Building electrical pay-off device

By introducing wire laying mechanism, compression structure and burying mechanism into the building electrical wire laying device, the problem of wire being unable to be tightened and buried during construction is solved, effective fixing and stable laying of wires is achieved, and working efficiency is improved The quality of the engineering extends the service life of the wires.

CN222023784UActive Publication Date: 2024-11-19HEILONGJIANG PROVINCIAL CONSTR ENG GRP CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420171851.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-19
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

The existing building electrical wiring discharging devices cannot assist in the compression of the wires during the collection and release of the wires, which makes the wires easily supported on the ground or wrapped around the laying rollers, and the laid wires are difficult to bury in time, which can easily cause damage.

Method used

An electrical wiring device for building is designed including a wire laying mechanism, a compression structure and a burial mechanism. The wire laying mechanism assists in laying wires through a support frame, a rotating pinch, a motor and a regulating roller. The compression structure uses a screw and an electric telescopic rod. The wire is tightened with the compression wheel, and the burial mechanism uses cylinders, pneumatic rods and trench plows to achieve rapid burial of the wires.

Benefits of technology

Effectively fix the wires, avoid sliding and winding, improve work efficiency and engineering quality, and extend the service life of the wires through timely burial, enhancing stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222023784U_ABST
    Figure CN222023784U_ABST
Patent Text Reader

Abstract

The utility model discloses a building electrical pay-off device, and relates to the technical field of building engineering. Comprising a bottom plate, paying-off mechanisms and a pressing structure are installed at the top end of the bottom plate, the pressing structure is located between the paying-off mechanisms, the paying-off mechanisms are used for conducting line auxiliary laying during building electrical construction, the pressing structure is used for conducting auxiliary pressing on a line to avoid line deviation during line laying, and a burying mechanism is installed at the bottom end of the bottom plate. And the burying mechanism is used for burying the laid line, so that the line is prevented from being damaged. According to the utility model, through the arrangement of the pressing structure, the electric wire can be effectively fixed, the disordered sliding of the electric wire on the ground or the pay-off roller is avoided, the time for rearranging or repairing the wound electric wire can be reduced, the working efficiency is improved, the electric wire can be well controlled in the laying process, the installation is more convenient, and the production efficiency is improved. And the progress and quality of the project are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a building electrical wiring device. Background Art

[0002] In a broad sense, building electrical engineering is an applied discipline that uses buildings as a platform and electrical technology as a means to create a humane living environment in a limited space. In a narrow sense, it is an electrical system that uses modern advanced scientific theories and electrical technologies (including power technology, information technology, and intelligent technology, etc.) in buildings to create a humane living environment. This is collectively referred to as building electrical engineering. As we all know, building electrical engineering generally requires a wire-laying device to align the wire harness during construction.

[0003] For example, a wire-releasing device for building electrical appliances with patent publication number CN214527281U has a cleaning mechanism installed, which facilitates cleaning the surface of the wires during the process of retracting and releasing the wires, effectively preventing dust from adhering to the surface of the wires.

[0004] Although the above-mentioned equipment can facilitate cleaning of the surface of the wires during the process of retracting and releasing the wires through the installed cleaning mechanism, and effectively prevent dust from adhering to the surface of the wires, the wires cannot be auxiliary pressed during the process of retracting and releasing the wires. When pulling the wires, it is easy to cause the wires to be supported on the ground or on the wire-releasing roller, which can easily cause the wires to be entangled. Moreover, when the wires are laid, the laid wires cannot be buried in time, which can easily cause damage to the wires in the groove. Therefore, the present application proposes a building electrical wire-releasing device to solve the above-mentioned problems. Utility Model Content

[0005] The purpose of the utility model is to provide a building electrical wiring device to solve the problems raised in the above background technology.

[0006] To achieve the above object, the utility model provides the following technical solutions: a building electrical wire-laying device, comprising a bottom plate, a wire-laying mechanism and a clamping structure are installed on the top of the bottom plate, and the clamping structure is located between the wire-laying mechanism;

[0007] The line-laying mechanism is used for assisting in laying lines during building electrical construction, and the clamping structure is used for assisting in clamping the lines to prevent the lines from deviating during laying. A burying mechanism is installed at the bottom end of the base plate, and the burying mechanism is used to bury the laid lines to prevent the lines from being damaged.

