Portable ground pricking marker post for geological survey
By using a combined structure of drill rod, universal ball, ball and counterweight ball in geological survey land benchmarks, the benchmark is automatically adjusted to be parallel to the horizontal plane, solving the problem of difficulty in adjusting the inclination and verticality of the benchmark on unplanar ground, and improving the Mapping accuracy and portability.
Patent Information
- Application Number
- CN202420673617.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-04-03
Smart Images

Figure CN222013133U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological survey, in particular to a convenient geological survey anchoring pole. Background Art
[0002] Geological survey is the abbreviation of geological survey work. In a broad sense, it can be generally understood as a synonym for geological work. It is a survey and research work with different focuses on the geological conditions such as rocks, strata, minerals, groundwater, and landforms in a certain area according to the needs of economic construction, national defense construction, and scientific and technological development. There are different geological surveys for different purposes. Before conducting geological surveys, designers need to survey the site, so it is necessary to set up benchmarks for auxiliary surveys. In the surveying process, benchmarks are a common and important tool used for field measurement and positioning.
[0003] The main function of a benchmark is to serve as a reference for surveyors to make accurate measurements and draw maps. The functions of a benchmark are: 1. Provide a stable reference. As a reference for measurement, a benchmark must have a stable nature. By fixing the benchmark on the ground, it can be ensured that it is not disturbed by external factors during the measurement process, which can greatly improve the accuracy and reliability of the measurement. 2. Achieve accurate measurement. The benchmark is usually engraved with scales, which can directly measure distances and heights. Surveyors can accurately measure objects or places on the ground according to the scales on the benchmark, so as to draw accurate maps. In order to ensure accuracy, the benchmark generally needs to be kept vertical. 3. Achieve relative positioning. Relative positioning is required when measuring and drawing maps. The benchmark can be used as a fixed reference to measure at different measuring points, thereby establishing a coordinate system and achieving relative positioning.
[0004] The patent document with application number CN202121895115.3 and titled "A kind of anchoring pole for geological survey and design personnel on site" discloses a anchoring pole with good stability. After the anchoring pole body is inserted into the soil and the supporting base plate is attached to the ground, two auxiliary cone rods are also inserted into the soil at the same time, and the anchoring pole is rotated. The anchoring pole rotates in the fixed hole, so that the anchoring pole drives the two driving control wheels to rotate, the driving control wheel drives pulley one to rotate, pulley one drives the belt to move, the belt drives pulley two to rotate, pulley two controls the fixed rod to rotate, the fixed rod drives bevel gear one to rotate, bevel gear one drives bevel gear two to rotate, bevel gear two drives the screw to rotate, the screw controls the insertion rod to move, and the two insertion rods slide out of the auxiliary cone rod and are inserted into the soil, so as to stabilize the position of the anchoring pole, and rotating the adjusting wheel can drive the worm to rotate, the worm controls the worm gear to rotate, the worm gear drives the threaded rod to rotate, the threaded rod drives the telescopic rod to move, and the telescopic rod drives the adjustment pole to move. However, when the ground is uneven, the pole tends to tilt, resulting in reduced surveying accuracy.
[0005] The patent document with application number CN202123375002.3 and titled "A Multifunctional Benchmark for Geotechnical Engineering Survey" discloses a multifunctional benchmark for engineering survey that can adjust the fixed cone and improve the stability of the benchmark. When conducting engineering survey, the geology is first surveyed and the hardness of the geology is determined, and then the depth of the fixed cone is calculated. The threaded column is rotated, and the threaded column can drive the adjustment plate to move linearly through the threaded transmission, and then the adjustment plate can drive the fixed cone to move until the length of the fixed cone is equal to the calculated depth. Stop rotating the threaded column, and finally fix the fixed cone to the ground. Finally, it is necessary to insert the mounting column into the connecting hole on the benchmark, and insert the limit column into the corresponding limit hole, and then pull the fixed column to move it into the fixed hole, so that the benchmark can be fixed on the mounting frame. However, the technical solution of this patent cannot adjust the verticality of the benchmark. When the verticality of the benchmark needs to be ensured, it is necessary to first ensure that the fixed cone is vertically inserted below the ground, so it is more troublesome to fix the benchmark. Utility Model Content
[0006] The technical problem to be solved by the utility model is to provide a convenient geological survey anchoring pole which is convenient and stable and can ensure that the pole is vertical to the horizontal plane.
