Defective product reinspection treatment equipment
Through integrated defective re-inspection and processing equipment, the re-inspection and processing of semiconductor sheets are achieved using lifting components and conveying mechanisms, which solves the problems of difficult and high cost of assembly and debugging of existing equipment, and improves the integration and production efficiency of equipment.
Patent Information
- Application Number
- CN202420610614.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-25
AI Technical Summary
Existing semiconductor detection equipment and defective processing equipment need to be designed and assembled separately, resulting in difficult assembly and debugging, high cost and much space.
Design an integrated defective re-inspection and processing equipment, including a machine, a piece conveying mechanism, a re-inspection mechanism and a defective processing mechanism, and drive the mounting frame to move back and forth between the detection position and the conveying position through the first lifting component to realize The re-checking and processing of defective material sheets reduces the use of sheet metal frames and the secondary assembly and debugging process.
It reduces the difficulty of debugging of re-inspection agencies and defective processing agencies, saves space and costs, and improves equipment integration and production efficiency.
Smart Images

Figure CN222015362U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of semiconductor detection, and particularly relates to a defective product re-inspection processing device. Background Art
[0002] In the field of semiconductor industry inspection, in order to avoid false detection and reduce losses, in addition to the first major inspection, there is generally a second inspection process, commonly known as re-inspection (repeated inspection) in the industry. Generally speaking, re-inspection is to use an electric 3D microscope to conduct a second inspection of the material to confirm whether the chip on the material is really defective.
[0003] After re-inspection of defective products, if there are still problems, the defective products need to be treated with ink dot or line cutting. When doing ink dot or line cutting on defective products, it is often necessary to design a separate defective product treatment device, which needs to be assembled with the inspection equipment (main inspection equipment, re-inspection equipment) to complete the functions of inspection and defective product treatment.
[0004] However, the testing equipment and defective product handling equipment are separate devices. They need to be assembled and debugged in advance, and then transported to the chip production company for secondary assembly and debugging. A lot of manpower and material costs are required for equipment assembly and debugging, which is difficult. In addition, both the testing equipment and the defective product handling equipment need to be designed with separate sheet metal racks, which are costly and take up a lot of space. Utility Model Content
[0005] The technical problem to be solved by the utility model is: to provide a defective product re-inspection processing device in view of the problem that the existing detection equipment and defective product processing equipment are difficult to assemble and debug.
[0006] In order to solve the above technical problems, the embodiment of the utility model provides a defective product re-inspection processing device, including a machine platform, a sheet conveying mechanism, a re-inspection mechanism and a defective product processing mechanism; the sheet conveying mechanism is arranged on the machine platform, and the sheet conveying mechanism is used to receive the sheet and convey the sheet to the re-inspection mechanism;
[0007] The re-inspection mechanism comprises a first lifting assembly, a mounting frame and a first conveying assembly arranged on the mounting frame, wherein the first lifting assembly is connected to the machine platform, an output end of the first lifting assembly is connected to the mounting frame, and the mounting frame is provided with a re-inspection channel for receiving defective webs among webs conveyed by the web conveying mechanism;
[0008] The defective product processing mechanism includes a detection part and a defective product processing part, the first lifting assembly can drive the mounting frame to reciprocate between a detection position and a conveying position, when the mounting frame is located at the detection position, the detection part is used to re-inspect the defective sheets on the re-inspection channel, and the defective product processing part is used to mark the defective sheets when the detection part confirms the defect of the defective sheets;
[0009] When the mounting frame is located at the conveying position, the first conveying assembly can convey the marked defective sheet out of the re-inspection channel.
[0010] Optionally, the re-inspection mechanism further comprises a second conveying assembly connected to the mounting frame, the mounting frame further comprising a discharge channel for receiving qualified sheets among the sheets conveyed by the sheet conveying mechanism, the second conveying assembly being capable of driving the qualified sheets to move in the discharge channel and delivering the qualified sheets;
[0011] The first lifting assembly drives the mounting frame to move up and down, so that the sheet conveying mechanism conveys the sheet to the re-inspection channel or the discharge channel.
[0012] Optionally, the first conveying assembly includes a first driving member and a first belt assembly, the first belt assembly is arranged in the re-inspection channel, the output end of the first driving member is connected to the first belt assembly, and the first belt assembly is used to convey defective webs;
[0013] The second conveying assembly includes a second driving member and a second belt assembly. The second belt assembly is arranged in the discharge channel. The output end of the second driving member is connected to the second belt assembly. The second belt assembly is used to convey qualified webs.
[0014] Optionally, the mounting frame includes a base plate, a first connecting plate and a second connecting plate, the output end of the first lifting assembly is connected to the base plate, the first connecting plate and the second connecting plate are relatively arranged on the base plate, and the re-inspection channel and the discharge channel are formed between the first connecting plate and the second connecting plate.
[0015] Optionally, the re-inspection mechanism further comprises a first pushing component for pushing defective sheets out of the re-inspection channel and a second pushing component for pushing qualified sheets out of the discharge channel;
[0016] The first pusher assembly includes a third driving member, a first slider and a first pusher plate, the first slider is slidably connected to the mounting frame, the third driving member is connected to the first slider, the first pusher plate is connected to the first slider, and the first pusher plate abuts against the defective material sheet when the first conveying assembly drives the defective material sheet to move;
[0017] The second pushing assembly includes a fourth driving member, a second slider and a second pushing plate. The second slider is slidably connected to the mounting frame. The fourth driving member is connected to the second slider. The second pushing plate is connected to the second slider. The second pushing plate abuts against the qualified material sheet when the second conveying assembly drives the qualified material sheet to move.