[0008] Furthermore, the wire-releasing mechanism comprises:

[0009] A support frame and a support plate are symmetrically mounted on the top of the bottom plate, a rotating clamp is rotatably connected inside the support frame, a pay-off roller is connected between the rotating clamps via bolts, and a motor is fixedly connected to one end of the support frame, and the output end of the motor is fixedly connected to the rotating clamp.

[0010] Furthermore, an adjusting roller is rotatably connected between the support plates, and the adjusting roller is used to tension the line.

[0011] Furthermore, the compression structure comprises:

[0012] A fixing frame is installed on the top of the bottom plate, a screw rod is rotatably connected to the inner side of the fixing frame, one end of the screw rod is connected to the output end of the motor, and a moving seat is movably connected to the outer wall of the screw rod.

[0013] Furthermore, an electric telescopic rod is installed at the bottom end of the movable seat, a mounting frame is installed at the telescopic end of the electric telescopic rod, a clamping wheel is rotatably connected between the inner sides of the mounting frame, and the clamping wheel is adapted to the adjusting roller.

[0014] Furthermore, the burying mechanism comprises:

[0015] A fixed plate is installed between the support frames, a cylinder is installed on the top of the fixed plate, the telescopic end of the cylinder passes through the bottom end of the fixed plate and is fixedly connected to a pneumatic rod, and a through hole is opened at the top of the bottom plate, the pneumatic rod is located on the outer wall of the through hole, and the telescopic rod of the pneumatic rod is fixedly connected to the connecting plate.

[0016] Furthermore, a movable guide rail is installed at one end of the connecting plate, a movable block is slidably connected to the outer wall of the movable guide rail, a furrowing plow mounting plate is installed on the outer side of the movable block, and a scraper plate is installed on the outer side of the other end of the connecting plate.

[0017] Furthermore, a universal wheel is installed at the bottom end of the base plate, and a push handle is installed on the outer side of one end of the base plate.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] The building electrical wire-laying device can effectively fix the wires by setting a clamping structure, avoid the wires from sliding disorderly on the ground or on the wire-laying roller, reduce the time for rearranging or repairing entangled wires, improve work efficiency, and make the wires well controlled during the laying process, which is more convenient during installation and ensures the progress and quality of the project.

[0020] At the same time, the burying mechanism can bury the laid wires underground in time, avoiding the wires from being damaged by various external factors due to being exposed to the outside. By burying, the wires are fixed underground and are not easily disturbed by external factors, which can enhance the stability of the wires and increase their service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the axial side of the utility model;

[0022] Figure 2 It is a schematic diagram of the wire-releasing mechanism and the clamping structure of the utility model;

[0023] Figure 3 This is a schematic diagram of the burying mechanism of the utility model;

[0024] Figure 4 It is a bottom view schematic diagram of the utility model.

[0025] In the figure: 1. bottom plate; 11. push handle; 12. universal wheel; 2. pay-off mechanism; 21. support frame; 22. motor; 23. pay-off roller; 24. rotating clamp; 25. support plate; 26. adjusting roller; 3. clamping structure; 31. fixed frame; 32. screw rod; 33. moving seat; 34. electric telescopic rod; 35. mounting frame; 36. clamping wheel; 4. burying mechanism; 41. fixed plate; 42. cylinder; 43. pneumatic rod; 44. connecting plate; 45. scraper plate; 46. moving guide rail; 47. moving block; 48. furrowing plow mounting plate. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] This type of building electrical line laying device is mainly used in building electrical engineering, especially in the laying process of electrical wires, cables, etc. It can be used indoors, outdoors and in various complex environments, such as large-scale construction projects such as bridges, tunnels, highways, etc. This device can work in various climatic conditions, such as sunny days, rainy days, snowy days, etc. However, in extremely severe weather conditions, such as strong winds, heavy rains, blizzards, etc., work may need to be suspended to ensure safety. The device needs to work in a dry, dust-free, non-corrosive gas environment to protect the integrity of the internal mechanism and wires. If there is a lot of dust or corrosive gas in the working environment, it may cause damage to the device and wires. A flat and spacious working area is required so that the device can be moved and carried out smoothly. For large-scale construction projects, specific equipment may be required to transport the device to the construction site. The device relies on power supply and control system to work. If the power supply is interrupted or the control system fails, the device will not work properly. In addition, it is also necessary to be equipped with appropriate tools and materials, such as wires, cables, soil, etc., to complete the work tasks. The operation of the device requires professionally trained and certified operators. The operator needs to be familiar with the structure and working principle of the device, and be able to operate and control the device correctly. At the same time, the operator also needs to understand the relevant safety regulations and operating procedures to ensure the safety and quality of the work. Since the device involves electrical and mechanical equipment, a series of safety measures need to be taken to ensure the safety of the operator. For example, necessary safety protection devices need to be installed, such as guardrails, safety nets, etc.; operators need to wear personal protective equipment, such as safety helmets, protective clothing, etc.; safety regulations need to be observed during operation, such as prohibiting maintenance or inspection when the device is running.