[0007] In order to achieve the above purpose, the technical solution provided by the utility model is:
[0008] A convenient geological survey anchoring pole includes a flat plate, on which a drill rod is detachably fixedly connected, and the lower end of the drill rod is a pointed end. A circular hole is opened on one side of the flat plate, and a plurality of push rods are evenly distributed and fixed on the circumference of the circular hole. A universal ball is installed on the end of the push rod facing the axis of the circular hole, and a sphere is placed in the circular hole. The outer edge of the lower side of the sphere is in rolling contact with the universal ball. A vertical connecting rod is fixed at the lower end of the sphere, and a counterweight ball is fixed at the lower end of the connecting rod. The sphere, the connecting rod and the counterweight ball are concentric. A pole is fixed at the upper end of the sphere, and a scale is printed on the outer side of the pole along its length. The axis of the pole coincides with the axis of the connecting rod, and a positioning component for stabilizing the sphere is provided on the flat plate.
[0009] Specifically, a threaded hole is provided on the flat plate, and the upper end of the drill rod is threadedly connected in the threaded hole.
[0010] Specifically, the positioning assembly includes an annular groove opened on the upper end of the plate, the annular groove is concentric with the circular hole, a sleeve is slidably inserted in the annular groove, an inner ring is fixed in the sleeve above the plate, the inner diameter of the inner ring is smaller than the diameter of the sphere, the lower end of the inner edge of the inner ring is tightly against the upper outer edge of the sphere, a support plate is fixed on the outside of the sleeve, a bolt is rotatably connected to the support plate, the bolt passes through the plate, and the bolt is threadedly connected to the plate.
[0011] Specifically, the sphere is a hollow sphere.
[0012] Specifically, a protrusion is eccentrically rotatably connected to the lower end of the bolt. The protrusion is made of rubber material, and an arc groove is provided on the distal end of the protrusion.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. After the flat plate is stabilized by the drill rod, the benchmark can be kept parallel to the horizontal plane under the gravity of the weighted ball, and the benchmark can be automatically adjusted so that the benchmark remains parallel to the horizontal plane.
[0015] 2. When the pole is parallel to the horizontal plane, the casing and the inner ring can be moved downward, and the sphere can be squeezed by the inner ring to position the sphere, thereby preventing the pole from swinging in windy weather. The pole has good stability.
[0016] 3. After the drill rod moves upward in the threaded hole, the protrusion can be used to position the drill rod, which can reduce the overall length of the utility model and facilitate carrying.
[0017] 4. The lower end of the drill rod is a pointed tip. After the drill rod is inserted under the ground, the drill rod can be pushed deeper into the ground by stepping on the flat plate, making it easier to insert the drill rod under the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the utility model.
[0019] Figure 2 A cross-sectional view of a flat plate.
[0020] Figure 3 This is a schematic diagram of the positioning of the drill rod by the protrusion after the drill rod moves upward.
[0021] Figure 4 A cross-sectional view of the casing.
[0022] Figure 5 A top view of the plate.