[0018] Optionally, the first pusher assembly further comprises a first cam rod and a first elastic member, the first cam rod is arranged at the entrance end of the re-inspection channel, the first elastic member is connected between the first slider and the first pusher plate, the first pusher plate is rotatably connected to the first slider, and the third driving member can drive the first pusher plate to abut against the first cam rod, so that the first pusher plate rotates and avoids when the defective sheet enters the re-inspection channel;
[0019] The second push assembly also includes a second cam rod and a second elastic member, the second cam rod is arranged at the entrance end of the discharge channel, the second elastic member is connected between the second slider and the second push plate, the second push plate is rotatably connected to the second slider, and the fourth driving member can drive the second push plate to abut against the second cam rod, so that the second push plate rotates and avoids when qualified material sheets enter the discharge channel.
[0020] Optionally, the defective product processing mechanism further comprises a motion module mounted on the machine platform, the detection unit and the defective product processing unit are connected to the motion module, and the motion module can drive the detection unit and the defective product processing unit to move toward the defective material sheet on the re-inspection channel.
[0021] Optionally, the sheet conveying mechanism includes a support base, a fifth driving member and a fifth belt assembly, the support base is arranged on the machine platform, the fifth driving member and the fifth belt assembly are arranged on the support base, the output end of the fifth driving member is connected to the fifth belt assembly, and the fifth belt assembly is used to convey the sheet.
[0022] Optionally, it further comprises a sheet cache mechanism, the sheet cache mechanism comprises a second lifting assembly and a material rack, the output end of the second lifting assembly is connected to the material rack, and the support seat is slidably connected to the material rack;
[0023] The second lifting assembly is suitable for driving the material rack to move upward so as to drive the defective sheets on the fifth belt assembly to be stored in the material rack, and the second lifting assembly is suitable for driving the material rack to move downward so as to transfer the defective sheets in the material rack to the fifth belt assembly and transport them to the re-inspection channel.
[0024] Optionally, the material rack includes a rack body, a first bracket and a second bracket, the support seat includes a first support plate and a second support plate that are arranged opposite to each other, the first support plate is slidably connected to the first bracket, and the second support plate is slidably connected to the second bracket;
[0025] The first bracket is provided with a plurality of first supporting columns, and the second bracket is provided with a plurality of second supporting columns. The first supporting columns and the second supporting columns located at the same height can support the material sheet.
[0026] The defective material re-inspection and processing equipment provided by the embodiment of the utility model can connect the re-inspection channel of the re-inspection mechanism through the material conveying mechanism, and can convey the defective material to the re-inspection channel, and drive the mounting frame to move through the first lifting component, so as to move the defective material to the detection position for re-inspection, and complete the re-inspection and processing of the defective material by marking the defective material through the defective processing part. In this embodiment, the re-inspection mechanism, the detection part and the defective processing part are integrated on a machine platform, which can save the process of secondary assembly and debugging, reduce the difficulty of debugging the re-inspection mechanism and the defective processing mechanism, and can reduce the use of sheet metal frames, improve integration, reduce occupied space, and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of a defective product re-inspection processing device provided by an embodiment of the utility model;
[0028] Figure 2 yes Figure 1 The enlarged schematic diagram of point A in the middle;
[0029] Figure 3 It is a schematic diagram of a re-inspection mechanism provided in one embodiment of the utility model;
[0030] Figure 4 It is a schematic diagram of a mounting frame provided by an embodiment of the utility model;
[0031] Figure 5 It is a schematic diagram of a first conveying assembly and a second conveying assembly provided in one embodiment of the utility model;
[0032] Figure 6 yes Figure 5 The enlarged schematic diagram of point B in the middle;
[0033] Figure 7 yes Figure 5 The enlarged schematic diagram of the center C;
[0034] Figure 8 It is a schematic diagram of a defective product processing mechanism provided by an embodiment of the utility model;
[0035] Fig. 9It is an assembly diagram of a sheet conveying mechanism and a sheet buffer mechanism provided by an embodiment of the utility model;
[0036] Fig.10 It is a schematic diagram of a sheet cache mechanism provided by an embodiment of the utility model;
[0037] Fig.11 It is a schematic diagram of a sheet conveying mechanism provided in one embodiment of the utility model.
[0038] The reference numerals in the specification are as follows:
[0039] 1. Machine;
[0040] 2. Sheet conveying mechanism; 21. Support seat; 211. First support plate; 2111. First groove; 212. Second support plate; 2121. Second groove; 213. Sixth driving member; 2131. Eighth motor; 2132. Sixth screw rod; 2133. Sixth synchronous belt assembly; 22. Fifth driving member; 221. Seventh motor; 222. Connecting rod; 23. Fifth belt assembly; 231. Fourth synchronous belt assembly; 232. Conveying wheel assembly; 233. Fifth belt unit;
[0041] 3. Re-inspection mechanism; 31. First lifting assembly; 32. Mounting frame; 321. Bottom plate; 322. First connecting plate; 323. Second connecting plate; 324. Vertical plate; 325. First adjustment assembly; 3251. First adjustment motor; 3252. Second screw rod; 3253. First synchronous belt assembly; 3254. Third screw rod;
[0042] 33. First conveying assembly; 331. First motor; 332. Second motor; 333. First belt unit; 334. Second belt unit;
[0043] 34. second conveying assembly; 341. third motor; 342. fourth motor; 343. third belt unit; 344. fourth belt unit;
[0044] 35. Pressing piece; 351. Pressing plate; 352. Pressing cylinder;
[0045] 36, first pusher assembly; 361, fifth motor; 362, second synchronous belt assembly; 363, first slider; 364, first pusher plate; 365, first cam rod; 366, first elastic member;
[0046] 37, second pusher assembly; 371, sixth motor; 372, third synchronous belt assembly; 373, second slider; 374, second pusher plate; 375, second cam rod; 376, second elastic member;
[0047] 4. Defective product processing mechanism; 41. Detection unit; 42. Defective product processing unit; 43. X-axis motion module; 44. Y-axis motion module; 45. Z-axis motion module;
[0048] 5. Material caching mechanism; 51. Second lifting assembly; 511. Second lifting motor; 512. Fourth screw rod; 513. Fifth screw rod; 514. Fifth synchronous belt assembly; 52. Material rack; 521. Rack body; 522. First bracket; 5221. First support column; 523. Second bracket; 5231. Second support column. DETAILED DESCRIPTION
[0049] In order to make the technical problems, technical solutions and beneficial effects solved by the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0050] like Figures 1 to 11 As shown, a defective product re-inspection processing device provided by an embodiment of the utility model includes a machine 1, a sheet conveying mechanism 2, a re-inspection mechanism 3 and a defective product processing mechanism 4, wherein the sheet conveying mechanism 2, the re-inspection mechanism 3 and the defective product processing mechanism 4 are arranged on the machine 1. The sheet conveying mechanism 2 is used to receive the sheet and convey the sheet to the re-inspection mechanism 3. The defective product re-inspection processing device may be provided with a sheet buffer mechanism 5, and the sheet conveying mechanism 2 can receive the sheet conveyed by the upstream device, and can also receive the sheet conveyed by the sheet buffer mechanism 5.
