pass through is opened on the outer wall of the support tube.

[0010] In an optional embodiment, the avoidance groove remains parallel to the axis of the support tube.

[0011] In an optional embodiment, the avoidance grooves are evenly distributed along the circumference of the support tube.

[0012] In an optional embodiment, the lifting plate is configured to be in an arc shape coaxial with the supporting tube.

[0013] In an optional embodiment, both ends of the lifting plate have convex edges for engaging with the door tube.

[0014] In an optional embodiment, the height of the convex edge is lower than the outer circumferential surface of the tunnel portal tube.

[0015] In an optional embodiment, a slot is provided on one of the two supporting plates, and an inserting plate is provided on the other one. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The exemplary embodiments of the present application will be described in detail below with reference to the accompanying drawings. It should be understood that the embodiments described below are only used to explain the present application, rather than to limit the scope of the present application. In the accompanying drawings:

[0017] Figure 1 is a schematic diagram of a mechanical method communication channel tunnel construction structure according to an embodiment of the present application;

[0018] Figure 2 is a schematic diagram of a lifting plate according to an embodiment of the present application;

[0019] Reference numerals:

[0020] 10. Main line tunnel;

[0021] 20. Roadheader trolley;

[0022] 30. Cave entrance tube;

[0023] 40. Support tube;

[0024] 50. Screw;

[0025] 11. Cave entrance;

[0026] 21. Cylinder;

[0027] 41. Avoidance slot;

[0028] 51. Sliding sleeve;

[0029] 52. Support arm;

[0030] 53. Lifting board;

[0031] 531, slot;

[0032] 532, plug board;

[0033] 533, convex edge;

[0034] 54. Motor;

[0035] 55. Threaded section. DETAILED DESCRIPTION

[0036] Example 1

[0037] See also Figure 1-Figure 2 In this embodiment, the mechanical communication channel portal construction structure includes a support tube 40 fixedly connected to the movable end of the cylinder 21 on the tunnel boring machine trolley 20, and a rotatable screw 50 is provided inside the support tube 40. The screw 50 has a threaded section 55 with opposite rotation directions, and a sliding sleeve 51 is screwed on the threaded section 55. A support arm 52 passing through the support tube 40 is hinged on the sliding sleeve 51. The support arms 52 on adjacent sliding sleeves 51 are cross-hinged, and the ends of the support arms 52 are hinged with lifting plates 53 plugged into each other. The lifting plates 53 abut against the inner wall of the portal tube 30, and the portal tube 30 is correspondingly plugged into the portal 11 on the main line tunnel 10.

[0038] In this embodiment, the rotation of the screw rod 50 is used to drive the two sliding sleeves 51 to move toward each other, thereby driving the two lifting plates 53 to move outward through the support arm 52 and to be supported tightly against the inner wall of the portal cylinder 30, and then the portal cylinder 30 is moved into the portal 11 on the main line tunnel 10 through the extension of the cylinder 21, and the portal cylinder 30 is used to support the portal 11, and the portal cylinder 30 becomes a part of the portal structure, thereby reducing the influence of the portal coring on the structural strength of the main line tunnel segment.

[0039] It should be noted that the fixed end of the cylinder 21 is fixedly connected to the tunnel boring machine trolley 20, the cylinder 21 is kept horizontally arranged as a whole, the end of the support tube 40 is fixedly connected to the movable end of the cylinder 21, and the cylinder 21 is used to drive the support tube 40 to move horizontally as a whole; an avoidance groove 41 is opened on the outer wall of the support tube 40, and the avoidance groove 41 is kept parallel to the axis of the support tube 40 as a whole, and at the same time, the avoidance groove 41 is evenly distributed along the circumference of the support tube 40; the screw 50 is kept coaxially arranged with the support tube 40 as a whole, and both ends of the screw 50 are rotatably connected to the two ends of the support tube 40, one end of the screw 50 is fixedly connected to a motor 54, and the motor 54 is used to drive the screw 50 to rotate inside the support tube 40; the screw 50 has two threaded sections 55 with opposite rotation directions distributed along the axial direction, and the sliding sleeve 51 is screwed on the threaded section 55, and the screw 50 is used to drive the two spaced sliding sleeves 51 to move in opposite or reverse directions.

