Sampling device for engineering geological survey

By designing a sampling device including base, column and drilling assembly in engineering geological survey, the retractable fixing rod and adjustment mechanism are maintained stable, the problem of manual pressing increasing labor intensity and large device volume is solved, and the problem of manual pressing is realized. Stable sampling and portable effect.

CN222013560UActive Publication Date: 2024-11-15田瑞川 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323333134.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-11-15
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

In engineering geological surveys, existing sampling devices require manual pressing to maintain stability, but increase labor intensity, and the device without manual pressing is large in size, which is inconvenient for portability and transport.

Method used

A sampling device including a base, a column and a drilling assembly is designed to maintain stability using a retractable fixing rod and an adjustment mechanism, and the device is removable and stored for easy portability and transport.

Benefits of technology

It realizes stable sampling without manual manual pressing, reduces the labor intensity of workers, and facilitates the carrying and transport of the device through a detachable and storage design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222013560U_ABST
    Figure CN222013560U_ABST
Patent Text Reader

Abstract

The utility model relates to a sampling device for engineering geological survey, which comprises a base, a stand column arranged above the base and a drilling component arranged on one side of the stand column, a connecting plate is arranged at the lower end of the stand column, the stand column is detachably connected with the base through the connecting plate, and an adjusting mechanism in sliding fit with the stand column along the vertical direction is arranged on the stand column. The drilling assembly is connected with the stand column through an adjusting mechanism. Through grooves are formed in the two sides of the base in the horizontal direction respectively, a fixing rod is arranged in each through groove, the fixing rods can stretch out and draw back along the two ends of the through grooves respectively, first limiting blocks are arranged on the positions, located on the two opening sides of the through grooves, of the base respectively, and the first limiting blocks are used for fixing the contracted fixing rods in the through grooves. The sampling device for engineering geological survey can keep stable during sampling without manual supporting, can better complete soil sampling work, can be disassembled, assembled and stored after sampling is completed, and is convenient to carry and transfer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of geological survey sampling, in particular to a sampling device for engineering geological survey. Background Art

[0002] Engineering geological survey is a geological investigation and research work carried out to identify the geological factors that affect engineering buildings. The geological factors that need to be surveyed include landforms, hydrogeological conditions, physical and mechanical properties of soil and rocks, etc. In the process of geological exploration, sampling of soil layers is a very important link.

[0003] At present, when the drilling mechanism is inserted deep into the ground to sample the soil layer, the operator is usually required to manually press the drilling mechanism to ensure the stability of the drilling mechanism and avoid the position of the sampling device from shifting. However, manual pressing will increase the labor intensity of the workers. At the same time, the existing sampling devices that do not require manual pressing are mostly large in size and inconvenient to carry and transport. Utility Model Content

[0004] The technical problem to be solved by the utility model is that, in view of the above-mentioned defects, a sampling device for engineering geological survey is provided, which can maintain stability during sampling without manual pressing, better complete the soil sampling work, and can be disassembled and stored after the sampling is completed, which is convenient for carrying and transportation.

[0005] The technical solution adopted by the utility model to solve its technical problems is: a sampling device for engineering geological survey, comprising a base, a column arranged above the base and a drilling assembly arranged on one side of the column, the drilling assembly comprising a first motor assembly, a sleeve and a drill bit, the two ends of the sleeve are respectively fixedly connected to the output shaft of the first motor assembly and the drill bit, a connecting plate is provided at the lower end of the column, the column is detachably connected to the base through the connecting plate, an adjusting mechanism is provided on the column that slides with the column in a vertical direction, and the drilling assembly is connected to the column through the adjusting mechanism; through grooves are respectively opened on both sides of the base in the horizontal direction, each through groove is provided with a fixing rod, the fixing rod can be retracted and retracted along the two ends of the through groove, and first limit blocks are respectively provided on the base and on the two opening sides of the through groove, the first limit blocks are used to fix the retracted fixing rod in the through groove.