[0051] The re-inspection mechanism 3 includes a first lifting assembly 31, a mounting frame 32, and a first conveying assembly 33 disposed on the mounting frame 32. The first lifting assembly 31 is connected to the machine platform 1. The output end of the first lifting assembly 31 is connected to the mounting frame 32, and can drive the mounting frame 32 to move up and down. The mounting frame 32 has a re-inspection channel for receiving defective sheets from the sheets conveyed by the sheet conveying mechanism 2. The first conveying assembly 33 can drive the defective sheets to move in the re-inspection channel to receive or deliver the defective sheets.
[0052] The defective processing mechanism 4 includes a detection unit 41 and a defective processing unit 42. The first lifting assembly 31 can drive the mounting frame 32 to move back and forth between the detection position and the conveying position. When the mounting frame 32 is located at the detection position, the detection unit 41 can re-inspect the defective sheets on the re-inspection channel to confirm whether the defective sheets are indeed defective. When the detection unit 41 confirms that the defective sheets are defective, the defective processing unit 42 marks the defective sheets so as to avoid confusion between defective sheets and qualified sheets when transferring to the next process. The first lifting assembly 31 drives the mounting frame 32 to switch from the detection position to the conveying position. When the mounting frame 32 is located at the conveying position, the first conveying assembly 33 can deliver the marked defective sheets from the re-inspection channel. It can be understood that when the detection unit 41 re-inspects and finds that there are no defects on the defective sheets, the defective sheets should be a false detection and can be determined as qualified sheets. At this time, the sheet no longer needs to be marked by the defective processing unit 42.
[0053] Among them, when the detection part 41 detects the defective material, the two need to maintain an appropriate distance to ensure the accuracy of the re-inspection result. The detection position is located above the conveying position, and the first lifting component 31 can drive the defective material to approach the detection part 41 for detection. After the detection is completed, the first lifting component 31 drives the mounting frame 32 to descend, so that the re-inspection channel can be connected with the downstream equipment, which is convenient for the output of defective material.
[0054] The defective re-inspection and processing equipment provided by the embodiment of the utility model can connect the re-inspection channel of the re-inspection mechanism 3 with the material conveying mechanism 2, so as to convey the defective material to the re-inspection channel, and drive the mounting frame 32 to move by the first lifting component 31, so as to move the defective material to the detection position for re-inspection, and complete the re-inspection and processing of the defective material by marking the defective material through the defective processing part 42. In this embodiment, the re-inspection mechanism 3, the detection part 41 and the defective processing part 42 are integrated on a machine 1, which can save the process of secondary assembly and debugging, reduce the difficulty of debugging the re-inspection mechanism 3 and the defective processing mechanism 4, and can reduce the use of sheet metal frames, improve integration, reduce occupied space, and reduce costs.
[0055] In one embodiment, if Figure 3 As shown, the first lifting assembly 31 includes a first lifting motor, a first screw rod and a belt assembly. The first motor 331 is installed on the machine 1. One end of the first screw rod is connected to the mounting frame 32, and the other end of the first screw rod is connected to the output end of the first motor 331 through the belt assembly. The driving of the first motor 331 can realize the overall up and down movement of the mounting frame 32.
[0056] In one embodiment, if Figure 8As shown, the inspection unit 41 can re-inspect the defective material sheets to confirm whether the defective material sheets have defects. Preferably, the inspection unit 41 is an electric 3D microscope that can observe and inspect the features on the semiconductor chip.
[0057] The defective processing unit 42 is an ink dot module or a wire cutting module. For semiconductor products, the ink dot module can be used to mark defective chips with ink. At the same time, the UV lamp on the ink dot module will irradiate and solidify the ink to prevent the ink from not solidifying and contaminating other qualified chips. For defective solder wires, the solder wires need to be cut. At this time, the user does not need the ink dot module to dot the ink, but needs the wire cutting function. The ink dot module can be replaced with the wire cutting module (either one of the two) to perform wire cutting on the defective chips.
[0058] In one embodiment, if Figure 2 , Figure 5 As shown, a pressing piece 35 is provided on the mounting frame 32, and the pressing piece 35 is located above the re-inspection channel. The pressing piece 35 includes a pressing plate 351 and a pressing cylinder 352. The output end of the pressing cylinder 352 is connected to the pressing plate 351, and can drive the pressing plate 351 to move. When the defective sheet moves in the re-inspection channel, the pressing piece 35 does not work. When the defective processing unit 42 marks the defective sheet, the pressing cylinder 352 drives the pressing plate 351 to abut against the defective sheet, which can press the defective sheet to prevent the defective sheet from moving, thereby ensuring accurate cutting lines or avoiding ink dot smudging.