[0023] The names of the parts in the attached drawings are:
[0024] 1 Tablet
[0025] 2 Drill rod
[0026] 3 Bolts
[0027] 4 Bumps
[0028] 5 Arc groove
[0029] 6 spheres
[0030] 7 Benchmark
[0031] 8 Connecting rod
[0032] 9 Weighted Ball
[0033] 10 boards
[0034] 11 Inner Ring
[0035] 12 Ring groove
[0036] 13. Ejector
[0037] 14 Universal ball
[0038] 15 Round hole
[0039] 16 Casing. DETAILED DESCRIPTION
[0040] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0041] Reference Figure 1-Figure 5 As shown, a convenient geological survey anchoring pole includes a flat plate 1, a threaded hole is formed on the flat plate 1, and the upper end of a drill rod 2 is threadedly connected in the threaded hole. After the lower end of the drill rod 2 passes through the threaded hole, the drill rod 2 is rotated so that the upper end of the drill rod 2 is threadedly connected in the threaded hole, and the drill rod 2 is stabilized on the flat plate 1. The lower end of the drill rod 2 is a pointed end, which facilitates the insertion of the drill rod 2 under the ground. After the drill rod 2 is inserted under the ground, the drill rod 2 can be pushed deeper into the ground by stepping on the flat plate 1.
[0042] A circular hole 15 is formed on one side of the plate 1 , and a plurality of push rods 13 are evenly distributed and fixed on the inner circumference of the circular hole 15 . A universal ball 14 is installed on one end of the push rod 13 facing the axis of the circular hole 15 .
[0043] A sphere 6 is placed in the circular hole 15, and the lower outer edge of the sphere 6 is in rolling contact with the universal ball 14. The sphere 6 is a hollow sphere. In this embodiment, the material of the sphere 6 is 304 stainless steel.
[0044] The universal ball 14 can reduce the friction force during the rotation of the ball 6 in the circular hole 15 .
[0045] A vertical connecting rod 8 is fixed to the lower end of the sphere 6, and a counterweight ball 9 is fixed to the lower end of the connecting rod 8. The sphere 6, the connecting rod 8 and the counterweight ball 9 are concentric.
[0046] A rod 7 is fixed to the upper end of the sphere 6, and a scale is printed on the outer side of the rod 7 along its length direction. The axis of the rod 7 coincides with the axis of the connecting rod 8.
[0047] The flat plate 1 is provided with a positioning assembly for stabilizing the sphere 6 .
[0048] The positioning assembly includes an annular groove 12 provided at the upper end of the plate 1, the annular groove 12 is concentric with the circular hole 15, a sleeve 16 is slidably inserted in the annular groove 12, the sleeve 16 is concentric with the circular hole 15, an inner ring 11 is fixed in the sleeve 16 above the plate 1, the inner diameter of the inner ring 11 is smaller than the diameter of the sphere 6, the lower end of the inner edge of the inner ring 11 is tightly against the upper outer edge of the sphere 6, and a support plate 10 is fixed outside the sleeve 16. Bolts 3 are rotatably connected to the support plate 10. Specifically, two retaining rings are fixed to the bolts 3 above the plate 1, the retaining rings are concentric with the bolts 3, and the support plate 10 is located between the two retaining rings.
[0049] The bolt 3 passes through the plate 1, and the bolt 3 is threadedly connected to the plate 1. A clevis handle is fixed on the upper end of the bolt 3. By providing the clevis handle, it is convenient to turn the bolt 3.
[0050] The lower end of the bolt 3 is eccentrically connected to a protrusion 4, which is made of rubber and has an arc groove 5 on its distal end. Since the protrusion 4 is rotatably connected to the bolt 3, the protrusion 4 will not block the rotation of the bolt 3 when the bolt 3 is rotated to adjust the position of the sleeve 16 in the vertical direction.
[0051] After the drill rod 2 is inserted into the ground, the plate 1 is stabilized. When the plate 1 is tilted, since the sphere 6, the connecting rod 8 and the counterweight ball 9 are concentric, the axis of the mark rod 7 coincides with the axis of the connecting rod 8. Under the gravity of the counterweight ball 9, the sphere 6, the connecting rod 8, the counterweight ball 9 and the mark rod 7 can rotate. After the sphere 6, the connecting rod 8, the counterweight ball 9 and the mark rod 7 rotate, the mark rod 7 can remain perpendicular to the horizontal plane.