[0006] Compared with the prior art, the benefits of this solution are:

[0007] (1) Through grooves are opened in the horizontal direction on both sides of the base, and fixed rods are arranged in the through grooves, which can be extended and retracted along the two ends of the through grooves. When the device is placed for sampling, the fixed rods are pulled out of the through grooves to increase the contact area between the base and the ground, so that the device can remain stable during drilling and is not prone to deviation, thereby better completing the soil sampling work;

[0008] (2) The column is detachably connected to the base through a connecting plate, and the drilling assembly is connected to the column through an adjusting mechanism. After sampling is completed, the column can be removed from the base, and then the drilling assembly can be removed from the adjusting mechanism. Since the fixing rod can be extended and retracted along the two ends of the through slot, the fixing rod can be pushed back into the through slot after sampling is completed and fixed by a limit piece. After use, the device can be stored, which can reduce the space occupied by the overall structure of the device and facilitate carrying and transportation.

[0009] A further preferred scheme of the utility model is: the base is respectively connected with second limit blocks on both sides close to the two fixing rods, the fixing rod comprises an outer sleeve rod and an inner sleeve rod, the outer sleeve rod is sleeved and connected with the inner sleeve rod, the sides of the outer sleeve rod and the inner sleeve rod are respectively provided with connecting holes, the base is provided with a square hole in the vertical direction for accommodating the drill bit and the sleeve to pass through, and limit holes connected with the square holes are respectively provided on both sides close to the two fixing rods, the second limit block passes through the limit hole and the connecting hole and is detachably connected to the base, and when the inner sleeve rod and the outer sleeve rod extend outward from both ends of the through groove, one side of the two connecting holes respectively abuts against the two sides of the second limit block.

[0010] The benefits of this solution are:

[0011] (1) The outer rod and the inner rod are sleeved and connected, and the second limit block can pass through the limit hole set on the base and the connection hole set on the side of the outer rod and the inner rod to connect the outer rod, the inner rod and the base together. When the outer rod and the inner rod are pulled outward along the two ends of the through groove, one side of the two connection holes abuts against the two sides of the second limit block respectively, and the outer rod and the inner rod will not be completely moved out of the through groove, thereby preventing the fixing rod from being separated from the base, which causes the fixing rod to fail to play a supporting and stable role;

[0012] (2) The second limit block is detachably connected to the base. When the outer rod or the inner rod needs to be replaced, the second limit block can be removed from the base first, and then the outer rod or the inner rod can be replaced. It is not necessary to replace the base and the fixed rod all at once, thus saving resources.

[0013] A further preferred solution of the utility model is: the adjusting mechanism includes a slider sleeved on the column and a second motor assembly fixedly connected to one end of the slider, one side of the slider is a cavity structure, the output shaft of the second motor assembly is located in the cavity, a rack is provided in the vertical direction on the side of the column close to the cavity, a gear that can mesh with the rack is connected to the output shaft of the second motor assembly, and a fixing part for fixing the first motor assembly is provided on the side of the slider away from the column.

[0014] The benefit of this solution lies in that the drilling assembly is driven up and down by the meshing of gear racks, the distance between the drill bit and the ground is adjusted according to the ground conditions, and then the first motor assembly is started to drive the drill bit and the sleeve to rotate and extend into the ground for sampling. After drilling to a certain depth, the drilling assembly is driven upward by the adjustment mechanism to expose the drill bit and the sleeve from the ground, and the soil sample in the sleeve is collected to complete the sampling. The drilling operation and the removal operation do not need to be performed manually, which improves the sampling efficiency and reduces the labor intensity of workers.

[0015] A further preferred solution of the utility model is: a support rod is detachably connected to the top of the base, the support rod is tilted, and the upper end of the support rod is fixedly connected to the upper end of the side of the column away from the drilling assembly through a locking piece.

[0016] The benefits of this solution are as follows: the drilling assembly is installed on one side of the column, the end of the column connected to the drilling assembly bears a larger weight, a support rod is connected to the side of the column away from the drilling assembly, the upper end of the support rod is fixedly connected to the upper end of the column away from the drilling assembly by a locking piece, and a triangle is formed between the support rod, the column and the base, so that the force on the entire device is more uniform, the connection between the column and the base is more secure, and the safety is increased; the two ends of the support rod are detachably connected to the base and the column respectively, and can be removed after sampling is completed, which is convenient for carrying and shipping.

[0017] A further preferred solution of the utility model is that a reinforcing rib is provided between the column and the connecting plate, and the reinforcing rib is symmetrically arranged on both sides of the column along the length direction of the square hole.