[0059] In one embodiment, if Figure 3 , Figure 5 As shown, the re-inspection mechanism 3 also includes a second conveying assembly 34 connected to the mounting frame 32, and the mounting frame 32 also has a discharge channel for receiving qualified sheets among the sheets conveyed by the sheet conveying mechanism 2. The first lifting assembly 31 drives the mounting frame 32 to move up and down, so that the sheet conveying mechanism 2 conveys the sheet to the re-inspection channel or the discharge channel, and the second conveying assembly 34 can drive the qualified sheet to move in the discharge channel and deliver the qualified sheet.
[0060] The discharge channel is located below the re-inspection channel, and one of the discharge channel and the re-inspection channel can be docked with the sheet conveying mechanism 2 through the first lifting assembly 31. The sheets received by the sheet conveying mechanism 2 include qualified sheets and defective sheets. When the sheet conveying mechanism 2 conveys qualified sheets, the first lifting assembly 31 drives the mounting frame 32 to move upward, so that the sheet conveying mechanism 2 and the discharge channel are located at the same height, so that qualified sheets enter the discharge channel, and qualified sheets do not need to be re-inspected. At this time, the qualified sheets can be sent to the downstream equipment through the second conveying mechanism.
[0061] When the sheet conveying mechanism 2 conveys defective sheets, the first lifting component 31 drives the mounting frame 32 to move downward, so that the sheet conveying mechanism 2 and the re-inspection channel are located at the same height, so that the defective sheets can enter the re-inspection channel, and then the mounting frame 32 is driven by the first lifting component 31 to move upward to the detection position, and the detection unit 41 starts to re-inspect the defective sheets. After the detection is completed, it descends to the conveying position, and the re-inspected sheets are conveyed to the downstream equipment through the first conveying mechanism.
[0062] In one embodiment, if Figure 3 , Figure 5 As shown, the first conveying assembly 33 includes a first driving member and a first belt assembly. The first belt assembly is arranged in the re-inspection channel. The output end of the first driving member is connected to the first belt assembly. The first driving member drives the first belt assembly to move, thereby conveying defective sheets.
[0063] In one embodiment, if Figure 5 As shown, the first driving member includes a first motor 331 and a second motor 332 arranged opposite to each other, and the first belt assembly includes a first belt unit 333 and a second belt unit 334 arranged opposite to each other. The first belt unit 333 and the second belt unit 334 can synchronously move and convey defective sheets.
[0064] The first belt unit 333 includes a first belt, a first driving pulley and a first passive pulley, the first belt is wound around the first driving pulley and the first passive pulley, the first driving pulley is connected to the output end of the first motor 331, and the first motor 331 can drive the first belt to transmit. It can be understood that at least one first tensioning wheel can be arranged between the first driving pulley and the first passive pulley to tighten the first belt to prevent the first belt from being loosened and affecting the transmission of the sheet.
[0065] The second belt unit 334 includes a second belt, a second driving pulley and a second passive pulley, the second belt is wound around the second driving pulley and the second passive pulley, the second driving pulley is connected to the output end of the second motor 332, and the second motor 332 can drive the second belt to transmit. It can be understood that at least one second tensioning wheel can be set between the second driving pulley and the second passive pulley to tighten the second belt to prevent the second belt from loosening and affecting the transmission of the sheet.
[0066] In one embodiment, if Figure 3 , Figure 5 As shown, the second conveying assembly 34 includes a second driving member and a second belt assembly. The second belt assembly is arranged in the discharge channel. The output end of the second driving member is connected to the second belt assembly. The second driving member drives the second belt assembly to move, thereby realizing the transmission of qualified sheets.
[0067] In one embodiment, if Figure 5 As shown, the second driving member includes a third motor 341 and a fourth motor 342 arranged opposite to each other, and the second belt assembly includes a third belt unit 343 and a fourth belt unit 344 arranged opposite to each other. The third belt unit 343 and the fourth belt unit 344 can synchronously move to convey qualified sheets.
[0068] The third belt unit 343 includes a third belt, a third driving pulley and a third passive pulley, the third belt is wound around the third driving pulley and the third passive pulley, the third driving pulley is connected to the output end of the third motor 341, and the third motor 341 can drive the third belt to transmit. It can be understood that at least one third tensioning wheel can be set between the third driving pulley and the third passive pulley to tighten the third belt to prevent the third belt from being loose and affecting the transmission of the sheet.
[0069] The fourth belt unit 344 includes a fourth belt, a fourth driving pulley and a fourth passive pulley, the fourth belt is wound around the fourth driving pulley and the fourth passive pulley, the fourth driving pulley is connected to the output end of the fourth motor 342, and the fourth motor 342 can drive the fourth belt to transmit. It can be understood that at least one fourth tensioning wheel can be set between the fourth driving pulley and the fourth passive pulley to tighten the fourth belt to prevent the fourth belt from being loose and affecting the transmission of the sheet.
[0070] In one embodiment, if Figure 3 , Figure 4 As shown, the mounting frame 32 includes a base plate 321, a first connecting plate 322 and a second connecting plate 323. The output end of the first lifting assembly 31 is connected to the base plate 321. Specifically, the first screw rod of the first lifting assembly 31 is connected to the base plate 321. The first connecting plate 322 and the second connecting plate 323 are relatively arranged on the base plate 321. The re-inspection channel and the discharge channel are formed between the first connecting plate 322 and the second connecting plate 323.
[0071] Among them, Figure 5 As shown, the first motor 331, the first belt unit 333, the third motor 341 and the third belt unit 343 are mounted on the first connecting plate 322, and the first belt unit 333 is located above the third belt unit 343. The second motor 332, the second belt unit 334, the fourth motor 342 and the fourth belt unit 344 are mounted on the second connecting plate 323, and the second belt unit 334 is located above the fourth belt unit 344.