[0052] Then the bolt 3 is rotated, and the bolt 3 drives the sleeve 16 and the inner ring 11 downward through the support plate 10. The inner ring 11 can squeeze the upper side of the sphere 6 to position the sphere 6, and can prevent the pole 7 from swinging in windy weather.
[0053] Reference Figure 3 As shown, after use, the drill rod 2 is pulled out from under the ground. Then the drill rod 2 is rotated upward, and when the thread at the upper end of the drill rod 2 is separated from the threaded hole, the drill rod 2 is moved upward in the threaded hole. Then the protrusion 4 is rotated so that the outer edge of the drill rod 2 is located in the arc groove 5. At this time, under the friction between the protrusion 4 and the drill rod 2, the drill rod 2 is stabilized, the overall length of the utility model is reduced, and it is convenient to carry.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A convenient geological survey anchoring pole, comprising a flat plate (1), to which a drill rod (2) is detachably and fixedly connected, characterized in that: A circular hole (15) is provided on one side of the plate (1), a plurality of push rods (13) are fixed in the circular hole (15), a universal ball (14) is installed at one end of the push rod (13) facing the axis of the circular hole (15), a sphere (6) is placed in the circular hole (15), the lower outer edge of the sphere (6) is in rolling contact with the universal ball (14), a vertical connecting rod (8) is fixed at the lower end of the sphere (6), a counterweight ball (9) is fixed at the lower end of the connecting rod (8), the sphere (6), the connecting rod (8) and the counterweight ball (9) are concentric, a benchmark rod (7) is fixed at the upper end of the sphere (6), the axis of the benchmark rod (7) coincides with the axis of the connecting rod (8), and a positioning component for stabilizing the sphere (6) is provided on the plate (1).
2. A portable geological survey anchoring pole according to claim 1, characterized in that: The flat plate (1) is provided with a threaded hole, and the upper end of the drill rod (2) is threadedly connected in the threaded hole.
3. A portable geological survey anchoring pole according to claim 1, characterized in that: The positioning assembly comprises an annular groove (12) formed on the upper end of the plate (1), the annular groove (12) being concentric with the circular hole (15), a sleeve (16) being slidably inserted in the annular groove (12), an inner ring (11) being fixed in the sleeve (16) above the plate (1), the inner diameter of the inner ring (11) being smaller than the diameter of the sphere (6), the inner edge of the inner ring (11) being tightly against the upper outer edge of the sphere (6), a support plate (10) being fixed on the outer side of the sleeve (16), a bolt (3) being rotatably connected to the support plate (10), the bolt (3) penetrating the plate (1), and the bolt (3) being threadedly connected to the plate (1).
4. The portable geological survey anchoring pole according to claim 1, characterized in that: The sphere (6) is a hollow sphere.
5. The portable geological survey anchoring pole according to claim 3, characterized in that: The lower end of the bolt (3) is eccentrically rotatably connected to a protrusion (4), the protrusion (4) is made of rubber material, and an arc groove (5) is provided on the distal end of the protrusion (4).
6. The portable geological survey anchoring pole according to claim 1, characterized in that: The lower end of the drill rod (2) is a tip.
7. The portable geological survey anchoring pole according to claim 1, characterized in that: The outer side of the marking rod (7) is printed with scale along its length direction.
8. The portable geological survey anchoring pole according to claim 3, characterized in that: Two retaining rings are fixed on the bolts (3) above the plate (1), the retaining rings are concentric with the bolts (3), and the support plate (10) is located between the two retaining rings.
9. The portable geological survey anchoring pole according to claim 3, characterized in that: A horn handle is fixed to the upper end of the bolt (3).
10. The portable geological survey anchoring pole according to claim 1, characterized in that: The multiple push rods (13) are evenly distributed around the circumference of the axis of the circular hole (15).
Citation Information
Cited By
Portable survey ground-pricking marker post
CN224285947U