[0028] like Figure 1-Figure 4 As shown, the utility model provides a technical solution: a building electrical wire-laying device, comprising a base plate 1, a wire-laying mechanism 2 and a clamping structure 3 are installed on the top of the base plate 1, and the clamping structure 3 is located between the wire-laying mechanism 2;

[0029] The wire-laying mechanism 2 is used for assisting in laying lines during building electrical construction. The clamping structure 3 is used for assisting in clamping the lines to prevent the lines from deviating during laying. A burying mechanism 4 is installed at the bottom end of the base plate 1. The burying mechanism 4 is used to bury the laid lines to prevent the lines from being damaged.

[0030] The pay-off mechanism 2 comprises:

[0031] A support frame 21 and a support plate 25 are symmetrically mounted on the top of the base plate 1 , a rotating clamp 24 is rotatably connected to the inner side of the support frame 21 , a pay-off roller 23 is connected between the rotating clamps 24 by bolts, and a motor 22 is fixedly connected to one end of the support frame 21 , and an output end of the motor 22 is fixedly connected to the rotating clamp 24 .

[0032] An adjusting roller 26 is rotatably connected between the support plates 25, and the adjusting roller 26 is used to tension the line.

[0033] It should be noted that if Figure 2 As shown, first, the pay-off roller 23 is connected to the rotating clamp 24 by bolts, and then connected to the motor 22 through an external power supply. The rotating clamp 24 is driven to rotate by the motor 22, so that the pay-off roller 23 winds the wire. After completion, the entire device is moved to the position where the wire needs to be laid through the universal wheel 12, and then the wire is wound around the adjusting roller 26 for one circle.

[0034] The compression structure 3 comprises:

[0035] A fixing frame 31 is installed on the top of the bottom plate 1 , and a screw rod 32 is rotatably connected to the inner side of the fixing frame 31 . One end of the screw rod 32 is connected to the output end of the motor 22 , and a moving seat 33 is movably connected to the outer wall of the screw rod 32 .

[0036] An electric telescopic rod 34 is installed at the bottom end of the movable seat 33 , and a mounting frame 35 is installed at the telescopic end of the electric telescopic rod 34 . A clamping wheel 36 is rotatably connected between the inner sides of the mounting frame 35 , and the clamping wheel 36 is adapted to the adjusting roller 26 .

[0037] It should be noted that if Figure 2 and Figure 3 As shown, the movable seat 33 is driven by the motor 22 to move on the screw rod 32, and the movable seat 33 can drive the clamping wheel 36 to move back and forth through the electric telescopic rod 34, so that when laying the wires, the clamping wheel 36 performs auxiliary clamping according to the reverse direction of the wire laying movement.

[0038] The burying mechanism 4 comprises:

[0039] A fixed plate 41 is installed between the support frames 21, and a cylinder 42 is installed on the top of the fixed plate 41. The telescopic end of the cylinder 42 passes through the bottom end of the fixed plate 41 and is fixedly connected to a pneumatic rod 43. A through hole is opened at the top of the bottom plate 1, and the pneumatic rod 43 is located on the outer wall of the through hole. The telescopic rod of the pneumatic rod 43 is fixedly connected to a connecting plate 44.

[0040] A movable guide rail 46 is installed at one end of the connecting plate 44 , a movable block 47 is slidably connected to the outer wall of the movable guide rail 46 , a furrowing plow mounting plate 48 is installed on the outer side of the movable block 47 , and a scraper plate 45 is installed on the outer side of the other end of the connecting plate 44 .

[0041] A universal wheel 12 is installed at the bottom end of the bottom plate 1, and a push handle 11 is installed on the outer side of one end of the bottom plate 1.