[0072] In one embodiment, if Figure 3 , Figure 4As shown, the mounting frame 32 further includes a vertical plate 324 and a first adjustment assembly 325, the vertical plate 324 is fixedly connected to the bottom plate 321, the first connecting plate 322 is fixedly connected to the bottom plate 321, the second connecting plate 323 is slidably connected to the bottom plate 321, and the second connecting plate 323 is located between the vertical plate 324 and the first connecting plate 322. The first adjustment assembly 325 can drive the second connecting plate 323 to slide relative to the bottom plate 321, so as to adjust the width of the re-inspection channel and the discharge channel, and can adapt to the transmission of trays of different models and sizes.
[0073] like Figure 4 As shown, the first adjustment assembly 325 includes a first adjustment motor 3251, a second screw rod 3252, a first synchronous belt assembly 3253 and a third screw rod 3254. The second screw rod 3252 and the third screw rod 3254 are arranged in parallel. One end of the second screw rod 3252 passes through the first connecting plate 322 and is connected to the output end of the first adjustment motor 3251. The other end of the second screw rod 3252 is connected to the first connecting plate 322, and the screw nut on the second screw rod 3252 is fixedly installed on the second connecting plate 323. The two ends of the third screw rod 3254 are rotatably connected to the vertical plate 324 and the first connecting plate 322, respectively, and the screw nut on the third screw rod 3254 is fixedly installed on the second connecting plate 323.
[0074] The first synchronous belt assembly 3253 is installed on the vertical plate 324, and the first synchronous belt assembly 3253 connects the second screw rod 3252 and the third screw rod 3254. The first adjusting motor 3251 drives the second screw rod 3252 to rotate, and drives the third screw rod 3254 to rotate synchronously through the first synchronous belt assembly 3253, so that the second connecting plate 323 can reciprocate along the second screw rod 3252 and the third screw rod 3254, thereby adjusting the distance between the first connecting plate 322 and the second connecting plate 323.
[0075] In one embodiment, if Figure 3 As shown, the re-inspection mechanism 3 also includes a first pusher assembly 36 for pushing defective sheets out of the re-inspection channel and a second pusher assembly 37 for pushing qualified sheets out of the discharge channel. The first conveying assembly 33 and the first pusher assembly 36 cooperate to push defective sheets to the downstream equipment, ensuring the stability and reliability of the conveying, and effectively avoiding the problem that defective sheets cannot be pushed into place, get stuck or stagnate. The second conveying assembly 34 and the second pusher assembly 37 can push qualified sheets to the downstream equipment, ensuring the stability and reliability of the conveying, and effectively avoiding the problem that qualified sheets cannot be pushed into place, get stuck or stagnate.
[0076] In one embodiment, if Figure 5 , Figure 6 , Figure 7As shown, the first pusher assembly 36 includes a third driving member, a first slider 363 and a first pusher plate 364. The third driving member is mounted on the first connecting plate 322. The first slider 363 is slidably connected to the first connecting plate 322 of the mounting frame 32. The third driving member is connected to the first slider 363 and can drive the first slider 363 to reciprocate on the first connecting plate 322. The first pusher plate 364 is connected to the first slider 363. When the first conveying assembly 33 drives the defective material to move, the first pusher plate 364 abuts against the defective material, which can ensure that the defective material moves smoothly in the re-inspection channel without jamming.
[0077] The third driving member includes a fifth motor 361 and a second synchronous belt assembly 362, wherein the output end of the fifth motor 361 is connected to the second synchronous belt assembly 362, wherein the second synchronous belt assembly 362 is a conventional structure consisting of a driving wheel, a passive wheel and a synchronous belt, wherein the synchronous belt is connected to the first slider 363 via a synchronous belt pressure plate having meshing teeth, and when the fifth motor 361 drives the synchronous belt transmission, it can drive the first slider 363 to slide on the first connecting plate 322, thereby driving the first push plate 364 to move, so that the first push plate 364 maintains contact with the defective material during the movement of the defective material.
[0078] In one embodiment, if Figure 6 , Figure 7 As shown, the first pusher assembly 36 also includes a first cam rod 365 and a first elastic member 366. The first cam rod 365 is arranged at the entrance end of the re-inspection channel, the first cam rod 365 is connected to the first connecting plate 322, the first elastic member 366 is connected between the first slider 363 and the first pusher plate 364, the first pusher plate 364 is rotatably connected to the first slider 363, the first pusher plate 364 has two states of standing and tilting, and the first pusher plate can maintain the standing state and abut against the defective sheet under the tension of the first elastic member 366. The third driving member can drive the first pusher plate 364 to abut against the first cam rod 365, so that the first pusher plate 364 rotates and avoids when the defective sheet enters the re-inspection channel.
[0079] When the first cam rod 365 pushes the first push plate 364 to rotate, the first push plate 364 switches from an upright state to a tilted state. At this time, the first push plate 364 can no longer abut against the defective material sheet. When the defective material sheet enters the re-inspection channel, the first cam rod 365 abuts against the first push plate 364 and avoids the defective material sheet. When the first conveying assembly 33 drives the defective material sheet to move, the third driving member drives the first slider 363 to move, so that the first push plate 364 disengages from the first cam rod 365. Under the action of the first elastic member 366, the first push plate 364 stands up so that it can abut against the material sheet.
[0080] In one embodiment, if Figure 5 , Figure 6 , Figure 7 As shown, the second pusher assembly 37 includes a fourth driving member, a second slider 373 and a second pusher plate 374. The fourth driving member is mounted on the first connecting plate 322. The second slider 373 is slidably connected to the first connecting plate 322 of the mounting frame 32. The fourth driving member is connected to the second slider 373, and can drive the second slider 373 to reciprocate on the first connecting plate 322. The second pusher plate 374 is connected to the second slider 373. When the second conveying assembly 34 drives the qualified sheet to move, the second pusher plate 374 abuts against the qualified sheet, which can ensure that the qualified sheet moves smoothly in the discharge channel without jamming.