[0018] The benefit of this solution is that the end of the column connected to the drilling assembly bears a large weight, and reinforcing ribs are arranged between the connecting plate and the column, and the reinforcing ribs are symmetrically arranged on both sides of the column along the length direction of the square hole, so that the column can remain stable and not easily deformed. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The utility model is a schematic diagram of an embodiment of a sampling device for engineering geological survey.

[0020] Figure 2 It is a structural schematic diagram of the outer sleeve rod and the inner sleeve rod being accommodated in the through groove.

[0021] Figure 3 It is a schematic diagram of the structure of the outer sleeve rod and the inner sleeve rod. DETAILED DESCRIPTION

[0022] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described below are only used to explain the present invention and will not limit the protection scope of the present invention.

[0023] The terms "first", "second" and the like in the specification, claims and embodiments of the present application are used to distinguish similar objects rather than to describe a specific order or sequential sequence.

[0024] The present invention is further described in detail below through preferred specific embodiments:

[0025] The figure marks in the drawings of the specification include: base 1, through groove 101, square hole 102, limit hole 103, column 2, connecting plate 3, drilling assembly 4, first motor assembly 401, sleeve 402, drill bit 403, adjustment mechanism 5, second motor assembly 501, slider 502, rack 503, fixing part 504, fixing rod 6, first limit block 7, clamping strip 701, clamping block 702, second limit block 8, outer sleeve rod 9, connecting hole 901, inner sleeve rod 10, support rod 11, reinforcing rib 12, roller 13.

[0026] As attached Figure 1 and attached Figure 2 As shown: A sampling device for engineering geological survey in this embodiment includes a base 1 and a column 2 arranged above the base 1, a connecting plate 3 is provided at the lower end of the column 2, and the column 2 is detachably connected to the base 1 through the connecting plate 3. In this embodiment, four rollers 13 are symmetrically arranged along the columns 2 on both sides of the base 1.

[0027] The base 1 is provided with a square hole 102 in the vertical direction, and through grooves 101 are respectively opened on both sides of the base 1 in the horizontal direction. A fixing rod 6 is provided in each through groove 101, and the fixing rod 6 can be retracted and extended along the two ends of the through groove 101 respectively. The fixing rod 6 is provided with a first limit block 7 on the base 1 and on the two opening sides of the through groove 101. The first limit block 7 is used to fix the retracted fixing rod 6 in the through groove 101. In this embodiment, the first limit block 7 includes a clamping strip 701 and a clamping block 702 which are arranged on the base 1 and located on the opening side of the through groove 101. The clamping strip 701 and the clamping block 702 are respectively arranged on the left and right sides of the opening side of the through groove 101. The clamping strip 701 is rotatably connected to the base 1. After the fixing rod 6 is retracted back to the through groove 101, the clamping strip 701 rotates to a position engaged with the clamping block 702 to lock the fixing rod 6 in the through groove 101.

[0028] As attached Figure 2 and attached Figure 3As shown: the base 1 is provided with limiting holes 103 connected with the square hole 102 on both sides near the two fixing rods 6, the fixing rod 6 includes an outer sleeve rod 9 and an inner sleeve rod 10, the outer sleeve rod 9 is sleeved and connected with the inner sleeve rod 10, and the sides of the outer sleeve rod 9 and the inner sleeve rod 10 are respectively provided with connecting holes 901, and the base 1 is connected with second limiting blocks 8 on both sides near the two fixing rods 6, the second limiting blocks 8 pass through the limiting holes 103 and the connecting holes 901 and are detachably connected to the base 1, and when the inner sleeve rod 10 and the outer sleeve rod 9 extend outward from both ends of the through groove 101, one side of the two connecting holes 901 respectively abuts against the two sides of the second limiting block 8.

[0029] As attached Figure 1 As shown: the sampling device for engineering geological survey also includes a drilling assembly 4 arranged on one side of the column 2, and the drilling assembly 4 includes a first motor assembly 401, a sleeve 402 and a drill bit 403. The two ends of the sleeve 402 are respectively fixedly connected to the output shaft of the first motor assembly 401 and the drill bit 403. In this embodiment, the front end of the drill bit 403 is serrated, and the column 2 is provided with an adjustment mechanism 5 that slides with it in the vertical direction. The drilling assembly 4 is connected to the column 2 through the adjustment mechanism 5.