[0040] In addition, two support arms 52 are provided inside each avoidance groove 41, and the two support arms 52 are cross-hinged. The inner ends of the two support arms 52 are respectively hinged to the sliding sleeves 51, and the outer ends of the two support arms 52 are respectively hinged to the lifting plates 53. One of the two opposing lifting plates 53 is provided with a slot 531, and the other is provided with an insert plate 532, and the insert plate 532 can be inserted into the slot 531 with an adaptive shape. By plugging and matching the insert plate 532 with the slot 531, the corresponding two lifting plates 53 can be connected as a whole, and relative rotation of the two lifting plates 53 can be avoided, so that the two lifting plates 53 can only slide relative to each other along the axial direction.

[0041] In addition, the lifting plate 53 is constructed as a whole to be coaxial with the support tube 40 , and a flange 533 for clamping the tunnel door tube 30 is provided at the outer end of the lifting plate 53 , and the height of the flange 533 is lower than the outer peripheral surface of the tunnel door tube 30 .

[0042] It should be noted that the two corresponding lifting plates 53 are plugged in and matched, and the radial position of the lifting plates 53 can be adjusted by rotating the screw 50 so as to tighten the tunnel door tube 30. At the same time, the rotation of the screw 50 can also change the relative position of the two lifting plates 53, that is, the axial spacing of the convex edges 533 of the two lifting plates 53 can be changed so as to restrict the tunnel door tube 30 as a whole between the corresponding two convex edges 533.

[0043] When in use, the screw rod 50 is first driven to rotate by the motor 54, so that the two sleeves 51 move toward each other, the angle between the corresponding two support arms 52 becomes smaller, and the two plug-in supporting plates 53 move radially outward as a whole, and the axial spacing between the convex edges 533 of the two supporting plates 53 becomes smaller until the portal cylinder 30 is tightened and fixed, and then the portal cylinder 30 is moved to the position corresponding to the portal 11 by the tunneling machine trolley 20, and finally the portal cylinder 30 is inserted into the interior of the portal 11 by extending the cylinder 21, thereby completing the installation of the portal cylinder 30 on the portal 11.

[0044] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A mechanical communication passage portal construction structure, comprising a support tube fixedly connected to the movable end of a cylinder on a tunnel boring machine trolley, a rotatable screw being arranged inside the support tube, the screw having threaded sections with opposite rotation directions, a sliding sleeve being screwed on the threaded section, a support arm passing through the support tube being hinged on the sliding sleeve, the support arms on adjacent sliding sleeves being cross-hinged, lifting plates plugged into each other being hinged at the ends of the support arms, the lifting plates being in contact with the inner wall of the portal tube, and the portal tube being correspondingly plugged into the portal on the main line tunnel.

2. The mechanical method communication channel tunnel construction structure according to claim 1 is characterized in that: The screw rod and the support tube are coaxially arranged.

3. The mechanical method communication channel tunnel construction structure according to claim 1 is characterized in that: A motor is arranged at the end of the screw.

4. The mechanical method communication channel tunnel construction structure according to claim 1 is characterized in that: An escape groove for the support arm to pass through is provided on the outer wall of the support tube.

5. The mechanical method communication channel tunnel construction structure as claimed in claim 4 is characterized in that: The avoidance groove is kept parallel to the axis of the support tube.

6. The mechanical method communication channel tunnel construction structure as claimed in claim 5, characterized in that: The avoidance grooves are evenly distributed along the circumference of the support tube.

7. The mechanical method communication channel tunnel construction structure according to claim 1 is characterized in that: The lifting plate is configured to be in an arc shape coaxial with the supporting tube.

8. The mechanical method communication channel tunnel construction structure according to claim 1 is characterized in that: Both ends of the lifting plate are provided with convex edges for clamping the door tube.

9. The mechanical method communication channel tunnel construction structure according to claim 8, characterized in that: The height of the convex edge is lower than the outer peripheral surface of the cave entrance tube.

10. The mechanical method communication channel tunnel construction structure according to claim 9, characterized in that: One of the two lifting plates is provided with a slot, and the other is provided with an inserting plate.

Citation Information

Cited By

  • Construction method for connecting channel main tunnel broken hole

    CN121556866A