[0081] The fourth driving member includes a sixth motor 371 and a third synchronous belt assembly 372. The output end of the sixth motor 371 is connected to the third synchronous belt assembly 372. The third synchronous belt assembly 372 is a conventional structure consisting of a driving wheel, a passive wheel and a synchronous belt, wherein the synchronous belt is connected to the second slider 373 through a synchronous belt pressure plate with meshing teeth. When the sixth motor 371 drives the synchronous belt transmission, it can drive the second slider 373 to slide on the first connecting plate 322, and then drive the second push plate 374 to move, so that the second push plate 374 remains in contact with the qualified material during the movement of the qualified material.
[0082] In one embodiment, if Figure 6 , Figure 7 As shown, the second pusher assembly 37 also includes a second cam rod 375 and a second elastic member 376. The second cam rod 375 is connected to the first connecting plate 322. The second cam rod 375 is arranged at the entrance end of the discharge channel. The second elastic member 376 is connected between the second slider 373 and the second pusher plate 374. The second pusher plate 374 is rotatably connected to the second slider 373. The second pusher plate 374 has two states: standing up and tilting. The second pusher plate can maintain the standing state and abut against the defective sheet under the tension of the second elastic member 376. The fourth driving member can drive the second pusher plate 374 to abut against the second cam rod 375, so that the second pusher plate 374 rotates and avoids when the qualified sheet enters the discharge channel.
[0083] When the second cam rod 375 pushes the second push plate 374 to rotate, the second push plate 374 switches from an upright state to a tilted state. At this time, the second push plate 374 can no longer abut against the qualified material sheet. When the qualified material sheet enters the discharge channel, the second cam rod 375 abuts against the second push plate 374 and avoids the qualified material sheet. When the second conveying assembly 34 drives the qualified material sheet to move, the fourth driving member drives the second slider 373 to move, so that the second push plate 374 disengages from the second cam rod 375. Under the action of the second elastic member 376, the second push plate 374 stands up so that it can abut against the material sheet.
[0084] In one embodiment, if Figure 8 As shown, the defective product processing mechanism 4 also includes a motion module installed on the machine 1, and the detection part 41 and the defective product processing part 42 are connected to the motion module. The motion module can drive the detection part 41 and the defective product processing part 42 to move toward the defective material on the re-inspection channel.
[0085] Specifically, the motion module includes an X-direction motion module 43, a Y-direction motion module 44 and a Z-direction motion module 45. The X-direction motion module 43 is mounted on the machine table 1, the Y-direction motion module 44 is mounted on the X-direction motion module 43, and the Z-direction motion module 45 is mounted on the Y-direction motion module 44, so as to realize the movement of the defective product processing mechanism 4 in the X direction, the Y direction and the Z direction. When the first lifting assembly 31 drives the defective material to move to the detection position, the defective product processing mechanism 4 is driven by the motion module to approach the defective material, so as to perform detection and defective product processing.
[0086] In one embodiment, if Fig. 9 , Fig.11 As shown, the material conveying mechanism 2 includes a support base 21, a fifth driving member 22 and a fifth belt assembly 23. The support base 21 is arranged on the machine 1, and the fifth driving member 22 and the fifth belt assembly 23 are arranged on the support base 21. The output end of the fifth driving member 22 is connected to the fifth belt assembly 23. The material is placed on the fifth belt assembly 23, and the material is conveyed by the drive of the fifth driving member 22.
[0087] In one embodiment, if Fig.11 As shown, the fifth driving member 22 includes a seventh motor 221 and a connecting rod 222. The rotation of the seventh motor 221 can drive the connecting rod 222 to rotate. The fifth belt assembly 23 includes a fourth synchronous belt assembly 231, a conveying wheel assembly 232 and a fifth belt unit 233 connected in sequence. The fourth synchronous belt assembly 231 is composed of a driving wheel, a driven wheel and a synchronous belt. The conveying wheel assembly 232 includes a conveying belt and a plurality of conveying wheels. The conveying belt surrounds the plurality of conveying wheels. The fifth belt unit 233 is composed of a driving pulley, a driven pulley and a belt. Among them, the driving wheel of the fourth synchronous belt assembly 231 is installed on the connecting rod 222, the conveying wheel of the conveying wheel assembly 232 close to the end of the fourth synchronous belt assembly 231 is coaxial with the passive wheel of the fourth synchronous belt assembly 231, and the conveying wheel of the conveying wheel assembly 232 close to the end of the fifth belt unit 233 is coaxial with the driving pulley of the belt assembly. In this way, when the seventh motor 221 drives the connecting rod 222 to rotate, it can drive the fourth synchronous belt assembly 231, the conveying wheel assembly 232 and the fifth belt unit 233 to move synchronously to realize the conveying of the material sheet.
[0088] In a preferred embodiment, if Fig.11As shown, the support base 21 includes a first support plate 211 and a second support plate 212 that are arranged opposite to each other, and two fourth synchronous belt assemblies 231, two conveying wheel assemblies 232 and two belt assemblies are provided, one group of which is provided on the first support plate 211, and the other group is provided on the second support plate 212. The seventh motor 221 can drive the two fourth synchronous belt assemblies 231, the two conveying wheel assemblies 232 and the two fifth belt units 233 to rotate synchronously.
[0089] In one embodiment, if Fig. 9 As shown, the defective product re-inspection processing equipment also includes a material cache mechanism 5, which includes a second lifting component 51 and a material rack 52. The output end of the second lifting component 51 is connected to the material rack 52, and the support seat 21 is slidably connected to the material rack 52. When the second lifting component 51 drives the material rack 52 to move up and down, the material rack 52 can move relative to the support seat 21 to drive the material to transfer between the material conveying mechanism 2 and the material rack 52.
[0090] Specifically, when the second lifting assembly 51 drives the material rack 52 to move upward, it can support the web and make it separate from the fifth belt assembly 23, thereby driving the defective web on the fifth belt assembly 23 to be stored in the material rack 52. When the second lifting assembly 51 drives the material rack 52 to move downward, it can transfer the defective web in the material rack 52 to the fifth belt assembly 23 and convey it to the re-inspection channel.