[0042] It should be noted that if Figure 3As shown, when the laying of the wires is completed, the air cylinder 42 can drive the pneumatic rod 43 to move downward, and drive the scraper plate 45 on the connecting plate 44 to directly cover the laid wires with the soil piled on both sides of the wire trench. If the depth of the wire trench is not enough or re-ditching is required, the external trenching plow can be installed with the trenching plow mounting plate 48 through bolts, and then the moving block 47 can be adjusted to move on the moving guide rail 46, so as to facilitate trenching in the place where trenching is required to facilitate the laying and installation of the wires.

[0043] Therefore, it can be seen from the above that through the setting of the clamping structure 3, the electric wires can be effectively fixed, avoiding the electric wires from sliding disorderly on the ground or the wire-releasing roller 23, reducing the time for reorganizing or repairing the entangled electric wires, improving work efficiency, and making the electric wires well controlled during the laying process, which can be more convenient during installation, ensuring the progress and quality of the project. At the same time, the set burying mechanism 4 can bury the laid electric wires underground in time, avoiding the electric wires from being damaged by various external factors due to being exposed to the outside, and by burying the electric wires, they are fixed underground and are not easily disturbed by external factors, which can enhance the stability of the electric wires and increase their service life.

[0044] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is limited by the attached embodiments and their equivalents.

Claims

1. A building electrical wiring device, comprising a base plate (1), characterized in that: A wire-releasing mechanism (2) and a clamping structure (3) are installed on the top of the bottom plate (1), and the clamping structure (3) is located between the wire-releasing mechanism (2); The wire-laying mechanism (2) is used for assisting the laying of lines during building electrical construction, the clamping structure (3) is used for assisting the clamping of the lines to prevent the lines from deviating during laying, and a burying mechanism (4) is installed at the bottom end of the base plate (1), the burying mechanism (4) is used for burying the laid lines to prevent the lines from being damaged.

2. A building electrical wiring device according to claim 1, characterized in that: The wire-releasing mechanism (2) comprises: A support frame (21) and a support plate (25) are symmetrically mounted on the top of a bottom plate (1); a rotating clamp (24) is rotatably connected to the inner side of the support frame (21); a wire-releasing roller (23) is connected between the rotating clamps (24) via bolts; and a motor (22) is fixedly connected to one end of the support frame (21); an output end of the motor (22) is fixedly connected to the rotating clamp (24).

3. A building electrical wiring device according to claim 2, characterized in that: An adjusting roller (26) is rotatably connected between the support plates (25), and the adjusting roller (26) is used to tension the line.

4. A building electrical wiring device according to claim 1, characterized in that: The pressing structure (3) comprises: A fixing frame (31) is mounted on the top of the bottom plate (1), a screw rod (32) is rotatably connected to the inner side of the fixing frame (31), one end of the screw rod (32) is connected to the output end of the motor (22), and a moving seat (33) is movably connected to the outer wall of the screw rod (32).

5. A building electrical wiring device according to claim 4, characterized in that: An electric telescopic rod (34) is installed at the bottom end of the movable seat (33), a mounting frame (35) is installed at the telescopic end of the electric telescopic rod (34), a pressing wheel (36) is rotatably connected between the inner sides of the mounting frame (35), and the pressing wheel (36) is adapted to the adjusting roller (26).

6. A building electrical wiring device according to claim 1, characterized in that: The burying mechanism (4) comprises: A fixed plate (41) is installed between the support frames (21), and a cylinder (42) is installed at the top of the fixed plate (41). The telescopic end of the cylinder (42) passes through the bottom end of the fixed plate (41) and is fixedly connected to a pneumatic rod (43). A through hole is opened at the top of the bottom plate (1), and the pneumatic rod (43) is located on the outer wall of the through hole. The telescopic rod of the pneumatic rod (43) is fixedly connected to a connecting plate (44).

7. A building electrical wiring device according to claim 6, characterized in that: A movable guide rail (46) is installed at one end of the connecting plate (44), a movable block (47) is slidably connected to the outer wall of the movable guide rail (46), a furrowing plow mounting plate (48) is installed on the outer side of the movable block (47), and a scraper plate (45) is installed on the outer side of the other end of the connecting plate (44).

8. A building electrical wiring device according to claim 1, characterized in that: A universal wheel (12) is installed at the bottom end of the base plate (1), and a push handle (11) is installed on the outer side of one end of the base plate (1).