[0030] The adjustment mechanism 5 includes a slider 502 mounted on the column 2 and a second motor assembly 501 fixedly connected to one end of the slider 502. One side of the slider 502 is a cavity structure. The output shaft of the second motor assembly 501 is located in the cavity. A rack 503 is provided in the vertical direction on the side of the column 2 close to the cavity. A gear that can mesh with the rack 503 is connected to the output shaft of the second motor assembly 501, which is not shown in the figure. A fixing part 504 for fixing the first motor assembly 401 is provided on the side of the slider 502 away from the column 2.

[0031] A support rod 11 is detachably connected to the top of the base 1, and the support rod 11 is tilted. The upper end of the support rod 11 is fixedly connected to the upper end of the column 2 on the side away from the drilling assembly 4 through a locking piece. A reinforcing rib 12 is provided between the column 2 and the connecting plate 3, and the reinforcing rib is symmetrically arranged on both sides of the column 2 along the length direction of the square hole.

[0032] The preferred implementation mode of the present application is described in detail above in conjunction with the accompanying drawings. The typical known structures and common knowledge technologies in the preferred implementation mode are not described in detail here. Ordinary technicians in the relevant field can improve and implement the technical solution of the utility model based on their own abilities under the inspiration given by the present implementation mode. Some typical known structures, known methods or common knowledge technologies should not become obstacles for ordinary technicians in the relevant field to implement the present application.

[0033] The scope of protection required by this application shall be based on the contents of its claims, and the contents of the utility model, specific implementation methods and the contents recorded in the drawings of the specification shall be used to interpret the claims.

[0034] Within the technical concept of the present application, several modifications may be made to the specific implementation methods of the present application, and these modified specific implementation methods should also be regarded as within the protection scope of the present application.

Claims

1. A sampling device for engineering geological survey, comprising a base, a column arranged above the base, and a drilling assembly arranged on one side of the column, the drilling assembly comprising a first motor assembly, a sleeve and a drill bit, the two ends of the sleeve are respectively fixedly connected to the output shaft of the first motor assembly and the drill bit, characterized in that: A connecting plate is provided at the lower end of the column, and the column is detachably connected to the base through the connecting plate. An adjusting mechanism is provided on the column and slides with it in a vertical direction, and the drilling assembly is connected to the column through the adjusting mechanism; through grooves are respectively opened on both sides of the base in a horizontal direction, and a fixing rod is provided in each through groove, and the fixing rod can be retracted and extended along the two ends of the through groove respectively, and first limit blocks are respectively provided on the base and on the two opening sides of the through groove, and the first limit blocks are used to fix the retracted fixing rod in the through groove.

2. The sampling device for engineering geological survey according to claim 1, characterized in that: The base is respectively connected to second limit blocks on both sides near the two fixing rods, and the fixing rod includes an outer sleeve rod and an inner sleeve rod, the outer sleeve rod is sleeved and connected to the inner sleeve rod, and the sides of the outer sleeve rod and the inner sleeve rod are respectively provided with connecting holes, and the base is provided with a square hole in the vertical direction for accommodating a drill bit and a sleeve to pass through, and limiting holes connected to the square holes are respectively provided on both sides near the two fixing rods, the second limit block passes through the limiting hole and the connecting hole and is detachably connected to the base, and when the inner sleeve rod and the outer sleeve rod extend outward from both ends of the through groove, one side of the two connecting holes respectively abuts against both sides of the second limit block.

3. The sampling device for engineering geological survey according to claim 1, characterized in that: The adjustment mechanism includes a slider sleeved on the column and a second motor assembly fixedly connected to one end of the slider, one side of the slider is a cavity structure, the output shaft of the second motor assembly is located in the cavity, a rack is provided in the vertical direction on the side of the column close to the cavity, a gear that can mesh with the rack is connected to the output shaft of the second motor assembly, and a fixing part for fixing the first motor assembly is provided on the side of the slider away from the column.

4. The sampling device for engineering geological survey according to claim 2, characterized in that: A support rod is detachably connected to the top of the base, the support rod is tilted, and the upper end of the support rod is fixedly connected to the upper end of the side of the column away from the drilling assembly through a locking piece.

5. The sampling device for engineering geological survey according to claim 1, characterized in that: A reinforcing rib is arranged between the column and the connecting plate, and the reinforcing rib is symmetrically arranged on both sides of the column along the length direction of the square hole.