[0091] When there are many defective sheets, the defective sheets on the re-inspection mechanism 3 are being inspected, and the defective sheets transported from the upstream equipment to the sheet conveying mechanism 2 are waiting for re-inspection. In order to improve production efficiency, the second lifting component 51 drives the material rack 52 to move upward, so that the defective sheets on the sheet conveying mechanism 2 can be stored in the material rack 52 so as not to affect the subsequent transportation of defective sheets. During the waiting period, each time a defective sheet is transported, the second lifting component 51 drives the material rack 52 to move upward one layer to continue storing the defective sheets, so that the continuously transported defective sheets can be stored layer by layer, thereby not affecting the production efficiency of the upstream equipment. It should be noted that, during the inspection of defective sheets, the mounting frame 32 is driven by the first lifting assembly 31 to rise to the inspection position. At this time, the discharge channel can be docked with the sheet conveying mechanism 2. When the upstream equipment conveys qualified sheets, the fifth belt assembly 23 is driven by the fifth driving member 22 to move, and the qualified sheets are directly conveyed to the discharge channel, and then the sheets are directly pushed to the downstream equipment through the second conveying assembly 34 and the second pushing assembly 37.
[0092] In one embodiment, if Fig. 9 , Fig.10As shown, the second lifting assembly 51 includes a second lifting motor 511, a fourth screw rod 512, a fifth screw rod 513 and a fifth synchronous belt assembly 514. The second lifting motor 511 is installed on the machine platform 1. One end of the fourth screw rod 512 passes through the material rack 52 and is connected to the output end of the second lifting motor 511. The other end of the fourth screw rod 512 is connected to one end of the fifth screw rod 513 through the fifth synchronous belt assembly 514. The other end of the fifth screw rod 513 is connected to the material rack 52, wherein the screw nuts on the fourth screw rod 512 and the fifth screw rod 513 are both connected to the material rack 52. Driven by the second lifting motor 511, the fourth screw rod 512 and the fifth screw rod 513 can drive the material rack 52 to move up and down, thereby cooperating with the sheet conveying mechanism 2 to store the sheets layer by layer in the material rack 52.
[0093] In one embodiment, if Fig.10 As shown, the material rack 52 includes a frame body 521, and a first bracket 522 and a second bracket 523 arranged opposite to each other on the frame body 521, a fourth screw rod 512 and a fifth screw rod 513 are connected to the frame body 521, and the first bracket 522 and the second bracket 523 jointly support the material sheet. The first support plate 211 is slidably connected to the first bracket 522, and the second support plate 212 is slidably connected to the second bracket 523, so as to realize the relative sliding of the material rack 52 and the support seat 21.
[0094] A plurality of first support columns 5221 are arranged on the first bracket 522, and a plurality of second support columns 5231 are arranged on the second bracket 523. The plurality of first support columns 5221 are arranged at intervals in the vertical direction, and the plurality of second support columns 5231 are arranged at intervals in the vertical direction, so that the inside of the material rack 52 can be divided into multiple layers, with a material sheet placed on each layer. The first support columns 5221 and the second support columns 5231 located at the same height can support the material sheet.
[0095] In one embodiment, if Fig.11 As shown, a first groove 2111 is provided on a side of the first support plate 211 facing the second support plate 212, and a first bracket 522 is provided in the first groove 2111; a second groove 2121 is provided on a side of the second support plate 212 facing the first support plate 211, and a second bracket 523 is provided in the second groove 2121, and an extension direction of the first support column 5221 and an extension direction of the second support column 5231 are relatively arranged. When the sheet is conveyed to the support seat 21, the sheet can be confined between the first bracket 522 and the second bracket 523 at the same time. When the second lifting assembly 51 drives the material rack 52 to move upward, the first support column 5221 and the second support column 5231 located below the sheet can lift the sheet and make it disengage from the fifth belt assembly 23, thereby transferring the sheet from the sheet conveying mechanism 2 to the material rack 52.
[0096] When the defective material at the detection position is re-inspected and output by the first conveying assembly 33 at the conveying position, it is necessary to continue to convey the defective material to the re-inspection channel. At this time, the second lifting assembly 51 drives the material rack 52 to move downward, and when the first support column 5221 and the second support column 5231 supporting the material drop to below the fifth belt assembly 23, the material falls onto the fifth belt assembly 23, and the defective material is conveyed to the re-inspection channel by the fifth belt assembly 23 to continue the re-inspection operation.
[0097] In one embodiment, if Fig.11 As shown, the first support plate 211 is fixedly connected to the machine 1, the second support plate 212 is slidably connected to the machine 1, and the support base 21 also includes a sixth driving member 213. The output end of the sixth driving member 213 is connected to the second support plate 212, which can drive the second support plate 212 to slide to adapt to the transmission of sheets of different models and sizes.
[0098] The sixth driving member 213 includes an eighth motor 2131, a sixth screw rod 2132 and a sixth synchronous belt assembly 2133. The output end of the eighth motor 2131 is connected to one end of the sixth screw rod 2132 through the sixth synchronous belt assembly 2133. The other end of the sixth screw rod 2132 passes through the second support plate 212 and is connected to the first support plate 211. The screw nut on the sixth screw rod 2132 is connected to the second support plate 212. When the eighth motor 2131 drives the sixth screw rod 2132 to rotate, it can drive the second support plate 212 to move, thereby adjusting the distance between the first support plate 211 and the second support plate 212.
[0099] By cooperating between the first bracket 522 and the first groove 2111, and between the second bracket 523 and the second groove 2121, the second support plate 212 moves, which can drive the second bracket 523 to slide, thereby adjusting the distance between the first bracket 522 and the second bracket 523 to accommodate the storage of sheets of different sizes.
[0100] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A defective product re-inspection processing equipment, characterized in that: It includes a machine platform, a sheet conveying mechanism, a re-inspection mechanism and a defective product processing mechanism; the sheet conveying mechanism is arranged on the machine platform, and the sheet conveying mechanism is used to receive the sheet and convey the sheet to the re-inspection mechanism; The re-inspection mechanism comprises a first lifting assembly, a mounting frame and a first conveying assembly arranged on the mounting frame, wherein the first lifting assembly is connected to the machine platform, an output end of the first lifting assembly is connected to the mounting frame, and the mounting frame is provided with a re-inspection channel for receiving defective webs among webs conveyed by the web conveying mechanism; The defective product processing mechanism includes a detection part and a defective product processing part, the first lifting assembly can drive the mounting frame to reciprocate between a detection position and a conveying position, when the mounting frame is located at the detection position, the detection part is used to re-inspect the defective sheets on the re-inspection channel, and the defective product processing part is used to mark the defective sheets when the detection part confirms the defect of the defective sheets; When the mounting frame is located at the conveying position, the first conveying assembly can convey the marked defective sheet out of the re-inspection channel.
2. The defective product re-inspection processing equipment according to claim 1, characterized in that: The re-inspection mechanism further comprises a second conveying assembly connected to the mounting frame, the mounting frame further comprising a discharge channel for receiving qualified sheets among the sheets conveyed by the sheet conveying mechanism, the second conveying assembly being capable of driving the qualified sheets to move in the discharge channel and delivering the qualified sheets; The first lifting assembly drives the mounting frame to move up and down, so that the sheet conveying mechanism conveys the sheet to the re-inspection channel or the discharge channel.
3. The defective product re-inspection processing equipment according to claim 2, characterized in that: The first conveying assembly includes a first driving member and a first belt assembly, the first belt assembly is arranged in the re-inspection channel, the output end of the first driving member is connected to the first belt assembly, and the first belt assembly is used to convey defective webs; The second conveying assembly includes a second driving member and a second belt assembly. The second belt assembly is arranged in the discharge channel. The output end of the second driving member is connected to the second belt assembly. The second belt assembly is used to convey qualified webs.
4. The defective product re-inspection processing equipment according to claim 2, characterized in that: The mounting frame includes a base plate, a first connecting plate and a second connecting plate. The output end of the first lifting assembly is connected to the base plate. The first connecting plate and the second connecting plate are relatively arranged on the base plate. The re-inspection channel and the discharge channel are formed between the first connecting plate and the second connecting plate.
5. The defective product re-inspection processing equipment according to claim 2, characterized in that: The re-inspection mechanism further comprises a first pushing component for pushing defective sheets out of the re-inspection channel and a second pushing component for pushing qualified sheets out of the discharge channel; The first pusher assembly includes a third driving member, a first slider and a first pusher plate, the first slider is slidably connected to the mounting frame, the third driving member is connected to the first slider, the first pusher plate is connected to the first slider, and the first pusher plate abuts against the defective material sheet when the first conveying assembly drives the defective material sheet to move; The second pushing assembly includes a fourth driving member, a second slider and a second pushing plate. The second slider is slidably connected to the mounting frame. The fourth driving member is connected to the second slider. The second pushing plate is connected to the second slider. The second pushing plate abuts against the qualified material sheet when the second conveying assembly drives the qualified material sheet to move.
6. The defective product re-inspection processing equipment according to claim 5, characterized in that: The first pusher assembly further includes a first cam rod and a first elastic member, the first cam rod is arranged at the entrance end of the re-inspection channel, the first elastic member is connected between the first slider and the first pusher plate, the first pusher plate is rotatably connected to the first slider, and the third driving member can drive the first pusher plate to abut against the first cam rod, so that the first pusher plate rotates and avoids when the defective sheet enters the re-inspection channel; The second push assembly also includes a second cam rod and a second elastic member, the second cam rod is arranged at the entrance end of the discharge channel, the second elastic member is connected between the second slider and the second push plate, the second push plate is rotatably connected to the second slider, and the fourth driving member can drive the second push plate to abut against the second cam rod, so that the second push plate rotates and avoids when qualified material sheets enter the discharge channel.
7. The defective product re-inspection processing equipment according to claim 1, characterized in that: The defective product processing mechanism also includes a motion module installed on the machine platform, the detection unit and the defective product processing unit are connected to the motion module, and the motion module can drive the detection unit and the defective product processing unit to move toward the defective material sheet on the re-inspection channel.
8. The defective product re-inspection processing equipment according to claim 2, characterized in that: The sheet conveying mechanism includes a support base, a fifth driving member and a fifth belt assembly. The support base is arranged on the machine platform. The fifth driving member and the fifth belt assembly are arranged on the support base. The output end of the fifth driving member is connected to the fifth belt assembly. The fifth belt assembly is used to convey the sheet.
9. The defective product re-inspection processing equipment according to claim 8, characterized in that: It also includes a material cache mechanism, the material cache mechanism includes a second lifting assembly and a material rack, the output end of the second lifting assembly is connected to the material rack, and the support seat is slidably connected to the material rack; The second lifting assembly is suitable for driving the material rack to move upward so as to drive the defective sheets on the fifth belt assembly to be stored in the material rack, and the second lifting assembly is suitable for driving the material rack to move downward so as to transfer the defective sheets in the material rack to the fifth belt assembly and transport them to the re-inspection channel.
10. The defective product re-inspection processing equipment according to claim 9, characterized in that: The material rack includes a frame body, a first bracket and a second bracket, the support seat includes a first support plate and a second support plate arranged opposite to each other, the first support plate is slidably connected to the first bracket, and the second support plate is slidably connected to the second bracket; The first bracket is provided with a plurality of first supporting columns, and the second bracket is provided with a plurality of second supporting columns. The first supporting columns and the second supporting columns located at the same height can support the material sheet.